CN103485312A - 一种碾压混凝土坝与河床建基面衔接的施工工艺 - Google Patents

一种碾压混凝土坝与河床建基面衔接的施工工艺 Download PDF

Info

Publication number
CN103485312A
CN103485312A CN201310428224.8A CN201310428224A CN103485312A CN 103485312 A CN103485312 A CN 103485312A CN 201310428224 A CN201310428224 A CN 201310428224A CN 103485312 A CN103485312 A CN 103485312A
Authority
CN
China
Prior art keywords
concrete
riverbed
construction
abnormal
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310428224.8A
Other languages
English (en)
Other versions
CN103485312B (zh
Inventor
崔进
赵继勇
杨家修
居浩
何建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201310428224.8A priority Critical patent/CN103485312B/zh
Publication of CN103485312A publication Critical patent/CN103485312A/zh
Application granted granted Critical
Publication of CN103485312B publication Critical patent/CN103485312B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种碾压混凝土坝与河床建基面衔接的施工工艺,它包含以下步骤:(1)变态混凝土找平建基面;(2)在变态混凝土未初凝前,在已浇筑的变态混凝土面上部浇筑碾压混凝土;(3)继续采用变态混凝土找平下一段河床建基面直到建基面完全覆盖;(4)过程中可在已经碾压完成施工面继续进行二次碾压混凝土施工,完成河床混凝土坝浇筑。本发明的有益效果是:采用变态混凝土作为碾压混凝土与河床基岩面的衔接层,使大坝碾压混凝土与河床基岩面有效衔接,实现了真正的碾压混凝土坝从建基面开始的连续上升,提高了大坝与河床基岩面的衔接安全性能、缩短了施工工期。

Description

一种碾压混凝土坝与河床建基面衔接的施工工艺
技术领域
本发明涉及一种碾压混凝土坝与河床建基面衔接的施工工艺,属于水电水利工程技术领域。
背景技术
水电水利工程碾压混凝土坝河床基础垫层,目前一般采取两种办法:方法一是采用常态混凝土作为垫层,缺点是考虑温控问题需要分缝分块,施工较为麻烦,工期长;方法二是采先铺撒砂浆后,直接进行碾压混凝土施工,缺点是对建基面的平整度要求较高,适应范围较小。
发明内容
本发明的目的在于提供一种碾压混凝土坝与河床建基面衔接的施工工艺,能克服现有技术的不足,实现碾压混凝土坝从建基面开始的连续上升。
本发明的目的是通过以下技术方案来实现的:一种碾压混凝土坝与河床建基面衔接的施工工艺,它包含以下步骤:
(1)、变态混凝土找平建基面:在河床基岩面达到设计要求后,对不平整的河床基岩面采用变态混凝土进行摊铺、浇筑,找平建基面,保证最薄处变态混凝土达30cm以上;
(2)、当变态混凝土找平建基面的宽度达到具备碾压施工2~3个带后,在变态混凝土未初凝前,在已浇筑的变态混凝土面上部浇筑碾压混凝土;
(3)、在碾压混凝土施工过程中,继续采用变态混凝土找平下一段河床建基面,碾压混凝土施工始终滞后于已施工的变态混凝土找平部分1~2个带,直到建基面完全覆盖;
(4)、过程中可在已经碾压完成施工面继续进行二次碾压混凝土施工,完成河床混凝土坝浇筑。
所述的变态混凝土是碾压混凝土摊铺后注射4~7%的水泥浆液或直接在拌和楼拌制而得。
本发明的有益效果在于:采用变态混凝土作为碾压混凝土与河床基岩面的衔接层,先在基岩面浇筑变态混凝土,变态混凝土初凝前,在已浇筑的变态混凝土面上部浇筑碾压混凝土,使大坝碾压混凝土与河床基岩面有效衔接,实现了真正的碾压混凝土坝从建基面开始的连续上升,提高了大坝与河床基岩面的衔接安全性能、缩短了施工工期。
具体实施方式
下面结合实施例进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。
一种碾压混凝土坝与河床建基面衔接的施工工艺,它包含以下步骤:
(1)、变态混凝土找平建基面:在河床基岩面达到设计要求后,对不平整的河床基岩面采用变态混凝土进行摊铺、浇筑,找平建基面,保证最薄处变态混凝土达30cm以上;
(2)、当变态混凝土找平建基面的宽度达到具备碾压施工2~3个带后,在变态混凝土未初凝前,在已浇筑的变态混凝土面上部浇筑碾压混凝土;
(3)、在碾压混凝土施工过程中,继续采用变态混凝土找平下一段河床建基面,碾压混凝土施工始终滞后于已施工的变态混凝土找平部分1~2个带,直到建基面完全覆盖;
(4)、过程中可在已经碾压完成施工面继续进行二次碾压混凝土施工,完成河床混凝土坝浇筑。
所述的变态混凝土是碾压混凝土摊铺后注射4~7%的水泥浆液或直接在拌和楼拌制而得。
本发明提出了先采用变态混凝土对不平整建基面进行摊铺、浇筑,找平建基面,在变态混凝土未初凝前,在上部进行碾压混凝土浇筑,既克服了采用方法一采用常态混凝土而分缝分块、工期长的缺点,又能适应方法二由于河床建基面不平整造成直接铺撒砂浆无法碾压的问题,实现了真正的碾压混凝土坝从建基面开始的连续上升。

Claims (2)

