CN103514490A - 一种基于广义外推法的用户超短期用电量预测方法和系统 - Google Patents

一种基于广义外推法的用户超短期用电量预测方法和系统 Download PDF

Info

Publication number
CN103514490A
CN103514490A CN201310474103.7A CN201310474103A CN103514490A CN 103514490 A CN103514490 A CN 103514490A CN 201310474103 A CN201310474103 A CN 201310474103A CN 103514490 A CN103514490 A CN 103514490A
Authority
CN
China
Prior art keywords
power consumption
value
extrapolation
constantly
demand forecasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310474103.7A
Other languages
English (en)
Inventor
李艳西
刘小平
唐义德
刘永亮
齐明
张鹏
蒋苏湘
陈中伟
谢俭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN TONGFEI POWER SWITCHING INFORMATION CO Ltd
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Hunan Electric Power Co Ltd
Original Assignee
HUNAN TONGFEI POWER SWITCHING INFORMATION CO Ltd
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN TONGFEI POWER SWITCHING INFORMATION CO Ltd, State Grid Corp of China SGCC, Information and Telecommunication Branch of State Grid Hunan Electric Power Co Ltd filed Critical HUNAN TONGFEI POWER SWITCHING INFORMATION CO Ltd
Priority to CN201310474103.7A priority Critical patent/CN103514490A/zh
Publication of CN103514490A publication Critical patent/CN103514490A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提供一种基于广义外推法的用户超短期用电量预测方法,包括如下步骤:1)考虑用电量的横向性、周期性影响,利用电量求导法求取用电量预测值P1;2)考虑用电量的纵向性、延续性影响,利用增量外推法求取用电量预测值P2;3)利用广义外推法综合利用电量求导法求取用电量预测值P1和利用增量外推法求取用电量预测值P2,获得最终超短期电量预测值P,P=w1P1+w2P2,w1、w2分别为其对应的权重因子,w1+w2=1。本发明还提供一种基于广义外推法的用户超短期用电量预测系统。

Description

一种基于广义外推法的用户超短期用电量预测方法和系统
发明领域
本发明涉及一种用户超短期用电量预测方法和系统。更具体地,本发明涉及一种基于广义外推法的用户超短期用电量预测方法和系统。
背景技术
实际电力生产过程中,用户用电量预测非常重要,对于中长期用电量的预测,现有技术中国专利公开号CN10287221A公开的一种中长期电量预测动态横向修正方法。而对于短期、特别是超短期用电量预测研究显得不足,现有技术中已知使用常规的趋势外推法来预测短期用户用电量,但是准确度不高。因此存在研究更准确的预测方法的需求。
发明内容
本发明目的在于提供一种基于广义外推法的用户超短期用电量预测方法和系统,填补在该领域的空白。
一种基于广义外推法的用户超短期用电量预测方法,包括如下步骤:
1)考虑用电量的横向性、周期性影响,利用电量求导法求取用电量预测值P1;
2)考虑用电量的纵向性、延续性影响,利用增量外推法求取用电量预测值P2;
3)利用广义外推法综合利用电量求导法求取用电量预测值P1和利用增量外推法求取用电量预测值P2,获得最终超短期电量预测值P,P=w1P1+w2P2,w1、w2分别为其对应的权重因子,w1+w2=1。
其中,利用电量求导法求取用电量预测值P1的步骤包括如下子步骤:
1)从用电量数据库获取历史用电量序列P(i),(i=1,2,3,…);
2)利用历史用电量序列,求取在第i点的用电量变换率的预测值ΔP(i)fore
Figure BDA0000394410130000021
其中D为选用用电量的过去时刻数;Kj为第j时刻的合适因子,
Figure BDA0000394410130000022
ΔPj(i)re为第j时刻的第i点ΔP(i)re
3)根据用电量求导法获得第i+1点的用电量变换率的预测值P(i+1)fore=P(i)re+ΔP(i)fore
其中,利用增量外推法求取用电量预测值P2包括如下子步骤:
1)获得t0、t1时刻的用电量值P(t0)、P(t1);
2)计算t0时刻到t1时刻的电量增量ΔP,ΔP=P(t1)-P(t0);
3)计算t2时刻的电量预测值P(t2),P(t2)=P(t1)-ΔP。
一种基于广义外推法的用户超短期用电量预测系统,包括:
电量求导计算单元,其用于对从电量数据库获取的历史电量数据序列进行求导计算,获得用电量预测值P1;
增量外推计算单元,其用于对从电量数据库获取的历史电量数据序列增量外推计算,获得用电量预测值P2;
广义外推计算单元,其综合用电量预测值P1和用电量预测值P2,计算获得最终超短期电量预测值P。
其中所述电量求导计算单元包括:
电量数据获取单元,其从用电量数据库获取历史用电量序列P(i),(i=1,2,3,…);
第i点用电量变换率预测值计算单元,其利用历史用电量序列,求取在第i点的用电量变换率的预测值ΔP(i)fore
Figure BDA0000394410130000023
其中D为选用用电量的过去时刻数;Kj为第j时刻的合适因子,
Figure BDA0000394410130000024
ΔPj(i)re为第j时刻的第i点ΔP(i)re
第i+1点用电量变换率预测值计算单元,其根据用电量求导法获得第i+1点的用电量变换率的预测值P(i+1)fore=P(i)re+ΔP(i)fore
其中增量外推计算单元包括:
t0、t1时刻用电量值获取单元,其获得t0、t1时刻的用电量值P(t0)、P(t1);
t0时刻到t1时刻电量增量计算单元,其计算t0时刻到t1时刻的电量增量ΔP,ΔP=P(t1)-P(t0);
t2时刻电量预测值计算单元,其计算t2时刻的电量预测值P(t2),P(t2)=P(t1)-ΔP。
附图说明
图1为基于广义外推法的用户超短期用电量预测方法的流程图。
图2为基于电量求导法的用户超短期用电量预测方法的流程图。
图3为基于增量外推法的用户超短期用电量预测基本模型。
图4为基于增量外推法的用户超短期用电量预测方法的流程图。
图5为基于广义外推法的用户超短期用电量预测系统的方框图。
图6为常规的趋势外推法与本发明的广义外推法用户超短期用电量的预测偏差情况的比较。
图7为常规的趋势外推法与本发明的广义外推法用户超短期用电量的预测结果的比较。
具体实施方式
用户超短期用电量预测不仅要重视用电量成因分析,还应重视用电量本身内在变化规律的研究。把用电量数据当成一系列“纯粹”的数据看待来研究用电量预测,使用纯粹的数学方法,这就是失去了电力系统的特色。为此,项目中从用电量规律着手,研究了一种基于广义外推法的用户超短期用电量预测方法。
用户超短期用电量的周期性和延续性是进行超短期用电量预测的依据。用电量的周期性主要考虑的是相似日相同时刻的用电量变化量与当前预测日当前时刻的用电量变化量的相似性,以此进行预测;而用电量的连续性是考虑当前同前一时刻的变化量对当前日未来时刻的用电量变化量的影响。超短期用电量的周期性和延续性是与未来短时间内用电量变化关联最大的因素。项目中将周期性影响称为横向影响,延续性影响称为纵向影响。采用普通的用电量求导法来考虑横向影响,采用增量外推法来考虑纵向影响。
图2示出了考虑横向影响采用用电量求导法预测超短期用电量的方法。
对于用电量序列P(i)(i=1,2,3,…),用电量求导法的预测公式为:
P(i+1)fore=P(i)re+ΔP(i)fore
其中P(i+1)fore为对第i+1点的用电量预测值;P(i)re为第i点的用电量实际值;ΔP(i)fore为第i点的用电量变化率的预测值。
ΔP ( i ) fore = Σ j = 1 D K j · ΔP j ( i ) re
其中D为选用用电量的过去时刻数;Kj为第j时刻的合适因子,
Figure BDA0000394410130000042
ΔPj(i)re为第j时刻的第i点ΔP(i)re
用电量求导法的优点是原理清楚,便于理解和应用,但是用电量求导法要求用电量的变化率具有稳定性和规律性,并且预测误差有累计效应。
图4示出了考虑纵向影响基于增量外推法的用户超短期用电量预测方法的流程图。
增量外推法就是一种线性外推,它把用户的超短期用电量看作一种近似线性变化的曲线,图3为基于增量外推法的用户超短期用电量预测基本模型,如图3所示,根据现有的用户超短期用电量的发展变化拟合一条直线,未来时刻的超短期用电量按照这条直线的规律进行变化和延伸,即把历史用电量发展的趋势用于预测后面时刻用电量的变化,增量外推法的外推增量为:
