CN103441463A - 一种长距离集束pe管道非开挖穿越方法 - Google Patents

一种长距离集束pe管道非开挖穿越方法 Download PDF

Info

Publication number
CN103441463A
CN103441463A CN2013104087809A CN201310408780A CN103441463A CN 103441463 A CN103441463 A CN 103441463A CN 2013104087809 A CN2013104087809 A CN 2013104087809A CN 201310408780 A CN201310408780 A CN 201310408780A CN 103441463 A CN103441463 A CN 103441463A
Authority
CN
China
Prior art keywords
steel pipe
pipeline
excavation
conduit bundles
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013104087809A
Other languages
English (en)
Inventor
魏如林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN SHIJIDONGDA PIPE-CROSSING ENGINEERING Co Ltd
Original Assignee
TIANJIN SHIJIDONGDA PIPE-CROSSING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN SHIJIDONGDA PIPE-CROSSING ENGINEERING Co Ltd filed Critical TIANJIN SHIJIDONGDA PIPE-CROSSING ENGINEERING Co Ltd
Priority to CN2013104087809A priority Critical patent/CN103441463A/zh
Publication of CN103441463A publication Critical patent/CN103441463A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提供一种长距离集束PE管道非开挖穿越方法,包括组装PE管道成束、焊接钢管、PE管道束拉进钢管、焊接钢管两端使其封闭、定向钻孔、扩孔、将带PE管道束的钢管拉进钻孔内、切割掉钢管两端的封闭头、放缆。本发明的有益效果是:将长距离集束PE管道穿越河流成为现实,且可完全避免管道回拖造成PE管道拉断,PE管道外围的钢管还可以起到保护套管的作用,增加PE管道寿命。

Description

一种长距离集束PE管道非开挖穿越方法
 
技术领域
本发明属于非开挖铺管施工工程领域,尤其是涉及一种长距离集束PE管道非开挖穿越方法。
背景技术
     在现有的非开挖铺管施工技术中,电缆穿管遇到穿越距离长且管道多时,如果用常规的穿管方法,在穿越回拖管道时容易把PE管道拉断,浪费材料且耽误施工进度,目前需要一种保证管道不被拉断的方法。
发明内容
本发明的目的是提供一种结构简单、操作方便、施工效率高的长距离集束PE管道非开挖穿越方法,尤其适合长距离集束PE管道非开挖穿越工程中。
本发明的技术方案是:
一种长距离集束PE管道非开挖穿越方法,它包括以下步骤:
(1)将若干根PE管道首尾对齐后,组装成PE管道束,该单根PE管道的长度大于提前设定好的地下穿越路线的长度;
(2)在陆地上焊接能容纳PE管道束的钢管,钢管焊接总长度与单根PE管道长度相同;
(3)把PE管道束全部拉进已焊接完成的钢管内,使PE管道束的首尾与钢管的首尾对齐;
(4)用铁板焊接钢管的两端,使钢管的两端封闭;
(5)沿提前设定好的地下穿越路线,使用导向钻头进行定向钻孔;
(6)钻孔完毕后,使用扩孔器回扩钻孔,直到钻孔的直径大于钢管的外径;
(7)待扩孔施工结束后,将钻杆与内部装有PE管道束的钢管端部进行连接,利用钻杆带动钢管在钻孔内进行回拖,使钢管贯穿在钻孔内;
(8)待钻杆将钢管的端部拖出地面后,切割掉钢管两端的铁板封闭头;
(9)将电缆穿过于PE管道,完成长距离PE管道束非开挖的穿越。
进一步,把PE管道束拉进钢管的方法为钻机拉进。
进一步,所用钢管为厚壁防锈钢管。
进一步,焊接钢管两端的铁板为厚壁的铁板且外侧带有牵引柄。
本发明具有的优点和积极效果是:由于采用上述技术方案,将长距离集束PE管道穿越河流成为现实,且可完全避免管道回拖造成PE管道拉断。PE管道外围的钢管还可以起到保护套管的作用,增加PE管道寿命,具有步骤简单,操作方便,加工成本低、生产效率高等优点 。
附图说明
图1是本发明的工作流程图
具体实施方式
如图1所示:
本发明的技术方案为:一种长距离集束PE管道非开挖穿越方法,以工程过河路线总长700米,需铺设管径为200mm的PE管道8根的工程为例,具体方法如下:
(1)共需PE管材5680米,在陆地上将8根710米长的管道首尾对齐后,组装成PE管道束;
(2)先焊接能容纳8根PE管道的直径为800mm的钢管,钢管焊接总长度为710米;
(3)使用50t钻机把8根PE管全部拉进已焊接完成的钢管内;
    (4)用铁板焊接钢管的两端,使钢管的两端封闭,防止进水;
    (5)沿提前设定好的地下穿越路线,使用导向钻头进行定向钻孔;
(6)用扩孔器回扩钻孔使孔径达到1000mm;
(7)待扩孔施工结束后,将钻杆与内部装有PE管道束的钢管端部进行连接,利用钻杆带动钢管在钻孔内进行回拖,使钢管贯穿在钻孔内;
(8)待钻杆将钢管的端部拖出地面后,切割掉钢管两端的铁板封闭头;
(9)将电缆穿过于PE管道,投产使用,完成长距离PE管道束非开挖的穿越。
本实施例中,所用钢管为厚壁防锈钢管,焊接钢管两端的铁板为厚壁的铁板且外侧带有牵引柄。
以上对本发明的一个实施例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。