1.一种碾压混凝土坝与河床建基面衔接的施工工艺,其特征在于:它包含以下步骤:
(1)、变态混凝土找平建基面:在河床基岩面达到设计要求后,对不平整的河床基岩面采用变态混凝土进行摊铺、浇筑,找平建基面,保证最薄处变态混凝土达30cm以上;
(2)、当变态混凝土找平建基面的宽度达到具备碾压施工2~3个带后,在变态混凝土未初凝前,在已浇筑的变态混凝土面上部浇筑碾压混凝土;
(3)、在碾压混凝土施工过程中,继续采用变态混凝土找平下一段河床建基面,碾压混凝土施工始终滞后于已施工的变态混凝土找平部分1~2个带,直到建基面完全覆盖;
(4)、过程中可在已经碾压完成施工面继续进行二次碾压混凝土施工,完成河床混凝土坝浇筑。
2.根据权利要求1所述的碾压混凝土坝与河床建基面衔接的施工工艺,其特征在于:所述的变态混凝土是碾压混凝土摊铺后注射4~7%的水泥浆液或直接在拌和楼拌制而得。
CN201310428224.8A 2013-09-18 2013-09-18 一种碾压混凝土坝与河床建基面衔接的施工工艺 Active CN103485312B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310428224.8A CN103485312B (zh) 2013-09-18 2013-09-18 一种碾压混凝土坝与河床建基面衔接的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310428224.8A CN103485312B (zh) 2013-09-18 2013-09-18 一种碾压混凝土坝与河床建基面衔接的施工工艺

Publications (2)

Publication Number Publication Date
CN103485312A true CN103485312A (zh) 2014-01-01
CN103485312B CN103485312B (zh) 2015-07-22

Family

ID=49825867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310428224.8A Active CN103485312B (zh) 2013-09-18 2013-09-18 一种碾压混凝土坝与河床建基面衔接的施工工艺

Country Status (1)

Country Link
CN (1) CN103485312B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395266A (zh) * 2020-03-13 2020-07-10 中电建十一局工程有限公司 一种加浆混凝土的施工方法
CN111535322A (zh) * 2020-04-26 2020-08-14 中电建十一局工程有限公司 一种底部加浆的变态混凝土施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1106877A (zh) * 1994-08-30 1995-08-16 中国水利水电第八工程局 碾压砼拱坝施工方法
CN103132489A (zh) * 2011-12-02 2013-06-05 中国水电顾问集团贵阳勘测设计研究院 200m级高碾压混凝土防渗坝的构建方法及防渗坝

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1106877A (zh) * 1994-08-30 1995-08-16 中国水利水电第八工程局 碾压砼拱坝施工方法
CN103132489A (zh) * 2011-12-02 2013-06-05 中国水电顾问集团贵阳勘测设计研究院 200m级高碾压混凝土防渗坝的构建方法及防渗坝

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沈崇刚: "中国碾压混凝土坝技术的进展与运行经验", 《水力发电》 *
龙起煌等: "中国碾压混凝土坝技术", 《水力水电技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395266A (zh) * 2020-03-13 2020-07-10 中电建十一局工程有限公司 一种加浆混凝土的施工方法
CN111395266B (zh) * 2020-03-13 2021-07-09 中电建十一局工程有限公司 一种加浆混凝土的施工方法
CN111535322A (zh) * 2020-04-26 2020-08-14 中电建十一局工程有限公司 一种底部加浆的变态混凝土施工方法
CN111535322B (zh) * 2020-04-26 2021-07-09 中电建十一局工程有限公司 一种底部加浆的变态混凝土施工方法

Also Published As

Publication number Publication date
CN103485312B (zh) 2015-07-22

Similar Documents

Publication Publication Date Title
CN203546678U (zh) 一种沥青混凝土心墙堆石坝结构
CN203256699U (zh) 一种过水土石坝的构筑构造
CN104060619B (zh) 水工心墙堆石坝免围堰的施工方法及结构
CN205382466U (zh) 一种混凝土面板堆石坝
CN103485312B (zh) 一种碾压混凝土坝与河床建基面衔接的施工工艺
CN203716168U (zh) 混凝土面板堆石坝深厚覆盖层趾板基础结构
CN102071675A (zh) 一种联合排水堆载预压和深层搅拌桩加固软土地基的方法
CN104790404B (zh) 一种坝基高压灌浆结构及灌浆方法
CN202090324U (zh) 一种新型过水围堰
CN101476309A (zh) 超高混凝土面板堆石坝坝体预压反台填筑施工方法
CN205917662U (zh) 一种防开裂混凝土面板堆石坝
CN203213078U (zh) 一种重力坝与堆石坝复合的坝型
CN203229927U (zh) 一种坝体上游迎水面浅层温度裂缝处理结构
CN104032713A (zh) 一种压力引水隧洞复合衬砌混凝土防渗结构及其施工工艺
CN203383193U (zh) 免围堰的心墙堆石坝结构
CN205369167U (zh) 水中抛填砂砾石料低坝坝体
CN104404918A (zh) 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法
CN204590034U (zh) 一种坝基高压灌浆结构
CN108343033B (zh) 一种水利工程上的防渗止水方法
CN206298874U (zh) 一种防止垫层料内水反向压力破坏的结构
CN204982784U (zh) 一种河道堤坝生态护坡结构
CN203808025U (zh) 一种用于较陡地形的截水沟结构
CN110453659B (zh) 一种软弱围岩引水隧洞岩塞预留施工关键技术施工方法
CN104631425B (zh) 一种加快粉煤灰排渗固结的方法
CN202073107U (zh) 一种降水井封闭结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant