CN203756015U - Aerial work platform for power transmission iron tower - Google Patents

Aerial work platform for power transmission iron tower Download PDF

Info

Publication number
CN203756015U
CN203756015U CN201420121413.0U CN201420121413U CN203756015U CN 203756015 U CN203756015 U CN 203756015U CN 201420121413 U CN201420121413 U CN 201420121413U CN 203756015 U CN203756015 U CN 203756015U
Authority
CN
China
Prior art keywords
power transmission
platform
aerial work
hook
ladder body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420121413.0U
Other languages
Chinese (zh)
Inventor
陈建文
杨瑞波
彭真君
郑晓旗
李武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420121413.0U priority Critical patent/CN203756015U/en
Application granted granted Critical
Publication of CN203756015U publication Critical patent/CN203756015U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses an aerial work platform for a power transmission iron tower, belonging to the technical fields of mobile platforms. The aerial work platform comprises a symmetrical ladder body and a hook, wherein the hook is arranged at the upper end of the symmetrical ladder body; the lower end of the symmetrical ladder body is connected with horizontal foot treadles; the symmetrical ladder body is respectively fixedly connected with sleeves; and safety bolts for clamping angle iron cross arms of a power transmission tower pole are mounted on the sleeves through screw threads. Cross beams are arranged on the symmetrical ladder body. The platform is simple in structure, light in weight, quite convenient to carry, mount and dismount by an operator and capable of being stably connected with the power transmission iron tower through the safety bolts, and by adopting the platform during aerial work, the safety of an overhauling worker can be guaranteed and the labor efficiency can be improved.

Description

A kind of electric power pylon aerial work platform
Technical field
The utility model relates to a kind of mobile platform technical field.
Background technology
Electric power pylon is by angle bar, steel plate and the welding of various section bar or riveting molding, upkeep operation on electric power pylon, shape and structure by electric power pylon determines, there are different stulls and brace in different positions, some electric power pylons are provided with welding ladder, service work personnel's pin will be trampled at these stulls and the enterprising line operate of brace, makes inspection operation not only dangerous but also inconvenient.Especially pin steps down in brace, and personal injury easily occurs, and only, with the effect of safety belt, can not guarantee operator's personal safety.In prior art, need operator that interim ladder is installed, interim ladder hangs over electric power pylon by hook, and this ladder can't effectively prevent that ladder from breaking off relations.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of electric power pylon aerial work platform, has to carry, mount and dismount all very convenient, can guarantee the feature that job platform is firmly connected with power transmission tower bar.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of electric power pylon aerial work platform, comprises symmetrical terraced body and hook; The ladder of described symmetry is held with it and is provided with hook, connects the foot rest of level in symmetrical terraced body lower end, is fixedly connected with respectively sleeve with it at symmetrical ladder, on described sleeve, by screw thread, the breaker bolt that blocks the stull of power transmission tower bar angle bar is installed.
The further improvement that the utility model is done is: the ladder of described symmetry is provided with crossbeam with it.
The beneficial effect that adopts technique scheme to produce is: this platform structure is simply lightweight, operator carries, mounts and dismounts very convenient, can be connected with electric power pylon is stable by breaker bolt, service work personnel use this platform in work high above the ground, can guarantee safety, raise labour efficiency.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the structural representation of this platform;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the top view of Fig. 1.
As shown in the figure: 1 hook, 2 terraced bodies, 3 breaker bolts, 4 angle bar stulls, 5 foot rests.
Detailed description of the invention
Pair operation of the present utility model of contrast Fig. 1-3 is used step to be described further:
Embodiment 1: a kind of electric power pylon aerial work platform, comprises symmetrical terraced body 2 and hook 1; Terraced body 2 upper ends of described symmetry are provided with hook 1, connect the foot rest 5 of level in symmetrical terraced body 2 lower ends, on symmetrical terraced body 2, are fixedly connected with respectively sleeve, on described sleeve, by screw thread, the breaker bolt 3 that blocks power transmission tower bar angle bar stull 4 are installed.
The using method of the present embodiment: operator carries this platform and climbs up electric power pylon, the hook of platform 1 is hung in the angle bar stull 4 on power transmission tower bar, two breaker bolts 3 are screwed into respectively in sleeve, the front end head of breaker bolt 3 is stretched out and block the 4 times transverse planes of angle bar stull on power transmission tower bar, platform is installed reliable, and operator can climb up platform operation.The hook 1 of this platform is carrying operator's body weight, and breaker bolt 3 can prevent that platform from teetertottering, and guarantees all the time to link up with in the 1 angle bar stull 4 hanging over reliably on power transmission tower bar.Inspection operation finishes, and breaker bolt 3 is back-outed, and this platform can move easily or take.
Embodiment 2: a kind of electric power pylon aerial work platform, comprises symmetrical terraced body 2 and hook 1; Terraced body 2 upper ends of described symmetry are provided with hook 1, connect the foot rest 5 of level in symmetrical terraced body 2 lower ends, on symmetrical terraced body 2, are fixedly connected with respectively sleeve, on described sleeve, by screw thread, the breaker bolt 3 that blocks power transmission tower bar angle bar stull 4 are installed.The terraced body 2 of described symmetry is provided with crossbeam.
The using method of the present embodiment: operator carries this platform and climbs up electric power pylon, the hook of platform 1 is hung in the angle bar stull 4 on power transmission tower bar, two breaker bolts 3 are screwed into respectively in sleeve, the front end head of breaker bolt 3 is stretched out and block the 4 times transverse planes of angle bar stull on power transmission tower bar, platform is installed reliable, and operator can climb up platform operation.The hook 1 of this platform is carrying operator's body weight, and breaker bolt 3 can prevent that platform from teetertottering, and guarantees all the time to link up with in the 1 angle bar stull 4 hanging over reliably on power transmission tower bar.Inspection operation finishes, and breaker bolt 3 is back-outed, and this platform can move easily or take.

Claims (2)

1. an electric power pylon aerial work platform, is characterized in that: comprise symmetrical terraced body (2) and hook (1); Terraced body (2) upper end of described symmetry is provided with hook (1), connect the foot rest (5) of level in symmetrical terraced body (2) lower end, on symmetrical terraced body (2), be fixedly connected with respectively sleeve, on described sleeve, by screw thread, the breaker bolt (3) that blocks power transmission tower bar angle bar stull (4) be installed.
2. an electric power pylon aerial work platform, is characterized in that: the terraced body (2) of described symmetry is provided with crossbeam.
CN201420121413.0U 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower Expired - Fee Related CN203756015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420121413.0U CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420121413.0U CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Publications (1)

Publication Number Publication Date
CN203756015U true CN203756015U (en) 2014-08-06

Family

ID=51251303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420121413.0U Expired - Fee Related CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Country Status (1)

Country Link
CN (1) CN203756015U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389508A (en) * 2014-11-18 2015-03-04 国网安徽省电力公司阜阳供电公司 High-altitude special operation platform
CN107060632A (en) * 2017-05-15 2017-08-18 国家电网公司 Electric transmission line isolator inspection platform
CN109138574A (en) * 2018-09-29 2019-01-04 国网河北省电力有限公司沧州供电分公司 Telegraph pole tower operation platform and Sign Board installation method
CN113958106A (en) * 2021-11-24 2022-01-21 广东电网有限责任公司 Iron tower operation platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389508A (en) * 2014-11-18 2015-03-04 国网安徽省电力公司阜阳供电公司 High-altitude special operation platform
CN107060632A (en) * 2017-05-15 2017-08-18 国家电网公司 Electric transmission line isolator inspection platform
CN109138574A (en) * 2018-09-29 2019-01-04 国网河北省电力有限公司沧州供电分公司 Telegraph pole tower operation platform and Sign Board installation method
CN113958106A (en) * 2021-11-24 2022-01-21 广东电网有限责任公司 Iron tower operation platform

Similar Documents

Publication Publication Date Title
CN203756015U (en) Aerial work platform for power transmission iron tower
CN205452906U (en) Combination dock switch overhauls platform
CN205133081U (en) Novel hanging flower basket system
CN110748138A (en) Labor-saving pole climbing device for telegraph pole
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN210331418U (en) Fixing upright rod device for hanging safety belt
CN201981995U (en) Pole ladder for maintenance of single-column device
CN204030382U (en) Lift maintaining platform
CN103247966A (en) High-voltage aerial work elevator
CN203736798U (en) Auxiliary pedal for climbing steel pylon
CN105384097A (en) Operation platform structure applied to high-voltage line operation
CN204038917U (en) Dismountable external hanging service platform
CN204720888U (en) Portable power distribution less important work platform
CN202997372U (en) Multipurpose maintenance ladder
CN204823738U (en) Two roof beam electric hoist formula hoist girder orthotic devices
CN204050726U (en) Fixed connector between framework and safety belt during work high above the ground
CN204205258U (en) High-altitude dismounting grounding wire device
CN203787859U (en) Portable derrick applied to transmission line overhauling
CN210396617U (en) External hanging type working platform for cable maintenance of wind generating set
CN203813313U (en) Mobile workbench for check and repair of strain insulator string
CN203373954U (en) Attached type lifting canopy frame or scaffold
CN203208568U (en) Safety belt hanger
CN206468014U (en) A kind of concreting workbench
CN205277273U (en) Pole ladder is stepped on to cement concrete pole
CN204782703U (en) Exempt from to hold up safe insulating ladder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20200318