CN106545030A - A kind of small-sized buried cistern and preparation method thereof - Google Patents

A kind of small-sized buried cistern and preparation method thereof Download PDF

Info

Publication number
CN106545030A
CN106545030A CN201610867958.XA CN201610867958A CN106545030A CN 106545030 A CN106545030 A CN 106545030A CN 201610867958 A CN201610867958 A CN 201610867958A CN 106545030 A CN106545030 A CN 106545030A
Authority
CN
China
Prior art keywords
cistern
concrete
template
manhole
cell body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610867958.XA
Other languages
Chinese (zh)
Other versions
CN106545030B (en
Inventor
郝卫增
秦朋立
郭永良
郭强
聂亚辉
杨明
彭志国
武会徐
秦振凯
张国杰
刘宇涛
王海东
姬瑞超
李飞
袁辉
武元轩
宋喜玲
周春言
李剑峰
徐瑞祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Chengxing Construction Engineering Co Ltd
Henan Linxiang Engineering Construction Co Ltd
TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd
Original Assignee
Henan Chengxing Construction Engineering Co Ltd
Henan Linxiang Engineering Construction Co Ltd
TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Chengxing Construction Engineering Co Ltd, Henan Linxiang Engineering Construction Co Ltd, TIHOME CONSTRUCTION AND DEVELOPMENT Co Ltd filed Critical Henan Chengxing Construction Engineering Co Ltd
Priority to CN201610867958.XA priority Critical patent/CN106545030B/en
Publication of CN106545030A publication Critical patent/CN106545030A/en
Application granted granted Critical
Publication of CN106545030B publication Critical patent/CN106545030B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of small-sized buried cistern and preparation method thereof;Cistern includes cell body and upper manhole, and cell body includes base plate, pool wall and top board, and pool wall is circular configuration, and top board is dome structure;Cell body is plain concrete one-time-concreting molding structure;In the manufacture method of cistern, cell body is the one layer of HDPE antiseepage film covered using in crater wall as exterior sheathing, with the combined steel formwork with cell body form fit as inner template primary concreting molding, upper manhole is that above manhole inner and outer template pours molding, specifically includes making template, the construction line-putting, cell body excavations, Ground Treatment, installs combined steel formwork, cell body concreting, install manhole inner and outer template, pour outboard template in manhole concrete, the upper manhole of dismountings, Chi Ding covering antiseepage film, dismounting combined steel formwork and pond and push up the steps such as earthing.Good seepage-proof property of the present invention, long service life, headroom can be with effectively utilizes, and the construction period is short, low cost.

