CN102425182A - Annular negative pressure foundation cofferdam and construction method thereof - Google Patents

Annular negative pressure foundation cofferdam and construction method thereof Download PDF

Info

Publication number
CN102425182A
CN102425182A CN2011103923630A CN201110392363A CN102425182A CN 102425182 A CN102425182 A CN 102425182A CN 2011103923630 A CN2011103923630 A CN 2011103923630A CN 201110392363 A CN201110392363 A CN 201110392363A CN 102425182 A CN102425182 A CN 102425182A
Authority
CN
China
Prior art keywords
cofferdam
negative
pressure foundation
annular
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103923630A
Other languages
Chinese (zh)
Other versions
CN102425182B (en
Inventor
荣洪宝
徐江
周永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina New Energy Group Co Ltd
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN201110392363.0A priority Critical patent/CN102425182B/en
Publication of CN102425182A publication Critical patent/CN102425182A/en
Application granted granted Critical
Publication of CN102425182B publication Critical patent/CN102425182B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to an annular negative pressure foundation cofferdam and a construction method thereof. The invention aims to provide the annular negative pressure foundation cofferdam which is low in investment, easy and convenient to construct, and safe and convenient and the construction method for the annular negative pressure foundation cofferdam. According to the technical scheme, the annular negative pressure foundation cofferdam is characterized in that: at least two negative pressure foundation structures are connected end to end through a connecting piece to form a closed annular structure, and the single negative pressure foundation structure is spliced into a section of circular arc of the annular structure by at least one bucket foundation. The cofferdam is suitable for a temporary surrounding structure required by offshore wind turbine foundation construction.

