CN103526931A - Concrete wallboard anti-crack steel-plastic grating web construction method - Google Patents

Concrete wallboard anti-crack steel-plastic grating web construction method Download PDF

Info

Publication number
CN103526931A
CN103526931A CN201310502715.2A CN201310502715A CN103526931A CN 103526931 A CN103526931 A CN 103526931A CN 201310502715 A CN201310502715 A CN 201310502715A CN 103526931 A CN103526931 A CN 103526931A
Authority
CN
China
Prior art keywords
concrete
plastic geogrid
steel plastic
wallboard
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310502715.2A
Other languages
Chinese (zh)
Inventor
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310502715.2A priority Critical patent/CN103526931A/en
Publication of CN103526931A publication Critical patent/CN103526931A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a concrete wallboard anti-crack steel-plastic grating web construction method. A positioning clamp is fixedly welded to a vertical steel bar of a wallboard and is used for hanging and fixing a steel-plastic geogrid, one end of the positioning clamp is bound to the steel-plastic geogrid, the other end of the positioning clamp is welded to the vertical steel bar of the wallboard and forms a composite interlocking system with a concrete wall, then conceal inspection is carried out, concrete pouring is carried out after conceal inspection is qualified, and maintenance work is carried out well after concrete pouring is finished. According to the method, construction is convenient to achieve, leaking and cracking phenomena can be effectively avoided, the concrete anti-crack requirement is met, concrete structural quality is well guaranteed, and obvious social benefits and economical benefits are achieved.

Description

Concrete wall slab is moulded cracking resistance grid job practices
Technical field
The present invention relates to a kind of concrete wall slab and mould cracking resistance grid job practices.
Background technology
Concrete material is current most widely used constructional materials, but concrete produces the shortcoming of embrittlement cracking because of contraction.Affected the use function of cracking resistance seepage resistance demand higher buildings, the crack of reinforced concrete structure and seepage, become the significant problem that perplexs reinforced concrete structure quality.
Summary of the invention
The object of the present invention is to provide a kind of concrete wall slab that causes seepage and crack phenomenon to occur of effectively avoiding to mould cracking resistance grid job practices.
Technical solution of the present invention is:
A kind of concrete wall slab is moulded cracking resistance grid job practices, it is characterized in that: comprise the following steps: after concrete panel reinforcing bar is checked and accepted, on wallboard vertical reinforcement, be welded and fixed locator card, for hanging and fixing steel plastic geogrid, one end colligation steel plastic geogrid of locator card, the other end and wallboard vertical reinforced-bar-welding, form compound interlocking system with concrete wall, steel plastic geogrid is arranged within the scope of the concrete cover that 50 ㎜ are thick, apart from body of wall vertical reinforcement 30 ㎜ and apart from concrete wall external surface 20 ㎜, steel plastic geogrid from external surface too close to concrete to the bond stress of steel plastic geogrid, can not guarantee, from external surface, do not reach effect of prestressed away from too, then carry out carrying out concrete construction after hidden acceptance(check), during concreting, adopt poker vibrator to carry out jolt ramming, vibration frequency and time are can make the composition of air effusion in mixture be as the criterion, the vibrator spacing of vibrating is 30~40 ㎝, insertion depth is 50 ㎝, after using secondary vibration technique 20~30min, shake again, the concrete protective bed thickness outside wallboard vertical reinforcement is 50 ㎜, after building, carry out maintenance work.
Described locator card is half-twist and " does " font, and steel plastic geogrid is fixed in head two parallel arms of " doing " font.
Easy construction of the present invention, effectively avoids causing seepage and crack phenomenon to occur, and has both reached the requirement of concrete anticracking, has well guaranteed again to have obvious Social benefit and economic benefit by concrete structure quality.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is steel plastic geogrid scheme of installation of the present invention.
The specific embodiment
A kind of concrete wall slab is moulded cracking resistance grid job practices, comprise the following steps: after concrete panel reinforcing bar is checked and accepted, on wallboard vertical reinforcement 1, be welded and fixed locator card 2, for hanging and fixing steel plastic geogrid 3, one end colligation steel plastic geogrid of locator card, the other end and wallboard vertical reinforced-bar-welding, form compound interlocking system with concrete wall, steel plastic geogrid is arranged within the scope of the concrete cover that 50 ㎜ are thick, apart from body of wall vertical reinforcement 30 ㎜ and apart from concrete wall external surface 20 ㎜, steel plastic geogrid from external surface too close to concrete to the bond stress of steel plastic geogrid, can not guarantee, from external surface, do not reach effect of prestressed away from too, then carry out carrying out concrete construction after hidden acceptance(check), during concreting, adopt poker vibrator to carry out jolt ramming, vibration frequency and time are can make the composition of air effusion in mixture be as the criterion, the vibrator spacing of vibrating is 30~40 ㎝, insertion depth is 50 ㎝, after using secondary vibration technique 20~30min, shake again, the concrete protective bed thickness outside wallboard vertical reinforcement is 50 ㎜, after building, carry out maintenance work.
Described locator card is half-twist and " does " font, and steel plastic geogrid is fixed in head two parallel arms of " doing " font.