Claims (4)

1.一种长距离集束PE管道非开挖穿越方法,其特征在于:
它包括以下步骤:
(1)将若干根PE管道首尾对齐后,组装成PE管道束,该单根PE管道的长度大于提前设定好的地下穿越路线的长度;
(2)在陆地上焊接能容纳PE管道束的钢管,钢管焊接总长度与单根PE管道长度相同;
(3)把PE管道束全部拉进已焊接完成的钢管内,使PE管道束的首尾与钢管的首尾对齐;
(4)用铁板焊接钢管的两端,使钢管的两端封闭;
(5)沿提前设定好的地下穿越路线,使用导向钻头进行定向钻孔;
(6)钻孔完毕后,使用扩孔器回扩钻孔,直到钻孔的直径大于钢管的外径;
(7)待扩孔施工结束后,将钻杆与内部装有PE管道束的钢管端部进行连接,利用钻杆带动钢管在钻孔内进行回拖,使钢管贯穿在钻孔内;
(8)待钻杆将钢管的端部拖出地面后,切割掉钢管两端的铁板封闭头;
(9)将电缆穿过于PE管道,完成长距离PE管道束非开挖的穿越。
2.根据权利要求1所述的一种长距离集束PE管道非开挖穿越方法,其特征在于:把PE管道束拉进钢管的方法为钻机拉进。
3. 根据权利要求1所述的一种长距离集束PE管道非开挖穿越方法,其特征在于:所用钢管为厚壁防锈钢管。
4.根据权利要求1所述的一种长距离集束PE管道非开挖穿越方法,其特征在于:焊接钢管两端的铁板为厚壁的铁板且外侧带有牵引柄。
CN2013104087809A 2013-09-10 2013-09-10 一种长距离集束pe管道非开挖穿越方法 Pending CN103441463A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013104087809A CN103441463A (zh) 2013-09-10 2013-09-10 一种长距离集束pe管道非开挖穿越方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013104087809A CN103441463A (zh) 2013-09-10 2013-09-10 一种长距离集束pe管道非开挖穿越方法

Publications (1)

Publication Number Publication Date
CN103441463A true CN103441463A (zh) 2013-12-11

Family

ID=49695145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013104087809A Pending CN103441463A (zh) 2013-09-10 2013-09-10 一种长距离集束pe管道非开挖穿越方法

Country Status (1)

Country Link
CN (1) CN103441463A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810714A (zh) * 2020-06-11 2020-10-23 中石化南京工程有限公司 一种集输管道定向钻集束敷设施工方法
CN112103852A (zh) * 2020-07-02 2020-12-18 广东电网有限责任公司佛山供电局 一种利用水平定向钻技术穿越河道并敷设电缆的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1037384A (zh) * 1988-11-17 1989-11-22 辽河石油勘探局油田建设工程二公司 长输管线无沟铺设工艺及机具
JP2000248884A (ja) * 1999-02-25 2000-09-12 Tokyo Gas Co Ltd 非開削による配管の敷設工法
US20080124178A1 (en) * 2006-06-15 2008-05-29 Green Core Technologies, Llc Methods and apparatus for installing conduit underground
CN101457853A (zh) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 非开挖拉管施工工法
CN102522723A (zh) * 2011-12-15 2012-06-27 绍兴电力局 一种不开挖地面电力电缆穿越方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1037384A (zh) * 1988-11-17 1989-11-22 辽河石油勘探局油田建设工程二公司 长输管线无沟铺设工艺及机具
JP2000248884A (ja) * 1999-02-25 2000-09-12 Tokyo Gas Co Ltd 非開削による配管の敷設工法
US20080124178A1 (en) * 2006-06-15 2008-05-29 Green Core Technologies, Llc Methods and apparatus for installing conduit underground
CN101457853A (zh) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 非开挖拉管施工工法
CN102522723A (zh) * 2011-12-15 2012-06-27 绍兴电力局 一种不开挖地面电力电缆穿越方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王清元等: "利用定向钻穿越塔里木河", 《油气田地面工程》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810714A (zh) * 2020-06-11 2020-10-23 中石化南京工程有限公司 一种集输管道定向钻集束敷设施工方法
CN111810714B (zh) * 2020-06-11 2022-05-20 中石化南京工程有限公司 一种集输管道定向钻集束敷设施工方法
CN112103852A (zh) * 2020-07-02 2020-12-18 广东电网有限责任公司佛山供电局 一种利用水平定向钻技术穿越河道并敷设电缆的方法
CN112103852B (zh) * 2020-07-02 2021-12-10 广东电网有限责任公司佛山供电局 一种利用水平定向钻技术穿越河道并敷设电缆的方法

Similar Documents

Publication Publication Date Title
CN103398215A (zh) 一种微创非开挖顶拉管工艺
CN102208779A (zh) 电缆线快速穿管方法
CN105673934A (zh) 一种电缆缚设排管非开挖方法
CN201874465U (zh) 勘探用扩孔钻头
CN103486331B (zh) 一种非开挖管道施工中卡管事故的处理方法
CN103441463A (zh) 一种长距离集束pe管道非开挖穿越方法
CN202039771U (zh) 长螺旋注浆、压灌砼多功能钻具
CN104235498B (zh) 一种实壁管材布管固定连接器
CN202431276U (zh) 泥水平衡式顶管掘进机切削刀盘
CN205077502U (zh) 用于钻孔涌砂冒水的防喷装置
CN102011889B (zh) 短程下穿道路掘孔装置
CN203547532U (zh) 一种带保护装置的钻具
CN203603813U (zh) 适用于密闭取心的岩心爪组合件
JP6389681B2 (ja) トンネル掘削工事における切羽前方の地盤改良方法
CN204942755U (zh) 光缆与油管道同孔回拖的组合结构
CN201953334U (zh) 套铣头
CN209228306U (zh) 回拖头
CN102522718A (zh) 一种利用迪尼玛绳将电缆穿入保护管的方法
CN202228786U (zh) 一种mpp牵引管
CN205639863U (zh) 专用于地埋玻璃钢管线替换施工的破切扩孔穿管安装器
CN204256235U (zh) 一种光缆与油管管道同孔回拖穿越装置
CN206487410U (zh) 一种钻进机构及小型埋管设备
CN219388801U (zh) 一种隧道配筋管棚分节安装施工工具套管
CN204677113U (zh) 扩孔器
CN204785053U (zh) 钢塑复合拉管套

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211

RJ01 Rejection of invention patent application after publication