Description

A kind of annular negative-pressure foundation cofferdam and job practices thereof
Technical field
The present invention relates to a kind of annular negative-pressure foundation cofferdam and job practices thereof.Be applicable to the interim enclosing body structure that the foundation construction of offshore wind farm unit is required.
Background technology
In China, the Oversea wind power generation industry belongs to an emerging industry.After 2000,, domestic wind-power electricity generation industry is developed rapidly because country encourages the development and utilization of regenerative resource.Because key technology area waits ripe cause, the offshore wind farm engineering of implementing at present seldom, the engineering design and construction experience is all not enough.
At present at sea in the wind-powered electricity generation unit foundation construction process; On the working procedure of condition setting cofferdam of creating dry work for foundation construction as interim enclosing body; Take typing steel sheet-pile cofferdam commonly used in barged-in fill cofferdam or the bridge engineering more; Not only the investment of self temporary works is big for above cofferdam form, and the duration is longer, and has bigger environmental problem; Need carry out reinforcing work to the cofferdam for the influence of resisting abominable marine environment simultaneously, for the construction of major project and the dismounting work in later stage bring inconvenience than the large-engineering amount.
In addition, need before major project, adopt special cofferdam construction ship to construct in advance, and be equipped with various auxiliary ships, the Description of Ship that relates to is many, and the construction period is long, has increased the investment of wind-powered electricity generation engineering.
Summary of the invention
The technical problem that the present invention will solve is: based on the problem that needs in the offshore wind turbine foundation construction to solve; And take into full account the ambient conditions in the coastal marine site of China, a kind of annular negative-pressure foundation cofferdam and job practices thereof of investing little, easy construction, safe ready is provided.
The technical scheme that the present invention adopted is: a kind of annular negative-pressure foundation cofferdam; It is characterized in that: said cofferdam is connected to form the cirque structure of a sealing by two negative-pressure foundation structures through connector at least from beginning to end, and single negative-pressure foundation structure is spliced into one section circular arc of said cirque structure at least by a bucket base.
Each barrel base is the identical circular arc steel plate tube of radius, and the bottom of steel plate tube is uncovered, and the top is provided with air vent device, and steel plate tube inside is equipped with air bag and is communicated with air vent device.
The width of said bucket base is 1m, and ring radius is 9 meters in it.
Said air bag is quality softness and the high rubberized fabric of tensile strength, and volume ratio bucket base cavity volume is smaller.
The job practices in described annular negative-pressure foundation cofferdam is characterized in that comprising step:
1, makes the bucket base in surface facility;
2, inflate through the air bag of air vent device in each barrel base, rely on himself buoyancy, place it in the sea, adopt the transportation of little rank transportation ship;
3, select depth condition to locate for planning to build the cofferdam less than the negative-pressure foundation structure height; Confirm the quantity of the negative-pressure foundation structure in composition cofferdam, and the quantity of forming the bucket base of single negative-pressure foundation structure, extract the interior gas of air bag through air vent device then; The bucket base is sunk one by one by the circular arc of setting and is pressed in the mud; Form a negative-pressure foundation structure, at last each negative-pressure foundation structure is interconnected through connector from beginning to end, form the annular cofferdam of a sealing and sealing;
4, extract the central seawater in annular cofferdam, form the local ground condition of doing, in dried ground, part, carry out blower foundation and construct;
5, after blower foundation construction is accomplished,, remove the connector between each negative-pressure foundation structure then, inflate through the air bag of air vent device in each barrel base and make foundation structure extract the mud face at first to water-filling in the cofferdam.
The invention has the beneficial effects as follows: the critical piece in (1) cofferdam is the negative-pressure foundation structure; The negative-pressure foundation technology can guarantee carrying out smoothly of this novel negative pressure basic constructional design and construction as design and construction technology ripe in the haulage device in the offshore oil platform recovery process.(2) the required materials such as steel plate of negative-pressure foundation structure belong to conventional goods and materials, and ripe roll bending technology can be made large-sized foundation structure, and the abundant maturation with construction technology of material goods and materials can guarantee the making of each gauge size negative-pressure foundation.(3) the negative-pressure foundation structure is the chief component in interim cofferdam; Simultaneously also can utilize negative-pressure foundation self spatial volume big; The characteristics that buoyancy is big; The time directly place it on the sea in transportation and to haul, the horsepower grade that has reduced the transportation ship has also reduced be the transportation ship of its configuration simultaneously, makes its shallow water along the coast that can can't arrive at conventional ship and to take advantage of tide entering intertidal zone regional.(4) a few negative-pressure foundation structure just can be combined to form an interim cofferdam, and the construction works amount is little, and the time is short.(5) in the negative-pressure foundation structure air bag is set, promptly can increases the buoyancy in the basic haul process, can inwardly inflate the formation malleation simultaneously, reduce the basis and play the resistance in the floating process.(6) adopt the connector of moulding to connect and the ring-like cofferdam of fixing formation between each negative-pressure foundation structure, simple aspect reduces the engineering time.(7) each negative-pressure foundation structure can reuse to next place, cofferdam after remove in the cofferdam, has reduced the loss of temporary services.
Has short advantage of cheapness, easy construction, construction period in addition.
Description of drawings
Fig. 1 is the vertical view of the embodiment of the invention.
Fig. 2 is the vertical view of negative-pressure foundation structure among Fig. 1.
Fig. 3 is the sectional view of negative-pressure foundation structure among Fig. 2.
The specific embodiment
As shown in Figure 1, present embodiment annular negative-pressure foundation cofferdam is connected to form the cirque structure of a sealing through connector 4 head and the tail by the negative-pressure foundation structure of four 1/4 circular arcs.Said negative-pressure foundation structure is spliced by three identical arc bucket bases 1, and bucket base 1 is the only curved plate tube of the uncovered 1-1 in bottom, and steel plate tube top is provided with air vent device 2, and steel plate tube inside is equipped with air bag 3 and this air bag is communicated with top air vent device 2.
Wherein air bag 3 is processed for quality softness and the high rubber dry goods material of tensile strength, and volume ratio bucket base 1 cavity volume is smaller, and air vent device 2 is used for bleeding or inflating to air bag 3.The width of this example bucket base 1 is 1 meter, and interior ring radius is 9 meters, and is highly general as long as a little more than planning to build the sea water advanced of place, cofferdam, be located at about 10 meters based on the practical experience height.
Present embodiment annular negative-pressure foundation cofferdam practical implementation method is following:
A, at the surface facility bucket base 1 that completes;
B, wait to complete after, inflate through the air bag 3 of air vent device 2 in each barrel base 1, rely on the big characteristics of himself buoyancy, directly bucket base 1 is placed on the sea and adopts little other cargo ship of level only to be transported to plan to build the place, cofferdam;
After c, bucket base 1 are transported to the appointed place, select depth condition to locate for planning to build the cofferdam less than the position of bucket base 1 height; Carry out the seat basic skill or training preface of negative-pressure foundation structure then; At first pass through the gas in the air vent device 2 extraction air bags 3, the draught head inside and outside the formation bucket basic 1, bucket basic 1 sinks one by one by a circular arc of setting and is pressed in the mud; Form negative-pressure foundation structure (three bucket bases are formed a negative-pressure foundation structure); After four negative-pressure foundation structure seat bottom application workers finish, carry out connector 4 constructions then, the negative-pressure foundation structure is tightly connected through connector 4 head and the tail each other; Form the cirque structure of a sealing and sealing, look the field condition decision between adjacent two bucket bases 1 and whether need connect and seal;
After d, the installation of negative-pressure foundation structure, form annular negative-pressure foundation cofferdam, extract the central seawater in cofferdam and form the local ground condition of doing, just can be in dried ground, part to blower foundation 5 constructions;
E, when the function completion need to be removed in the cofferdam; At first to water-filling in the cofferdam; Remove the connector 4 between each negative-pressure foundation structure then; Inflate through the air bag 3 of air vent device 2 in each barrel base 1 and to make the negative-pressure foundation structure extract the mud face, utilize previous transportation ship haul negative-pressure foundation structure to next cofferdam construction place.