Claims (2)

1. a concrete wall slab is moulded cracking resistance grid job practices, it is characterized in that: comprise the following steps: after concrete panel reinforcing bar is checked and accepted, on wallboard vertical reinforcement, be welded and fixed locator card, for hanging and fixing steel plastic geogrid, one end colligation steel plastic geogrid of locator card, the other end and wallboard vertical reinforced-bar-welding, form compound interlocking system with concrete wall, steel plastic geogrid is arranged within the scope of the concrete cover that 50 ㎜ are thick, apart from body of wall vertical reinforcement 30 ㎜ and apart from concrete wall external surface 20 ㎜, steel plastic geogrid from external surface too close to concrete to the bond stress of steel plastic geogrid, can not guarantee, from external surface, do not reach effect of prestressed away from too, then carry out carrying out concrete construction after hidden acceptance(check), during concreting, adopt poker vibrator to carry out jolt ramming, vibration frequency and time are can make the composition of air effusion in mixture be as the criterion, the vibrator spacing of vibrating is 30~40 ㎝, insertion depth is 50 ㎝, after using secondary vibration technique 20~30min, shake again, the concrete protective bed thickness outside wallboard vertical reinforcement is 50 ㎜, after building, carry out maintenance work.
2. concrete wall slab according to claim 1 is moulded cracking resistance grid job practices, it is characterized in that: described locator card is " doing " font of half-twist, and steel plastic geogrid is fixed in head two parallel arms of " doing " font.
CN201310502715.2A 2013-10-24 2013-10-24 Concrete wallboard anti-crack steel-plastic grating web construction method Pending CN103526931A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310502715.2A CN103526931A (en) 2013-10-24 2013-10-24 Concrete wallboard anti-crack steel-plastic grating web construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310502715.2A CN103526931A (en) 2013-10-24 2013-10-24 Concrete wallboard anti-crack steel-plastic grating web construction method

Publications (1)

Publication Number Publication Date
CN103526931A true CN103526931A (en) 2014-01-22

Family

ID=49929251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310502715.2A Pending CN103526931A (en) 2013-10-24 2013-10-24 Concrete wallboard anti-crack steel-plastic grating web construction method

Country Status (1)

Country Link
CN (1) CN103526931A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018601A (en) * 2014-06-06 2014-09-03 江苏扬建集团有限公司 Method for constructing concrete wallboard in pouring mode through steel-plastic anti-crack grilles
CN113356394A (en) * 2021-05-17 2021-09-07 林培炎 Anti-corrosion precast concrete wallboard

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672182U (en) * 2012-06-06 2013-01-16 浙江省科威工程咨询有限公司 Reinforcing slab and geogrid reinforced retaining wall
CN103321320A (en) * 2013-06-27 2013-09-25 彭代汉 Anti-vibration wall and mounting and constructing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672182U (en) * 2012-06-06 2013-01-16 浙江省科威工程咨询有限公司 Reinforcing slab and geogrid reinforced retaining wall
CN103321320A (en) * 2013-06-27 2013-09-25 彭代汉 Anti-vibration wall and mounting and constructing method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李世波: "浅谈混凝土的二次振捣", 《土木建筑学术文库》 *
陈志岳: "关于混凝土二次振捣施工技术的讨论", 《价值工程》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018601A (en) * 2014-06-06 2014-09-03 江苏扬建集团有限公司 Method for constructing concrete wallboard in pouring mode through steel-plastic anti-crack grilles
CN113356394A (en) * 2021-05-17 2021-09-07 林培炎 Anti-corrosion precast concrete wallboard

Similar Documents

Publication Publication Date Title
CN101294423B (en) Construction method for embedding thermal insulation in concrete structure exterior wall surface
CN104963289B (en) A kind of abnormity pier stud mass concrete overall time pouring construction method
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN104032771B (en) Anti-cracking construction method for additionally arranging induction joint on underground structure
CN105442629B (en) A kind of large scale equipment T stage vibration isolation mounts construction
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN103485370B (en) A kind of concrete construction control method preventing wallboard harmful cracks
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN205399774U (en) Cast -in -place hollow superstructure mandrel is anti to float and prevents side and move structure
CN103696437A (en) Construction method for cutting latticed column
CN103526931A (en) Concrete wallboard anti-crack steel-plastic grating web construction method
CN101845797A (en) One-step molding method of vase-shaped columnar pier for urban viaduct bridges
CN105908883A (en) Construction method for preventing upward floating of composite floor system lightweight core formwork
CN208870274U (en) Concrete prefabricated board and concrete folding plate
CN204163113U (en) A kind of nethike embrane formula ater-casting being applied to basement wall slab
CN203394019U (en) Frame type template structure for placing of concrete
CN103161311A (en) Construction method for transverse penetration of long-diameter reinforced concrete pipeline through bridge abutment
CN105839824B (en) Shed deckhead construction method
CN107023078A (en) Assemble cast-in-place combined type superposed box mesh-beam floor system and construction method
CN102220808A (en) Beam lowering construction method of frame structure
CN202689278U (en) Superimposed hollow slab
CN102605895B (en) Installation and construction method of ceiling board heat insulation mortar prefabricated block
CN105064710B (en) It is a kind of to be used for insulate against sound the outrigger formula balcony reinforcement means transformed and ruggedized construction
CN105178264B (en) Magnetic embedded steel plate fixing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140122