Description

A kind of small-sized buried cistern and preparation method thereof
Technical field
The invention belongs to cistern technical field of construction, more particularly to a kind of small-sized buried cistern and its making side Method.
Background technology
In the rare area in drinking water source, many families or unit all have cistern, for solving the problems, such as domestic water. With economic continuous development, although tap water has realized all standing substantially, due to the needs of management of the use of water, especially winter water Event Jing of pipe bursting by freezing often occurs, and cistern still plays an important role in some regions.
But for a long time, cistern occurs with buried form, and version is also varied.Common pool wall material is Brick, stone, concrete, it is prefabricated section or monolithic reinforced concrete structure that top board is most of.No matter which kind of existing structure, is using During, there are problems:1st, as pool wall and pond top board bound fraction process bad, pond Zhong Shui is contaminated often; 2nd, due to being limited by top board arrangement of reinforcement or the bearing capacity of precoated plate is limited to, earthing, pond top upper space on top board, are not allowed Utilization be restricted;3rd, after common rectangular configuration pond uses for many years, there is crack, drainage is serious, using the longevity Life is short;4th, pool wall adopts rectangular configuration, and pool wall lateral pressure is big, the necessary arrangement of reinforcement of concrete-pool-wall, and Chi Ding adopts reinforced concrete Soil structure, above earthing, arrangement of reinforcement necessarily increases;Thus construction period length, cost are high.
The content of the invention
The technical problem to be solved in the present invention is exactly to overcome above-mentioned the deficiencies in the prior art, and offer one kind being capable of antiseepage effect Really good, long service life, headroom can be with effectively utilizes, and the construction period is short, low cost small-sized buried cistern Manufacture method.
To solve above-mentioned technical problem, the technical solution used in the present invention is:
A kind of small-sized buried cistern of design, including cell body and upper manhole, wherein cell body include base plate, pool wall and top board, institute It is circular configuration to state pool wall, and top board is dome structure;The cell body is plain concrete one-time-concreting molding structure.
Preferably, in above-mentioned small-sized buried cistern, the pool wall internal diameter is 2-3m.
Preferably, in above-mentioned small-sized buried cistern, the thickness of the pool wall and Chi Ding junctions is compared with pool wall and pond Top thickness degree is all big.
Preferably, in above-mentioned small-sized buried cistern, the cistern concrete that pours is C20 concrete, and The orthoaluminic acid calcium extender of cement weight 8% is added with concrete.
The manufacture method that a kind of small-sized buried cistern described in as above any one is simultaneously also provided, the cell body be with The one layer of HDPE antiseepage film covered in crater wall as exterior sheathing, with the combined steel formwork with cell body form fit as inner template once Property pours molding;The upper manhole is that above manhole inner and outer template pours molding;Specifically include following steps:
(1)Make template:According to cistern design size, using the method for calculating, setting-out combines, wall portions and pond are determined The size of the template used rib in length and breadth in top point and form surfacing;Blanking is carried out according to the size;At the top of wall portions or pond Point template used panel and in length and breadth rib welding fabrication;With reference to Technical code of composite steelform(GB/T50214-2013)Requirement, U-shaped card hole is bored in the stupefied beam portion position of template;
The size of upper manhole inner and outer template is determined according to manhole design size on cistern, according to measure, then by upper people Hole exterior sheathing rolls welding fabrication, and upper manhole inner template is rolled for scene and is mounted directly;
(2)The construction line-putting:According to position and the size of cistern, the shoveling sideline of cistern is put on the ground, meanwhile, in the earthwork Intersecting guide pile is set outside excavation line;
(3)Cell body is excavated:Cut the earth according to unwrapping wire size, after reaching designed elevation, repair side slope and bottom surface;
(4)Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls process;
(5)Combined steel formwork is installed:One layer of HDPE antiseepage film is covered in crater wall as the exterior sheathing of concreting;Using ground Cistern position line is caused bottom of pond by the guide pile in face;Concrete pad is placed on template position line;According to position line in pad Assembled on block successively and a good combined steel formwork;
(6)Cell body concreting:Base plate is first poured, after underplate concrete initial set, concrete pad is removed;Pool wall concrete Uniformly place along surrounding, placement layer by layer, per thickness degree≤500mm;
(7)Install manhole inner and outer template:After Deng cell body concreting shaping, upper manhole exterior sheathing is placed in into pond top coagulation At the upper manhole of soil, upper manhole inner template is rolled and is placed on the inside of upper manhole after fixing;
(8)Pour manhole concrete:Concrete is poured between upper manhole inner and outer template, and vibration compacting;
(9)Manhole template in dismounting:60 minutes after concrete final set, outboard template in manhole in dismounting;
(10)Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered into the concrete-pool-wall of Chi Ding and upper manhole On;
(11)Remove combined steel formwork:After concreting completes 48 hours, combined steel formwork is removed from upper manhole position;
(12)Push up earthing in pond:After concreting completes 15 days, original soil is covered on Chi Ding.
Preferably, in above-mentioned small-sized buried cistern manufacture method, also including step(13)Anti-seeping technology:In water-retention It is 1 that pond inwall smears one layer of cement and mortar quality ratio:2 cement mortar.
Preferably, in above-mentioned small-sized buried cistern manufacture method, in the step(6)With(8)In, pour and use mixed Solidifying soil is added with ten thousand CEPODEM cement-based capillary crystalline waterproof coatings of cement weight 2%.
Preferably, in above-mentioned small-sized buried cistern manufacture method, the step(12)Middle thickness of earth covering is 800- 1500mm。
Preferably, in above-mentioned small-sized buried cistern manufacture method, in the step(1)In, upper manhole exterior sheathing Outside be symmetrically welded with and lift handle.
The beneficial effect of technical solution of the present invention is:
1st, pool wall of the present invention adopts circular design, makes pool wall before non-water filling, and the soil body is applied with precompressed to birdcage should Power, after water filling, to the stress of pool wall less than native stress, pool wall will not be produced crack to water by water ballast(ing).And, pool wall is adopted Plain concrete pours molding, makes full use of the compressive property of plain concrete, the various load circular arch knots that pool wall normal condition occurs Structure can bear.Thus, good seepage-proof property, long service life.
2nd, Chi Ding of the present invention adopts dome structure, and pours molding using plain concrete, makes full use of the anti-of plain concrete Pressure performance, the various load dome structures that pond top normal condition occurs can be born.Thus, long service life, headroom Can be with effectively utilizes.
3rd, when specifically used, certain thickness original soil is coated with Chi Ding, whole cistern may be at below frozen soil, entirely Usage cycles are in a kind of temperature constant state, and whole pond will not produce crack due to temperature stress.Thus, good seepage-proof property, Long service life.
4th, crater wall of the present invention is covered with HDPE antiseepage film, after waiting pond top concreting to finish, can directly overlie pond On the concrete of top, a kind of water proof effect is played, it is to avoid outside contamination water.
5th, to sum up, reasonable in design, process is simple of the invention and easy to implement;Good seepage-proof property, long service life, top are empty Between can be with effectively utilizes, using full plain concrete construction, short construction period, low cost.
Description of the drawings
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is described in further detail, wherein:
Fig. 1 is the structural representation of the small-sized buried cistern of the present invention;
Fig. 2 is the structural representation during the small-sized buried cistern of the present invention makes;
Fig. 3 is the structural representation after the making shown in Fig. 2;
Sequence number in figure:1st, cell body, 2, upper manhole, 3, HDPE antiseepage film, 4, combined steel formwork, 5, upper manhole inner template, 6, upper people Hole exterior sheathing, 7, concrete pad, 8, earthing.
Specific embodiment
With reference to the accompanying drawings and examples illustrating the specific embodiment of the present invention, but following examples are used only to specifically The bright present invention, and the scope of the present invention is limited never in any form, involved instrument element is such as without spy in the examples below Do not mentionlet alone bright, be conventional instrument element.
Embodiment 1:
Referring to Fig. 1, in figure, the small-sized buried cistern of the present invention, including cell body 1 and upper manhole 2, wherein cell body include base plate, Pool wall and top board, pool wall are circular configuration, and top board is dome structure;Cell body is plain concrete one-time-concreting molding structure.Pool wall Internal diameter is 2m, and pool wall depth is 1m, and pond dome height is 1m.
Further, the concrete for pouring cistern can adopt the concrete of C20, concrete add cement weight 8% orthoaluminic acid calcium extender.Contour compensation, and the work with filling, blocking capillary slit can be carried out to the contraction of concrete With drastically increasing the seepage control and crack resistance ability of concrete, and it be less to increase cost.
The thickness of institute's casting concrete is 200mm, and wherein pool wall is intersected upper and lower 300mm positions concrete thickness and increased with Chi Ding Add as 300mm.Avoid pool wall from concentrating with Chi Ding intersections stress and cause cracking, strengthen antiseepage function, improve making for cell body Use the life-span.
Embodiment 2:
The present embodiment is similar to 1 structure of embodiment, and its structure same section here is no longer repeated, and its difference is:The present embodiment Cistern pool wall internal diameter is 3m.
Embodiment 3:
Referring to Fig. 2-3, in figure, the as described in Example 1 small-sized buried cistern manufacture method of the present invention, wherein cell body 1 is The one layer of HDPE antiseepage film 3 covered using in crater wall is as exterior sheathing, with the combined steel formwork 4 with cell body form fit as inner template Primary concreting molding;Upper manhole 2 is located in the middle of the top of pond and is that above manhole inner and outer template 5,6 pours molding;Specifically include with Lower step:
(1)Make template:
Cistern intended diameter 2m, using the method for calculating, setting-out combines, to determine and divide template used at the top of wall portions and pond The size of rib and form surfacing in length and breadth;Every piece of gang form width of wall portions is 200mm, is highly 500mm;Divide at the top of pond every Block gang form is most wide and length is determined according to calculating and full scale layout;By form surfacing(2mm thick steel plate is made)And in length and breadth Rib(5mm thick steel plate is made)Welding fabrication;With reference to Technical code of composite steelform(GB/T50214-2013)Requirement, in mould Bore U-shaped card hole in the stupefied beam portion position of plate;
Upper manhole inner and outer template is according to manhole design size on cistern, wherein upper manhole exterior sheathing is by 2mm with veneer reeling machine Thick steel plate is processed into cylindric, then welding forming, meanwhile, the round steel for symmetrically having two diameters 20 of welding in cylindrical outer side is made To lift handle;And iron sheet is then rolled scene and is mounted directly by upper manhole inner template;
(2)The construction line-putting:According to position and the size of cistern, the shoveling sideline of cistern is put on the ground, meanwhile, in the earthwork At the outer 1m of excavation line, four intersecting guide piles are set;
(3)Cell body is excavated:Cut the earth according to unwrapping wire size with digging machine, after reaching designed elevation, side slope and bottom are repaired with spade The flatness in face;
(4)Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls process, compacting factor is 0.95;
(5)Combined steel formwork is installed:One layer of HDPE antiseepage film is covered on the wall of Chi Keng sides as the exterior sheathing of concreting;Profit With the guide pile on ground, cistern position line is caused into bottom of pond;The concrete pad 7 of 200 thickness is placed on template position line;Press Assembled on cushion block successively and propped up according to position line and combine special steel form;
(6)Cell body is poured:Base plate is first poured, after base plate strength be enough to support combinations template, concrete pad is removed;Pool wall is mixed Solidifying soil is uniformly placed along surrounding and placement layer by layer, per thickness degree no more than 500mm;Concrete is pushed up on the basis of vibration compacting in pond On, it is compacted twice with wooden float before concrete initial set;
(7)Install manhole template:Shape Deng cell body concreting, upper manhole exterior sheathing is pacified before final set after concrete initial set It is placed at the upper manhole of pond top concrete;3mm thick iron sheet is rolled and is placed directly on the inside of upper manhole, crossed overlapping in iron sheet Fixed with iron wire;
(8)Pour manhole concrete:Concrete is poured between upper manhole inner and outer template, manual vibration compacting;
(9)Outboard template in manhole in dismounting:60 minutes after concrete final set, exterior sheathing is carried using the handle in template Rise, and remove the inner template on the inside of upper manhole;
(10)Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered into the concrete-pool-wall of Chi Ding and upper manhole On, the foldable process of redundance.
(11)Remove combined steel formwork:After concreting completes 48 hours, cell body dedicated set is removed from upper manhole position Close steel form;
(12)Push up earthing in pond:After concreting completes 15 days, original soil is covered on Chi Ding;8 thickness of earthing is 800mm;
(13)It is anti-to mix process:In institute's casting concrete inner surface(That is cistern inwall)Smear one layer 1:2 cement mortar, increase antiseepage Effect.
Through research worker test of many times, it is found that pool wall adopts rectangular configuration, pool wall lateral pressure is big, and concrete-pool-wall is necessary Arrangement of reinforcement etc., but pool wall adopts circular configuration, forms a kind of birdcage, can make full use of the compressive property of plain concrete, together When, before water filling, the soil body increases a pre-compression stress to pool wall, effectively prevents the crack problem of pool wall.And, Chi Ding is using pre- Making sheet, above earthing, it is impossible to ensure structure safety, Chi Ding adopts reinforced concrete structure, above earthing, arrangement of reinforcement necessarily increases, It is uneconomical, but Chi Ding adopts plain concrete dome structure, has equally given full play to the compressive property of concrete, that is, has met structure The demand of safety, also solves economy problems.After the earthing of pond top, upper space can also reach and make full use of.
Therefore, application of the present invention in Practical Project show, the method can effectively solve the problem that cistern water easily pollute, The problem that position can not make full use of at the top of easy leak, pond, the method are based on good seepage-proof property, long service life, and headroom can With effectively utilizes, and the construction period is short, low cost, and achieved with public's praise, social benefit is obvious.
Embodiment 4, the present embodiment is different from where embodiment 3 being:The present embodiment pond push up centre beyond other The upper manhole of position indwelling one, after form removal, the upper manhole closure on Chi Ding.
Embodiment 5, this example is different from where embodiment 3 being:The present embodiment saves step(13), in step(6) With(8)In pour with concrete add cement weight 2% ten thousand CEPODEM cement-based capillary crystalline waterproof coatings to replace step (13)Middle cistern inwall smears 1:2 cement mortar are used as Anti-seeping technology.
Additionally, manufacture method of the present invention can also be applied to the making of methane-generating pit, simply methane-generating pit in manufacturing process not With considering that cistern water quality is polluted by outside body of water, i.e., HDPE antiseepage film can not be covered on the outside of pool wall.
In this specification, each embodiment is described by the way of progressive, and what each embodiment was stressed is and which The difference of its embodiment, between each embodiment, identical similar part is cross-referenced.
The present invention is described in detail above in conjunction with drawings and Examples, but, those of skill in the art Member is it is understood that on the premise of without departing from present inventive concept, can also carry out to the design parameter of each in above-described embodiment Change, forms multiple specific embodiments, is the common excursion of the present invention, and here is no longer described in detail one by one.

