CN103590410A - 铁路路基排水沟定位仪的定位施工方法 - Google Patents
铁路路基排水沟定位仪的定位施工方法 Download PDFInfo
- Publication number
- CN103590410A CN103590410A CN201310325361.9A CN201310325361A CN103590410A CN 103590410 A CN103590410 A CN 103590410A CN 201310325361 A CN201310325361 A CN 201310325361A CN 103590410 A CN103590410 A CN 103590410A
- Authority
- CN
- China
- Prior art keywords
- gutter
- position indicator
- horizontal support
- positioning
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
本发明公开了一种铁路路基排水沟开挖的定位施工方法,首先以路基排水沟设计图纸为基础,设计、加工定位模具;再以砌筑好的浆砌片石角墙为基础,根据设计图纸确定基坑开挖的每端的两个上坡顶点及定位仪插入点,先预开挖一段1-2m基槽,将定位仪两端插入插入点位置处,通过在两个上坡顶角点的位置拉线,即可完成进行排水沟上口基坑开挖,开挖结束后,通过在下坡脚点拉线,可以进行基坑底标高控制,顺利形成排水坡度,同时利用坡脚与坡顶线可行顺利进行边坡修整,实现开挖和修整的双控。同时可将多个定位仪连成一片,形成整体施工优势,提高施工效率。本发明使路基排水沟基坑开挖定位、修整更加精准、有序,确保了工程施工质量。
Description
技术领域
本发明涉及铁路路基排水沟定位仪的定位施工方法。
背景技术
随着我国客运专线及高速铁路的快速发展及大规模建设,铁路路基排水沟多采用预制块或浆砌片石的设计,在传统的路基排水沟基坑开挖过程中,常采用多次测量、挂线打桩、且无法保证基坑侧壁的坡度及排水沟的纵坡。现场施工放样点位多且不准确,施工边坡成型质量差,施工期间和施工后无法取出,投入较大,不能重复利用或周转次数较少。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种铁路路基排水沟基坑开挖、修整的定位方法,以改善传统铁路路基排水沟基坑开挖、修整定位困难、耗用材料多、重复利用率低、随意性较大的现况。
本发明解决技术问题采用如下技术方案:
铁路路基排水沟定位仪的定位施工方法,按如下过程施工:
a、以设计施工图纸为依据,设计和加工倒梯形排水沟钢筋定位模具,整个模具由基础骨架1、竖向支撑2、带钩水平支撑3组成,整个模具依据施工图纸形状为倒梯形;
b、以基础骨架1为模型,通过钢筋焊接方式将竖向支撑2与基础钢筋骨架1连成整体,增强模具的整体刚度,焊接位置在基础钢筋骨架1的中心;带钩水平钢筋在制作时要保证两端钩长不小于6cm,以便于固定和加固;再将竖向支撑2与带钩水平支撑3相焊接,焊接位置在带钩水平支撑3的中部;最后将带钩水平支撑3与基础骨架1相接处 ,焊接牢固,形成定位仪整体;
c、以平整好的排水沟路基为基础,精密放样出排水沟定位仪的带钩水平支撑3的插入点,开挖1-2m左右的基槽,将定位仪的带钩水平支撑3相对应的插入两个插入点,再利用吸附式倾斜仪4分别放置在带钩水平支撑3与竖向支撑2上,调整期水平和竖直位置;另一端同理设置此定位仪;
d、将两端定位仪上坡顶位置带线,撒石灰线,进行基坑开挖;开挖完毕后,将两端定位仪下坡脚位置处带线,根据线可调整水流的坡度和排水沟的边坡,实现排水沟基底和边坡修整精细化作业。
所述外基础骨架1采用φ16mm的螺纹钢。
所述竖向支撑2采用Φ16mm的螺纹钢。
所述带钩水平支撑3采用Φ16mm的螺纹钢。
所述吸附式倾斜仪4采用聚氯乙烯或木质材料制作。
与已有技术相比,本发明有益效果体现在:
