CN203756015U - Aerial work platform for power transmission iron tower - Google Patents

Aerial work platform for power transmission iron tower Download PDF

Info

Publication number
CN203756015U
CN203756015U CN201420121413.0U CN201420121413U CN203756015U CN 203756015 U CN203756015 U CN 203756015U CN 201420121413 U CN201420121413 U CN 201420121413U CN 203756015 U CN203756015 U CN 203756015U
Authority
CN
China
Prior art keywords
platform
ladder body
hook
transmission tower
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420121413.0U
Other languages
Chinese (zh)
Inventor
陈建文
杨瑞波
彭真君
郑晓旗
李武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hebei Electric Power Co Ltd
Priority to CN201420121413.0U priority Critical patent/CN203756015U/en
Application granted granted Critical
Publication of CN203756015U publication Critical patent/CN203756015U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

本实用新型公开了一种输电铁塔高空作业平台,属移动式平台技术领域。包括对称的梯身和挂钩;所述对称的梯身上端设有挂钩,在对称的梯身下端连接水平的脚踏板,在对称的梯身上分别固定连接套筒,在所述套筒上通过螺纹安装卡住输电塔杆角铁横撑的安全螺栓。所述对称的梯身上设有横梁。该平台结构简单重量轻,操作者携带、安装和拆卸都很方便,通过安全螺栓可以和输电铁塔稳定连接,检修工作人员在高空作业使用这种平台,可以确保安全,提高劳动效率。

The utility model discloses a high-altitude operation platform of a power transmission iron tower, which belongs to the technical field of mobile platforms. It includes a symmetrical ladder body and a hook; the upper end of the symmetrical ladder body is provided with a hook, the lower end of the symmetrical ladder body is connected with a horizontal foot pedal, and the connecting sleeves are respectively fixed on the symmetrical ladder body. Threaded installation of safety bolts that capture transmission tower mast angle iron cross braces. Cross beams are arranged on the symmetrical ladder body. The platform is simple in structure and light in weight, and is very convenient for the operator to carry, install and disassemble. It can be stably connected to the transmission tower through safety bolts. The use of this platform by maintenance workers in high-altitude operations can ensure safety and improve labor efficiency.

Description

一种输电铁塔高空作业平台An aerial work platform for a power transmission tower

技术领域 technical field

本实用新型涉及一种移动式平台技术领域。 The utility model relates to the technical field of a mobile platform.

背景技术 Background technique

输电铁塔是由角铁、钢板以及各种型材焊接或铆接成型,在输电铁塔上检修作业,由输电铁塔的形状结构决定,在不同的位置有不同的横撑和斜拉筋,有的输电铁塔上设有焊接梯,检修工作人员的脚要踩踏在这些横撑和斜拉筋上进行操作,使检修操作既不安全又不方便。尤其是脚踩在斜拉筋上,易发生人身事故 ,仅凭安全带的作用,不能确保操作者的人身安全。现有技术中,需要操作者安装临时梯子,临时梯子靠挂钩挂在输电铁塔,这种梯子还不能有效防止梯子脱钩。 The transmission tower is formed by welding or riveting angle iron, steel plate and various profiles. The maintenance operation on the transmission tower is determined by the shape and structure of the transmission tower. There are different horizontal braces and cable stays at different positions. Some transmission towers Welding ladders are arranged on the top, and the feet of the maintenance workers will step on these cross braces and oblique bars to operate, which makes the maintenance operation both unsafe and inconvenient. Especially if the foot is stepped on the cable tie bars, personal accidents are prone to occur, and the safety belt alone cannot ensure the personal safety of the operator. In the prior art, the operator is required to install a temporary ladder, and the temporary ladder is hung on the power transmission tower by a hook. This kind of ladder cannot effectively prevent the ladder from being unhooked.

实用新型内容 Utility model content

本实用新型所要解决的技术问题是提供一种输电铁塔高空作业平台,具有携带、安装和拆卸都很方便,可以确保作业平台与输电塔杆牢固连接的特点。 The technical problem to be solved by the utility model is to provide a power transmission tower high-altitude work platform, which is easy to carry, install and disassemble, and can ensure the firm connection between the work platform and the power transmission tower.

为解决上述技术问题,本实用新型所采取的技术方案是:一种输电铁塔高空作业平台,包括对称的梯身和挂钩;所述对称的梯身上端设有挂钩,在对称的梯身下端连接水平的脚踏板,在对称的梯身上分别固定连接套筒,在所述套筒上通过螺纹安装卡住输电塔杆角铁横撑的安全螺栓。 In order to solve the above technical problems, the technical solution adopted by the utility model is: an aerial work platform of a power transmission tower, including a symmetrical ladder body and a hook; the upper end of the symmetrical ladder body is provided with a hook, which is connected to The horizontal pedals are respectively fixed on the symmetrical ladder body to connect the sleeves, and the safety bolts that block the angle iron cross braces of the transmission tower rods are installed on the sleeves through threads.

对本实用新型所做的进一步改进是:所述对称的梯身上设有横梁。 The further improvement made to the utility model is that: the symmetrical ladder is provided with crossbeams.

采用上述技术方案所产生的有益效果在于:该平台结构简单重量轻,操作者携带、安装和拆卸都很方便,通过安全螺栓可以和输电铁塔稳定连接,检修工作人员在高空作业使用这种平台,可以确保安全,提高劳动效率。 The beneficial effects of adopting the above technical solution are: the platform is simple in structure and light in weight, it is very convenient for the operator to carry, install and disassemble, and it can be stably connected with the transmission tower through safety bolts. It can ensure safety and improve labor efficiency.

附图说明 Description of drawings

下面结合附图和具体实施方式对本实用新型作进一步详细的说明。 Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail.

图1为该平台的结构示意图; Fig. 1 is the structural representation of this platform;

图2为图1的右视图; Fig. 2 is the right view of Fig. 1;

图3为图1的俯视图。 FIG. 3 is a top view of FIG. 1 .

如图所示:1挂钩、2梯身、3安全螺栓、4角铁横撑、5脚踏板。 As shown in the figure: 1 hook, 2 ladder bodies, 3 safety bolts, 4 angle iron cross braces, 5 pedals.

具体实施方式 Detailed ways

对照图1-3对本实用新型的操作使用步骤作进一步说明: Contrasted with Fig. 1-3, the operation steps of the present utility model are further described:

实施例1:一种输电铁塔高空作业平台,包括对称的梯身2和挂钩1;所述对称的梯身2上端设有挂钩1,在对称的梯身2下端连接水平的脚踏板5,在对称的梯身2上分别固定连接套筒,在所述套筒上通过螺纹安装卡住输电塔杆角铁横撑4的安全螺栓3。 Embodiment 1: A power transmission tower aerial work platform, including a symmetrical ladder body 2 and a hook 1; the upper end of the symmetrical ladder body 2 is provided with a hook 1, and a horizontal foot pedal 5 is connected to the lower end of the symmetrical ladder body 2, The connecting sleeves are respectively fixed on the symmetrical ladder bodies 2, and the safety bolts 3 clamping the angle iron cross braces 4 of the transmission tower rods are installed on the sleeves through threads.

本实施例的使用方法:操作者携带该平台登上输电铁塔,将平台的挂钩1挂在输电塔杆上的角铁横撑4上,把两条安全螺栓3分别拧进套筒内,使安全螺栓3的前端头部伸出并卡住输电塔杆上的角铁横撑4下端平面,平台安装可靠,操作者可以登上平台作业。该平台的挂钩1承载着操作者的体重,安全螺栓3可以防止平台上下晃动,始终确保挂钩1可靠地挂在输电塔杆上的角铁横撑4上。检修操作结束,把安全螺栓3拧出来,该平台可以方便的移动或摘下。 The use method of this embodiment: the operator carries the platform to board the power transmission tower, hangs the hook 1 of the platform on the angle iron cross brace 4 on the pole of the power transmission tower, and screws the two safety bolts 3 into the sleeve respectively, so that The front end head of the safety bolt 3 stretches out and blocks the lower end plane of the angle iron cross brace 4 on the transmission tower pole, the platform is installed reliably, and the operator can board the platform for operation. The hook 1 of the platform bears the weight of the operator, and the safety bolt 3 can prevent the platform from shaking up and down, ensuring that the hook 1 is reliably hung on the angle iron cross brace 4 on the transmission tower pole. After the maintenance operation is finished, the safety bolt 3 is unscrewed, and the platform can be easily moved or taken off.

实施例2:一种输电铁塔高空作业平台,包括对称的梯身2和挂钩1;所述对称的梯身2上端设有挂钩1,在对称的梯身2下端连接水平的脚踏板5,在对称的梯身2上分别固定连接套筒,在所述套筒上通过螺纹安装卡住输电塔杆角铁横撑4的安全螺栓3。所述对称的梯身2上设有横梁。 Embodiment 2: A power transmission tower aerial work platform, including a symmetrical ladder body 2 and a hook 1; the upper end of the symmetrical ladder body 2 is provided with a hook 1, and a horizontal foot pedal 5 is connected to the lower end of the symmetrical ladder body 2, The connecting sleeves are respectively fixed on the symmetrical ladder bodies 2, and the safety bolts 3 clamping the angle iron cross braces 4 of the transmission tower rods are installed on the sleeves through threads. The symmetrical ladder body 2 is provided with crossbeams.

本实施例的使用方法:操作者携带该平台登上输电铁塔,将平台的挂钩1挂在输电塔杆上的角铁横撑4上,把两条安全螺栓3分别拧进套筒内,使安全螺栓3的前端头部伸出并卡住输电塔杆上的角铁横撑4下端平面,平台安装可靠,操作者可以登上平台作业。该平台的挂钩1承载着操作者的体重,安全螺栓3可以防止平台上下晃动,始终确保挂钩1可靠地挂在输电塔杆上的角铁横撑4上。检修操作结束,把安全螺栓3拧出来,该平台可以方便的移动或摘下。 The use method of this embodiment: the operator carries the platform to board the power transmission tower, hangs the hook 1 of the platform on the angle iron cross brace 4 on the pole of the power transmission tower, and screws the two safety bolts 3 into the sleeve respectively, so that The front end head of the safety bolt 3 stretches out and blocks the lower end plane of the angle iron cross brace 4 on the transmission tower pole, the platform is installed reliably, and the operator can board the platform for operation. The hook 1 of the platform bears the weight of the operator, and the safety bolt 3 can prevent the platform from shaking up and down, ensuring that the hook 1 is reliably hung on the angle iron cross brace 4 on the transmission tower pole. After the maintenance operation is finished, the safety bolt 3 is unscrewed, and the platform can be easily moved or taken off.

Claims (2)

1. an electric power pylon aerial work platform, is characterized in that: comprise symmetrical terraced body (2) and hook (1); Terraced body (2) upper end of described symmetry is provided with hook (1), connect the foot rest (5) of level in symmetrical terraced body (2) lower end, on symmetrical terraced body (2), be fixedly connected with respectively sleeve, on described sleeve, by screw thread, the breaker bolt (3) that blocks power transmission tower bar angle bar stull (4) be installed.
2. an electric power pylon aerial work platform, is characterized in that: the terraced body (2) of described symmetry is provided with crossbeam.
CN201420121413.0U 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower Expired - Fee Related CN203756015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420121413.0U CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420121413.0U CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Publications (1)

Publication Number Publication Date
CN203756015U true CN203756015U (en) 2014-08-06

Family

ID=51251303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420121413.0U Expired - Fee Related CN203756015U (en) 2014-03-18 2014-03-18 Aerial work platform for power transmission iron tower

Country Status (1)

Country Link
CN (1) CN203756015U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389508A (en) * 2014-11-18 2015-03-04 国网安徽省电力公司阜阳供电公司 High-altitude special operation platform
CN107060632A (en) * 2017-05-15 2017-08-18 国家电网公司 Electric transmission line isolator inspection platform
CN109138574A (en) * 2018-09-29 2019-01-04 国网河北省电力有限公司沧州供电分公司 Telegraph pole tower operation platform and Sign Board installation method
CN112160583A (en) * 2020-09-24 2021-01-01 中冶建设高新工程技术有限责任公司 Fixing device, temporary hanging basket for steel structure installation and vertical ladder
CN113958106A (en) * 2021-11-24 2022-01-21 广东电网有限责任公司 Iron tower operation platform
WO2026031706A1 (en) * 2024-08-07 2026-02-12 中建科工集团有限公司 Climbing ladder structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389508A (en) * 2014-11-18 2015-03-04 国网安徽省电力公司阜阳供电公司 High-altitude special operation platform
CN107060632A (en) * 2017-05-15 2017-08-18 国家电网公司 Electric transmission line isolator inspection platform
CN109138574A (en) * 2018-09-29 2019-01-04 国网河北省电力有限公司沧州供电分公司 Telegraph pole tower operation platform and Sign Board installation method
CN112160583A (en) * 2020-09-24 2021-01-01 中冶建设高新工程技术有限责任公司 Fixing device, temporary hanging basket for steel structure installation and vertical ladder
CN113958106A (en) * 2021-11-24 2022-01-21 广东电网有限责任公司 Iron tower operation platform
WO2026031706A1 (en) * 2024-08-07 2026-02-12 中建科工集团有限公司 Climbing ladder structure

Similar Documents

Publication Publication Date Title
CN203756015U (en) Aerial work platform for power transmission iron tower
CN202031469U (en) Horizontal hanging ladder used for maintenance of overhead transmission line
CN204662383U (en) A kind of draft tube of hydropower station inspection platform
CN204324741U (en) Load switch of transformer suspended core apparatus
CN203736798U (en) Auxiliary pedal for climbing steel pylon
CN203439984U (en) Handjack for pole
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN211422500U (en) A connecting ladder for steel pipe pole climbing
CN206457187U (en) A kind of pole of mounting steel chimney
CN204038917U (en) Detachable external hanging type operating platform
CN203612837U (en) Safety belt fixing device used for crane maintenance
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN203699783U (en) Hanging bracket fixed with wire pole
CN203769402U (en) Steel pipe tower safety climbing and treading device
CN202925471U (en) Hydraulic formwork system for high pier construction
CN201549792U (en) 220 kV transformer maintenance workbench
CN205953375U (en) Can dismantle and tower crane attachment jacking platform of independent assortment
CN205531402U (en) Steel construction temporary remove lattice column butting positioning device
CN203218796U (en) Operation platform for high-altitude line construction
CN204441795U (en) Synthetic insulator outlet bridge
CN203321297U (en) Auxiliary ladder of steel tube tower
CN204012445U (en) Scissors crossing ladder
CN204510797U (en) A kind of hydraulic climbing formwork structure
CN206266130U (en) A kind of hoisting bracket on power transmission tower bar
CN203895804U (en) Multifunctional overhaul platform for isolating switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20200318

CF01 Termination of patent right due to non-payment of annual fee