Claims (5)

1. annular negative-pressure foundation cofferdam; It is characterized in that: said cofferdam is connected to form the cirque structure of a sealing by two negative-pressure foundation structures through connector (4) head and the tail at least, and single negative-pressure foundation structure is spliced into one section circular arc of said cirque structure at least by a bucket base (1).
2. annular negative-pressure foundation according to claim 1 cofferdam; It is characterized in that: each barrel base (1) is the identical circular arc steel plate tube of radius; The bottom of steel plate tube is uncovered (1-1); The top is provided with air vent device (2), and steel plate tube inside is equipped with air bag (3) and is communicated with air vent device (2).
3. annular negative-pressure foundation according to claim 2 cofferdam is characterized in that: the width of said bucket base (1) is 1m, and ring radius is 9 meters in it.
4. annular negative-pressure foundation according to claim 2 cofferdam is characterized in that: said air bag (3) is quality softness and the high rubberized fabric of tensile strength, and volume ratio bucket base (1) cavity volume is smaller.
5. the job practices in an annular negative-pressure foundation as claimed in claim 2 cofferdam is characterized in that comprising step:
5.1 make bucket base (1) in surface facility;
5.2 inflate through the air bag (3) of air vent device (2) in each barrel base (1), rely on himself buoyancy, place it in the sea, adopt the transportation of little rank transportation ship;
5.3 selecting depth condition locates for planning to build the cofferdam less than the negative-pressure foundation structure height; Confirm the quantity of the negative-pressure foundation structure in composition cofferdam; And the quantity of forming the bucket base (1) of single negative-pressure foundation structure; Extract the gas in the air bag (3) through air vent device (2) then, bucket base (1) is sunk one by one by the circular arc of setting and is pressed in the mud, form a negative-pressure foundation structure; At last each negative-pressure foundation structure is interconnected through connector (2) head and the tail, form the annular cofferdam of a sealing and sealing;
5.4 extract the seawater in the middle of the annular cofferdam, form the local ground condition of doing, in dried ground, part, carry out blower foundation (5) construction;
5.5 blower foundation (5) at first to water-filling in the cofferdam, is removed the connector (4) between each negative-pressure foundation structure after constructing and accomplishing then, inflates through the air bag (3) of air vent device (2) in each barrel base (1) to make foundation structure extract the mud face.
CN201110392363.0A 2011-12-01 2011-12-01 Annular negative pressure foundation cofferdam and construction method thereof Active CN102425182B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110392363.0A CN102425182B (en) 2011-12-01 2011-12-01 Annular negative pressure foundation cofferdam and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110392363.0A CN102425182B (en) 2011-12-01 2011-12-01 Annular negative pressure foundation cofferdam and construction method thereof

Publications (2)

Publication Number Publication Date
CN102425182A true CN102425182A (en) 2012-04-25
CN102425182B CN102425182B (en) 2014-02-12

Family

ID=45959208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110392363.0A Active CN102425182B (en) 2011-12-01 2011-12-01 Annular negative pressure foundation cofferdam and construction method thereof

Country Status (1)

Country Link
CN (1) CN102425182B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213571A (en) * 2014-07-17 2014-12-17 北京翔鲲水务建设有限公司 Underwater closed cofferdam structure
CN104746523A (en) * 2013-12-30 2015-07-01 上海勘测设计研究院 Cofferdam structure and application method thereof
CN108166515A (en) * 2017-12-29 2018-06-15 华北水利水电大学 A kind of waterpower self-stabilization type underwater construction cofferdam
CN108331009A (en) * 2018-04-28 2018-07-27 西南交通大学 Suction type Conveyor belt constructing structure
CN110397052A (en) * 2019-07-30 2019-11-01 中交一航局第二工程有限公司 Dry construction system and dry operating environment construction method for underwater repair
CN113338286A (en) * 2021-05-31 2021-09-03 华新建工集团有限公司 Pile foundation safety device for building engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1285442A (en) * 2000-09-29 2001-02-28 大港油田集团有限责任公司 Method and apparatus for controlling raise and subsidence of barrel-shape negative-pressure foundation moveable platform
CN2443914Y (en) * 2000-09-29 2001-08-22 大港油田集团有限责任公司 Cylindrical negative pressure based device made of steel of internal sack
JP2005042480A (en) * 2003-07-25 2005-02-17 Ohbayashi Corp Temporary cutoff structure and temporary cutoff method
CN101787686A (en) * 2010-01-13 2010-07-28 史颜 Method for building offshore wind farm
CN201943084U (en) * 2011-03-04 2011-08-24 中国水电顾问集团华东勘测设计研究院 Negative pressure bucket type foundation structure for offshore wind driven generator with stabilizers
CN102251534A (en) * 2011-04-19 2011-11-23 上海海事大学 Ocean engineering foundation adopting pile-barrel foundation structure
CN202390845U (en) * 2011-12-01 2012-08-22 中国水电顾问集团华东勘测设计研究院 Annular negative pressure foundation cofferdam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1285442A (en) * 2000-09-29 2001-02-28 大港油田集团有限责任公司 Method and apparatus for controlling raise and subsidence of barrel-shape negative-pressure foundation moveable platform
CN2443914Y (en) * 2000-09-29 2001-08-22 大港油田集团有限责任公司 Cylindrical negative pressure based device made of steel of internal sack
JP2005042480A (en) * 2003-07-25 2005-02-17 Ohbayashi Corp Temporary cutoff structure and temporary cutoff method
CN101787686A (en) * 2010-01-13 2010-07-28 史颜 Method for building offshore wind farm
CN201943084U (en) * 2011-03-04 2011-08-24 中国水电顾问集团华东勘测设计研究院 Negative pressure bucket type foundation structure for offshore wind driven generator with stabilizers
CN102251534A (en) * 2011-04-19 2011-11-23 上海海事大学 Ocean engineering foundation adopting pile-barrel foundation structure
CN202390845U (en) * 2011-12-01 2012-08-22 中国水电顾问集团华东勘测设计研究院 Annular negative pressure foundation cofferdam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张文洪等: "滩海可移动钢制桶型负压基础平台", 《中国海洋平台》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746523A (en) * 2013-12-30 2015-07-01 上海勘测设计研究院 Cofferdam structure and application method thereof
CN104746523B (en) * 2013-12-30 2016-05-04 上海勘测设计研究院 cofferdam structure and using method thereof
CN104213571A (en) * 2014-07-17 2014-12-17 北京翔鲲水务建设有限公司 Underwater closed cofferdam structure
CN108166515A (en) * 2017-12-29 2018-06-15 华北水利水电大学 A kind of waterpower self-stabilization type underwater construction cofferdam
CN108331009A (en) * 2018-04-28 2018-07-27 西南交通大学 Suction type Conveyor belt constructing structure
CN108331009B (en) * 2018-04-28 2024-06-07 西南交通大学 Negative pressure formula landing stage foundation construction structure
CN110397052A (en) * 2019-07-30 2019-11-01 中交一航局第二工程有限公司 Dry construction system and dry operating environment construction method for underwater repair
CN113338286A (en) * 2021-05-31 2021-09-03 华新建工集团有限公司 Pile foundation safety device for building engineering

