CN103541573B - A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold - Google Patents
A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold Download PDFInfo
- Publication number
- CN103541573B CN103541573B CN201310350648.7A CN201310350648A CN103541573B CN 103541573 B CN103541573 B CN 103541573B CN 201310350648 A CN201310350648 A CN 201310350648A CN 103541573 B CN103541573 B CN 103541573B
- Authority
- CN
- China
- Prior art keywords
- gas
- cellar
- concrete
- pvc
- basin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention relates to a kind of little water cellar, construction method, biomass pool build in application and special gas mould, just " eight " shape gas sealing port is had in the junction being positioned at concrete cellar for storing things body and entrance of cellar neck, just " eight " shape gas sealing port Feng Youyi dismountable envelope gas basin, leaves one for converging the spill desilting hole that bottom sludge is convenient to clear up bottom the body of concrete cellar for storing things; Adopt cylindrical gas mould to water, efficiently solve punching block, wooden model pouring ordinary concrete method freight volume is large, dress, form removal tool are time-consuming; Bottom is plane and places a circle anti-floating circle in the middle and lower part in hole, stops mortar to flow to bottom and produces buoyancy, solve the difficult problem that gas mould floats, solve the problem being difficult to bottom spherical gas mould stand firm; Bottom pouring is carried out at upper wall and the top of first watering concrete cellar for storing things body again, solves the unsafe difficult problem of water cellar top constructing operation; Water cellar mouth neck place adopts positive eight shape gas sealing ports, improves the accuracy whether little water cellar is airtight.
Description
Technical field
The present invention relates to a kind of little water cellar, construction method, biomass pool build in application and special gas mould.
Background technology
Current little water cellar adopts punching block, wooden model or spherical gas mould to water ordinary concrete mostly, and it is large that punching block, wooden model pouring ordinary concrete method exists freight volume, and especially in ungetable mountain area, very important person carries on the back horse camel, and dress, form removal tool are time-consuming; Spherical or spheroid gas mould is in construction, along with the continuous perfusion of cement mortar, can from bottom produce to lower and buoyancy gas mould up jack-up cause difficulty of construction to strengthen, its formed cellar for storing things body inwall be hyperboloid or justify concave bottom, not only constructor cannot stand, and difficulty of wiping one's face; The little water cellar of tradition is built up rear without detecting seal means, be not easy Timeliness coverage water leakage situation, even if find to leak during examination retaining, also need first water put dry after could keep in repair, wait for that retaining in rainy season is checked again again after maintenance is good, even to wait until that the rainy season of Second Year or longer time could filled with water, not give play to due economic and social benefit in time.
Summary of the invention
The object of this invention is to provide one, the bubble-tight little water cellar of the timely and effective detection of energy, particular manufacturing craft and production method, and this little water cellar concrete cellar for storing things body application in biomass pool is built.
The present invention is achieved in that
A kind of gas mould builds the little water cellar of polymerization concrete inflation inspection formula, comprises concrete cellar for storing things body 16, entrance of cellar lid 9, entrance of cellar neck 8, drainage canal 1, ponding sand trap 3, water inlet 2, PVC water inlet pipe 4, entrance of cellar neck 8 is drum-shaped, be positioned at directly over concrete cellar for storing things body 16 arc ledge 23, entrance of cellar lid 9 covers on entrance of cellar neck 8, for hiding entrance of cellar neck 8, be positioned on the ground above the body 16 of concrete cellar for storing things and excavate drainage canal 1, the delivery port level of ponding sand trap 3 is in entrance of cellar neck 8 top, the delivery port of ponding sand trap 3 is connected with PVC water inlet pipe 4 one end, in the body 16 of other end access concrete cellar for storing things, be positioned at concrete cellar for storing things body 16 and have just " eight " shape gas sealing port 14 with the junction of entrance of cellar neck 8, there is aduncate radian two side, in inverted " basin " shape, just " eight " shape gas sealing port 14 envelope has a dismountable envelope gas basin 13 for closed concrete cellar for storing things body 16 to detect seal, its upper end closed lower ending opening of envelope gas basin 13, the radian of its outer arcuate and just " eight " shape gas sealing port 14 matches, envelope gas basin 13 sidewall is flexible, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, play the effect of fixing envelope gas basin 13, concrete cellar for storing things body 16 is provided with inspection gas tube 5, is provided with air valve 6 and pressure meter 7, for the seal checking concrete to store body 16 in the body 16 of ft connection concrete cellar for storing things, one is left for converging the spill desilting hole 18 that bottom sludge is convenient to clear up bottom the body 16 of concrete cellar for storing things.
Further: described envelope gas basin 13 high-strength plastic feed basin replaces.
Further: be drum-shaped in the middle part of the body 16 of described concrete cellar for storing things, top is the arc ledge 23 be bent upwards, and arc ledge 23 is built-in with stiffener net.
Gas mould builds the utilization of the polymerization concrete inflation little water cellar of inspection formula on building biomass pool: concrete is stored body 16 as a fermentation vat, increases vault hydraulic space, feed pipe, discharge nozzle and deslagging pond just can become biomass pool according to the routine of biomass pool means of building.
