CN103507914A - Installation process for ship body generator set - Google Patents

Installation process for ship body generator set Download PDF

Info

Publication number
CN103507914A
CN103507914A CN201310414480.1A CN201310414480A CN103507914A CN 103507914 A CN103507914 A CN 103507914A CN 201310414480 A CN201310414480 A CN 201310414480A CN 103507914 A CN103507914 A CN 103507914A
Authority
CN
China
Prior art keywords
billet
screw hole
width
hole
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310414480.1A
Other languages
Chinese (zh)
Other versions
CN103507914B (en
Inventor
董志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG RUNLI MACHINE MANUFACTURING CO., LTD.
Original Assignee
Nantong Mingde Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Mingde Heavy Industry Co Ltd filed Critical Nantong Mingde Heavy Industry Co Ltd
Priority to CN201310414480.1A priority Critical patent/CN103507914B/en
Publication of CN103507914A publication Critical patent/CN103507914A/en
Application granted granted Critical
Publication of CN103507914B publication Critical patent/CN103507914B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The invention relates to an installation process for a ship body generator set. The installation process includes the following steps of manufacturing a first steel base plate, manufacturing a second steel base plate, conducting finish machining, preparing a base, installing the base, hoisting the generator set, pouring epoxy resin into the position between the second steel base plate and the base to form an epoxy resin gasket, and a temporary cushion block is removed after gasket pouring is finished. The installation process has the advantages that working efficiency is improved, and the even stress is guaranteed.

Description

Mounting process for hull generator set
Technical field
The present invention relates to a kind of mounting process for hull generator set.
Background technology
While generator set being installed on hull, traditional generator set adopts steel plate washer to install, Xu cabin regulates after generator set resilient mounting, on-the-spot brush steel cushion block, work under bad environment, manual playground, labour intensity is large, and because being difficult to control, size need to carry out repeatedly brush, inefficiency.
Summary of the invention
The object of the invention is, in order to overcome above deficiency, provides a kind of and increases work efficiency, and guarantees the stressed uniform mounting process for hull generator set.
Object of the present invention is achieved through the following technical solutions: a kind of mounting process for hull generator set, comprises the following steps:
A, the preparation of the first billet: prepare a plurality of the first billets, it is that 210mm thickness is 40mm that the length of each the first billet is 420mm width, on each first billet, bore the first tightening screw hole of four M20, four the first tightening screw hole symmetrical placements between two, width between centers between two the first tightening screw holes that place left and right is 205mm, width between centers between two the first tightening screw holes that place front and back is 150mm, and the first through hole that is 22mm at the equal drill diameter in the outside in each the first tightening screw hole, width between centers between two the first through holes that place left and right is 298mm, the first screw hole of the M14 placing before and after two of the outer sidetrackings in a side first tightening screw hole of each the first billet, the second screw hole of a M14 of outer sidetracking in opposite side the first tightening screw hole, width between centers between two the first screw holes is 80mm, width between centers between the first screw hole and the second screw hole is 382mm,
The preparation of B, the second billet: prepare a plurality of the second billets, it is that 210mm thickness is 16mm that the length of each the second billet is 420mm width, on each second billet, bore the second through hole of four M20, four the second through hole symmetrical placements between two, width between centers between two the second through holes that place left and right is 298mm, and the width between centers between two the second through holes that place front and back is 150mm; The 3rd screw hole that the diameter of placing before and after two of the outer sidetrackings of side second through hole of each the first billet is 16mm, the 4th screw hole that diameter of outer sidetracking of opposite side the second through hole is 16mm, width between centers between two the 3rd screw holes is 80mm, and the width between centers between the 3rd screw hole and the 4th screw hole is 382mm;
C, fine limit work: by each the second billet fine limit work on grinding machine, making the thickness of the second billet is 14mm, and roughness of surface is less than 3.2, and planeness is less than 0.05mm;
D, preparation pedestal: pedestal is used for being arranged on smooth hull, and the planeness of each pedestal is less than or equal to 2mm;
E, mounting base: by first billet, second billet carries out overlapping placement, and adjust each tightening screw hole to matching, by the first billet, the second billet is connected by many first screws with pedestal, every the first screw is all through the second through hole and first through hole of corresponding setting, then pass pedestal fastening nuts, then with three the second screws, first pass respectively two the first screw holes and second screw hole on each first billet, through two the 3rd screw holes and the 4th screw hole, then use nut locking again, and with temporary cushion block pad between the second screw and pedestal, make the distance between the second billet and pedestal be less than 30mm, form supporting seat,
F, lifting generator set: use loop wheel machine generator set, be then slowly placed on pedestal;
G, with epoxy resin, by being cast between the second billet and pedestal, form epoxy washer, after packing ring casting complete, take away temporary cushion block.
The present invention compared with prior art has the following advantages: when generator set is installed, can guarantee that supporting seat is stressed even, each supports bearing load equalization, and resilient mounting conventionally has the deflection of 5-11mm from the zero load situation to loading again.
accompanying drawing explanation:
Fig. 1 is the structural representation of the present invention's the first billet;
Fig. 2 is the structural representation of the present invention's the second billet;
Fig. 3 is that pedestal and backing plate are arranged schematic diagram;
Fig. 4 is structural representation of the present invention;
Number in the figure: 1-pedestal, 2-the first billet, 3-the first tightening screw hole, 4-the first through hole, 5-the second billet, 6-the second through hole, 7-the first screw hole, 8-the second screw hole, 9-the 3rd screw hole, 10-the 4th screw hole, 11-temporary cushion block.
the specific embodiment:
In order to deepen the understanding of the present invention, below in conjunction with embodiment and accompanying drawing, the invention will be further described, and this embodiment only, for explaining the present invention, does not form limiting the scope of the present invention.
The specific embodiment that shows as shown in Figure 1 to Figure 4 a kind of mounting process for hull generator set of the present invention, comprises the following steps:
A, the preparation of the first billet 2: prepare a plurality of the first billets 2, it is that 210mm thickness is 40mm that the length of each the first billet 2 is 420mm width, on each first billet 2, bore the first tightening screw hole 3 of four M20, four the first tightening screw hole 3 symmetrical placements between two, width between centers between two the first tightening screw holes 3 that place left and right is 205mm, width between centers between two the first tightening screw holes 3 that place front and back is 150mm, and the first through hole 4 that is 22mm at the equal drill diameter in the outside in each the first tightening screw hole 3, width between centers between two the first through holes 4 that place left and right is 298mm, the first screw hole 7 of the M14 placing before and after two of the outer sidetrackings in a side first tightening screw hole 3 of each the first billet 2, the second screw hole 8 of a M14 of outer sidetracking in opposite side the first tightening screw hole 3, width between centers between two the first screw holes 7 is 80mm, width between centers between the first screw hole 7 and the second screw hole 8 is 382mm,
The preparation of B, the second billet 5: prepare a plurality of the second billets 5, it is that 210mm thickness is 16mm that the length of each the second billet 5 is 420mm width, on each second billet 5, bore the second through hole 6 of four M20, four the second through hole 6 symmetrical placements between two, width between centers between two the second through holes 6 that place left and right is 298mm, and the width between centers between two the second through holes 6 that place front and back is 150mm; The 3rd screw hole 9 that the diameter of placing before and after two of the outer sidetrackings of side second through hole 6 of each the first billet 2 is 16mm, the 4th screw hole 10 that diameter of outer sidetracking of opposite side the second through hole 6 is 16mm, width between centers between two the 3rd screw holes 9 is 80mm, and the width between centers between described the 3rd screw hole 9 and the 4th screw hole 10 is 382mm;
C, fine limit work: by each the second billet 5 fine limit work on grinding machine, making the thickness of the second billet 5 is 14mm, and roughness of surface is less than 3.2, and planeness is less than 0.05mm;
D, preparation pedestal 1: pedestal 1 is for being arranged on smooth hull, and the planeness of each pedestal 1 is less than or equal to 2mm;
E, mounting base 1: by first billet 2, second billet 5 carries out overlapping placement, and adjust each tightening screw hole to matching, by the first billet 2, the second billet 5 is connected by many first screws with pedestal 1, every the first screw is all through the second through hole 6 and first through hole 4 of corresponding setting, then pass pedestal 1 use fastening nuts, then with three the second screws, first pass respectively two the first screw holes 7 and second screw hole 8 on each first billet 2, through two the 3rd screw holes 9 and the 4th screw hole 10, then use nut locking again, and pad between the second screw and pedestal 1 with temporary cushion block 11, make the distance between the second billet 5 and pedestal 1 be less than 30mm, form supporting seat,
F, lifting generator set: use loop wheel machine generator set, be then slowly placed on pedestal 1;
G, with epoxy resin, by being cast between the second billet 5 and pedestal 1, form epoxy washer, after packing ring casting complete, take away temporary cushion block 11.
Mounting process of the present invention can guarantee that when generator set is installed supporting seat is stressed even, and each supports bearing load equalization, and resilient mounting conventionally has the deflection of 5-11mm from the zero load situation to loading again.

Claims (1)

1. for a mounting process for hull generator set, it is characterized in that, comprise the following steps:
A, the preparation of the first billet (2): prepare a plurality of the first billets (2), described in each, to be 420mm width be that 210mm thickness is 40mm to the length of the first billet (2), in upper the first tightening screw hole (3) of boring four M20 of each first billet (2), four described the first tightening screw hole (3) symmetrical placements between two, width between centers between two described the first tightening screw holes (3) that place left and right is 205mm, width between centers between two described the first tightening screw holes (3) that place front and back is 150mm, and the first through hole (4) that the equal drill diameter in outside in the first tightening screw hole (3) is 22mm described in each, width between centers between two described the first through holes (4) that place left and right is 298mm, the first screw hole (7) of the M14 placing before and after two of the outer sidetrackings in a side first tightening screw hole (3) of each the first billet (2), the second screw hole (8) of a M14 of outer sidetracking in opposite side the first tightening screw hole (3), width between centers between two the first screw holes (7) is 80mm, width between centers between described the first screw hole (7) and described the second screw hole (8) is 382mm,
The preparation of B, the second billet (5): prepare a plurality of the second billets (5), it is that 210mm thickness is 16mm that the length of each the second billet (5) is 420mm width, at upper the second through hole (6) that bores four M20 of each second billet (5), four described the second through holes (6) are symmetrical placement between two, width between centers between two described the second through holes (6) that place left and right is 298mm, and the width between centers between two described the second through holes (6) that place front and back is 150mm; The 3rd screw hole (9) that the diameter of placing before and after two of the outer sidetrackings of side second through hole (6) of each the first billet (2) is 16mm, the 4th screw hole (10) that diameter of outer sidetracking of opposite side the second through hole (6) is 16mm, width between centers between two the 3rd screw holes (9) is 80mm, and the width between centers between described the 3rd screw hole (9) and described the 4th screw hole (10) is 382mm;
C, fine limit work: by each the second billet (5) fine limit work on grinding machine, making the thickness of the second billet (5) is 14mm, and roughness of surface is less than 3.2, and planeness is less than 0.05mm;
D, preparation pedestal (1): pedestal (1) is for being arranged on smooth hull, and the planeness of each pedestal (1) is less than or equal to 2mm;
E, mounting base (1): by first billet (2), second billet (5) carries out overlapping placement, and adjust each tightening screw hole to matching, by the first billet (2), the second billet (5) is connected by many first screws with pedestal (1), every the first screw is all through the second through hole (6) and first through hole (4) of corresponding setting, then pass fastening nuts for pedestal (1), then with three the second screws, first pass respectively each upper two first screw hole of the first billet (2) (7) and second screw hole (8), through two the 3rd screw holes (9) and the 4th screw hole (10), then use nut locking again, and pad between the second screw and pedestal (1) with temporary cushion block (11), make the distance between the second billet (5) and pedestal (1) be less than 30mm, form supporting seat,
F, lifting generator set: use loop wheel machine generator set, be then slowly placed on pedestal (1);
G, with epoxy resin, by being cast between the second billet (5) and pedestal (1), form epoxy washer, after packing ring casting complete, take away temporary cushion block (11).
CN201310414480.1A 2013-09-12 2013-09-12 For the mounting process of hull generating set Active CN103507914B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310414480.1A CN103507914B (en) 2013-09-12 2013-09-12 For the mounting process of hull generating set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310414480.1A CN103507914B (en) 2013-09-12 2013-09-12 For the mounting process of hull generating set