Claims (9)

1. a kind of small-sized buried cistern, including cell body and upper manhole, wherein cell body include base plate, pool wall and top board, and which is special Levying is:The pool wall is circular configuration, and top board is dome structure;The cell body is plain concrete one-time-concreting molding structure.
2. small-sized buried cistern according to claim 1, is characterized in that:The pool wall internal diameter is 2-3m.
3. small-sized buried cistern according to claim 1, is characterized in that:The pool wall and the thickness of Chi Ding junctions It is all big compared with thickness at pool wall and Chi Ding.
4. small-sized buried cistern according to claim 1, is characterized in that:The cistern that pours with concrete is C20 concrete, and in concrete, it is added with the orthoaluminic acid calcium extender of cement weight 8%.
5. a kind of manufacture method of the small-sized buried cistern as described in any one of Claims 1-4, is characterized in that:It is described Cell body is the one layer of HDPE antiseepage film covered using in crater wall as exterior sheathing, with the combined steel formwork with cell body form fit as interior Template primary concreting molding;The upper manhole is that above manhole inner and outer template pours molding;Specifically include following steps:
(1)Make template:According to cistern design size, using the method for calculating, setting-out combines, wall portions and pond are determined The size of the template used rib in length and breadth in top point and form surfacing;Blanking is carried out according to the size;At the top of wall portions or pond Point template used panel and in length and breadth rib welding fabrication;With reference to Technical code of composite steelform(GB/T50214-2013)Requirement, U-shaped card hole is bored in the stupefied beam portion position of template;
The size of upper manhole inner and outer template is determined according to manhole design size on cistern, according to measure, then by upper people Hole exterior sheathing rolls welding fabrication, and upper manhole inner template is rolled for scene and is mounted directly;
(2)The construction line-putting:According to position and the size of cistern, the shoveling sideline of cistern is put on the ground, meanwhile, in the earthwork Intersecting guide pile is set outside excavation line;
(3)Cell body is excavated:Cut the earth according to unwrapping wire size, after reaching designed elevation, repair side slope and bottom surface;
(4)Ground Treatment:According to edaphic condition, compacting is carried out to ground and rolls process;
(5)Combined steel formwork is installed:One layer of HDPE antiseepage film is covered in crater wall as the exterior sheathing of concreting;Using ground Cistern position line is caused bottom of pond by the guide pile in face;Concrete pad is placed on template position line;According to position line in pad Assembled on block successively and a good combined steel formwork;
(6)Cell body concreting:Base plate is first poured, after underplate concrete initial set, concrete pad is removed;Pool wall concrete Uniformly place along surrounding, placement layer by layer, per thickness degree≤500mm;
(7)Install manhole inner and outer template:After Deng cell body concreting shaping, upper manhole exterior sheathing is placed in into pond top coagulation At the upper manhole of soil, upper manhole inner template is rolled and is placed on the inside of upper manhole after fixing;
(8)Pour manhole concrete:Concrete is poured between upper manhole inner and outer template, and vibration compacting;
(9)Manhole template in dismounting:60 minutes after concrete final set, outboard template in manhole in dismounting;
(10)Chi Ding covers antiseepage film:The HDPE antiseepage film that pool wall is reserved is covered into the concrete-pool-wall of Chi Ding and upper manhole On;
(11)Remove combined steel formwork:After concreting completes 48 hours, combined steel formwork is removed from upper manhole position;
(12)Push up earthing in pond:After concreting completes 15 days, original soil is covered on Chi Ding.
6. small-sized buried cistern manufacture method according to claim 5, is characterized in that:Also include step(13)Antiseepage Process:It is 1 that one layer of cement and mortar quality ratio are smeared in cistern inwall:2 cement mortar.
7. small-sized buried cistern manufacture method according to claim 5, is characterized in that:In the step(6)With(8) In, pour with the ten thousand CEPODEM cement-based capillary crystalline waterproof coatings that cement weight 2% is added with concrete.
8. small-sized buried cistern manufacture method according to claim 5, is characterized in that:The step(12)Middle earthing Thickness is 800-1500mm.
9. small-sized buried cistern manufacture method according to claim 5, is characterized in that:In the step(1)In, on It is symmetrically welded with the outside of manhole exterior sheathing and lifts handle.
CN201610867958.XA 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof Active CN106545030B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610867958.XA CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610867958.XA CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106545030A true CN106545030A (en) 2017-03-29
CN106545030B CN106545030B (en) 2018-11-16