1、本发明利用制作定型钢筋骨架模具,有效避免了铁路路基排水沟基坑开挖、修整定位、定型困难的问题,同时避免了支撑体系的浪费,并且具有良好的结构稳定性,钢筋骨架可重复利用,周转方便,定位准确、线型优美、减少了一次投入,经济效益明显;
2、本发明结构设计及周转定位简单方便,所用材料均为施工现场易得的钢筋,多模具组合成整体,施工速度快,能有效的缩短施工周期,时间效益显著。
附图说明
图1为本发明铁路路基排水沟定位仪平面示意图;
图2为本发明铁路路基排水沟定位仪施工示意图。
图中标号:1基础骨架、2竖向支撑、3带钩水平支撑、4吸附式倾斜仪。
具体实施方式
铁路路基排水沟定位仪的定位施工方法,按如下过程施工:
a、以设计施工图纸为依据,设计和加工倒梯形排水沟钢筋定位模具,整个模具由基础骨架1、竖向支撑2、带钩水平支撑3组成,整个模具依据施工图纸形状为倒梯形,外基础骨架1采用φ16mm的螺纹钢,竖向支撑2采用Φ16mm的螺纹钢,带钩水平支撑3采用Φ16mm的螺纹钢,吸附式倾斜仪4采用聚氯乙烯或木质材料制作;
b、以基础骨架1为模型,通过钢筋焊接方式将竖向支撑2与基础钢筋骨架1连成整体,增强模具的整体刚度,焊接位置在基础钢筋骨架1的中心;带钩水平钢筋在制作时要保证两端钩长不小于6cm,以便于固定和加固;再将竖向支撑2与带钩水平支撑3相焊接,焊接位置在带钩水平支撑3的中部;最后将带钩水平支撑3与基础骨架1相接处 ,焊接牢固,形成定位仪整体;
c、以平整好的排水沟路基为基础,精密放样出排水沟定位仪的带钩水平支撑3的插入点,开挖1-2m左右的基槽,将定位仪的带钩水平支撑3相对应的插入两个插入点,再利用吸附式倾斜仪4分别放置在带钩水平支撑3与竖向支撑2上,调整期水平和竖直位置;另一端同理设置此定位仪;
d、将两端定位仪上坡顶位置带线,撒石灰线,进行基坑开挖;开挖完毕后,将两端定位仪下坡脚位置处带线,根据线可调整水流的坡度和排水沟的边坡,实现排水沟基底和边坡修整精细化作业。
1、以设计施工图纸为依据,设计和加工倒梯形排水沟钢筋定位模具,整个模具由基础骨架、竖向支撑、带钩水平支撑组成,整个模具依据施工图纸形状为倒梯形;
2、以基础骨架为模型,通过钢筋焊接方式将竖向支撑与基础钢筋骨架连成整体,增强模具的整体刚度,焊接位置在基础钢筋骨架的中心;带钩水平钢筋在制作时要保证两端钩长不小于6cm,以便于固定和加固;再将竖向支撑与带钩水平支撑相焊接,焊接位置在带钩水平支撑的中部;最后将带钩水平支撑与基础骨架相接处 ,焊接牢固,形成整体。
3、以平整好的排水沟路基为基础,精密放样出排水沟定位仪的带钩水平支撑的插入点,开挖1-2m左右的基槽,将定位仪的带钩水平支撑相对应的插入两个插入点,再利用吸附式倾斜仪分别放置在带钩水平支撑与竖向支撑上,调整期水平和竖直位置;另一端同理设置此定位仪。
4、将两端定位仪上坡顶位置带线,撒石灰线,进行基坑开挖;开挖完毕后,将两端定位仪下坡脚位置处带线,根据线可调整水流的坡度和排水沟的边坡,实现排水沟基底和边坡修整精细化作业。
具体实施过程中基础骨架1采用Φ16mm的螺纹钢;竖向支撑2采用Φ16mm的螺纹钢;带钩水平支撑3采用Φ16mm的螺纹钢;吸附式倾斜仪4采用聚氯乙烯或木质材料。
Claims (5)
1.铁路路基排水沟定位仪的定位施工方法,其特征是,按如下过程施工:
a、以设计施工图纸为依据,设计和加工倒梯形排水沟钢筋定位模具,整个模具由基础骨架(1)、竖向支撑(2)、带钩水平支撑(3)组成,整个模具依据施工图纸形状为倒梯形;
b、以基础骨架(1)为模型,通过钢筋焊接方式将竖向支撑(2)与基础钢筋骨架(1)连成整体,增强模具的整体刚度,焊接位置在基础钢筋骨架(1)的中心;带钩水平钢筋在制作时要保证两端钩长不小于6cm,以便于固定和加固;再将竖向支撑(2)与带钩水平支撑(3)相焊接,焊接位置在带钩水平支撑(3)的中部;最后将带钩水平支撑(3)与基础骨架(1)相接处 ,焊接牢固,形成定位仪整体;
c、以平整好的排水沟路基为基础,精密放样出排水沟定位仪的带钩水平支撑(3)的插入点,开挖1-2m左右的基槽,将定位仪的带钩水平支撑(3)相对应的插入两个插入点,再利用吸附式倾斜仪(4)分别放置在带钩水平支撑(3)与竖向支撑(2)上,调整期水平和竖直位置;另一端同理设置此定位仪;
d、将两端定位仪上坡顶位置带线,撒石灰线,进行基坑开挖;开挖完毕后,将两端定位仪下坡脚位置处带线,根据线可调整水流的坡度和排水沟的边坡,实现排水沟基底和边坡修整精细化作业。
2.根据权利要求1所述的铁路路基排水沟定位仪的定位施工方法,其特征是所述外基础骨架(1)采用φ16mm的螺纹钢。
3.根据权利要求1所述的铁路路基排水沟定位仪的定位施工方法,其特征是所述竖向支撑(2)采用Φ16mm的螺纹钢。
4.根据权利要求1所述的铁路路基排水沟定位仪的定位施工方法,其特征是所述带钩水平支撑(3)采用Φ16mm的螺纹钢。
5.根据权利要求1所述的铁路路基排水沟定位仪的定位施工方法,其特征是所述吸附式倾斜仪(4)采用聚氯乙烯或木质材料制作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310325361.9A CN103590410B (zh) | 2013-07-30 | 2013-07-30 | 铁路路基排水沟定位仪的定位施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310325361.9A CN103590410B (zh) | 2013-07-30 | 2013-07-30 | 铁路路基排水沟定位仪的定位施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103590410A true CN103590410A (zh) | 2014-02-19 |
CN103590410B CN103590410B (zh) | 2015-11-18 |
Family
ID=50080712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310325361.9A Active CN103590410B (zh) | 2013-07-30 | 2013-07-30 | 铁路路基排水沟定位仪的定位施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103590410B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103898919A (zh) * | 2014-04-08 | 2014-07-02 | 山东金城建设有限公司 | 深基坑开挖过程边坡坡率控制方法 |
CN114657997A (zh) * | 2022-05-11 | 2022-06-24 | 中冶建工集团有限公司 | 一种坡形基坑的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010068013A9 (ko) * | 2008-12-08 | 2010-09-02 | 코오롱건설주식회사 | 상하수도 공사에 적합한 저심도용 간이 흙막이 구조물 |
CN102094417A (zh) * | 2010-12-22 | 2011-06-15 | 中铁四局集团第一工程有限公司 | 一种利用定型模具制作钢筋笼的方法 |
CN201952735U (zh) * | 2010-12-22 | 2011-08-31 | 中铁四局集团第一工程有限公司 | 一种快速制作钢筋笼的定型模具 |
CN102409685A (zh) * | 2011-09-14 | 2012-04-11 | 中铁四局集团第一工程有限公司 | 铁路路基浆砌片石拱形骨架护坡的定位模具及定位方法 |
-
2013
- 2013-07-30 CN CN201310325361.9A patent/CN103590410B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010068013A9 (ko) * | 2008-12-08 | 2010-09-02 | 코오롱건설주식회사 | 상하수도 공사에 적합한 저심도용 간이 흙막이 구조물 |