Gas mould builds a construction method for the little water cellar of polymerization concrete inflation inspection formula, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter that PVC adds screen cloth inflating mold 17;
Second step, the drum-shaped in hole and flat circular arc intersection, be close on inwall and install a circle anti-floating circle 20;
3rd step, injecting gas in screen cloth inflating mold 17 is added to PVC by gas mould gas tube 10, PVC is made to add screen cloth inflating mold 17 when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold 17 lateral wall and buckle 22, adjustment PVC adds the position of screen cloth inflating mold 17, makes its gas mould charging connector 10 be in top center position, continue to add screen cloth inflating mold 17 topping up gas to PVC, until its pressure reaches pressure needed for the work of building;
4th step, add outside screen cloth inflating mold 17 at PVC and store the surrounding gap location of cheating between wall and insert the symmetrical anti-inclined stake 15 of 2-4 group, the top of anti-inclined stake 15 is above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold 17 to PVC and store to cheat between inwall gap and inject concrete mortar, with this simultaneously, while inject concrete mortar, while anti-inclined stake 15 is slowly extracted out symmetrically towards upper, resist inclined stake 15 all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, then vibrations PVC adds screen cloth inflating mold 17 and utilizes gas impact shock concrete to make its closely knit bubble-free;
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, lay arc ledge reinforcing steel bar net around the upper end face adding screen cloth inflating mold 17 at PVC and make arc ledge 23, and in arc ledge 23, reserve placement air inlet pipe road junction, water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck 8 as concrete cellar for storing things body 16 is placed at the top adding screen cloth inflating mold 17 at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold 17, this PVC is added screen cloth inflating mold 17 and shifts out concrete cellar for storing things body 16, arc ledge 23 is installed into water pipe 4 and inspection gas tube 5, using envelope gas basin 13 basin mouth downwards as mould, just building " eight " shape gas sealing port 14;
8th step, Compressed Gas is blown into concrete cellar for storing things body 16, after confirming that the boil-off gas of self-assembling formation in the body 16 of concrete cellar for storing things is discharged, constructor enters in the body 16 of concrete cellar for storing things and builds middle and lower part and bottom, and is reserved with one in bottom for converging the spill desilting hole 18 that bottom sludge is convenient to clear up.
9th step, after concrete cellar for storing things body 16 is solidifying clearly, with the lower end up jam-pack of pressure testing plug 24 from water inlet pipe 4, thus concrete is stored body 16 and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port 14 is smeared cunning, again envelope gas basin 13 is filled in entrance of cellar neck 8 and also up mention, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, thus envelope gas basin 13 is fixed, whether the examination of sanitary water that falls in the upper entrance of cellar neck 8 in envelope gas basin 13 top leaks gas,
Tenth step, whether when inspection concrete stores the seal of body 16, inject Compressed Gas inspection concrete cellar for storing things body 16 by inspection gas tube 5 and leak gas, leak, if any seepage, open envelope gas basin 13, the person of sending someone enters process to being up to the standards.
Further: described concrete mortar is modified concrete mortar.
Further: described anti-floating circle 20 installs like this: drum and the laterally inserted pouring stake 19 of flat intersection in hole, with adapter sleeve 21, PVC plastic pipe is connected into a circle simultaneously, girth equals hole inwall circumference, anti-floating circle 20 is close to hole inwall and is placed in pouring stake 19, the length of pouring stake 19 is greater than the diameter of PVC plastic pipe, firmly be advisable to insert the soil body, as having gap can level up with earth between anti-floating circle 20 and hole inwall, leak under concrete mortar when preventing from watering and causing gas mould 17 floating.
Further: the diameter of described anti-inclined stake 15 is more than or equal to PVC and adds when screen cloth inflating mold 17 pours into a mould operating pressure and concrete stores gap width between body 16 inwall.
Further: it is the cylindrical airbag be made up of PVC screen cloth that described PVC adds screen cloth inflating mold 17.
The application of concrete cellar for storing things body on building biomass pool that the construction method that gas mould builds the little water cellar of polymerization concrete inflation inspection formula is built out: utilize this construction method to build concrete cellar for storing things body 16 as a fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
Gas mould builds a special gas mould for the little water cellar of polymerization concrete inflation inspection formula, and it is cylindrical airbag that described PVC adds screen cloth inflating mold 17, outer wall is provided with gas modal balancing button 22 2-4 couple for adjustment.
Advantageous Effects:
The present invention adopts the pouring of " cylinder " shape gas mould, efficiently solves punching block, wooden model pouring ordinary concrete method exists freight volume greatly, the problem that dress, form removal tool are time-consuming; Bottom is plane and places a circle anti-floating circle in the middle and lower part in hole, stop mortar to flow to bottom during pouring and produce buoyancy, thus solve the difficult problem that in irrigation process, gas mould floats, solve bottom " ball " shape gas mould simultaneously and be difficult to stand firm, be not easy to the problem of constructing; First the upper wall of concrete cellar for storing things body and top are watered during pouring, then carry out bottom pouring, solve the unsafe difficult problem of top constructing operation of water cellar; Water cellar mouth neck place adopts just " eight " shape gas sealing port, effectively improves water cellar and detects envelope gas efficiency, improve the accuracy whether little water cellar is airtight; The concrete cellar for storing things body that concrete cellar for storing things body of the present invention and the method are produced can be applied to the fermentation vat of biomass pool, and sealing is very good.
Accompanying drawing illustrates:
Fig. 1: be longitudinal sectional view of the present invention;
Fig. 2: top of the present invention longitudinal sectional view;
In figure: 1-drainage canal, 2-water inlet, 3-ponding sand trap, 4-PVC water inlet pipe, 5-checks gas tube, 6-air valve, 7-pressure meter, 8-entrance of cellar neck, 9-entrance of cellar lid, 10-gas mould charging connector, 11-gas basin lift block, 12-gas basin fixed strip, 13-seals gas basin, and 14-is " eight " shape gas sealing port just, and 15-resists inclined stake, 16-concrete cellar for storing things body, 17-PVC adds screen cloth inflating mold, and 18-desilting is cheated, and 19-waters stake, 20-anti-floating circle, 21-adapter sleeve, 22-gas modal balancing button, 23-arc ledge, 24-pressure testing plug.
Detailed description of the invention:
Below in conjunction with accompanying drawing, the present invention will be further described, to facilitate the technical staff to understand.