ΔP=P(t1)-P(t0)   (1)
预测公式为:
P(t2)=P(t1)-ΔP   (2)
式中P(t0)、P(t1)、P(t2)分别为t0、t1、t2时刻的用户用电量值。P(t0)---预测时刻前10分钟的用电量值;P(t1)---预测时刻前一时刻(5分钟)的用电量值;P(t2)---下一时刻的超短期用电量预测值。
图1示出了综合横向和纵向影响基于广义外推法的用户超短期用电量预测方法的流程图。
项目所研究的广义外推法,就是综合考虑超短期用电量的周期性特性的影响(横向影响)和连续性特性的影响(纵向影响),通过改变权重因子的大小找到两种影响对超短期用电量预测的影响程度大小,对未来时刻的用电量进行预测的方法。因此,基于广义外推法的用户超短期用电量预测方法就是用电量求导法、增量外推法预测结果的综合,即:
P=w1P1+w2P2
其中P1、P2分别为用电量求导法、增量外推法的预测值,w1、w2分别为其对应的权重因子,w1+w2=1。通过样本训练数据,合理地选择权重因子,就可以达到较好的超短期用电量预测结果。
为了验证本发明的广义外推法短期电量预测的有效性,本发明采用用电量实际数据进行了测试。实测数据为每隔10分钟采样的60个连续序列值。实际数据序列值如下:
实测数据=[573.7497 582.9435 589.3779 595.1567 580.8102573.0629 553.6443 534.7770 519.8346 498.7110 526.9015526.3180 494.1884 492.2142 490.5487 477.3541 454.8817473.0930 482.6901 503.6997 491.9935 479.5175 468.8929462.4354 441.4081 468.7512 467.8610 469.1818 479.2343487.1357 528.5856 526.0914 517.9860 495.1850 479.3012483.9698 480.1622 490.6417 503.0011 527.1036 532.2483535.3905 555.7037 563.0077 580.8820 580.7686 570.9191584.7136 593.6661 628.3354 633.3656 629.6014 620.4784615.0239 610.2505 609.5192 604.4376 603.0524 603.6372600.8026 547.1266 518.6055 498.9842 485.8208 454.4066497.9559 499.0470 507.7101 510.2418 510.1987 499.0158529.3002 526.8433 528.7341 528.3079 522.1436 568.2221587.0901 559.6210 538.7662 528.3019 526.1219 505.6262555.0353 547.1266 518.6055 498.9842 485.8208 454.4066497.9559 499.0470 507.7101 510.2418 510.1987 499.0158529.3002 526.8433 528.7341 528.3079 522.1436]。
通过常规的趋势外推法获得的预测值序列如下:
趋势外推法预测值=[578.8751 591.9966 578.8332 578.2794585.5226 567.1227 540.8344 523.1021 531.1309 484.3030519.2151 533.1063 483.4008 482.0681 484.5576 478.4466452.7491 474.7147 495.0367 512.1642 476.9697 490.3015484.9614 456.9354 454.9545 460.4821 477.3792 468.9272478.4237 486.8153 537.7239 524.5023 526.7751 500.2386469.7965 497.7306 487.8418 482.9128 508.5778 538.2933521.2376 534.5627 543.1458 567.3429 568.5126 581.3017581.4075 584.7771 580.7347 644.3253 638.0620 615.1415604.5558 602.9253 620.1053 605.3513 597.8035 612.7417595.5111 589.3428 525.0796 460.2834 465.3260 531.1953398.3765 438.5980 560.8729 536.4155 450.3155 562.5270449.5571 451.6133 468.3956 540.2981 515.4657 590.2563563.5513 585.6464 567.4333 540.6187 531.1376 540.6725492.7741 565.1065 566.4443 505.6229 515.3607 488.6448441.4731 499.8947 498.8027 495.6624 491.2944 511.5187503.1035 514.6970 532.4656 535.7473 541.9949 508.2183]。
通过本发明的广义外推法获得的预测值如下:
广义外推法预测值=[580.0971 580.4271 592.3079 590.8145582.6517 582.8419 558.3619 533.4700 517.0328 499.8495519.5426 526.0361 486.2127 484.9091 499.5596 472.3078458.2634 475.2741 480.3040 496.8336 488.7877 477.0684470.9992 470.9951 448.4222 464.4611 471.8889 478.5351489.1324 487.2047 526.3473 518.7485 519.2906 501.1461486.4591 479.8102 476.9511 484.0472 503.7182 522.4508530.8720 541.0949 546.7308 553.5895 584.7731 581.6202576.7928 580.2462 601.3980 637.1860 625.1774 623.2505624.9771 617.7424 611.5756 615.9509 600.8251 603.1271608.2867 609.2241 566.8241 546.7503 498.9532 498.2151468.1700 529.1721 500.0973 541.0856 527.8988 529.8989494.0208 517.0702 523.3795 549.1757 530.5854 550.0793575.4488 588.5010 568.8394 541.4977 536.8442 519.5187500.4962 549.0181 551.3195 525.7714 508.2175 487.0784454.6802 491.2614 499.7493 510.1734 506.6176 506.7342496.2545 537.5765 530.0187 533.6253 528.6410 519.7569]。
常规的趋势外推法的预测偏差数据序列值如下:
趋势外推法预测偏差=[-5.125464 -9.053051 10.5446816.87742 -4.712420 5.940167 12.80998 11.67502 -11.2962714.40791 7.686372 -6.788265 10.78765 10.14613 5.991169-1.092439 2.132607 -1.621654 -12.34658 -8.46449115.02379 -10.78400 -16.06857 5.499970 -13.546448.269074 -9.518195 0.2545996 0.8105092 0.3203269-9.138278 1.589185 -8.789215 -5.053644 9.504760-13.76078 -7.679572 7.728838 -5.576620 -11.1897211.01070 0.8277287 12.55785 -4.335220 12.36938 -0.5330846-10.48844 -0.06348096 12.93139 -15.98983 -4.69635614.45992 15.92262 12.09860 -9.854817 4.167927 6.634052-9.689317 8.126111 11.45970 22.04709 58.32206 33.65823-45.37446 56.03012 59.35791 -61.82590 -28.7054059.92634 -52.32830 49.45877 77.68692 58.44767 -11.5639912.84214 -68.11270 4.670819 1.443632 -7.812273 -1.852519-2.835700 -14.55062 12.85204 -10.07117 -19.3176212.98255 -16.37646 -2.823988 12.93355 -1.9388770.2442785 12.04771 18.94738 -1.319981 -4.08761714.60317 -5.622354 -7.013213 -13.68710 13.92525];
本发明的广义外推法的预测偏差数据序列值如下:
广义外推法预测偏差=[-6.347411 2.516489 -2.9300354.342242 -1.841492 -9.779025 -4.717540 1.3070522.801809 -1.138511 7.358906 0.2819018 7.975709 7.305080-9.010900 5.046286 -3.381756 -2.181090 2.3860816.866064 3.205861 2.449047 -2.106372 -8.559674 -7.0141294.290090 -4.027905 -9.353355 -9.898110 -0.069067932.238310 7.342921 -1.304739 -5.961161 -7.1578154.159602 3.211084 6.594508 -0.7170331 4.652759 1.376273-5.704418 8.972885 9.418249 -3.891112 -0.8516484-5.873721 4.467359 -7.731955 -8.850526 8.1881976.350981 -4.498726 -2.718536 -1.325063 -6.4317223.612538 -0.07472874 -4.649510 -8.421504 -19.69744-28.14487 0.03094517 -12.39434 -13.76336 -31.21624-1.050323 -33.37553 -17.65701 -19.70012 4.99510612.23002 3.463778 -20.44163 -2.277558 -27.93573-7.226695 -1.410964 -9.218346 -2.731531 -8.5422436.603215 5.129913 6.017313 -4.192774 -7.165948 -9.233262-1.257585 -0.2735812 6.694451 -0.7023454 -2.4633783.624181 3.464525 2.761345 -8.276270 -3.175483 -4.891154-0.3331434 2.386714]。
如图6所示,其示出了常规的趋势外推法和本发明的广义外推法的预测偏差情况的比较。
并且,如图7所示,示出了常规的趋势外推法和本发明的广义外推法用户超短期用电量的预测结果。从图6和图7中可以发现本发明的广义外推法具有更好的准确度,可以满足实际要求。
虽然已经关于具体实施例描述了本发明,但是本发明不是意在对其进行限制。相关技术领域的技术人员很容易作出修改、改进和变形,意在将所有的这些修改、改进和变形包含在本发明的权利要求的范围内。

Claims (6)

1.一种基于广义外推法的用户超短期用电量预测方法,包括如下步骤: 
1)考虑用电量的横向性、周期性影响,利用电量求导法求取用电量预测值P1; 
2)考虑用电量的纵向性、延续性影响,利用增量外推法求取用电量预测值P2; 
3)利用广义外推法综合利用电量求导法求取用电量预测值P1和利用增量外推法求取用电量预测值P2,获得最终超短期电量预测值P,P=w1P1+w2P2,w1、w2分别为其对应的权重因子,w1+w2=1。 
2.根据权利要求1所述的方法,其中利用电量求导法求取用电量预测值P1的步骤包括如下子步骤: 
1)从用电量数据库获取历史用电量序列P(i),(i=1,2,3,…); 
2)利用历史用电量序列,求取在第i点的用电量变换率的预测值ΔP(i)fore, 
Figure FDA0000394410120000011
其中D为选用用电量的过去时刻数;Kj为第j时刻的合适因子,
Figure FDA0000394410120000012
ΔPj(i)re为第j时刻的第i点ΔP(i)re; 
3)根据用电量求导法获得第i+1点的用电量变换率的预测值P(i+1)fore=P(i)re+ΔP(i)fore
3.根据权利要求1所述的方法,其中利用增量外推法求取用电量预测值P2包括如下子步骤: 
1)获得t0、t1时刻的用电量值P(t0)、P(t1); 
2)计算t0时刻到t1时刻的电量增量ΔP,ΔP=P(t1)-P(t0); 
3)计算t2时刻的电量预测值P(t2),P(t2)=P(t1)-ΔP。 
4.一种实现权利要求1-3任意一项所述的方法的基于广义外推法的用 户超短期用电量预测系统,包括: 
电量求导计算单元,其用于对从电量数据库获取的历史电量数据序列进行求导计算,获得用电量预测值P1; 
增量外推计算单元,其用于对从电量数据库获取的历史电量数据序列增量外推计算,获得用电量预测值P2; 
广义外推计算单元,其综合用电量预测值P1和用电量预测值P2,计算获得最终超短期电量预测值P。 
5.根据权利要求4所述的系统,其中所述电量求导计算单元包括: 
电量数据获取单元,其从用电量数据库获取历史用电量序列P(i),(i=1,2,3,…); 
第i点用电量变换率预测值计算单元,其利用历史用电量序列,求取在第i点的用电量变换率的预测值ΔP(i)fore其中D为选用用电量的过去时刻数;Kj为第j时刻的合适因子,
Figure FDA0000394410120000022
ΔPj(i)re为第j时刻的第i点ΔP(i)re; 
第i+1点用电量变换率预测值计算单元,其根据用电量求导法获得第i+1点的用电量变换率的预测值P(i+1)fore=P(i)re+ΔP(i)fore。 
6.根据权利要求4所述的系统,其中增量外推计算单元包括: 
t0、t1时刻用电量值获取单元,其获得t0、t1时刻的用电量值P(t0)、P(t1); 
t0时刻到t1时刻电量增量计算单元,其计算t0时刻到t1时刻的电量增量ΔP,ΔP=P(t1)-P(t0); 
t2时刻电量预测值计算单元,其计算t2时刻的电量预测值P(t2),P(t2)=P(t1)-ΔP。 
CN201310474103.7A 2013-10-12 2013-10-12 一种基于广义外推法的用户超短期用电量预测方法和系统 Pending CN103514490A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310474103.7A CN103514490A (zh) 2013-10-12 2013-10-12 一种基于广义外推法的用户超短期用电量预测方法和系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310474103.7A CN103514490A (zh) 2013-10-12 2013-10-12 一种基于广义外推法的用户超短期用电量预测方法和系统