Also Published As

Publication number Publication date
CN102425182B (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN102425182B (en) Annular negative pressure foundation cofferdam and construction method thereof
CN103758147B (en) A kind of gravity type offshore wind crew base and towage thereof and sinking method
CN102369134B (en) Installation method and recovery method for offshore wind turbine
CN104264704A (en) Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
US20240003110A1 (en) Auxiliary structure for floating and sinking a whole offshore wind turbine with suction bucket foundation(s)
CN201746849U (en) Basic structure of offshore wind-power-station fan
CN102322074B (en) Jacket frame foundation structure and construction method thereof
CN110155264B (en) Marine fan composite cylinder foundation towing structure and towing method
CN108999975B (en) Sealing pile plug device for floating transportation of offshore fan steel piles
CN103590415A (en) Prefabricated bearing platform suitable for large-diameter tubular column foundation of sea bridge and construction method thereof
CN107792307B (en) Floating wind power tower convenient to installation
CN102286986B (en) Five-horse foundation structure and construction method thereof
CN202390845U (en) Annular negative pressure foundation cofferdam
CN104164885A (en) Caisson towing method
CN210562255U (en) Offshore wind power cylinder type foundation underwater construction structure
CN201914420U (en) Semisubmersible transferring and delivery platform
CN208085959U (en) A kind of floating wind tower being easily installed
CN207062916U (en) A kind of partial installation formula booster stations
CN214883833U (en) Whole quick-witted group of offshore wind power suction bucket basis floats and supplementary structure of sinking
CN203684191U (en) Fan construction system of offshore intertidal zone
CN210212705U (en) Offshore wind power floating foundation structure
CN108791738A (en) A kind of Large marine wind turbine entirety floating support mounting method
CN203420278U (en) Suction pile type gravity foundation and installation device thereof
CN105443311A (en) Tidal current energy generating device fixed to water bottom

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA HYDROPOWER ENGINEERING CONSULTING GROUP CO.,

Free format text: FORMER OWNER: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD.

Effective date: 20150629

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP EAST CHINA INVESTIGATION AND DES

Free format text: FORMER NAME: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INVESTIGATION AND DESIGN INSTITUTE CO., LTD.

Owner name: CHINESE HYDROPOWER CONSULTING GROUP EAST CHINA INV

Free format text: FORMER NAME: EAST CHINA SURVEY AND DESIGN INST., CHINA HYDROPOWER CONSULTING GROUP

CP01 Change in the name or title of a patent holder

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: Hydrochina Hangzhou Engineering Corp.

Address after: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee after: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: HYDROCHINA HUADONG ENGINEERING Corp.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20150629

Address after: 100120 Beijing Xicheng District six paved Kang District

Patentee after: HYDROCHINA Corp.

Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 22

Patentee before: POWERCHINA HUADONG ENGINEERING Corp.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20230404

Address after: 101, 1st Floor, Building 28, Yard 1, Hongye East Road, Daxing District, Beijing, 100162

Patentee after: China Power Construction New Energy Group Co.,Ltd.

Address before: 100120 liupukang District 1, Xicheng District, Beijing

Patentee before: HYDROCHINA Corp.

TR01 Transfer of patent right