A kind of gas mould builds the little water cellar of polymerization concrete inflation inspection formula, comprising in the middle part of the body 16 of body 16(concrete cellar for storing things, concrete cellar for storing things is drum-shaped, top is the arc ledge 23 be bent upwards, and arc ledge 23 is built-in with stiffener net), entrance of cellar lid 9, entrance of cellar neck 8, drainage canal 1, ponding sand trap 3, water inlet 2, PVC water inlet pipe 4, entrance of cellar neck 8 is drum-shaped, be positioned at directly over concrete cellar for storing things body 16 arc ledge 23, entrance of cellar lid 9 covers on entrance of cellar neck 8, for hiding entrance of cellar neck 8, be positioned on the ground above the body 16 of concrete cellar for storing things and excavate drainage canal 1, the delivery port level of ponding sand trap 3 is in entrance of cellar neck 8 top, the delivery port of ponding sand trap 3 is connected with PVC water inlet pipe 4 one end, in the body 16 of other end access concrete cellar for storing things, be positioned at concrete cellar for storing things body 16 and have just " eight " shape gas sealing port 14 with the junction of entrance of cellar neck 8, there is aduncate radian two side, in inverted " basin " shape, just " eight " shape gas sealing port 14 envelope has a dismountable envelope gas basin 13 for closed concrete cellar for storing things body 16 to detect seal, its upper end closed lower ending opening of envelope gas basin 13, the radian of its outer arcuate and just " eight " shape gas sealing port 14 matches, envelope gas basin 13 sidewall is flexible, and (available high-strength plastic feed basin replaces, because the object of this envelope gas basin 13 does not allow gas leakage be convenient to inflate the sealing detecting concrete cellar for storing things body 16 for sealing entrance of cellar neck 8, high-strength plastic feed basin replaces commercially can having bought everywhere, cost low elasticity is good, use ideal), envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, play the effect of fixing envelope gas basin 13, concrete cellar for storing things body 16 is provided with inspection gas tube 5, is provided with air valve 6 and pressure meter 7, for the seal checking concrete to store body 16 in the body 16 of ft connection concrete cellar for storing things, one is left for converging the spill desilting hole 18 that bottom sludge is convenient to clear up bottom the body 16 of concrete cellar for storing things,
This gas mould builds the utilization of the polymerization concrete inflation little water cellar of inspection formula on building biomass pool: concrete is stored body 16 as fermentation vat, increases vault hydraulic space, feed pipe, discharge nozzle and deslagging pond just can become biomass pool according to the routine of biomass pool means of building;
This gas mould builds the construction method of the little water cellar of polymerization concrete inflation inspection formula, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter (gap between them will be filled up with concrete mortar, form the sidewall of little water cellar concrete cellar for storing things body) that PVC adds screen cloth inflating mold 17;
Second step, drum-shaped in hole and flat circular arc intersection, being close to Main Function inwall being installed a circle anti-floating circle 20(anti-floating circle 20 is in the process of placing of concrete mortar, block concrete mortar to flow to the bottom that PVC adds screen cloth inflating mold and produce huge buoyancy, whole PVC is added screen cloth inflating mold up push up, and concrete mortar is constantly filled out bottom and is caused waste, the volume of water cellar is also had a greatly reduced quality, anti-floating circle 20 has been had to block concrete mortar, just first concrete can be stored the first half completion of processing of body, air bag is removed, reprocessing middle and lower part and bottom, thus overcome the not easy working difficult problem in top), anti-floating circle 20 can be installed like this: drum and the laterally inserted pouring stake 19 of flat intersection in hole, with adapter sleeve 21, PVC plastic pipe is connected into a circle simultaneously, girth equals hole inwall circumference, anti-floating circle 20 is close to hole inwall and is placed in pouring stake 19, the length of pouring stake 19 is greater than the diameter of PVC plastic pipe, firmly be advisable to insert the soil body, as having gap can level up with earth between anti-floating circle 20 and hole inwall, leak under concrete mortar when preventing from watering and causing gas mould 17 floating.
3rd step, injecting gas in screen cloth inflating mold 17 (it is the cylindrical airbag be made up of PVC screen cloth that PVC adds screen cloth inflating mold 17) is added to PVC by gas mould gas tube 10, PVC is made to add screen cloth inflating mold 17 when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold 17 lateral wall and buckle 22, adjustment PVC adds the position of screen cloth inflating mold 17, its gas mould charging connector 10 is made to be in top center position, continue to add screen cloth inflating mold 17 topping up gas to PVC, until its pressure reaches pressure needed for the work of building;
4th step, add screen cloth inflating mold at anti-inclined stake 15(PVC in the process of placing of concrete mortar that PVC adds outside screen cloth inflating mold 17 and the cellar for storing things surrounding gap location of cheat between wall inserts 2-4 group symmetry can offset, the object of anti-inclined stake overcomes this problem exactly), the diameter of anti-inclined stake 15 is more than or equal to PVC and adds screen cloth inflating mold 17 and concrete and store gap width between body 16 inwall, resists the top of inclined stake 15 to be above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold 17 to PVC and store to cheat between inwall gap and inject concrete mortar (available modified concrete mortar reduces mortar consumption with this and improves the quality of products), with this simultaneously, while inject concrete mortar, while inclined stake 15 will be resisted slowly to extract out (preventing PVC from adding the skew of screen cloth inflating mold) symmetrically towards upper, with this simultaneously, while inject concrete mortar, while anti-inclined stake 15 is slowly extracted out symmetrically towards upper, inclined stake 15 is resisted all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, then shake PVC to add screen cloth inflating mold 17 and utilize gas impact shock concrete to make its closely knit bubble-free,
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, lay arc ledge reinforcing steel bar net (reinforcing) around the upper end face adding screen cloth inflating mold 17 at PVC and make arc ledge 23, and in arc ledge 23, reserve placement air inlet pipe road junction, water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck 8 as concrete cellar for storing things body 16 is placed at the top adding screen cloth inflating mold 17 at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold 17, this PVC is added screen cloth inflating mold 17 and shifts out concrete cellar for storing things body 16, arc ledge 23 is installed into water pipe 4 and inspection gas tube 5, using envelope gas basin 13 basin mouth downwards as mould, just building " eight " shape gas sealing port 14;
8th step, Compressed Gas is blown into concrete cellar for storing things body 16, confirm that the boil-off gas of self-assembling formation in the body 16 of concrete cellar for storing things (can produce a large amount of gas in concrete mortar sweat after having discharged, temperature is very high, be unfavorable for construction), constructor enter concrete cellar for storing things body 16 in build middle and lower part and bottom, and be reserved with in bottom one for converge bottom sludge be convenient to clear up spill desilting hole 18(allow mud concentrate in hole, be convenient to cleaning).
9th step, after concrete cellar for storing things body 16 is solidifying clearly, with the lower end up jam-pack of pressure testing plug 24 from water inlet pipe 4, thus concrete is stored body 16 and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port 14 is smeared sliding (being convenient to sealing), again envelope gas basin 13 is filled in entrance of cellar neck 8 and also up mention, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, thus envelope gas basin 13 is fixed, whether the examination of sanitary water that falls in the upper entrance of cellar neck 8 in envelope gas basin 13 top leaks gas,
Tenth step, whether when inspection concrete stores the seal of body 16, inject Compressed Gas inspection concrete cellar for storing things body 16 by inspection gas tube 5 and leak gas, leak, if any seepage, open envelope gas basin 13, the person of sending someone enters process to being up to the standards.
The application of concrete cellar for storing things body on building biomass pool that the construction method that gas mould builds the little water cellar of polymerization concrete inflation inspection formula is built out: utilize this construction method to build concrete cellar for storing things body 16 as a fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
Gas mould builds a special inflating mold for the little water cellar of polymerization concrete inflation inspection formula, and it is cylindrical airbag that described PVC adds screen cloth inflating mold 17, outer wall is provided with gas modal balancing button 22 2-4 couple for adjustment.
Embodiment 1: a kind of gas mould builds the little water cellar of polymerization concrete inflation inspection formula, comprises concrete cellar for storing things body 16, entrance of cellar lid 9, entrance of cellar neck 8, drainage canal 1, ponding sand trap 3, water inlet 2, PVC water inlet pipe 4, entrance of cellar neck 8 is drum-shaped, concrete cellar for storing things body 16 is spheroidal, be positioned at directly over concrete cellar for storing things body 16 arc ledge 23, entrance of cellar lid 9 covers on entrance of cellar neck 8, for hiding entrance of cellar neck 8, be positioned on the ground above the body 16 of concrete cellar for storing things and excavate drainage canal 1, the delivery port level of ponding sand trap 3 is in entrance of cellar neck 8 top, the delivery port of ponding sand trap 3 is connected with PVC water inlet pipe 4 one end, in the body 16 of other end access concrete cellar for storing things, be positioned at concrete cellar for storing things body 16 and have just " eight " shape gas sealing port 14 with the junction of entrance of cellar neck 8, there is aduncate radian two side, in inverted " basin " shape, just " eight " shape gas sealing port 14 envelope has a dismountable envelope gas basin 13 for closed concrete cellar for storing things body 16 to detect seal, its upper end closed lower ending opening of envelope gas basin 13, the radian of its outer arcuate and just " eight " shape gas sealing port 14 matches, envelope gas basin 13 sidewall is flexible, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, play the effect of fixing envelope gas basin 13, concrete cellar for storing things body 16 is provided with inspection gas tube 5, is provided with air valve 6 and pressure meter 7, for the seal checking concrete to store body 16 in the body 16 of ft connection concrete cellar for storing things, one is left for converging the spill desilting hole 18 that bottom sludge is convenient to clear up bottom the body 16 of concrete cellar for storing things.
Embodiment 2: described in embodiment 1, concrete cellar for storing things body 16 is irregular cubes, and remainder is identical.
Embodiment 3: be drum-shaped in the middle part of concrete cellar for storing things body 16 described in embodiment 1-2, top is the arc ledge 23 be bent upwards, and arc ledge 23 is built-in with stiffener net, and remainder is identical.
Embodiment 4: the high-strength plastic feed basin of the envelope gas basin 13 described in embodiment 1-3 replaces, and remainder is identical.
Embodiment 5: the gas mould described in embodiment 1-4 is built high-performance polymerization concrete inflation inspection formula little water cellar concrete cellar for storing things body, concrete is stored body 16 as fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
Embodiment 6: a kind of gas mould builds the construction method of the little water cellar of polymerization concrete inflation inspection formula, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter that PVC adds screen cloth inflating mold 17;
Second step, the drum-shaped in hole and flat circular arc intersection, be close on inwall and install a circle anti-floating circle 20;
3rd step, injecting gas in screen cloth inflating mold 17 is added to PVC by gas mould gas tube 10, PVC is made to add screen cloth inflating mold 17 when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold 17 lateral wall and buckle 22, adjustment PVC adds the position of screen cloth inflating mold 17, makes its gas mould charging connector 10 be in top center position, continue to add screen cloth inflating mold 17 topping up gas to PVC, until its pressure reaches pressure needed for the work of building;
4th step, add outside screen cloth inflating mold 17 at PVC and store the anti-inclined stake 15 that the surrounding gap location of cheating between wall inserts 2 groups of symmetries, the top of anti-inclined stake 15 is above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold 17 to PVC and store to cheat between inwall gap and inject concrete mortar, with this simultaneously, while inject concrete mortar, while anti-inclined stake 15 is slowly extracted out symmetrically towards upper, resist inclined stake 15 all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, then vibrations PVC adds screen cloth inflating mold 17 and utilizes gas impact shock concrete to make its closely knit bubble-free;
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, lay arc ledge reinforcing steel bar net around the upper end face adding screen cloth inflating mold 17 at PVC and make arc ledge 23, and in arc ledge 23, reserve placement air inlet pipe road junction, water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck 8 as concrete cellar for storing things body 16 is placed at the top adding screen cloth inflating mold 17 at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold 17, this PVC is added screen cloth inflating mold 17 and shifts out concrete cellar for storing things body 16, arc ledge 23 is installed into water pipe 4 and inspection gas tube 5, using envelope gas basin 13 basin mouth downwards as mould, just building " eight " shape gas sealing port 14;
8th step, Compressed Gas is blown into concrete cellar for storing things body 16, after confirming that the boil-off gas of self-assembling formation in the body 16 of concrete cellar for storing things is discharged, constructor enters in the body 16 of concrete cellar for storing things and builds middle and lower part and bottom, and is reserved with one in bottom for converging the spill desilting hole 18 that bottom sludge is convenient to clear up.
