CN103587938B - 显示器面板生产线 - Google Patents

显示器面板生产线 Download PDF

Info

Publication number
CN103587938B
CN103587938B CN201310548499.5A CN201310548499A CN103587938B CN 103587938 B CN103587938 B CN 103587938B CN 201310548499 A CN201310548499 A CN 201310548499A CN 103587938 B CN103587938 B CN 103587938B
Authority
CN
China
Prior art keywords
collector plate
line
lower floor
leading portion
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310548499.5A
Other languages
English (en)
Other versions
CN103587938A (zh
Inventor
叶小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jetstar (fujian) Co Ltd Display Technology
Original Assignee
Jetstar (fujian) Co Ltd Display Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jetstar (fujian) Co Ltd Display Technology filed Critical Jetstar (fujian) Co Ltd Display Technology
Priority to CN201310548499.5A priority Critical patent/CN103587938B/zh
Publication of CN103587938A publication Critical patent/CN103587938A/zh
Application granted granted Critical
Publication of CN103587938B publication Critical patent/CN103587938B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Escalators And Moving Walkways (AREA)
  • Automatic Assembly (AREA)

Abstract

本发明涉及一种显示器面板生产线,包括显示器加温输送线,其前段上层的集电板将组装好的显示器送入加温室加温,所述集电板再从其后段下层回流到前段下层,并进入升降机内,其前段下层通过升降机下层过渡线连接有集电板存储线;当集电板供求平衡时,升降机上升以将回流的集电板从前段下层通过上层过渡线输送到前段上层;当集电板供大于求时,升降机不上升,多余的集电板通过下层过渡线自动输送到集电板存储线;当集电板供不应求时,存储的集电板从集电板存储线通过下层过渡线送回到升降机,升降机上升以将送回的集电板从前段下层通过上层过渡线输送到前段上层。本发明合理利用生产资源,大大提升集电板的使用效率,进而提高了显示器的生产效率。

Description

显示器面板生产线
技术领域
本发明涉及一种显示器面板生产线,属于液晶显示器/液晶电视制造领域。
背景技术
现行的组装皮带线的显示器面板制造过程中,面板在皮带线上组装完成后,放在集电板上送入加温室加温,加温完成后,集电板上的显示器经过一系列工序最后包装出货,集电板再回流到前段继续使用。在集电板回流过程中,由于每个工位或者某个时段经常会出现集电板供大于求或供不应求的情况,集电板供大于求时,需要人工将多余集电板从流水线上搬离,浪费了人力,供不应求则影响生产。
发明内容
本发明针对上述现有技术存在的问题做出改进,即本发明所要解决的技术问题是提供一种提升集电板使用效率、节省人力且提高显示器面板生产效率的显示器面板生产线。
为了解决上述技术问题,本发明的技术方案是:一种显示器面板生产线,包括上下两层的显示器加温输送线,所述显示器加温输送线前段上层的集电板将组装好的显示器面板送入加温室加温,所述集电板上的显示器面板在加温完成后经过一系列工序最后包装出货,所述集电板再从显示器加温输送线后段下层回流到前段下层,并进入升降机内,所述显示器加温输送线前段下层通过升降机下层过渡线连接有集电板存储线;当集电板供求平衡时,升降机上升以将回流的集电板从前段下层通过上层过渡线输送到前段上层,继续使用;当集电板供大于求时,升降机不上升,多余的集电板通过下层过渡线自动输送到集电板存储线,直到储满为止;当集电板供不应求时,存储的集电板从集电板存储线通过下层过渡线送回到升降机,升降机上升以将送回的集电板从前段下层通过上层过渡线输送到前段上层,继续使用。
进一步的,所述显示器加温输送线前段上层连接有显示器组装线。
进一步的,所述集电板存储线位于显示器组装线下方。
进一步的,所述显示器加温输送线、集电板存储线和显示器组装线均为皮带线。
与现有技术相比,本发明具有以下有益效果:该显示器面板生产线合理利用生产资源,在集电板供大于求时,可以将多余的集电板存储起来,无需人员搬动集电板,进而提高了显示器面板的生产效率;在集电板供不应求时,再将存储的集电板送到线上使用,大大提升集电板的使用效率,保证显示器面板正常生产。
下面结合附图和具体实施方式对本发明做进一步详细的说明。
附图说明
图1为本发明实施例的主视示意图。
图2为本发明实施例的上层俯视示意图。
图3为本发明实施例的下层俯视示意图。
图中:A-前段上层,B-后段下层,C-前段下层,1-显示器加温输送线,2-集电板,3-显示器面板,4-升降机,5-下层过渡线,6-集电板存储线,7-上层过渡线,8-显示器组装线。
具体实施方式
如图1~3所示,一种显示器面板生产线,包括上下两层的显示器加温输送线1,所述显示器加温输送线1前段上层A的集电板2将组装好的显示器面板3送入加温室加温,所述集电板2上的显示器面板3在加温完成后经过一系列工序最后包装出货,所述集电板2再从显示器加温输送线1后段下层B回流到前段下层C,并进入升降机4内,所述显示器加温输送线1前段下层C通过升降机4下层过渡线5连接有集电板存储线6;当集电板2供求平衡时,升降机4上升以将回流的集电板2从前段下层C通过上层过渡线7输送到前段上层A,继续使用;当集电板2供大于求时,升降机4不上升,多余的集电板2通过下层过渡线5自动输送到集电板存储线6,直到储满为止;当集电板2供不应求时,存储的集电板2从集电板存储线6通过下层过渡线5送回到升降机4,升降机4上升以将送回的集电板2从前段下层C通过上层过渡线7输送到前段上层A,继续使用。
在本实施例中,所述显示器加温输送线1前段上层A连接有显示器组装线8,显示器面板3在显示器组装线8上组装完成后,由作业员将组装好的显示器面板3放在显示器加温输送线1前段上层A的集电板2上。
在本实施例中,为了充分利用显示器加温输送线1的空间,所述集电板存储线6位于显示器组装线8下方,节省了整个显示器面板生产线的占地面积。
在本实施例中,所述显示器加温输送线1、集电板存储线6和显示器组装线8均为皮带线,所述上层过渡线7和下层过渡线5也均为皮带线。
该显示器面板生产线的集电板存储线6,在集电板2供大于求时,可以将多余的集电板2存储起来,在集电板2供不应求时,再将存储的集电板2送到线上使用,缓解了集电板2供不应求时线体的生产压力,大大提升集电板2的使用效率,无需人员搬动集电板2,进而提高了显示器面板的生产效率。
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。

Claims (4)

1.一种显示器面板生产线,包括上下两层的显示器加温输送线,其特征在于:所述显示器加温输送线前段上层的集电板将组装好的显示器面板送入加温室加温,所述集电板上的显示器面板在加温完成后经过一系列工序最后包装出货,所述集电板再从显示器加温输送线后段下层回流到前段下层,并进入升降机内,所述显示器加温输送线前段下层通过升降机下层过渡线连接有集电板存储线;当集电板供求平衡时,升降机上升以将回流的集电板从前段下层通过上层过渡线输送到前段上层,继续使用;当集电板供大于求时,升降机不上升,多余的集电板通过下层过渡线自动输送到集电板存储线,直到储满为止;当集电板供不应求时,存储的集电板从集电板存储线通过下层过渡线送回到升降机,升降机上升以将送回的集电板从前段下层通过上层过渡线输送到前段上层,继续使用。
2.根据权利要求1所述的显示器面板生产线,其特征在于:所述显示器加温输送线前段上层连接有显示器组装线。
3.根据权利要求2所述的显示器面板生产线,其特征在于:所述集电板存储线位于显示器组装线下方。
4.根据权利要求2或3所述的显示器面板生产线,其特征在于:所述显示器加温输送线、集电板存储线和显示器组装线均为皮带线。
CN201310548499.5A 2013-11-08 2013-11-08 显示器面板生产线 Expired - Fee Related CN103587938B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310548499.5A CN103587938B (zh) 2013-11-08 2013-11-08 显示器面板生产线