Family

ID=58368316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610867958.XA Active CN106545030B (en) 2016-09-30 2016-09-30 Small-sized buried reservoir of one kind and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106545030B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof
CN109183964A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction method
CN109183965A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction technology
CN115288193A (en) * 2022-08-08 2022-11-04 中铁二局集团有限公司 Space large-span dome structure construction method based on multilayer operation platform
CN116591295A (en) * 2023-04-17 2023-08-15 中铁一局集团市政环保工程有限公司 Construction method of anticorrosive coating in PE (polyethylene) plate sewage treatment tank based on multipoint anchoring

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087371A (en) * 1998-09-11 2000-03-28 Kumagai Gumi Co Ltd Execution of underground tank
CN102561779A (en) * 2012-02-17 2012-07-11 陈生金 Barrel-shaped integral concrete water storage tower tank and preparation method thereof
CN203403715U (en) * 2013-08-13 2014-01-22 刘安华 Air formwork pouring high-performance polymeric concrete inflating inspection small water cellar
CN103541573A (en) * 2013-08-13 2014-01-29 刘安华 Air mold pouring polymerization concrete air inflation detection type small water cellar, construction method of small water cellar, application of small water cellar in biogas digester construction and inflatable model special for small water cellar

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087371A (en) * 1998-09-11 2000-03-28 Kumagai Gumi Co Ltd Execution of underground tank
CN102561779A (en) * 2012-02-17 2012-07-11 陈生金 Barrel-shaped integral concrete water storage tower tank and preparation method thereof
CN203403715U (en) * 2013-08-13 2014-01-22 刘安华 Air formwork pouring high-performance polymeric concrete inflating inspection small water cellar
CN103541573A (en) * 2013-08-13 2014-01-29 刘安华 Air mold pouring polymerization concrete air inflation detection type small water cellar, construction method of small water cellar, application of small water cellar in biogas digester construction and inflatable model special for small water cellar

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof
CN109183964A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction method
CN109183965A (en) * 2018-09-05 2019-01-11 中铁贵州工程有限公司 A kind of storage pond construction technology
CN115288193A (en) * 2022-08-08 2022-11-04 中铁二局集团有限公司 Space large-span dome structure construction method based on multilayer operation platform
CN116591295A (en) * 2023-04-17 2023-08-15 中铁一局集团市政环保工程有限公司 Construction method of anticorrosive coating in PE (polyethylene) plate sewage treatment tank based on multipoint anchoring

Also Published As

Publication number Publication date
CN106545030B (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN106545030B (en) Small-sized buried reservoir of one kind and preparation method thereof
CN103015719B (en) Integral casting process for reinforced concrete wastewater tank of pre-drilling engineering
CN206376276U (en) A kind of prefabricated pipe gallery
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN201280725Y (en) Post-casting construction precast slab for basement of buildings
CN101343871A (en) Composite pile with high permanent stability protection layer and its production and construction method
CN107355010A (en) Precast concrete shear wall shaped steel node connection structure
WO2023155469A1 (en) Road structure transformed from oversized detached underground garage and construction method thereof
CN110158645A (en) Prefabricated components Hybrid connections assembly concrete pipe gallery
CN109723055B (en) Underground diaphragm wall bottom reinforcing structure and construction method thereof
CN114032943A (en) Cold region fabricated concrete bearing platform and miniature pile combined foundation
CN107268675A (en) Laying method and structure of combined multi-bin underground comprehensive pipe gallery
CN212477794U (en) Large-scale exhibition hall pile slab structure terrace in weak soil area
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN110130934A (en) The construction method of city tunnel bifurcation mouth with box top board structure
CN206368308U (en) Pre-stress type levelling prefabrication and assembly construction concrete
CN109594590A (en) Building basement waterproof treatment structure and its construction method under the conditions of a kind of rock-mass
CN108589758A (en) A kind of foundation structure and construction method of acid-resistance infiltration
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN103015457A (en) Method for building rural brick buried sewage treatment facility
Deng et al. Construction materials and structures of digesters
CN111005405A (en) Component for preventing uneven settlement of comprehensive pipe gallery and manufacturing method thereof
CN206233254U (en) A kind of underground captation
CN218147591U (en) Prefabricated sidewalk plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant