CN103485331A - 一种混凝土管桩的连接方法 - Google Patents

一种混凝土管桩的连接方法 Download PDF

Info

Publication number
CN103485331A
CN103485331A CN201310403792.2A CN201310403792A CN103485331A CN 103485331 A CN103485331 A CN 103485331A CN 201310403792 A CN201310403792 A CN 201310403792A CN 103485331 A CN103485331 A CN 103485331A
Authority
CN
China
Prior art keywords
pile tube
end plate
stake
reconditioning
lower joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310403792.2A
Other languages
English (en)
Inventor
胡德云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Pile Tube Branch Co Of Rich And Powerful Concrete Co Ltd
Original Assignee
Anhui Pile Tube Branch Co Of Rich And Powerful Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Pile Tube Branch Co Of Rich And Powerful Concrete Co Ltd filed Critical Anhui Pile Tube Branch Co Of Rich And Powerful Concrete Co Ltd
Priority to CN201310403792.2A priority Critical patent/CN103485331A/zh
Publication of CN103485331A publication Critical patent/CN103485331A/zh
Pending legal-status Critical Current

Links

Abstract

本发明涉及一种混凝土管桩的连接方法,该方法包括1)取材、2)管桩端面修磨、3)选择端板、4)端板修磨、5)埋下节桩、6)安装导向箍、7)对桩、8)端板焊接、9)防锈处理、10)管桩校核。本发明具有方案设计合理和方便方便操作等优点,能确保管桩拼接后仍具有相关强度,从而为管桩拼接后的质量提供保障。

Description

一种混凝土管桩的连接方法
技术领域
本发明涉及建筑施工技术领域,具体的说是一种混凝土管桩的连接方法。
背景技术
在混凝土管桩的施工过程中,由于管桩的尺寸均是根据国家标准生产的,不同的建筑对于根基的要求又不一样,尤其是大楼建设时,需要采用两根或者多根管桩拼接使用,以满足其特定的要求。而如何在拼接后仍能保证管桩具有相应的强度成为人们关注的焦点,且由于地下潮湿的环境,会对连接处造成一定的腐蚀,时间一长会严重的影响管桩的强度,会对大楼内的人身及财产安全造成破坏。
发明内容
本发明所要解决的技术问题在于提供一种方案设计合理的、方便操作的,能确保管桩拼接后仍具有相关强度的连接方法,即一种混凝土管桩的连接方法。
本发明所要解决的技术问题采用以下技术方案来实现:
一种混凝土管桩的连接方法,该方法包括以下步骤:
1)取材:查找规格型号一样的管桩,并检查管桩的表面有无裂痕、残缺以及管桩的壁厚是否均匀,避免因为管桩本身的质量影响到拼接后的强度;
2)管桩端面修磨:对步骤1)中选取的管桩进行端面的修磨,使管桩端面不存在凸起和凹坑的缺陷,修磨后用仪器检查端面的平面度,控制在±0.5mm以内,确保管桩拼接后端面之间的充分接触;
3)选择端板:选取与管桩尺寸相配的端板,检查端板的上表面和下表面有无油污和铁锈,采用端板有效的避免了传统机械快速接头连接存在的松动、连接强度不够的缺陷,为管桩的连接质量提供保障;
4)端板修磨:对端板上表面和下表面进行修磨,用铁刷子将端板表面的油污和铁锈清理干净,并使端板的坡口处露出金属光泽,为焊接做好准备;
5)埋下节桩:将下节桩埋入地下,确保下节桩的上端高出地面0.5~1.0m,使下节桩与地面的垂直度不超过Ф5mm;
6)安装导向箍:选择适宜的导向箍,套装在下节桩的上端,采用导向箍能够使上节桩顺利的套装在下节桩的上端,节省了对桩的时间,提高了管桩的拼接效率,且与传统的快速接头连接相比,能够有效的提高拼接后的强度;
7)对桩:沿着导向箍将上节桩套装在下节桩的上方,错位偏差不大于2mm;
8)端板焊接:焊接端板,使上节桩与下节桩连为一体,确保焊缝的质量,无漏焊、虚焊缺陷;
9)防锈处理:对端板和焊缝处进行防锈处理,从而避免了潮湿的环境使管桩腐蚀,为管桩的连接强度提供了保障;
10)管桩校核:对连接后的管桩进行弯扭强度的校核,检查该强度是否在允许的范围内,若满足,即可进行建筑体的搭建,若不满足,则需要对焊接成进行补焊,甚至增加相关强度连接件。
本发明的有益效果是:本发明具有方案设计合理和方便方便操作等优点,能确保管桩拼接后仍具有相关强度,从而为管桩拼接后的质量提供保障。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面对本发明进一步阐述。
一种混凝土管桩的连接方法,该方法包括以下步骤:
1)取材:查找规格型号一样的管桩,并检查管桩的表面有无裂痕、残缺以及管桩的壁厚是否均匀,避免因为管桩本身的质量影响到拼接后的强度;
2)管桩端面修磨:对步骤1)中选取的管桩进行端面的修磨,使管桩端面不存在凸起和凹坑的缺陷,修磨后用仪器检查端面的平面度,控制在±0.5mm以内,确保管桩拼接后端面之间的充分接触;
3)选择端板:选取与管桩尺寸相配的端板,检查端板的上表面和下表面有无油污和铁锈,采用端板有效的避免了传统机械快速接头连接存在的松动、连接强度不够的缺陷,为管桩的连接质量提供保障;
4)端板修磨:对端板上表面和下表面进行修磨,用铁刷子将端板表面的油污和铁锈清理干净,并使端板的坡口处露出金属光泽,为焊接做好准备;
5)埋下节桩:将下节桩埋入地下,确保下节桩的上端高出地面0.5~1.0m,使下节桩与地面的垂直度不超过Ф5mm;
6)安装导向箍:选择适宜的导向箍,套装在下节桩的上端,采用导向箍能够使上节桩顺利的套装在下节桩的上端,节省了对桩的时间,提高了管桩的拼接效率,且与传统的快速接头连接相比,能够有效的提高拼接后的强度;
7)对桩:沿着导向箍将上节桩套装在下节桩的上方,错位偏差不大于2mm;
8)端板焊接:焊接端板,使上节桩与下节桩连为一体,确保焊缝的质量,无漏焊、虚焊缺陷;
9)防锈处理:对端板和焊缝处进行防锈处理,从而避免了潮湿的环境使管桩腐蚀,为管桩的连接强度提供了保障;
10)管桩校核:对连接后的管桩进行弯扭强度的校核,检查该强度是否在允许的范围内,若满足,即可进行建筑体的搭建,若不满足,则需要对焊接成进行补焊,甚至增加相关强度连接件。
按照上述步骤实施,即可完成对管桩的拼接。
以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (1)

1.一种混凝土管桩的连接方法,其特征在于:该方法包括以下步骤:
1)取材:查找规格型号一样的管桩,并检查管桩的表面有无裂痕、残缺以及管桩的壁厚是否均匀;
2)管桩端面修磨:对步骤1)中选取的管桩进行端面的修磨,使管桩端面不存在凸起和凹坑的缺陷,修磨后用仪器检查端面的平面度,控制在±0.5mm以内;
3)选择端板:选取与管桩尺寸相配的端板,检查端板的上表面和下表面有无油污和铁锈;
4)端板修磨:对端板上表面和下表面进行修磨,用铁刷子将端板表面的油污和铁锈清理干净,并使端板的坡口处露出金属光泽,为焊接做好准备;
5)埋下节桩:将下节桩埋入地下,确保下节桩的上端高出地面0.5~1.0m,使下节桩与地面的垂直度不超过Ф5mm;
6)安装导向箍:选择适宜的导向箍,套装在下节桩的上端;
7)对桩:沿着导向箍将上节桩套装在下节桩的上方,错位偏差不大于2mm;
8)端板焊接:焊接端板,使上节桩与下节桩连为一体,确保焊缝的质量,无漏焊、虚焊缺陷;
9)防锈处理:对端板和焊缝处进行防锈处理;
10)管桩校核:对连接后的管桩进行弯扭强度的校核。
CN201310403792.2A 2013-09-07 2013-09-07 一种混凝土管桩的连接方法 Pending CN103485331A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310403792.2A CN103485331A (zh) 2013-09-07 2013-09-07 一种混凝土管桩的连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310403792.2A CN103485331A (zh) 2013-09-07 2013-09-07 一种混凝土管桩的连接方法

Publications (1)

Publication Number Publication Date
CN103485331A true CN103485331A (zh) 2014-01-01

Family

ID=49825886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310403792.2A Pending CN103485331A (zh) 2013-09-07 2013-09-07 一种混凝土管桩的连接方法

Country Status (1)

Country Link
CN (1) CN103485331A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677181A (zh) * 2016-12-30 2017-05-17 中国十七冶集团有限公司 一种解决桩基在下压过程中管桩偏移的施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274613A (ja) * 2007-04-27 2008-11-13 H G Service Kk 鋼管杭の接続構造
CN201276702Y (zh) * 2008-09-08 2009-07-22 马纯杰 预制预应力混凝土管桩接桩结构
CN102286973A (zh) * 2011-06-21 2011-12-21 天津市瑞固建材有限公司 一种预应力管桩接筋工艺方法
CN202787241U (zh) * 2012-09-26 2013-03-13 天津港航桩业有限公司 混凝土管桩

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274613A (ja) * 2007-04-27 2008-11-13 H G Service Kk 鋼管杭の接続構造
CN201276702Y (zh) * 2008-09-08 2009-07-22 马纯杰 预制预应力混凝土管桩接桩结构
CN102286973A (zh) * 2011-06-21 2011-12-21 天津市瑞固建材有限公司 一种预应力管桩接筋工艺方法
CN202787241U (zh) * 2012-09-26 2013-03-13 天津港航桩业有限公司 混凝土管桩

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁旭亭: ""超长预应力管桩施工实践"", 《探矿工程-岩土钻掘工程》 *
史三元等: ""预应力管桩接桩类型及影响控制"", 《煤炭工程》 *
陈明宝等: ""探讨PHC管桩拼接焊缝检测与现场质量控制"", 《安徽建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677181A (zh) * 2016-12-30 2017-05-17 中国十七冶集团有限公司 一种解决桩基在下压过程中管桩偏移的施工方法

Similar Documents

Publication Publication Date Title
CN102535478B (zh) 一种基坑支护用的方钢管轻质混凝土围檩
CN202925558U (zh) 一种降水井封闭结构
CN102877595A (zh) 大型大跨度钢桁架制作方法
CN108916470A (zh) 一种基于施工保护装置的天然气管线施工方法
CN103883797A (zh) 一种钢丝网骨架塑料复合管的施工方法
CN107763306A (zh) 一种聚乙烯缠绕结构壁管施工方法
CN103485331A (zh) 一种混凝土管桩的连接方法
CN204626453U (zh) 城市地下综合管廊中管道的支承机构
CN103850251B (zh) 一种机械钻孔灌注桩
CN103629474B (zh) 用于修复受损铸铁消防管道的连接导水管的修复方法
CN105156829A (zh) 城市管道阀门安装施工工艺
WO2011010814A3 (ko) 자체적인 부식방지 기능을 갖춘 언본디드 강연선과 내시경 카메라를 이용한 콘크리트 구조물 보강용 포스트텐셔닝 장치 및, 이를 이용한 콘크리트 구조물의 유지관리 방법
CN206529989U (zh) 一种带有敞开式导流管的防雨水飞溅的房屋屋顶导流装置
CN109898834A (zh) 一种剪力墙处外脚手架拉结点结构及其制作施工方法
CN104863347A (zh) 一种建筑脚手架连墙结构及施工工艺
CN204728701U (zh) 剪力墙接线盒定位支撑件
CN206945010U (zh) 一种新型沉降观测点装置
CN203250034U (zh) 一种探测pvc穿线管堵塞位置的测堵装置
CN104625553A (zh) 一种用于调整焊口组对错边量的工具
CN201833136U (zh) 管线焊道操作平台
CN203782690U (zh) 一种机械钻孔灌注桩
CN103883810A (zh) 一种钢丝网骨架塑料复合管及施工方法
CN108857119A (zh) 一种地埋管管道的焊接方式
CN203768910U (zh) 一种组合钢模板
CN204817592U (zh) 一种扁铁折弯治具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140101