Publications (2)

Publication Number Publication Date
CN103507914A true CN103507914A (en) 2014-01-15
CN103507914B CN103507914B (en) 2016-05-25

Family

ID=49891458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310414480.1A Active CN103507914B (en) 2013-09-12 2013-09-12 For the mounting process of hull generating set

Country Status (1)

Country Link
CN (1) CN103507914B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104527922A (en) * 2014-11-27 2015-04-22 沪东中华造船(集团)有限公司 Accurate positioning method of anchor bolt hole of marine main engine
CN104843163A (en) * 2015-05-18 2015-08-19 中国船舶重工集团公司第七○二研究所 U-type vibration isolating device with novel composite material structure
CN106143795A (en) * 2015-04-08 2016-11-23 江南造船(集团)有限责任公司 The dismounting of a kind of marine generator group and turnover cabin technique
CN110877665A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Installation device of fastening facility in ship cabin
CN112389594A (en) * 2020-12-20 2021-02-23 江龙船艇科技股份有限公司 Multi-layer ship cross-layer lifting device and assembling method thereof
CN113236911A (en) * 2021-04-02 2021-08-10 渤海造船厂集团有限公司 Device and method for determining thickness of steel adjusting gasket by adopting pouring form

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1047767A2 (en) * 1982-04-05 1983-10-15 Предприятие П/Я В-2598 Arrangement for positioning propeller shafts
CN201102619Y (en) * 2007-09-07 2008-08-20 江南造船(集团)有限责任公司 Fixture equipment for base installation
CN201176259Y (en) * 2008-04-11 2009-01-07 广西玉柴机器股份有限公司 Installation and adjustment device for marine engine
CN101376431A (en) * 2008-09-27 2009-03-04 江南造船(集团)有限责任公司 Method for mounting main unit with resilient support
CN201224479Y (en) * 2008-06-19 2009-04-22 江苏南极机械有限责任公司 Modularized shock resistant vibrating isolation buoyant raft for shipping main propulsion unit
CN201665302U (en) * 2009-11-10 2010-12-08 大连船舶重工集团有限公司 Hull hoisting structure
KR20120039130A (en) * 2010-10-15 2012-04-25 삼성중공업 주식회사 Mounting structure of ship outfit
CN102442406A (en) * 2010-09-30 2012-05-09 福建省长兴船舶重工有限公司 Method for fixing marine main engine with accurate positioning and firm locking