9th step, after concrete cellar for storing things body 16 is solidifying clearly, with the lower end up jam-pack of pressure testing plug 24 from water inlet pipe 4, thus concrete is stored body 16 and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port 14 is smeared cunning, again envelope gas basin 13 is filled in entrance of cellar neck 8 and also up mention, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, thus envelope gas basin 13 is fixed, whether the examination of sanitary water that falls in the upper entrance of cellar neck 8 in envelope gas basin 13 top leaks gas,
Tenth step, whether when inspection concrete stores the seal of body 16, inject Compressed Gas inspection concrete cellar for storing things body 16 by inspection gas tube 5 and leak gas, leak, if any seepage, open envelope gas basin 13, the person of sending someone enters process to being up to the standards.
Embodiment 7: a kind of gas mould builds the construction method of the little water cellar of polymerization concrete inflation inspection formula, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter that PVC adds screen cloth inflating mold 17;
Second step, the drum-shaped in hole and flat circular arc intersection, be close on inwall and install a circle anti-floating circle 20;
3rd step, injecting gas in screen cloth inflating mold 17 is added to PVC by gas mould gas tube 10, PVC is made to add screen cloth inflating mold 17 when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold 17 lateral wall and buckle 22, adjustment PVC adds the position of screen cloth inflating mold 17, makes its gas mould charging connector 10 be in top center position, continue to add screen cloth inflating mold 17 topping up gas to PVC, until its pressure reaches pressure needed for the work of building;
4th step, add outside screen cloth inflating mold 17 at PVC and store the anti-inclined stake 15 that the surrounding gap location of cheating between wall inserts 4 groups of symmetries, the top of anti-inclined stake 15 is above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold 17 to PVC and store to cheat between inwall gap and inject concrete mortar, with this simultaneously, while inject concrete mortar, while anti-inclined stake 15 is slowly extracted out symmetrically towards upper, resist inclined stake 15 all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, then vibrations PVC adds screen cloth inflating mold 17 and utilizes gas impact shock concrete to make its closely knit bubble-free;
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, lay arc ledge reinforcing steel bar net around the upper end face adding screen cloth inflating mold 17 at PVC and make arc ledge 23, and in arc ledge 23, reserve placement air inlet pipe road junction, water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck 8 as concrete cellar for storing things body 16 is placed at the top adding screen cloth inflating mold 17 at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold 17, this PVC is added screen cloth inflating mold 17 and shifts out concrete cellar for storing things body 16, arc ledge 23 is installed into water pipe 4 and inspection gas tube 5, using envelope gas basin 13 basin mouth downwards as mould, just building " eight " shape gas sealing port 14;
8th step, Compressed Gas is blown into concrete cellar for storing things body 16, after confirming that the boil-off gas of self-assembling formation in the body 16 of concrete cellar for storing things is discharged, constructor enters in the body 16 of concrete cellar for storing things and builds middle and lower part and bottom, and is reserved with one in bottom for converging the spill desilting hole 18 that bottom sludge is convenient to clear up.
9th step, after concrete cellar for storing things body 16 is solidifying clearly, with the lower end up jam-pack of pressure testing plug 24 from water inlet pipe 4, thus concrete is stored body 16 and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port 14 is smeared cunning, again envelope gas basin 13 is filled in entrance of cellar neck 8 and also up mention, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, thus envelope gas basin 13 is fixed, whether the examination of sanitary water that falls in the upper entrance of cellar neck 8 in envelope gas basin 13 top leaks gas,
Tenth step, whether when inspection concrete stores the seal of body 16, inject Compressed Gas inspection concrete cellar for storing things body 16 by inspection gas tube 5 and leak gas, leak, if any seepage, open envelope gas basin 13, the person of sending someone enters process to being up to the standards.
Embodiment 8: a kind of gas mould builds the construction method of the little water cellar of polymerization concrete inflation inspection formula, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter that PVC adds screen cloth inflating mold 17;
Second step, the drum-shaped in hole and flat circular arc intersection, be close on inwall and install a circle anti-floating circle 20;
3rd step, injecting gas in screen cloth inflating mold 17 is added to PVC by gas mould gas tube 10, PVC is made to add screen cloth inflating mold 17 when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold 17 lateral wall and buckle 22, adjustment PVC adds the position of screen cloth inflating mold 17, makes its gas mould charging connector 10 be in top center position, continue to add screen cloth inflating mold 17 topping up gas to PVC, until its pressure reaches pressure needed for the work of building;
4th step, add outside screen cloth inflating mold 17 at PVC and store the anti-inclined stake 15 that the surrounding gap location of cheating between wall inserts 3 groups of symmetries, the top of anti-inclined stake 15 is above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold 17 to PVC and store to cheat between inwall gap and inject concrete mortar, with this simultaneously, while inject concrete mortar, while anti-inclined stake 15 is slowly extracted out symmetrically towards upper, resist inclined stake 15 all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, then vibrations PVC adds screen cloth inflating mold 17 and utilizes gas impact shock concrete to make its closely knit bubble-free;
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold 17 and upper end face junction to PVC, lay arc ledge reinforcing steel bar net around the upper end face adding screen cloth inflating mold 17 at PVC and make arc ledge 23, and in arc ledge 23, reserve placement air inlet pipe road junction, water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck 8 as concrete cellar for storing things body 16 is placed at the top adding screen cloth inflating mold 17 at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold 17, this PVC is added screen cloth inflating mold 17 and shifts out concrete cellar for storing things body 16, arc ledge 23 is installed into water pipe 4 and inspection gas tube 5, using envelope gas basin 13 basin mouth downwards as mould, just building " eight " shape gas sealing port 14;
8th step, Compressed Gas is blown into concrete cellar for storing things body 16, after confirming that the boil-off gas of self-assembling formation in the body 16 of concrete cellar for storing things is discharged, constructor enters in the body 16 of concrete cellar for storing things and builds middle and lower part and bottom, and is reserved with one in bottom for converging the spill desilting hole 18 that bottom sludge is convenient to clear up.
9th step, after concrete cellar for storing things body 16 is solidifying clearly, with the lower end up jam-pack of pressure testing plug 24 from water inlet pipe 4, thus concrete is stored body 16 and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port 14 is smeared cunning, again envelope gas basin 13 is filled in entrance of cellar neck 8 and also up mention, envelope gas basin 13 top is connected with gas basin lift block 11 and gas basin fixed strip 12, gas basin fixed strip 12 is fixed on envelope gas basin 13 by gas basin lift block 11 and pushes up, the two ends of gas basin fixed strip 12 are just riding on the flat bank of " eight " shape gas sealing port 14, thus envelope gas basin 13 is fixed, whether the examination of sanitary water that falls in the upper entrance of cellar neck 8 in envelope gas basin 13 top leaks gas,
Tenth step, whether when inspection concrete stores the seal of body 16, inject Compressed Gas inspection concrete cellar for storing things body 16 by inspection gas tube 5 and leak gas, leak, if any seepage, open envelope gas basin 13, the person of sending someone enters process to being up to the standards.
Embodiment 9: concrete mortar described in embodiment 6-8 is modified concrete mortar, and remainder is identical.
Embodiment 10: described in embodiment 6-9, anti-floating circle 20 can be installed like this: drum and the laterally inserted pouring stake 19 of flat intersection in hole, with adapter sleeve 21, PVC plastic pipe is connected into a circle simultaneously, girth equals hole inwall circumference, anti-floating circle 20 is close to hole inwall and is placed in pouring stake 19, the length of pouring stake 19 is greater than the diameter of PVC plastic pipe, firmly be advisable to insert the soil body, as having gap can level up with earth between anti-floating circle 20 and hole inwall, leaking under concrete mortar when preventing from watering causes gas mould 17 floating, and remainder is identical.
Embodiment 11: the diameter of anti-inclined stake 15 described in embodiment 6-9 is more than or equal to PVC and adds screen cloth inflating mold 17 and water operating pressure and concrete and store gap width between body 16 inwall.
Embodiment 12: it is the cylindrical airbag be made up of PVC screen cloth that PVC described in embodiment 6-11 adds screen cloth inflating mold 17.
Embodiment 13: a kind of gas mould builds the utilization of construction method on biomass pool of the little water cellar of polymerization concrete inflation inspection formula: utilize this construction method to build concrete cellar for storing things body 16 as fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
Embodiment 14: a kind of gas mould builds the special inflating mold of the little water cellar of polymerization concrete inflation inspection formula, and it is cylindrical airbag that described PVC adds screen cloth inflating mold 17, and the gas modal balancing button 22 2 outer wall is provided with for adjustment is right.
Embodiment 15: a kind of gas mould builds the special inflating mold of the little water cellar of polymerization concrete inflation inspection formula, and it is cylindrical airbag that described PVC adds screen cloth inflating mold 17, outer wall is provided with for regulating the gas modal balancing button 4 of gas modal balancing right.
Embodiment 16: a kind of gas mould builds the special inflating mold of the little water cellar of polymerization concrete inflation inspection formula, and it is cylindrical airbag that described PVC adds screen cloth inflating mold 17, and the gas modal balancing button 22 3 outer wall is provided with for adjustment is right.
The present invention is described by accompanying drawing, without departing from the present invention, various conversion and equivalent replacement can also be carried out to patent of the present invention, therefore, patent of the present invention is not limited to disclosed specific implementation process, and should comprise the whole embodiments fallen within the scope of Patent right requirement of the present invention.
Claims (11)
1. gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, comprises concrete cellar for storing things body (16), entrance of cellar lid (9), entrance of cellar neck (8), drainage canal (1), ponding sand trap (3), water inlet (2), PVC water inlet pipe (4), entrance of cellar neck (8) is drum-shaped, be positioned at directly over concrete cellar for storing things body (16) arc ledge (23), entrance of cellar lid (9) covers on entrance of cellar neck (8), for hiding entrance of cellar neck (8), be positioned on the ground above concrete cellar for storing things body (16) and excavate drainage canal (1), the delivery port level of ponding sand trap (3) is in entrance of cellar neck (8) top, the delivery port of ponding sand trap (3) is connected with PVC water inlet pipe (4) one end, in other end access concrete cellar for storing things body (16), it is characterized in that, be positioned at concrete cellar for storing things body (16) and have just " eight " shape gas sealing port (14) with the junction of entrance of cellar neck (8), there is aduncate radian two side, in inverted " basin " shape, just " eight " shape gas sealing port (14) Feng Youyi dismountable envelope gas basin (13) stores body (16) to detect seal for closed concrete, envelope gas basin (13) its upper end closed lower ending opening, the radian of its outer arcuate and just " eight " shape gas sealing port (14) matches, envelope gas basin (13) sidewall is flexible, envelope gas basin (13) top is connected with gas basin lift block (11) and gas basin fixed strip (12), gas basin fixed strip (12) is fixed on envelope gas basin (13) top by gas basin lift block (11), the two ends of gas basin fixed strip (12) are just riding on the flat bank of " eight " shape gas sealing port (14), play the effect of fixing envelope gas basin (13), concrete cellar for storing things body (16) is provided with inspection gas tube (5), in ft connection concrete cellar for storing things body (16), be provided with air valve (6) and pressure meter (7), for checking the seal of concrete cellar for storing things body (16), one is left for converging spill desilting hole (18) that bottom sludge is convenient to clear up in concrete cellar for storing things body (16) bottom.
2. a kind of gas mould according to claim 1 builds the little water cellar of high-performance polymerization concrete inflation inspection formula, and it is characterized in that, described envelope gas basin (13) replaces with high-strength plastic feed basin.
3. a kind of gas mould according to claim 1 builds the little water cellar of high-performance polymerization concrete inflation inspection formula, it is characterized in that, described concrete cellar for storing things body (16) middle part is drum-shaped, and top is the arc ledge (23) be bent upwards, and arc ledge (23) is built-in with stiffener net.
