CN207062916U - A kind of partial installation formula booster stations - Google Patents

A kind of partial installation formula booster stations Download PDF

Info

Publication number
CN207062916U
CN207062916U CN201720910101.1U CN201720910101U CN207062916U CN 207062916 U CN207062916 U CN 207062916U CN 201720910101 U CN201720910101 U CN 201720910101U CN 207062916 U CN207062916 U CN 207062916U
Authority
CN
China
Prior art keywords
chunk
jacket
steel
booster stations
ductule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720910101.1U
Other languages
Chinese (zh)
Inventor
高宏飙
王健
杨光
陆俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority to CN201720910101.1U priority Critical patent/CN207062916U/en
Application granted granted Critical
Publication of CN207062916U publication Critical patent/CN207062916U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of partial installation formula booster stations, including support section and booster stations part, the support section includes the steel-pipe pile of several vertical regular arrangements, big jacket and ductule frame is installed on the steel-pipe pile, the booster stations part includes more pillars, switch cubicle chunk, GIS chunks, 1# main transformer chunks, 2# main transformers chunk and auxiliary chunk, every group of chunk is fixed on big jacket and ductule frame by pillar respectively, the utility model is using small one and large one two jackets as support component, and jacket is in inverted cone-shaped structure, substantially increase support component bears gravity, reduce difficulty of construction simultaneously;Booster stations part is mainly in the switch cubicle chunk of upper, middle and lower three-decker, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and auxiliary chunk, five chunks each install by independent split type, low is required to ship machine equipment, reduce installation cost, solve the installation problem that the depth of water crosses neritic zone offshore boosting station, reduce security risk again.

Description

A kind of partial installation formula booster stations
Technical field
A kind of offshore boosting station is the utility model is related to, specifically, is related to a kind of marine partial installation formula booster stations.
Background technology
Offshore boosting station is successively built, installed one by one positioned at sea, no land booster stations of the image of Buddha like that, general at present to use Monoblock type Hoisting Program construction, i.e., using offshore boosting station upper chunk as a module, after completing on the coast, overall fortune It is defeated to be installed to specified location by large-scale crane ship.But offshore boosting station upper chunk overall structure size is big, weight is big, adopts Large-scale crane ship more than 2000t levels is needed with monoblock type Hoisting Program, cost is high, risk is big, while can not be excessively shallow in the depth of water Marine site construction and installation.Therefore, the sea that a kind of security risk is low, low to ship machine equipment requirement has specially been invented regarding to the issue above Upper booster stations split-type structural, solve the depth of water and cross neritic zone offshore boosting station installation problem.
Utility model content
The purpose of this utility model is to provide a kind of partial installation formula booster stations, and its structure design can realize partial installation, It is convenient and swift, avoid the use of large-scale crane ship.
The technical solution adopted in the utility model is:
A kind of partial installation formula booster stations, including support section and booster stations part, the support section include several perpendicular To the steel-pipe pile of regular arrangement, big jacket and ductule frame is installed on the steel-pipe pile, the booster stations part includes more Root pillar, switch cubicle chunk, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and auxiliary chunk, the bottom of the pillar is fixed On big jacket and ductule frame, the switch cubicle chunk, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and auxiliary chunk It is three-decker, every group of chunk is fixed on big jacket and ductule frame by pillar respectively, the top of two of which chunk Layer is separately installed with helideck and boom hoisting, and the surrounding of the top layer of every group of chunk is additionally provided with guardrail, the ductule frame On be provided with cat ladder, the big jacket and ductule frame are in inverted cone-shaped structure.
Further, fixed and connected by jacket thimble assembly between the steel-pipe pile and big jacket and ductule frame Connect, the jacket thimble assembly includes guide pad, jacket sleeve pipe, grouting sealer, hard rubber packing ring, steel packing ring and ox Leg, the jacket sleeve pipe are set in outside steel-pipe pile, and the guide pad is arranged on the inwall of jacket sleeve pipe, the grouting envelope Close device to be arranged between steel-pipe pile and jacket sleeve pipe, the bracket is arranged on the bottom of jacket sleeve pipe, the hard rubber pad Circle and steel packing ring are arranged between jacket sleeve pipe and bracket.
Further, it is additionally provided with warning lamp on the chunk of one of which.
Further, the Z-shape structure in cross section of the grouting sealer.
The utility model has the advantages that:Using small one and large one two jackets as support component, and jacket is in back taper Shape structure, substantially increases the gravity that bears of support component, while reduces difficulty of construction;It is in upper, middle and lower that booster stations part, which is mainly, The switch cubicle chunk of three-decker, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and auxiliary chunk, five chunks are each independent Split installation, low is required to ship machine equipment, installation cost is reduced, solves the installation that the depth of water crosses neritic zone offshore boosting station Problem, security risk is reduced again.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model.
Fig. 2 is the structural representation of every group of chunk.
Structural representations of the Fig. 3 between steel-pipe pile and big jacket and ductule frame.
Fig. 4 is Fig. 3 partial enlarged drawing.
Wherein:1st, steel-pipe pile, 2, big jacket, 3, ductule frame, 4, pillar, 9, switch cubicle chunk, 10, GIS chunks, 11st, 1# main transformers chunk, 12,2# main transformer chunks, 13, auxiliary chunk, 14, helideck, 15, boom hoisting, 16, guardrail, 17, climb Ladder, 18, guide pad, 19, jacket sleeve pipe, 20, grouting sealer, 21, hard rubber packing ring, 22, steel packing ring, 23, bracket, 24th, warning lamp.
Embodiment
As shown in Figure 1 and Figure 2, a kind of partial installation formula booster stations, including support section and booster stations part, support section Include the steel-pipe pile 1 of several vertical regular arrangements, big jacket 2 and ductule frame 3, booster stations portion are installed on steel-pipe pile 1 Dividing includes more pillars 4, switch cubicle chunk 9, GIS chunks 10,1# main transformers chunk 11,2# main transformers chunk 12 and auxiliary chunk 13, The bottom of pillar 4 is fixed on big jacket 2 and ductule frame 3, switch cubicle chunk 9, GIS chunks 10,1# main transformers chunk 11,2# Main transformer chunk 12 and auxiliary chunk 13 are three-decker, and every group of chunk forms a single chunk by pillar 4 respectively, often Group chunk is separately fixed on big jacket 2 and ductule frame 3, and the top layer of two chunks is separately installed with helideck wherein 14 and boom hoisting 15, the surrounding of the top layer of every group of chunk be additionally provided with guardrail 16, cat ladder 17 be provided with ductule frame 3, Big jacket and ductule frame are in inverted cone-shaped structure.
As shown in Figure 3 and Figure 4, steel-pipe pile 1 and consolidated between jacket 2 and ductule frame 3 by jacket thimble assembly greatly Fixed connection, jacket thimble assembly include guide pad 18, jacket sleeve pipe 19, grouting sealer 20, hard rubber packing ring 21, steel Packing ring 22 and bracket 23, jacket sleeve pipe 19 are set in outside steel-pipe pile 1, and guide pad 18 is arranged on the inwall of jacket sleeve pipe 19 On, grouting sealer 20 is arranged between steel-pipe pile 1 and jacket sleeve pipe 19, and bracket 23 is arranged on the bottom of jacket sleeve pipe 19 Portion, hard rubber packing ring 21 and steel packing ring 22 are arranged between jacket sleeve pipe 19 and bracket 23, wherein on one group of chunk Warning lamp 24 is additionally provided with, the Z-shape structure in cross section for the sealer 20 that is in the milk.
When mounted, the steel-pipe pile of several vertical regular arrangements is driven piles in specified location, then by small one and large one Jacket be fixed on steel-pipe pile.Five chunks are individually fixed on corresponding pillar and form single chunk, utilize fortune Five chunks are transported specified location erection sequence and are installed to one by one on jacket by defeated ship, and installation process realizes split type peace Dress, can complete to install without large-scale crane ship oceangoing ship, require low to ship machine equipment, security risk is low, while solves depth of water mistake The installation problem of neritic zone offshore boosting station.

Claims (4)

1. a kind of partial installation formula booster stations, including support section and booster stations part, it is characterised in that:The supporting part subpackage The steel-pipe pile of several vertical regular arrangements is included, big jacket and ductule frame, the booster stations portion are installed on the steel-pipe pile Dividing includes more pillars, switch cubicle chunk, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and auxiliary chunk, the pillar Bottom is fixed on big jacket and ductule frame, the switch cubicle chunk, GIS chunks, 1# main transformers chunk, 2# main transformers chunk and It is three-decker to aid in chunk, and every group of chunk is fixed on big jacket and ductule frame by pillar respectively, two of which The top layer of chunk is separately installed with helideck and boom hoisting, and the surrounding of the top layer of every group of chunk is additionally provided with guardrail, described Cat ladder is provided with ductule frame, the big jacket and ductule frame are in inverted cone-shaped structure.
A kind of 2. partial installation formula booster stations according to claim 1, it is characterised in that:The steel-pipe pile and big jacket It is fixedly connected between ductule frame by jacket thimble assembly, the jacket thimble assembly includes guide pad, jacket Sleeve pipe, grouting sealer, hard rubber packing ring, steel packing ring and bracket, the jacket sleeve pipe is set in outside steel-pipe pile, described to lead It is arranged on to block on the inwall of jacket sleeve pipe, the grouting sealer is arranged between steel-pipe pile and jacket sleeve pipe, described Bracket is arranged on the bottom of jacket sleeve pipe, the hard rubber packing ring and steel packing ring be arranged on jacket sleeve pipe and bracket it Between.
A kind of 3. partial installation formula booster stations according to claim 1, it is characterised in that:Also set on the chunk of one of which It is equipped with warning lamp.
A kind of 4. partial installation formula booster stations according to claim 2, it is characterised in that:The transversal of sealer of being in the milk The Z-shape structure in face.
CN201720910101.1U 2017-07-26 2017-07-26 A kind of partial installation formula booster stations Expired - Fee Related CN207062916U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720910101.1U CN207062916U (en) 2017-07-26 2017-07-26 A kind of partial installation formula booster stations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720910101.1U CN207062916U (en) 2017-07-26 2017-07-26 A kind of partial installation formula booster stations

Publications (1)

Publication Number Publication Date
CN207062916U true CN207062916U (en) 2018-03-02

Family

ID=61517742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720910101.1U Expired - Fee Related CN207062916U (en) 2017-07-26 2017-07-26 A kind of partial installation formula booster stations

Country Status (1)

Country Link
CN (1) CN207062916U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208607A (en) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 A kind of offshore boosting station jacket grout sealing technique
CN111945767A (en) * 2020-07-24 2020-11-17 中交第三航务工程局有限公司 Construction process of pile-first outer jacket type jacket of offshore wind power booster station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208607A (en) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 A kind of offshore boosting station jacket grout sealing technique
CN111945767A (en) * 2020-07-24 2020-11-17 中交第三航务工程局有限公司 Construction process of pile-first outer jacket type jacket of offshore wind power booster station

Similar Documents

Publication Publication Date Title
CN102587342B (en) Buoyancy type mounting method for offshore boosting station
CN109056684A (en) The split type jacket structure of Large marine platform and its installation method of the installation of support method are floated suitable for shallow sea water
CN209178967U (en) The split type jacket structure of Large marine platform of support method installation is floated suitable for shallow sea water
CN106638530A (en) Process for lifting offshore booster station jacket in shallow water
CN207062916U (en) A kind of partial installation formula booster stations
WO2015188694A1 (en) Method for lifting and transporting large parts of underground nuclear power station
CN102817341B (en) Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN102936888A (en) Self-installation type offshore booster station structure and installation method thereof
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
CN201891123U (en) Single-wall steel hanging box with concrete bottom plate
CN107218179B (en) The construction method of offshore wind generating partial installation
CN206141788U (en) Utilize platform that solar energy and ocean current can generate electricity
CN102425182A (en) Annular negative pressure foundation cofferdam and construction method thereof
CN104264646A (en) Concrete marine nuclear power platform
CN204803864U (en) Marine booster stations structure in flange formula single pile basis
CN104594317A (en) Working platform, single pile foundation, offshore working platform and installing method of offshore working platform
CN203866800U (en) Offshore booster station
CN203978442U (en) A kind of public iron is built submerged tunnel jointly
CN204456044U (en) Mixing floating offshore booster station structure
CN202416334U (en) Thin-walled steel box
CN205934994U (en) Retaining pile combines guan liang's underground structure's anti structure of floating
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN201722700U (en) Infrastructure of tower crane
CN204435337U (en) Workbench and single-pile foundation and offshore work platform
CN203684191U (en) Fan construction system of offshore intertidal zone

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302