CN102094417A (zh) * | 2010-12-22 | 2011-06-15 | 中铁四局集团第一工程有限公司 | 一种利用定型模具制作钢筋笼的方法 |
CN201952735U (zh) * | 2010-12-22 | 2011-08-31 | 中铁四局集团第一工程有限公司 | 一种快速制作钢筋笼的定型模具 |
CN102409685A (zh) * | 2011-09-14 | 2012-04-11 | 中铁四局集团第一工程有限公司 | 铁路路基浆砌片石拱形骨架护坡的定位模具及定位方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103898919A (zh) * | 2014-04-08 | 2014-07-02 | 山东金城建设有限公司 | 深基坑开挖过程边坡坡率控制方法 |
CN114657997A (zh) * | 2022-05-11 | 2022-06-24 | 中冶建工集团有限公司 | 一种坡形基坑的施工方法 |
CN114657997B (zh) * | 2022-05-11 | 2024-03-19 | 中冶建工集团有限公司 | 一种坡形基坑的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103590410B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103114643A (zh) | 大口径排水管道施工组件及其施工方法 | |
CN104612120B (zh) | 一种有关水中钢管桩建立平台的一体化施工方法 | |
CN206015861U (zh) | 轻质砌块墙现浇芯体 | |
CN105625298A (zh) | 采用玻璃纤维筋搭接套铣的地下连续墙结构及其施工方法 | |
CN111270615B (zh) | 桥隧衔接部位隧道扩宽结构 | |
CN203248170U (zh) | 人行横道二次衬砌施工用衬砌台车 | |
CN205296209U (zh) | 预应力锚索装配式桩板墙防护结构 | |
CN103590410A (zh) | 铁路路基排水沟定位仪的定位施工方法 | |
CN204282399U (zh) | 一种地铁围护结构 | |
CN106283966B (zh) | 中低速磁浮单线填方地段独立墩柱式承轨梁过渡段结构 | |
CN106049665B (zh) | 轻质砌块墙现浇芯体的施工方法 | |
CN106283950B (zh) | 中低速磁浮交通工程双线填方地段桩基托梁式承轨梁过渡段结构 | |
CN207672389U (zh) | 路基混凝土路肩现浇模具 | |
CN205024719U (zh) | 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系 | |
CN107237343A (zh) | 一种用于软土地基的多壁式节状地下连续墙桥梁基础 | |
CN205637707U (zh) | 一种泳池 | |
CN201883440U (zh) | 分离式加筋支挡结构 | |
CN106400615B (zh) | 中低速磁浮单线挖方地段独立墩柱式承轨梁过渡段结构 | |
CN104695460A (zh) | 小半径曲线现浇梁横断面方向设不对称支架体系施工方法 | |
CN204000924U (zh) | 低扶壁式站房支挡结构 | |
CN209555962U (zh) | 一种适用于钻孔灌注桩ⅲ类桩与承台连接结构 | |
CN105951844A (zh) | 一种盖挖法顶板节点结构及其施工方法 | |
CN202380458U (zh) | 侧壁多孔空心桩 | |
CN206127759U (zh) | 中低速磁浮双线填方地段独立墩柱式承轨梁过渡段结构 | |
CN106283973B (zh) | 中低速磁浮交通工程双线挖方地段独立墩柱式承轨梁过渡段结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |