- CN103579951A CN103579951A CN201310409547.2A CN201310409547A CN103579951A CN 103579951 A CN103579951 A CN 103579951A CN 201310409547 A CN201310409547 A CN 201310409547A CN 103579951 A CN103579951 A CN 103579951A
- Authority
- CN
- China
- Prior art keywords
- movable plate
- block
- upper horizontal
- tension insulators
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Food-Manufacturing Devices (AREA)
Abstract
本发明涉及一种耐张绝缘子更换用朝天滑车,其特点是:包括手动滑车(4),在该手动滑车(4)顶部两侧分别安装有固定板和活动板(3),在该固定板和活动板(3)之间穿过有上部横连杆(1),并且该上部横连杆(1)的两端分别与固定板和活动板(3)连接;在该手动滑车(4)底部安装有槽钢(5),在该槽钢(5)上安装有至少2个紧固螺栓(6)。经过试用证明,采用本发明的耐张绝缘子更换用朝天滑车后,可以有效提高工作面平台,极大的减少作业人员体能消耗,降低工作难度,解决更换整串瓷瓶费时费力的问题。
The invention relates to an upward block for replacing tension insulators, which is characterized in that it includes a manual block (4), and a fixed plate and a movable plate (3) are respectively installed on both sides of the top of the manual block (4). There is an upper horizontal connecting rod (1) passing through the movable plate (3), and the two ends of the upper horizontal connecting rod (1) are respectively connected with the fixed plate and the movable plate (3); A channel steel (5) is installed at the bottom, and at least 2 fastening bolts (6) are installed on the channel steel (5). It has been proved by trials that the use of the sky block for replacing tension insulators of the present invention can effectively improve the platform of the working face, greatly reduce the physical energy consumption of operators, reduce the difficulty of work, and solve the problem of time-consuming and labor-intensive replacement of a whole string of porcelain bottles.
Description
技术领域technical field
本发明涉及一种耐张绝缘子更换用朝天滑车。The invention relates to an overhead tackle for replacing tension insulators.
背景技术Background technique
在西北地区投运的330kV线路中,耐张串均采用瓷质绝缘子,耐张瓷瓶均采用双串瓷瓶,瓷瓶设计拉力均为21kN,重量8~10kg,整串瓷瓶176~220kg。更换整串绝缘子,由于整串瓷瓶和更换工具过重,在安装工具及瓷瓶串时,由于循环绳的吊点低,导致工作人员在高空操作非常困难,无形中增加了作业人员的危险性。In the 330kV lines put into operation in Northwest China, porcelain insulators are used for tension strings, and double-string porcelain bottles are used for tension-resistant porcelain bottles. The design tension of the porcelain bottles is 21kN, the weight is 8-10kg, and the whole string of porcelain bottles is 176-220kg. To replace the whole string of insulators, because the whole string of porcelain bottles and replacement tools are too heavy, when installing tools and porcelain strings, due to the low lifting point of the circulating rope, it is very difficult for the staff to operate at high altitude, which virtually increases the danger of the workers.
目前带电更换330kV耐张整串绝缘子是线路检修工作中非常重要的一个项目,但在更换工作中,由于330kV线路瓷瓶设计拉力均为21kN,重量8~10kg,整串瓷瓶176~220kg,更换卡具笨重,安装费时费力,工作人员在高空操作非常困难,较大的体能消耗给作业人员带来的安全风险也非常大。At present, replacing the whole series of 330kV tension-resistant insulators with electricity is a very important item in the maintenance work of the line. The equipment is heavy, time-consuming and labor-intensive to install, it is very difficult for the staff to operate at high altitude, and the large physical energy consumption brings great safety risks to the operators.
发明内容Contents of the invention
本发明的目的是提供一种耐张绝缘子更换用朝天滑车,使用后能够提高工作面平台,从而极大的减少作业人员体能消耗。The purpose of the present invention is to provide an overhead tackle for replacing tension insulators, which can raise the platform of the working face after use, thereby greatly reducing the physical energy consumption of operators.
一种耐张绝缘子更换用朝天滑车,其特别之处在于:包括手动滑车,在该手动滑车顶部两侧分别安装有固定板和活动板,在该固定板和活动板之间穿过有上部横连杆,并且该上部横连杆的两端分别与固定板和活动板连接;在该手动滑车底部安装有槽钢,在该槽钢上安装有至少2个紧固螺栓。An overhead block for replacing strain insulators, which is special in that it includes a manual block, a fixed plate and a movable plate are respectively installed on both sides of the top of the manual block, and an upper horizontal block passes through between the fixed plate and the movable plate. connecting rod, and the two ends of the upper horizontal connecting rod are respectively connected with the fixed plate and the movable plate; a channel steel is installed at the bottom of the hand block, and at least 2 fastening bolts are installed on the channel steel.
其中固定板和活动板均为弧形板。Wherein the fixed plate and the movable plate are arc-shaped plates.
其中活动板的底端与手动滑车顶部铰接,而该活动板与上部横连杆之间采用可拆卸连接。Wherein the bottom end of the movable plate is hinged with the top of the manual tackle, and the movable plate is connected detachably with the upper horizontal link.
其中可拆卸连接具体是在活动板上安装有卡口,而在上部横连杆上安装有与该卡口配合的旋动式闭锁,从而能使活动板与上部横连杆之间固定或松开。The detachable connection is specifically that a bayonet is installed on the movable plate, and a rotary lock that cooperates with the bayonet is installed on the upper horizontal connecting rod, so that the movable plate and the upper horizontal connecting rod can be fixed or loosened. open.
经过试用证明,采用本发明的耐张绝缘子更换用朝天滑车后,可以有效提高工作面平台,极大的减少作业人员体能消耗,降低工作难度,解决更换整串瓷瓶费时费力的问题。本发明以升高循环绳的挂点为突破口,通过联板支撑朝天滑车,架高作业面,达到减轻工作负担,缩短作业时间,降低作业安全风险的有益效果。使用时通过连接在耐张串导线侧联板上的滑车,架高循环绳,提高最上部循环绳的吊点,可以明显减轻带电作业人员的作业强度,降低工作难度,增加工作效率,提高作业安全性。It has been proved by trials that the use of the sky block for replacing tension insulators of the present invention can effectively improve the platform of the working face, greatly reduce the physical energy consumption of operators, reduce the difficulty of work, and solve the problem of time-consuming and labor-intensive replacement of a whole string of porcelain bottles. The invention takes the hanging point of the raised circulating rope as a breakthrough, supports the overhead block through the connecting plate, and elevates the working surface, so as to reduce the working burden, shorten the working time, and reduce the beneficial effects of working safety risks. When in use, the pulley connected to the side connecting plate of the tension string conductor can be used to elevate the circulating rope and increase the lifting point of the uppermost circulating rope, which can significantly reduce the working intensity of live workers, reduce the difficulty of work, increase work efficiency and improve operation safety.
附图说明Description of drawings
附图1为本发明的结构示意图;Accompanying
附图2为本发明的结构示意图。Accompanying drawing 2 is the structural representation of the present invention.
具体实施方式Detailed ways
如图1、2所示,本发明是一种耐张绝缘子更换用朝天滑车,包括手动滑车4,手动滑车4基本上由滑轮和一个外壳组成。在该手动滑车4顶部两侧分别安装有固定板和活动板3,在该固定板和活动板3之间穿过有上部横连杆1,并且该上部横连杆1的两端分别与固定板和活动板3连接。在该手动滑车4底部安装有槽钢5,在该槽钢5上安装有2个紧固螺栓6。As shown in Figures 1 and 2, the present invention is an upturned block for replacing tension insulators, including a
其中固定板和活动板3均为弧形板,活动板3的底端与手动滑车4顶部铰接,而该活动板3与上部横连杆1之间采用可拆卸连接,从而方便循环绳穿过。另外在活动板3上安装有卡口,而在上部横连杆1上安装有与该卡口配合的旋动式闭锁2,从而能使活动板3与上部横连杆1之间固定或松开。Wherein the fixed plate and the
本发明的使用方法是:The using method of the present invention is:
使用时通过槽钢5和紧固螺栓6将本发明连接在耐张串导线侧联板上,架高循环绳,提高最上部循环绳的吊点,从而减轻带电作业人员的作业强度,降低工作难度,增加工作效率,提高作业安全性。When in use, the present invention is connected to the side connecting plate of the strain-resistant series wire through the
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310409547.2A CN103579951A (en) | 2013-08-29 | 2013-09-10 | Upturned tackle for replacing tension insulators |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310382823 | 2013-08-29 | ||
| CN201310382823.0 | 2013-08-29 | ||
| CN201310409547.2A CN103579951A (en) | 2013-08-29 | 2013-09-10 | Upturned tackle for replacing tension insulators |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN103579951A true CN103579951A (en) | 2014-02-12 |
Family
ID=50051170
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310409547.2A Pending CN103579951A (en) | 2013-08-29 | 2013-09-10 | Upturned tackle for replacing tension insulators |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103579951A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105811316A (en) * | 2016-03-23 | 2016-07-27 | 国家电网公司 | Crossing line-passing apparatus for overhead conductor |
| CN110768165A (en) * | 2019-12-09 | 2020-02-07 | 云南电网有限责任公司昆明供电局 | Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02188110A (en) * | 1989-01-17 | 1990-07-24 | Kandenko Co Ltd | Movable wire extension roller |
| CN201213208Y (en) * | 2008-07-09 | 2009-03-25 | 成都电业局 | A sky pulley device |
| CN101436764A (en) * | 2008-11-13 | 2009-05-20 | 江苏省电力公司宜兴市供电公司 | Crossover stringing method for overhead line and stringing sheave pulley |
| CN201307732Y (en) * | 2008-11-13 | 2009-09-09 | 江苏省电力公司宜兴市供电公司 | Aerial line cross-stringing tackle |
| CN201378707Y (en) * | 2009-03-24 | 2010-01-06 | 陈立秋 | Lifting tackle specially used for electrical maintenance |
| CN202308918U (en) * | 2011-11-14 | 2012-07-04 | 金华电业局 | Heavenward pulley device |
| CN102916370A (en) * | 2012-10-26 | 2013-02-06 | 高密胜鑫交通工程有限公司 | Cable pay-off device |
| CN202978115U (en) * | 2012-12-19 | 2013-06-05 | 国家电网公司 | Pedestal type/hanging type dual-mode pay-off pulley apparatus |
| CN203491598U (en) * | 2013-09-10 | 2014-03-19 | 国家电网公司 | Upturned pulley for replacing tension insulator |
-
2013
- 2013-09-10 CN CN201310409547.2A patent/CN103579951A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02188110A (en) * | 1989-01-17 | 1990-07-24 | Kandenko Co Ltd | Movable wire extension roller |
| CN201213208Y (en) * | 2008-07-09 | 2009-03-25 | 成都电业局 | A sky pulley device |
| CN101436764A (en) * | 2008-11-13 | 2009-05-20 | 江苏省电力公司宜兴市供电公司 | Crossover stringing method for overhead line and stringing sheave pulley |
| CN201307732Y (en) * | 2008-11-13 | 2009-09-09 | 江苏省电力公司宜兴市供电公司 | Aerial line cross-stringing tackle |
| CN201378707Y (en) * | 2009-03-24 | 2010-01-06 | 陈立秋 | Lifting tackle specially used for electrical maintenance |
| CN202308918U (en) * | 2011-11-14 | 2012-07-04 | 金华电业局 | Heavenward pulley device |
| CN102916370A (en) * | 2012-10-26 | 2013-02-06 | 高密胜鑫交通工程有限公司 | Cable pay-off device |
| CN202978115U (en) * | 2012-12-19 | 2013-06-05 | 国家电网公司 | Pedestal type/hanging type dual-mode pay-off pulley apparatus |
| CN203491598U (en) * | 2013-09-10 | 2014-03-19 | 国家电网公司 | Upturned pulley for replacing tension insulator |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105811316A (en) * | 2016-03-23 | 2016-07-27 | 国家电网公司 | Crossing line-passing apparatus for overhead conductor |
| CN110768165A (en) * | 2019-12-09 | 2020-02-07 | 云南电网有限责任公司昆明供电局 | Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103618251A (en) | Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line | |
| CN203491598U (en) | Upturned pulley for replacing tension insulator | |
| CN201766314U (en) | Insulator replacing tool | |
| CN201323398Y (en) | Small-sized electric power equipment landing gear | |
| CN203352051U (en) | Insulation protective umbrella | |
| CN201785175U (en) | Hoisting basket for high-voltage steel tower | |
| CN203536860U (en) | A Hanger for Replacing Tension Insulators | |
| CN102761077B (en) | Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line | |
| CN103579951A (en) | Upturned tackle for replacing tension insulators | |
| CN201674159U (en) | Double angle steel hanging point insulator string live replacement tool | |
| CN202308909U (en) | Clamping device for live line insulator string replacement | |
| CN203967613U (en) | Bird-scaring unit dismantling device that can live line working | |
| CN206233852U (en) | A kind of Portable lifting transmission platform | |
| CN204897278U (en) | Cable well cover opening device | |
| CN202856246U (en) | Insulator replacement device | |
| CN204258157U (en) | Composite insulator string Special-purpose lifting device | |
| CN205472325U (en) | Portable machine of taking off and land | |
| CN203522016U (en) | Device for lifting overhead ground wire | |
| CN203728474U (en) | Substation special elevator | |
| CN204243605U (en) | Power line tension string composite insulator changes hook special | |
| CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
| CN204741222U (en) | Portable multi -functional transmission line interruption maintenance appurtenance | |
| CN206442059U (en) | A kind of insulated gin | |
| CN203545559U (en) | Electric meter box hoisting tool | |
| CN203423430U (en) | Insulator maintenance device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140212 |
|