Publications (1)

Publication Number Publication Date
CN103514490A true CN103514490A (zh) 2014-01-15

Family

ID=49897179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310474103.7A Pending CN103514490A (zh) 2013-10-12 2013-10-12 一种基于广义外推法的用户超短期用电量预测方法和系统

Country Status (1)

Country Link
CN (1) CN103514490A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818678A (zh) * 2017-10-27 2018-03-20 武汉大学 用于用电信息采集系统的实时在线修正方法及装置

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012244897A (ja) * 2011-05-13 2012-12-10 Fujitsu Ltd 短期電力負荷を予測する方法及び装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012244897A (ja) * 2011-05-13 2012-12-10 Fujitsu Ltd 短期電力負荷を予測する方法及び装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李国辉: "《超短期负荷预测的广义外推法》", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818678A (zh) * 2017-10-27 2018-03-20 武汉大学 用于用电信息采集系统的实时在线修正方法及装置
CN107818678B (zh) * 2017-10-27 2019-10-11 武汉大学 用于用电信息采集系统的实时在线修正方法及装置

Similar Documents

Publication Publication Date Title
Wang et al. China's dependency on foreign oil will exceed 80% by 2030: Developing a novel NMGM-ARIMA to forecast China's foreign oil dependence from two dimensions
CN108846517B (zh) 一种分位数概率性短期电力负荷预测集成方法
CN103336891B (zh) 一种用于配电网状态估计的伪量测生成方法
CN104392274B (zh) 基于用电负荷与温度趋势的城市短期用电负荷预测方法
CN107844864A (zh) 一种求解水电机组组合问题的混合整数非线性规划模型
CN104052058A (zh) 一种基于马尔可夫链蒙特卡罗法的系统谐波概率评估方法
US20150168465A1 (en) Method and apparatus for electric power system distribution state estimations
CN105603955B (zh) 一种基于实测数据的剩余沉降计算方法及应用
CN109164759A (zh) 曲线插补方法、设备及计算机可读存储介质
CN103530701A (zh) 一种基于季节指数法的用户月用电量预测方法和系统
CN102135563B (zh) 一种电能的计算方法、系统及电能表
CN103886391B (zh) 业务量预测方法和装置
CN103559564A (zh) 一种钢铁企业电力超短期负荷预测方法
CN104537233B (zh) 一种基于核密度估计的配电网伪量测生成方法
CN110348600B (zh) 一种水库群防洪效益最大的库容分配方法
CN107748931A (zh) 一种基于最小二乘法的电费收入预测方法
CN102937946B (zh) 一种基于约束正则模式的复杂函数极小值搜索方法
CN103514490A (zh) 一种基于广义外推法的用户超短期用电量预测方法和系统
CN103324603B (zh) 一种不同采样速率的插值变换方法
Ge et al. Forecast of bus passenger traffic based on exponential smoothing and trend moving average method
CN104573865A (zh) 一种基于定基能源消费弹性系数预测能源消费总量的方法
JP2018152935A (ja) 電力系統状態推定装置
Ma et al. Iterative algorithm of conjugate depth for parabolic channels
CN106529083B (zh) 考虑输出容量可信度的光伏发电调度曲线编制方法
CN110034559A (zh) 基于切换系统模型的电力系统融合状态估计方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140115