4. a kind of gas mould as described in claim 1,2,3 any one builds the utilization of the high-performance polymerization concrete inflation little water cellar of inspection formula on building biomass pool, it is characterized in that, concrete is stored body (16) as fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
5. a kind of gas mould as claimed in claim 1 builds the construction method of the little water cellar of high-performance polymerization concrete inflation inspection formula, it is characterized in that, comprises the following steps:
The first step, select to excavate at Around the house or in the place of hypsography low-lying, after reaching depth requirements, hole is trimmed to flat, drum-shaped, its diameter is greater than the diameter that PVC adds screen cloth inflating mold (17);
Second step, the drum-shaped in hole and flat circular arc intersection, be close on inwall and install circle anti-floating circle (20);
3rd step, screen cloth inflating mold (17) interior injecting gas is added to PVC by gas mould charging connector (10), PVC is made to add screen cloth inflating mold (17) when having a definite shape, put it in hole, move by the stock hook of buckle the gas modal balancing that PVC adds on screen cloth inflating mold (17) lateral wall to buckle (22), adjustment PVC adds the position of screen cloth inflating mold (17), its gas mould charging connector (10) is made to be in top center position, continue to add screen cloth aerated film (17) topping up gas to PVC, until its pressure reaches the pressure needed for the work of building;
4th step, add screen cloth inflating mold (17) outside at PVC and store the surrounding gap location of cheating between wall and insert the symmetrical anti-inclined stake (15) of 2-4 group, the top of anti-inclined stake (15) is above the ground level and is convenient to extract;
5th step, add screen cloth inflating mold (17) to PVC and store to cheat between inwall gap and inject concrete mortar, with this simultaneously, while inject concrete mortar, while inclined stake (15) will be resisted slowly to extract out symmetrically towards upper, resist inclined stake (15) all to extract out when concrete mortar note adds the cylinder side wall of screen cloth inflating mold (17) and upper end face junction to PVC, then vibrations PVC adds screen cloth inflating mold (17) and utilizes gas impact shock concrete to make its closely knit bubble-free;
6th step, when concrete mortar note adds the cylinder side wall of screen cloth inflating mold (17) and upper end face junction to PVC, lay arc ledge reinforcing steel bar net around the upper end face adding screen cloth inflating mold (17) at PVC and make arc ledge (23), and at the upper reserved placement air inlet pipe road junction of arc ledge (23), water inlet pipe road junction, the opening of entrance of cellar eck mould making entrance of cellar neck (8) as concrete cellar for storing things body (16) is placed at the top adding screen cloth inflating mold (17) at PVC;
7th step, extraction PVC adds the gas in screen cloth inflating mold (17), this PVC is added screen cloth inflating mold (17) and shift out concrete cellar for storing things body (16), arc ledge (23) is installed into water pipe (4) and inspection gas tube (5), using envelope gas basin (13) basin mouth downwards as mould, just building " eight " shape gas sealing port (14);
8th step, Compressed Gas is blown into concrete cellar for storing things body (16), after confirming that the boil-off gas of concrete cellar for storing things body (16) interior self-assembling formation is discharged, constructor enters in concrete cellar for storing things body (16) and builds middle and lower part and bottom, and is reserved with one in bottom for converging spill desilting hole (18) that bottom sludge is convenient to clear up;
9th step, after concrete cellar for storing things body (16) is solidifying clearly, with the lower end up jam-pack of pressure testing plug (24) from water inlet pipe (4), thus concrete is stored body (16) and block, after unmanned in confirmation cellar for storing things, with thickness mud, just " eight " shape gas sealing port (14) is smeared cunning, again envelope gas basin (13) is filled in entrance of cellar neck (8) and also up mention, envelope gas basin (13) top is connected with gas basin lift block (11) and gas basin fixed strip (12), gas basin fixed strip (12) is fixed on envelope gas basin (13) top by gas basin lift block (11), the two ends of gas basin fixed strip (12) are just riding on the flat bank of " eight " shape gas sealing port (14), thus envelope gas basin (13) is fixed, whether the examination of sanitary water that falls in entrance of cellar neck (8) on envelope gas basin (13) top leaks gas,
Whether tenth step, when inspection concrete stores the seal of body (16), inject Compressed Gas inspection concrete cellar for storing things body (16) leak gas, leak by inspection gas tube (5), if any seepage, open and seal gas basin (13), the person of sending someone enters process to being up to the standards.
6. a kind of gas mould according to claim 5 builds the construction method of the little water cellar of high-performance polymerization concrete inflation inspection formula, and it is characterized in that, described concrete mortar is modified concrete mortar.
7. a kind of gas mould according to claim 5 builds the construction method of the little water cellar of high-performance polymerization concrete inflation inspection formula, it is characterized in that, described anti-floating circle (20) is installed like this: drum and the laterally inserted pouring stake (19) of flat intersection in hole, use adapter sleeve (21) that PVC plastic pipe is connected into a circle simultaneously, girth equals hole inwall circumference, anti-floating circle (20) is close to hole inwall and is placed in pouring stake (19), the length of pouring stake (19) is greater than the diameter of PVC plastic pipe, firmly be advisable to insert the soil body, as having gap can level up with earth between anti-floating circle (20) and hole inwall, leak under concrete mortar when preventing pouring that to cause PVC to add screen cloth inflating mold (17) floating.
8. a kind of gas mould according to claim 5 builds the construction method of the little water cellar of high-performance polymerization concrete inflation inspection formula, it is characterized in that, the diameter of described anti-inclined stake (15) is more than or equal to when PVC adds screen cloth inflating mold (17) cast operating pressure and concrete stores gap width between body (16) inwall.
9. a kind of gas mould according to claim 5 builds the construction method of the little water cellar of high-performance polymerization concrete inflation inspection formula, and it is characterized in that, it is the cylindrical airbag be made up of PVC screen cloth that described PVC adds screen cloth inflating mold (17).
10. as described in claim 5,6,7,8,9 any one, store the application of body on building biomass pool with the concrete that the construction method that a kind of gas mould builds the little water cellar of polymerization concrete inflation inspection formula is built out, it is characterized in that, utilize this construction method to build concrete cellar for storing things body (16) as fermentation vat, increase vault hydraulic space, feed pipe, discharge nozzle and deslagging pond according to the routine of biomass pool means of building and just can become biomass pool.
11. build the special inflating mold that a kind of gas mould according to claim 1 builds the little water cellar of polymerization concrete inflation inspection formula, it is characterized in that, it is cylindrical airbag that described PVC adds screen cloth inflating mold (17), outer wall is provided with gas modal balancing button (22) 2-4 couple for adjustment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310350648.7A CN103541573B (en) | 2013-08-13 | 2013-08-13 | A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310350648.7A CN103541573B (en) | 2013-08-13 | 2013-08-13 | A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103541573A CN103541573A (en) | 2014-01-29 |
CN103541573B true CN103541573B (en) | 2015-09-09 |
Family
ID=49965392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310350648.7A Active CN103541573B (en) | 2013-08-13 | 2013-08-13 | A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103541573B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121235A (en) * | 2016-08-29 | 2016-11-16 | 刘安华 | The method of construction of a kind of little water cellar and application |
CN106545030B (en) * | 2016-09-30 | 2018-11-16 | 泰宏建设发展有限公司 | Small-sized buried reservoir of one kind and preparation method thereof |
CN112482857B (en) * | 2020-10-14 | 2022-09-13 | 上海建工二建集团有限公司 | Silo, silo top construction method thereof and air bag type formwork system of silo top |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5997397A (en) * | 1982-11-26 | 1984-06-05 | Kawaju Koji Kk | Double shell low temperature tank insulation material re-filling method and device |
FR2629470A1 (en) * | 1988-04-01 | 1989-10-06 | Bec Freres Sa | Process for recovering the fuel gases produced by liquid-phase anaerobic fermentation of organic materials and fermenters for implementing this process |
EP0270459B1 (en) * | 1986-12-02 | 1992-10-21 | Valorga Process Sa | Process and installation for the production of a biogas |
CN2398338Y (en) * | 1999-04-28 | 2000-09-27 | 刘安华 | Multilayer composite plastic film water container |
CN2576666Y (en) * | 2002-09-10 | 2003-10-01 | 刘杰 | Combined water cellar |
CN101021106A (en) * | 2007-02-28 | 2007-08-22 | 兰州大学 | Integrated water pit constituting method |
CN101319580A (en) * | 2008-07-04 | 2008-12-10 | 西北农林科技大学 | Construction method for building water storage facilities by using soil solidification material |
CN101736775A (en) * | 2010-01-15 | 2010-06-16 | 石钰漳 | Rainwater collection and purification method and device thereof |
CN101831380A (en) * | 2010-04-16 | 2010-09-15 | 保定广顺化纤工业有限公司 | Cylindrical plastic methane generator |
CN102839718A (en) * | 2011-06-24 | 2012-12-26 | 北京仁创科技集团有限公司 | Water storage device |
-
2013
- 2013-08-13 CN CN201310350648.7A patent/CN103541573B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5997397A (en) * | 1982-11-26 | 1984-06-05 | Kawaju Koji Kk | Double shell low temperature tank insulation material re-filling method and device |
EP0270459B1 (en) * | 1986-12-02 | 1992-10-21 | Valorga Process Sa | Process and installation for the production of a biogas |
FR2629470A1 (en) * | 1988-04-01 | 1989-10-06 | Bec Freres Sa | Process for recovering the fuel gases produced by liquid-phase anaerobic fermentation of organic materials and fermenters for implementing this process |
CN2398338Y (en) * | 1999-04-28 | 2000-09-27 | 刘安华 | Multilayer composite plastic film water container |
CN2576666Y (en) * | 2002-09-10 | 2003-10-01 | 刘杰 | Combined water cellar |
CN101021106A (en) * | 2007-02-28 | 2007-08-22 | 兰州大学 | Integrated water pit constituting method |
CN101319580A (en) * | 2008-07-04 | 2008-12-10 | 西北农林科技大学 | Construction method for building water storage facilities by using soil solidification material |
CN101736775A (en) * | 2010-01-15 | 2010-06-16 | 石钰漳 | Rainwater collection and purification method and device thereof |
CN101831380A (en) * | 2010-04-16 | 2010-09-15 | 保定广顺化纤工业有限公司 | Cylindrical plastic methane generator |
CN102839718A (en) * | 2011-06-24 | 2012-12-26 | 北京仁创科技集团有限公司 | Water storage device |
Also Published As
Publication number | Publication date |
---|---|
CN103541573A (en) | 2014-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758147B (en) | A kind of gravity type offshore wind crew base and towage thereof and sinking method | |
CN209145612U (en) | A kind of anti-floating type section of jurisdiction for shield tunnel | |
CN204703956U (en) | A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain | |
CN103541573B (en) | A kind of gas mould builds the little water cellar of high-performance polymerization concrete inflation inspection formula, construction method, application and special inflating mold | |
CN102587715B (en) | Device and method for quickly constructing small water cellar | |
CN103590415A (en) | Prefabricated bearing platform suitable for large-diameter tubular column foundation of sea bridge and construction method thereof | |
CN106677257A (en) | Installation process of sinking pipe for offshore water intake and discharge in power plant | |
CN202466631U (en) | Prefabricated reinforced concrete inspection well and die thereof | |
CN106522263B (en) | A kind of wind-powered electricity generation complete machine construction method of four bucket foundations and concrete support structure | |
CN208830261U (en) | It is a kind of for constructing the prefabricated block structure of earth and rockfill dam ecological slope protection | |
CN205296100U (en) | Husky equipment is arranged in reservoir segmentation | |
CN204163116U (en) | For the mud capsule of diaphragm wall header space packing | |
CN102425182A (en) | Annular negative pressure foundation cofferdam and construction method thereof | |
CN108239919B (en) | The device and construction method of a kind of underwater cushion cap, the underwater cushion cap of building | |
CN203403715U (en) | Air formwork pouring high-performance polymeric concrete inflating inspection small water cellar | |
CN113982342A (en) | Concrete waterproof structure for pool | |
CN202116553U (en) | Gas collecting hood device of methane generating pit | |
CN107318613A (en) | Water-collecting infiltrating irrigator | |
CN208917821U (en) | The shoe of oscillatory type board-plugging device and plastic draining board insert mechanism | |
CN202012090U (en) | Glass fiber reinforced plastic well body | |
CN104060635B (en) | The underground structure anti-floating power construction method closed | |
CN207073150U (en) | A kind of buffer-type plastic inspection well | |
CN205503183U (en) | Formula of covering delivery port structure in tunnel heat preservation escape canal | |
CN106284506A (en) | A kind of silt arrester water resource storing facilities of water | |
CN205935052U (en) | Floating small -size pump station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |