CN106545030B - Small-sized buried reservoir of one kind and preparation method thereof - Google Patents

Small-sized buried reservoir of one kind and preparation method thereof Download PDF

Info

Publication number
CN106545030B
CN106545030B CN201610867958.XA CN201610867958A CN106545030B CN 106545030 B CN106545030 B CN 106545030B CN 201610867958 A CN201610867958 A CN 201610867958A CN 106545030 B CN106545030 B CN 106545030B
Authority
CN
China
Prior art keywords
template
concrete
manhole
reservoir
pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610867958.XA
Other languages
Chinese (zh)
Other versions
CN106545030A (en
Inventor
郝卫增
秦朋立
郭永良
郭强
聂亚辉
杨明
彭志国
武会徐
秦振凯
张国杰
刘宇涛
王海东
姬瑞超
李飞
袁辉
武元轩
宋喜玲
周春言
李剑峰
徐瑞祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Chengxing Construction Engineering Co Ltd
Henan Linxiang Engineering Construction Co Ltd
TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd
Original Assignee
Henan Chengxing Construction Engineering Co Ltd
Henan Linxiang Engineering Construction Co Ltd
TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Chengxing Construction Engineering Co Ltd, Henan Linxiang Engineering Construction Co Ltd, TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd filed Critical Henan Chengxing Construction Engineering Co Ltd
Priority to CN201610867958.XA priority Critical patent/CN106545030B/en
Publication of CN106545030A publication Critical patent/CN106545030A/en
Application granted granted Critical
Publication of CN106545030B publication Critical patent/CN106545030B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of small-sized buried reservoirs and preparation method thereof;Reservoir includes pond body and upper manhole, and pond body includes bottom plate, pool wall and top plate, and pool wall is circular configuration, and top plate is dome structure;Pond body is plain concrete one-time-concreting molding structure;In the production method of reservoir pond body be one layer of HDPE antiseepage film being covered using in crater wall as exterior sheathing, to be formed with the matched combined steel formwork of pond body shape as inner template primary concreting, upper manhole is the above manhole inner and outer template pouring molding, specifically includes production template, the construction line-putting, pond body excavations, Ground Treatment, installation combined steel formwork, pond body concreting, installs manhole inner and outer template, pours that manhole concrete, outboard template, Chi Ding cover antiseepage film, dismounting combined steel formwork and pond and push up earthing in the upper manhole of dismountings.Good seepage-proof property of the present invention, long service life, headspace can efficiently use, and the construction period is short, low cost.

Description

Small-sized buried reservoir of one kind and preparation method thereof
Technical field
The invention belongs to reservoir technical field of construction, more particularly to a kind of small-sized buried reservoir and its production side Method.
Background technique
In the rare area in drinking water source, many families or unit all have reservoir, for solving the problems, such as domestic water. With economic continuous development, although tap water realizes all standing substantially, due to the needs of management of the use of water, especially winter water Frequent occurrence, reservoir still plays an important role the event of pipe bursting by freezing in certain regions.
However for a long time, reservoir occurs in the form of buried, and structure type is also varied.Common pool wall material is Brick, stone, concrete, top plate are largely prefabricated section or monolithic reinforced concrete structure.No matter which kind of existing structure, using In the process, there are problems:1, since pool wall and the processing of pond top plate bound fraction are bad, pond Zhong Shui is contaminated often; 2, due to being limited or the limitation of the bearing capacity of prefabricated board by top plate arrangement of reinforcement, earthing is not allowed on top plate, upper space is pushed up in pond Utilization be restricted;3, there is crack, drainage is serious, uses the longevity using after many years in common rectangular configuration pond It orders short;4, pool wall uses rectangular configuration, and pool wall lateral pressure is big, the necessary arrangement of reinforcement of concrete-pool-wall, and Chi Ding uses reinforced concrete Soil structure, above earthing, arrangement of reinforcement necessarily increases;Thus the construction period is long, cost is high.
Summary of the invention
The technical problem to be solved in the present invention is to overcome above-mentioned the deficiencies in the prior art, and providing one kind being capable of antiseepage effect Fruit is good, long service life, and headspace can efficiently use, and the construction period is short, small-sized buried reservoir of low cost Production method.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of small-sized buried reservoir, including pond body and upper manhole are designed, wherein pond body includes bottom plate, pool wall and top Plate, the pool wall are cylindrical structure, and top plate is dome structure;The pond body is plain concrete one-time-concreting molding structure.
Preferably, in above-mentioned small-sized buried reservoir, the pool wall internal diameter is 2-3m.
Preferably, in above-mentioned small-sized buried reservoir, the thickness of the pool wall and the junction Chi Ding is compared with pool wall and pond Top thickness degree is all big.
Preferably, in above-mentioned small-sized buried reservoir, described to pour reservoir with concrete be C20 concrete, and The orthoaluminic acid calcium swelling agent of cement weight 8% is added in concrete.
Simultaneously also provide it is a kind of as above described in any item small-sized buried reservoirs production method, the pond body be with The one layer of HDPE antiseepage film covered in crater wall as exterior sheathing, using primary as inner template with the matched combined steel formwork of pond body shape Property pouring molding;The upper manhole is the above manhole inner and outer template pouring molding;Specifically include following steps:
(1)Make template:Wall portions are determined using the method calculated, setting-out combines according to reservoir design size With the size of the template used rib in length and breadth in pond top part and form surfacing;Blanking is carried out according to the size;By wall portions or pond The template used panel in top part and in length and breadth rib welding fabrication;Referring to Technical code of composite steelform(GB/T50214-2013)Want It asks, bores U-shaped card hole in the stupefied beam portion position of template;
Then the size that upper manhole inner and outer template is determined according to manhole design size on reservoir will according to measure Upper manhole exterior sheathing rolls welding fabrication, and upper manhole inner template is rolled for scene and is mounted directly;
(2)The construction line-putting:According to the position of reservoir and size, the shoveling sideline of reservoir is put on the ground, meanwhile, The guide pile of intersection is set outside earth excavation line;
(3)Pond body is excavated:It cuts the earth according to unwrapping wire size, after reaching designed elevation, repairs side slope and bottom surface;
(4)Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls processing;
(5)Combined steel formwork is installed:Exterior sheathing of the one layer of HDPE antiseepage film as concreting is covered in crater wall;Benefit With the guide pile on ground, reservoir position line is led into bottom of pond;Concrete pad is placed on template position line;According to position line It is successively assembled on cushion block and has propped up combined steel formwork;
(6)Pond body concreting:Bottom plate is first poured, after underplate concrete initial set, removes concrete pad;Pool wall is mixed Solidifying soil uniformly places along surrounding, placement layer by layer, every thickness degree≤500mm;
(7)Install manhole inner and outer template:Etc. pond bodies concreting forming after, upper manhole exterior sheathing is placed in Chi Ding At the upper manhole of concrete, it is placed on after upper manhole inner template is rolled and fixed on the inside of upper manhole;
(8)Pour manhole concrete:Concrete is poured between upper manhole inner and outer template, and vibration compacting;
(9)Manhole template in dismounting:60 minutes after concrete final set, outboard template in manhole in dismounting;
(10)Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered to the concrete sump of Chi Ding and upper manhole On wall;
(11)Remove combined steel formwork:After concreting is completed 48 hours, combined steel formwork is removed from upper manhole position;
(12)Push up earthing in pond:After concreting is completed 15 days, original soil is covered on Chi Ding.
It preferably, further include step in above-mentioned small-sized buried reservoir production method(13)Anti-seeping technology:In water storage Pond inner wall smears one layer of cement and mortar quality ratio is 1:2 cement mortar.
Preferably, in above-mentioned small-sized buried reservoir production method, in the step(6)With(8)In, it pours with mixed Solidifying soil is added with ten thousand cefpodoxime proxetil cement-based capillary crystalline waterproof coatings of cement weight 2%.
Preferably, in above-mentioned small-sized buried reservoir production method, the step(12)Middle thickness of earth covering is 800- 1500mm。
Preferably, in above-mentioned small-sized buried reservoir production method, in the step(1)In, upper manhole exterior sheathing Outside be symmetrically welded with and lift handle.
The beneficial effect of technical solution of the present invention is:
1, pool wall of the present invention uses cylinder design, makes pool wall before not filling the water, the soil body is applied with to birdcage Compressive pre-stress, after water filling, water is less than the stress of soil to the stress of pool wall, and pool wall will not generate crack by water ballast(ing).Moreover, pond Wall uses plain concrete pouring molding, makes full use of the compressive property of plain concrete, the various loads that pool wall normal condition occurs Birdcage can be born.Thus, good seepage-proof property, long service life.
2, Chi Ding of the present invention uses dome structure, and uses plain concrete pouring molding, makes full use of the anti-of plain concrete Performance is pressed, the various load dome structures that pond top normal condition occurs can be born.Thus, long service life, headspace It can efficiently use.
3, when specifically used, it is covered with certain thickness original soil in Chi Ding, entire reservoir may be at frozen soil hereinafter, complete Service life is in a kind of temperature constant state, and entire pond will not generate crack due to temperature stress.Thus, good seepage-proof property, Long service life.
4, crater wall of the present invention is covered with HDPE antiseepage film, after waiting ponds to push up concreting, can directly overlie pond It pushes up on concrete, plays a kind of water proof effect, avoid outside contamination water.
5, to sum up, the present invention has rational design, simple process and easy to implement;Good seepage-proof property, long service life, top are empty Between can efficiently use, using full plain concrete construction, short construction period, low cost.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing, wherein:
Fig. 1 is the structural schematic diagram of the small-sized buried reservoir of the present invention;
Fig. 2 is the structural schematic diagram in the small-sized buried reservoir production of the present invention;
Fig. 3 is the structural schematic diagram after production shown in Fig. 2;
Serial number in figure:1, pond body, 2, upper manhole, 3, HDPE antiseepage film, 4, combined steel formwork, 5, upper manhole inner template, 6, Upper manhole exterior sheathing, 7, concrete pad, 8, earthing.
Specific embodiment
Illustrate a specific embodiment of the invention with reference to the accompanying drawings and examples, but following embodiment is used only in detail Describe the bright present invention in detail, do not limit the scope of the invention in any way, in the examples below involved in instrument element such as It is conventional instrument element without special instruction.
Embodiment 1:
Referring to Fig. 1, in figure, the small-sized buried reservoir of the present invention, including pond body 1 and upper manhole 2, wherein pond body includes bottom Plate, pool wall and top plate, pool wall are cylindrical structure, and top plate is dome structure;Pond body is plain concrete one-time-concreting molding structure. Pool wall internal diameter is 2m, and pool wall depth is 1m, and pond dome height is 1m.
Further, the concrete for pouring reservoir can use the concrete of C20, and concrete can add cement weight 8% orthoaluminic acid calcium swelling agent.Contour compensation can be carried out to the contraction of concrete, and there is the work of filling, blocking capillary slit With greatly improving the seepage control and crack resistance ability of concrete, and it is less to increase cost.
Institute's casting concrete with a thickness of 200mm, wherein pool wall intersects the position 300mm concrete thickness up and down with Chi Ding and increases Add as 300mm.It avoids pool wall from concentrating with the intersection Chi Ding stress and cause to crack, enhances antiseepage function, improve making for pond body Use the service life.
Embodiment 2:
The present embodiment is similar to 1 structure of embodiment, and structure same section no longer repeats herein, and difference is:This reality Applying a reservoir pool wall internal diameter is 3m.
Embodiment 3:
Referring to figure 2-3, in figure, the present invention small-sized buried reservoir production method as described in Example 1, wherein pond body 1 be one layer of HDPE antiseepage film 3 being covered using in crater wall as exterior sheathing, to be interior with the matched combined steel formwork 4 of pond body shape The molding of template primary concreting;Upper manhole 2 is located among the top of pond and is the above manhole inner and outer template 5,6 pouring moldings;Specific packet Include following steps:
(1)Make template:
Reservoir design diameter 2m is determined used in wall portions and pond top part using the method calculated, setting-out combines The size of template rib and form surfacing in length and breadth;Every piece of gang form width of wall portions is 200mm, is highly 500mm;At the top of pond Divide every piece of gang form most wide and length is determining with full scale layout according to calculating;By form surfacing(The steel plate of 2mm thickness is made)And Rib in length and breadth(The steel plate of 5mm thickness is made)Welding fabrication;Referring to Technical code of composite steelform(GB/T50214-2013)Requirement, U-shaped card hole is bored in the stupefied beam portion position of template;
Upper manhole inner and outer template is according to manhole design size on reservoir, wherein upper manhole exterior sheathing is will with veneer reeling machine The steel plate of 2mm thickness is processed into cylindric, then welding forming, meanwhile, symmetrically there is the circle of two diameters 20 of welding in cylindrical outer side Steel, which is used as, lifts handle;And iron sheet is then rolled scene and is mounted directly by upper manhole inner template;
(2)The construction line-putting:According to the position of reservoir and size, the shoveling sideline of reservoir is put on the ground, meanwhile, The guide pile of four intersections of setting at the outer 1m of earth excavation line;
(3)Pond body is excavated:It is cut the earth with digging machine according to unwrapping wire size, after reaching designed elevation, repairs side slope with spade With the flatness of bottom surface;
(4)Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls processing, compacting factor 0.95;
(5)Combined steel formwork is installed:External mold of the one layer of HDPE antiseepage film of covering as concreting on the side wall of pond hole Plate;Using the guide pile on ground, reservoir position line is led into bottom of pond;200 thick concrete mats are placed on template position line Block 7;It successively assembles and props up on cushion block according to position line and combine dedicated steel form;
(6)Pond body pours:Bottom plate is first poured, after base plate strength is enough support combinations template, removes concrete pad;Pond Wall concrete is uniformly placed along surrounding and placement layer by layer, and every thickness degree is no more than 500mm;Concrete is pushed up in vibration compacting in pond On the basis of, it is compacted twice before concrete initial set with wooden float;
(7)Install manhole template:Etc. pond bodies concreting forming, by upper manhole external mold before final set after concrete initial set Plate is placed at the upper manhole of pond top concrete;The iron sheet of 3mm thickness is rolled and is placed directly on the inside of upper manhole, is crossed again in iron sheet Folded place is fixed with iron wire;
(8)Pour manhole concrete:Between concrete is poured into upper manhole inner and outer template, manual vibration compacting;
(9)Outboard template in manhole in dismounting:60 minutes after concrete final set, using the handle in template by exterior sheathing Lift, and removes the inner template on the inside of upper manhole;
(10)Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered to the concrete sump of Chi Ding and upper manhole On wall, the foldable processing of redundance.
(11)Remove combined steel formwork:After concreting is completed 48 hours, pond body dedicated set is removed from upper manhole position Close steel form;
(12)Push up earthing in pond:After concreting is completed 15 days, original soil is covered on Chi Ding;Earthing 8 is with a thickness of 800mm;
(13)It is anti-to mix processing:In institute's casting concrete inner surface(That is reservoir inner wall)Smear one layer 1:2 cement mortar increase Anti-seepage effect.
Personnel's test of many times after study, discovery pool wall use rectangular configuration, and pool wall lateral pressure is big, and concrete-pool-wall is necessary Arrangement of reinforcement etc., but pool wall uses cylindrical structure, forms a kind of birdcage, can make full use of the compressive property of plain concrete, Meanwhile pool wall, before water filling, the soil body increases a pre-compression stress, effectively prevent the crack problem of pool wall.Moreover, Chi Ding is used Prefabricated board, above earthing, not can guarantee structure safety, Chi Ding uses reinforced concrete structure, above earthing, arrangement of reinforcement necessarily adds Greatly, uneconomical, but Chi Ding uses plain concrete dome structure, has equally given full play to the compressive property of concrete, that is, has met The demand of structure safety, also solves economy problems.After earthing is pushed up in pond, upper space also can achieve and make full use of.
Therefore, the present invention in practical projects application show this method can effectively solve the problem that reservoir water it is easy to pollute, The problem of position cannot make full use of at the top of easy leak, pond, this method is based on good seepage-proof property, long service life, and headspace can With effective use, and the construction period is short, low cost, has obtained public's praise, social benefit is obvious.
Embodiment 4, the place that the present embodiment is different from embodiment 3 are:The present embodiment pond push up among other than it is other Position indwelling one upper manhole blocks the upper manhole on Chi Ding after demoulding.
Embodiment 5, the place that this example is different from embodiment 3 are:The present embodiment saves step(13), in step(6) With(8)In pour in concrete add cement weight 2% ten thousand cefpodoxime proxetil cement-based capillary crystalline waterproof coatings with replace step (13)Middle reservoir inner wall smears 1:2 cement mortar are as Anti-seeping technology.
In addition, production method of the present invention can also be applied to the production of methane-generating pit, only methane-generating pit is not in the production process With consideration reservoir water quality by the pollution of outside body of water, i.e., HDPE antiseepage film can not be covered on the outside of pool wall.
Each embodiment in this specification is described in a progressive manner, what each embodiment stressed be and its The difference of its embodiment, same and similar part is cross-referenced between each embodiment.
The present invention is described in detail above in conjunction with drawings and examples, still, those of skill in the art Member is it is understood that without departing from the purpose of the present invention, can also carry out each design parameter in above-described embodiment Change, forms multiple specific embodiments, is common variation range of the invention, is no longer described in detail one by one herein.

Claims (8)

1. a kind of production method of small-sized buried reservoir, it is characterized in that:The small-sized buried reservoir include pond body and Upper manhole, wherein pond body includes bottom plate, pool wall and top plate, and the pool wall is cylindrical structure, and top plate is dome structure;The pond Body is plain concrete one-time-concreting molding structure;The upper manhole is cylinder, and upper manhole is set among the top plate;It is described Pond body be one layer of HDPE antiseepage film being covered using in crater wall as exterior sheathing, to be interior with the matched combined steel formwork of pond body shape The molding of template primary concreting;The upper manhole is the above manhole inner and outer template pouring molding;Specifically include following steps:
(1) template is made:Wall portions and pond are determined using the method calculated, setting-out combines according to reservoir design size The size of the template used rib in length and breadth in top part and form surfacing;Blanking is carried out according to the size;At the top of wall portions or pond Divide template used panel and in length and breadth rib welding fabrication;The requirement of reference Technical code of composite steelform GB/T50214-2013, Bore U-shaped card hole in the stupefied beam portion position of template;
The size that upper manhole inner and outer template is determined according to manhole design size on reservoir, according to measure, then by upper people Hole exterior sheathing rolls welding fabrication, and upper manhole inner template is rolled for scene and is mounted directly;
(2) the construction line-putting:According to the position of reservoir and size, the shoveling sideline of reservoir is put on the ground, meanwhile, in the earthwork The guide pile of intersection is set outside excavation line;
(3) pond body is excavated:It cuts the earth according to unwrapping wire size, after reaching designed elevation, repairs side slope and bottom surface;
(4) Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls processing;
(5) combined steel formwork is installed:Exterior sheathing of the one layer of HDPE antiseepage film as concreting is covered in crater wall;Utilize ground Reservoir position line is led to bottom of pond by the guide pile in face;Concrete pad is placed on template position line;It is being padded according to position line It is successively assembled on block and has propped up combined steel formwork;
(6) pond body concreting:Bottom plate is first poured, after underplate concrete initial set, removes concrete pad;Pool wall concrete It is uniformly placed along surrounding, placement layer by layer, every thickness degree≤500mm;
(7) manhole inner and outer template is installed:Etc. pond bodies concreting forming after, by upper manhole exterior sheathing be placed in pond top coagulation At the upper manhole of soil, it is placed on after upper manhole inner template is rolled and fixed on the inside of upper manhole;
(8) manhole concrete is poured:Concrete is poured between upper manhole inner and outer template, and vibration compacting;
(9) manhole template in dismounting:60 minutes after concrete final set, outboard template in manhole in dismounting;
(10) Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered to the concrete-pool-wall of Chi Ding and upper manhole On;
(11) combined steel formwork is removed:After concreting is completed 48 hours, combined steel formwork is removed from upper manhole position;
(12) earthing is pushed up in pond:After concreting is completed 15 days, original soil is covered on Chi Ding.
2. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:It further include that step (13) are anti- Infiltration processing:One layer of cement is smeared in reservoir inner wall and mortar quality ratio is 1:2 cement mortar.
3. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:In the step (6) and (8) it in, pours with the ten thousand cefpodoxime proxetil cement-based capillary crystalline waterproof coatings for being added with cement weight 2% in concrete.
4. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:It is covered in the step (12) Soil thickness is 800-1500mm.
5. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:In the step (1), It is symmetrically welded on the outside of upper manhole exterior sheathing and lifts handle.
6. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:The pool wall internal diameter is 2- 3m。
7. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:The pool wall and pond are crossed The thickness for meeting place is all big compared with thickness at pool wall and Chi Ding.
8. the production method of small-sized buried reservoir according to claim 1, it is characterized in that:It is described to pour reservoir use Concrete is C20 concrete, and the orthoaluminic acid calcium swelling agent of cement weight 8% is added in concrete.
CN201610867958.XA 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof Active CN106545030B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610867958.XA CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610867958.XA CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106545030A CN106545030A (en) 2017-03-29
CN106545030B true CN106545030B (en) 2018-11-16

Family

ID=58368316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610867958.XA Active CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106545030B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof
CN109183964A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction method
CN109183965A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction technology
CN115288193A (en) * 2022-08-08 2022-11-04 中铁二局集团有限公司 Space large-span dome structure construction method based on multilayer operation platform
CN116591295A (en) * 2023-04-17 2023-08-15 中铁一局集团市政环保工程有限公司 Construction method of anticorrosive coating in PE (polyethylene) plate sewage treatment tank based on multipoint anchoring

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087371A (en) * 1998-09-11 2000-03-28 Kumagai Gumi Co Ltd Execution of underground tank
CN102561779A (en) * 2012-02-17 2012-07-11 陈生金 Barrel-shaped integral concrete water storage tower tank and preparation method thereof
CN203403715U (en) * 2013-08-13 2014-01-22 刘安华 Air formwork pouring high-performance polymeric concrete inflating inspection small water cellar
CN103541573A (en) * 2013-08-13 2014-01-29 刘安华 Air mold pouring polymerization concrete air inflation detection type small water cellar, construction method of small water cellar, application of small water cellar in biogas digester construction and inflatable model special for small water cellar

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087371A (en) * 1998-09-11 2000-03-28 Kumagai Gumi Co Ltd Execution of underground tank
CN102561779A (en) * 2012-02-17 2012-07-11 陈生金 Barrel-shaped integral concrete water storage tower tank and preparation method thereof
CN203403715U (en) * 2013-08-13 2014-01-22 刘安华 Air formwork pouring high-performance polymeric concrete inflating inspection small water cellar
CN103541573A (en) * 2013-08-13 2014-01-29 刘安华 Air mold pouring polymerization concrete air inflation detection type small water cellar, construction method of small water cellar, application of small water cellar in biogas digester construction and inflatable model special for small water cellar

Also Published As

Publication number Publication date
CN106545030A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN106545030B (en) Small-sized buried reservoir of one kind and preparation method thereof
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN102383443B (en) Connection structures between foundation pit support piles and outer walls of basement and construction method
CN103015719B (en) Preliminary work for spudding steel concrete wastewater disposal basin monobloc cast technique
CN101343871A (en) Composite pile with high permanent stability protection layer and its production and construction method
CN101298782A (en) Method and system for basement engineering water proof and water drain
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN113668928B (en) Method for controlling construction cracks of ultra-large-volume concrete water pool
CN103161176B (en) Tower crane foundation construction method in main building disjunctor garage
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN107152034A (en) A kind of pipe gallery and its construction method
CN106638544A (en) Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN207469438U (en) A kind of prefabricated open tubular column
CN206368308U (en) Pre-stress type levelling prefabrication and assembly construction concrete
CN212477794U (en) Large-scale exhibition hall pile slab structure terrace in weak soil area
CN108589758A (en) A kind of foundation structure and construction method of acid-resistance infiltration
CN104234432B (en) Shed deckhead construction method
CN209412856U (en) A kind of assembled integral basement structure meeting stability against floating requirement
CN104250976A (en) Basement
CN111021391A (en) Large-scale exhibition hall pile slab structure terrace in weak soil area
CN111005405A (en) Component for preventing uneven settlement of comprehensive pipe gallery and manufacturing method thereof
CN116290059B (en) Prefabricated ultra-high performance concrete spiral pile cap and construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant