CN103601089A - Shaft construction air duct suspension method - Google Patents

Shaft construction air duct suspension method Download PDF

Info

Publication number
CN103601089A
CN103601089A CN201310596160.2A CN201310596160A CN103601089A CN 103601089 A CN103601089 A CN 103601089A CN 201310596160 A CN201310596160 A CN 201310596160A CN 103601089 A CN103601089 A CN 103601089A
Authority
CN
China
Prior art keywords
air duct
steel wire
shaft
wire ropes
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310596160.2A
Other languages
Chinese (zh)
Other versions
CN103601089B (en
Inventor
方伟
赵娜
胡晓旭
王建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Mining Administration Technology Service Group Co Ltd
Original Assignee
Shandong Mining Administration Technology Service Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Mining Administration Technology Service Group Co Ltd filed Critical Shandong Mining Administration Technology Service Group Co Ltd
Priority to CN201310596160.2A priority Critical patent/CN103601089B/en
Publication of CN103601089A publication Critical patent/CN103601089A/en
Application granted granted Critical
Publication of CN103601089B publication Critical patent/CN103601089B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a shaft construction air duct suspension method. The method includes that two suspension rings of steel wire ropes are fixedly welded on steel I-beams of a shaft construction shaft cover, the upper ends of the two steel wire ropes penetrate the suspension rings respectively prior to turning around and being folded and then are clamped by steel wire rope clamps, the lower ends of the two steel wire ropes are vertically disposed in a shaft, and an air duct is fixed on the steel wire ropes with air duct clamps so as to realize suspension. The steel wire ropes no longer penetrate a sheave wheel platform and a strike board, construction organization design is simplified, and shaft plane layout, sheave wheel platform layout and strike board layout are more flexible; a double-drum winch, a power distribution cabinet and two dual head sheaves are omitted, a large amount of equipment purchase capital is saved, and economic benefit is improved.

Description

Shaft construction air duct suspention method
Technical field
Facility location method while the present invention relates to shaft construction.
Background technology
During shaft construction, some construction installations need to carry out wire rope suspensioning in pit shaft.At present, all adopting conventional stable car is that sinking winch suspends in midair.Its sus-pension is, on the sheave wheel platform of sinking headframe, arrange two-wheel head sheave, at ground configuration twin-roll stable car, by two wirerope-windings on stable car cylinder, steel rope overhangs in pit shaft through after turning over cash platform and closure plate after walking around two-wheel head sheave again, by every 10 meter of one secondary air duct card, air duct is fixed on steel rope, thereby realizes suspention.This traditional air duct sus-pension not only affects sheave wheel platform, turns over the arrangement form of cash platform and each beam of closure plate, but also makes ground surely twist difficult arrangement.People never change this traditional concept in decades.
Summary of the invention
In order to overcome the deficiency of existing air duct sus-pension, the invention provides a kind of suspention method that shaft construction air duct can be economic, safe, simple and direct that makes.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of shaft construction air duct suspention method, it is characterized in that, on the steel I-beam of shaft construction closure plate, be welded and fixed two suspension rings of steel rope, by the upper end of two steel ropes respectively through reversing end for end doubling after suspension ring, with wire rope grip, clamp, the lower end of two steel ropes falls in pit shaft, air duct is fastened on steel rope with air duct, thereby realize suspention.
For convenience of construction, steel rope be take 50 meters as one section, adopts shackle connect and protect steel rope with the collar between every section.
The invention has the beneficial effects as follows:
(1) steel rope of air duct Suspension System no longer passes sheave wheel platform and turns over cash platform and simplified Design of Construction Organization, and pit shaft floor plan, sheave wheel platform are arranged and turn over the cash tablecloth and put more flexible.
(2) save twin-roll stable car and electric power distribution cabinet, two two head sheaves, saved large number quipments and purchase fund, improved economic benefit.
(3) due to shaft of vertical well of every construction, Equipment Foundations all will be done once again, need not do basis after saving equipment again, and in the long term, only this item just reduces a large amount of costs of investment.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the embodiment of the present invention.
In figure: 1-steel I-beam, 2-suspension ring, 3-steel rope, 4-wire rope grip, 5-air duct card, 6-air duct.
The specific embodiment
As shown in Figure 1, a kind of shaft construction air duct suspention method, it is on the steel I-beam 1 of shaft construction closure plate, to weld two suspension rings 2, the rear tune doubling of suspension ring 2 is passed respectively in the upper end of two steel ropes 3, with wire rope grip 4 clampings, the lower end of two steel ropes 3 falls in pit shaft, air duct 6 use air duct cards 5 is fixed on steel rope 3, thereby realizes suspention.For convenience of construction, steel rope 3 be take 50 meters as one section, adopts shackle connect and protect the steel rope 3(collar not shown in FIG. with the collar between every section).

Claims (2)

1. a shaft construction air duct suspention method, it is characterized in that, on the steel I-beam of shaft construction closure plate, be welded and fixed two suspension rings of steel rope, by the upper end of two steel ropes respectively through reversing end for end doubling after suspension ring, with wire rope grip, clamp, the lower end of two steel ropes falls in pit shaft, air duct is fastened on steel rope with air duct, thereby realize suspention.
2. shaft construction air duct suspention method as claimed in claim 1, is characterized in that, described steel rope be take 50 meters as one section, adopts shackle connect and protect steel rope with the collar between every section.
CN201310596160.2A 2013-11-22 2013-11-22 Shaft construction air duct suspension method Expired - Fee Related CN103601089B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310596160.2A CN103601089B (en) 2013-11-22 2013-11-22 Shaft construction air duct suspension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310596160.2A CN103601089B (en) 2013-11-22 2013-11-22 Shaft construction air duct suspension method

Publications (2)

Publication Number Publication Date
CN103601089A true CN103601089A (en) 2014-02-26
CN103601089B CN103601089B (en) 2016-06-29

Family

ID=50119379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310596160.2A Expired - Fee Related CN103601089B (en) 2013-11-22 2013-11-22 Shaft construction air duct suspension method

Country Status (1)

Country Link
CN (1) CN103601089B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104344075A (en) * 2014-10-24 2015-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN108867651A (en) * 2018-07-26 2018-11-23 江苏兴厦建设工程集团有限公司 A kind of pervious concrete well casing mounting device for base pit dewatering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
JPH0393996A (en) * 1989-09-06 1991-04-18 Taisei Corp Method and device for constructing vertical shaft
CN1078016A (en) * 1993-01-15 1993-11-03 山西矿业学院 All supporting type well rigs of vertical borehole wall ring and job practices thereof
CN2790997Y (en) * 2005-04-04 2006-06-28 中国矿业大学 Round tail rope suspension device
CN202500567U (en) * 2012-03-30 2012-10-24 河南黄河工程有限公司 Multilayer combined hanging scaffold for concrete liner of well wall of vertical well

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU941595A1 (en) * 1980-07-02 1982-07-07 Донецкий Государственный Институт Проектирования Организации Шахтного Строительства Form for erecting concrete roof support of vertical mine working

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
JPH0393996A (en) * 1989-09-06 1991-04-18 Taisei Corp Method and device for constructing vertical shaft
CN1078016A (en) * 1993-01-15 1993-11-03 山西矿业学院 All supporting type well rigs of vertical borehole wall ring and job practices thereof
CN2790997Y (en) * 2005-04-04 2006-06-28 中国矿业大学 Round tail rope suspension device
CN202500567U (en) * 2012-03-30 2012-10-24 河南黄河工程有限公司 Multilayer combined hanging scaffold for concrete liner of well wall of vertical well

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
万喜彬等: "永久井架在立井施工中的应用", 《煤炭技术》, no. 03, 10 March 2008 (2008-03-10) *
吕华浦: "合理利用永久井架优化凿井设施布置", 《建井技术》, no. 01, 29 February 1992 (1992-02-29) *
张德林: "长广七号井深井施工技术", 《建井技术》, no. 02, 30 April 1982 (1982-04-30) *
黄俊贤: "济宁二号风井井筒临时改绞管路及风筒井壁固定", 《煤矿现代化》, no. 04, 30 April 1994 (1994-04-30) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104344075A (en) * 2014-10-24 2015-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN104344075B (en) * 2014-10-24 2017-03-29 铜陵有色金属集团铜冠矿山建设股份有限公司 Shaft construction hangs the quick handling of interim edema due to wind pathogen pipeline and installation method using the borehole wall
CN108867651A (en) * 2018-07-26 2018-11-23 江苏兴厦建设工程集团有限公司 A kind of pervious concrete well casing mounting device for base pit dewatering

Also Published As

Publication number Publication date
CN103601089B (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN203922522U (en) A kind of shield machine broken-up and hanging goes out well system
CN103058056B (en) Container lifting mechanism with balance anti-swinging function and eight-rope lifting three-point balancing method using container lifting mechanism
CN203112376U (en) Hoisting equipment achieving inversion of A-shaped support through pay-off and take-up of steel wire rope
CN206502579U (en) Power pole hoisting device
CN103601089A (en) Shaft construction air duct suspension method
CN101877460B (en) Extreme high voltage combined paying off pulley
CN104942564B (en) A kind of offshore vessel carries the installation method of the large-tonnage bearing pin on jib-type crane arm support
CN202755300U (en) Hanging basket of main cable working vehicle
CN204823586U (en) Online safety inspection device of mine hoisting wire rope
CN204265218U (en) A kind of power station unit internal head cover special hanger
CN203654191U (en) Device for stay cable to be lifted on bridge
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN207017153U (en) Main push-towing rope inspection trolley lifting device
CN201762053U (en) Simple automatic derrick
CN207313007U (en) A kind of pulley arrangements form of conveying trolley used in inclined shaft trailer system
CN209041886U (en) Suspension arrangement for bridge pier crack detection
CN202657825U (en) Device for lifting guyed tower in integrally assembled mode
CN106006434B (en) A kind of single drum four-point lifting lifting mechanism
CN204370397U (en) The wind resistance cable device of adjustable length
CN207417689U (en) A kind of new straightening roll box in-out apparatus
CN102060231A (en) Hoisting method and device for work roller or middle roller
CN206667058U (en) A kind of across cable walking cord clip handling erecting device
CN204038909U (en) Mobile hoisting suspension bracket equipment
CN202924578U (en) Special hoisting device for ship clearing machinery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20171122

CF01 Termination of patent right due to non-payment of annual fee