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310548499.5A CN103587938B (zh) 2013-11-08 2013-11-08 显示器面板生产线

Publications (2)

Publication Number Publication Date
CN103587938A CN103587938A (zh) 2014-02-19
CN103587938B true CN103587938B (zh) 2015-10-21

Family

ID=50078314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310548499.5A Expired - Fee Related CN103587938B (zh) 2013-11-08 2013-11-08 显示器面板生产线

Country Status (1)

Country Link
CN (1) CN103587938B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105035679B (zh) * 2015-08-31 2017-04-26 上海沪工焊接集团股份有限公司 流水线工位存储结构及其控制方法
CN105752687A (zh) * 2016-04-26 2016-07-13 东旭(昆山)显示材料有限公司 传送装置和加工系统
CN107553146B (zh) * 2017-10-05 2019-02-19 苏州君驰联动机械有限公司 一种面板生产线

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0370689A (ja) * 1989-08-08 1991-03-26 Sanyo Mach Works Ltd 自動車車体の組立ライン
JPH03106719A (ja) * 1989-09-19 1991-05-07 Honda Motor Co Ltd 物品製造ラインの物品の搬送装置
DE4225338A1 (de) * 1992-07-31 1994-02-03 Grob Gmbh & Co Kg Aus Montagestationen bestehende Montagestraße
CN201713103U (zh) * 2010-01-29 2011-01-19 上海欧菲滤清器有限公司 双层流水线传送带
CN203095029U (zh) * 2012-12-26 2013-07-31 重庆歇马机械曲轴有限公司 传送线托盘循环使用装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0370689A (ja) * 1989-08-08 1991-03-26 Sanyo Mach Works Ltd 自動車車体の組立ライン
JPH03106719A (ja) * 1989-09-19 1991-05-07 Honda Motor Co Ltd 物品製造ラインの物品の搬送装置
DE4225338A1 (de) * 1992-07-31 1994-02-03 Grob Gmbh & Co Kg Aus Montagestationen bestehende Montagestraße
CN201713103U (zh) * 2010-01-29 2011-01-19 上海欧菲滤清器有限公司 双层流水线传送带
CN203095029U (zh) * 2012-12-26 2013-07-31 重庆歇马机械曲轴有限公司 传送线托盘循环使用装置

Also Published As

Publication number Publication date
CN103587938A (zh) 2014-02-19

Similar Documents

Publication Publication Date Title
CN103587938B (zh) 显示器面板生产线
CN203487027U (zh) 玻璃加工自动平整挡板
GB201205998D0 (en) lamp standard
CN202221130U (zh) 一种分布式区域集中供冷供热系统
CN203010928U (zh) 电热水器内胆
CN202778849U (zh) 汽车轮胎喷胶机
CN203933505U (zh) 嵌入式安装光伏组件支架
CN204555376U (zh) 一种平板集热器
CN204038459U (zh) 可拆卸滚轮
CN203930541U (zh) 一种预热台
CN103267364B (zh) 一种太阳能加热冷水循环系统及其方法
CN202303945U (zh) 一种电热水器的加热结构
CN103822485B (zh) 一种台车
CN207006861U (zh) Smt铁硅合金材料的低温烧结系统
CN204409462U (zh) 茶叶烘焙架
CN204279159U (zh) 一种安装有加热垫的汽车座椅及具有其的汽车
CN205418265U (zh) 一种热压密封机
CN204100784U (zh) 组合式回转窑窑尾下料溜子
CN203450849U (zh) 茶叶杀青输送装置
CN202709069U (zh) 余热回收利用装置
CN202912308U (zh) 一种布匹运送机构
CN106418648B (zh) 一种茴香薄片生产用的布料成形装置
CN205838488U (zh) 粮食加工提升机提升管咬边结构
CN202869215U (zh) 一种改装的双开口的加热炉装置
CN204380724U (zh) 一种容量瓶架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20181108

CF01 Termination of patent right due to non-payment of annual fee