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1047767A2 (en) * 1982-04-05 1983-10-15 Предприятие П/Я В-2598 Arrangement for positioning propeller shafts
CN201102619Y (en) * 2007-09-07 2008-08-20 江南造船(集团)有限责任公司 Fixture equipment for base installation
CN201176259Y (en) * 2008-04-11 2009-01-07 广西玉柴机器股份有限公司 Installation and adjustment device for marine engine
CN201224479Y (en) * 2008-06-19 2009-04-22 江苏南极机械有限责任公司 Modularized shock resistant vibrating isolation buoyant raft for shipping main propulsion unit
CN101376431A (en) * 2008-09-27 2009-03-04 江南造船(集团)有限责任公司 Method for mounting main unit with resilient support
CN201665302U (en) * 2009-11-10 2010-12-08 大连船舶重工集团有限公司 Hull hoisting structure
CN102442406A (en) * 2010-09-30 2012-05-09 福建省长兴船舶重工有限公司 Method for fixing marine main engine with accurate positioning and firm locking
KR20120039130A (en) * 2010-10-15 2012-04-25 삼성중공업 주식회사 Mounting structure of ship outfit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104527922A (en) * 2014-11-27 2015-04-22 沪东中华造船(集团)有限公司 Accurate positioning method of anchor bolt hole of marine main engine
CN104527922B (en) * 2014-11-27 2017-02-22 沪东中华造船(集团)有限公司 Accurate positioning method of anchor bolt hole of marine main engine
CN106143795A (en) * 2015-04-08 2016-11-23 江南造船(集团)有限责任公司 The dismounting of a kind of marine generator group and turnover cabin technique
CN106143795B (en) * 2015-04-08 2018-03-23 江南造船(集团)有限责任公司 A kind of dismounting of marine generator group and disengaging cabin technique
CN104843163A (en) * 2015-05-18 2015-08-19 中国船舶重工集团公司第七○二研究所 U-type vibration isolating device with novel composite material structure
CN110877665A (en) * 2019-11-15 2020-03-13 沪东中华造船(集团)有限公司 Installation device of fastening facility in ship cabin
CN112389594A (en) * 2020-12-20 2021-02-23 江龙船艇科技股份有限公司 Multi-layer ship cross-layer lifting device and assembling method thereof
CN113236911A (en) * 2021-04-02 2021-08-10 渤海造船厂集团有限公司 Device and method for determining thickness of steel adjusting gasket by adopting pouring form

Also Published As

Publication number Publication date
CN103507914B (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN103507914A (en) Installation process for ship body generator set
CN203031328U (en) Automatic hydraulic jig for crankshaft connecting rod journal lathe
CN104191186B (en) The processing method of gear-box
CN103161177B (en) Integrated equipment quick centering device and equipment aligning method
CN106002421A (en) Special-shaped part turning fixture and application method thereof
CN205271708U (en) Free positioning fixture in plane
CN201916314U (en) Connecting bolt for ship main engine shaft and flange
CN104109747B (en) Edge strip part method for controlling heat treatment deformation and control fixture under aircraft
CN113182894A (en) Clamping method for double-sided processing of pipe clamping layer structure of array composite material
CN202804734U (en) Abnormal-shaped piece machining fixture
CN203817987U (en) Sand blasting surface treatment clamping fixture
CN204353955U (en) The high-performance polishing disk of stone polishing machine
CN202985159U (en) Bending plate for turning and clamping nut with irregular shape
CN201769073U (en) Easily-adjusted lathe turning tooling for brake disc of wind generator
CN211332742U (en) Clamp for grinding and processing chrome plating outer diameter roundness of positioning ring
CN105114435A (en) Omni-bearing locking and one-face connection fixing device
CN202702021U (en) Fast positioning fixture for steering gear shell
CN209551145U (en) Disk turning clamp in the middle part of back-plate
CN204039444U (en) Under aircraft, edge strip part heat treatment deformation controls fixture
CN207508732U (en) A kind of fixture for Milling Process
CN210819187U (en) A bonding frock for emery wheel
CN202292162U (en) Tool for processing bearing bush of coal mill
CN204800320U (en) A fixed frock for in front -bank rotor housing processing
CN201769072U (en) Easy-maintenance vertical turning tooling for wind driven generator brake disc
CN103770001B (en) Machining clamping tool special for large-scale conical disc type workpieces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Gu Dawei

Inventor after: Cao Zhonghua

Inventor before: Dong Zhiyong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160223

Address after: 226361 industrial concentration area, five town, Nantong, Jiangsu, Tongzhou District

Applicant after: NANTONG RUNLI MACHINE MANUFACTURING CO., LTD.

Address before: 226361 Tongzhou District City, Jiangsu Province, the town of Thean Hou Temple,, five

Applicant before: Nantong Mingde Heavy Industry Co., Ltd.

CB03 Change of inventor or designer information

Inventor after: Gu Dawei

Inventor after: Cao Zhonghua

Inventor after: Xie Lihuan

Inventor before: Gu Dawei

Inventor before: Cao Zhonghua

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant