CN103418986A - 步进梁运输机临时轨道安装方法 - Google Patents

步进梁运输机临时轨道安装方法 Download PDF

Info

Publication number
CN103418986A
CN103418986A CN2012101486817A CN201210148681A CN103418986A CN 103418986 A CN103418986 A CN 103418986A CN 2012101486817 A CN2012101486817 A CN 2012101486817A CN 201210148681 A CN201210148681 A CN 201210148681A CN 103418986 A CN103418986 A CN 103418986A
Authority
CN
China
Prior art keywords
moving
moving beam
walking
another
walking beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101486817A
Other languages
English (en)
Other versions
CN103418986B (zh
Inventor
索乐都
孙剑
周专
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201210148681.7A priority Critical patent/CN103418986B/zh
Publication of CN103418986A publication Critical patent/CN103418986A/zh
Application granted granted Critical
Publication of CN103418986B publication Critical patent/CN103418986B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及步进梁运输机的安装方法。一种步进梁运输机临时轨道安装方法,它包括步骤一,定梁安装后根据定梁上的下轨道尺寸,选用腹板宽度相同的型钢使其连接起来作为临时轨道;步骤二,使用行车吊装安装一个动梁;步骤三,安装另一个动梁,由一个行车将另一个步进梁运输机动梁吊装到已安装的定梁轨道上,随后由该行车控制一端,另一端使用手拉葫芦自一端安装定梁轨道位置沿所述临时轨道一直将该动梁拖拽到所述步进梁梁上前端,随后改由另一台行车对其进行拖拽,直至安装至步进另一个定梁上;步骤四,安装定梁下部液压缸和附属构件完成二台步进梁运输机的安装。本发明通过拖拽和滑行的原理,完成步进梁运输机的安装,缩短了安装工期。

Description

步进梁运输机临时轨道安装方法
技术领域
本发明涉及步进梁运输机,尤其涉及步进梁运输机的安装方法。
背景技术
随着企业的发展,越来越多的单位遇到了生产线更新的阶段。对于步进梁运输机来说,除了定梁外还有动梁需要安装。而对于老厂房而言,车间内可能空间比较狭小,无法使用吊机直接吊装,另一方面,由于车间设计思路前后不一致,步进梁运输机安装位置并不适应车间原有行车布局,因此无法直接使用行车吊运。
发明内容
本发明旨在解决上述缺陷,提供一种步进梁运输机临时轨道安装方法。本发明通过拖拽和滑行的原理,完成步进梁运输机的安装,使用材料简单,大幅度节约了成本,缩短了安装工期。
为实现上述目的,一种步进梁运输机临时轨道安装方法,它包括下列步骤:
步骤一,定梁安装后根据定梁上的下轨道尺寸,选用腹板宽度相同的型钢使其连接起来作为临时轨道,型钢根部采用满焊;
步骤二,使用行车吊装安装一个动梁;
步骤三,安装另一个动梁,由一个行车将另一个步进梁运输机动梁吊装到已安装的定梁轨道上,随后由该行车控制一端,保持动梁稳定,另一端使用手拉葫芦自已安装定梁轨道位置沿所述临时轨道一直将该动梁拖拽到所述步进梁梁上前端,随后改由另一台行车对其进行拖拽,直至安装至步进另一个定梁上,至此完成另一个动梁的安装;
步骤四,全部动梁就位后,安装定梁下部液压缸和附属构件完成二台步进梁运输机的安装,最后拆除临时轨道。
所述的步进梁运输机的动梁临时轨道安装方法,所述步骤二是参照步骤三的方法安装该动梁的。
本发明是在无法完全使用吊具安装的情况下,利用已经安装完毕的动梁制作两条临时轨道,然后使用厂房内行车对两台的步进梁运输机动梁部分(每台约28吨)进行拖拽,进而完成其设备安装。本发明使用材料简单,大幅度节约了成本,缩短了安装工期。
附图说明
下面结合附图对本发明作进一步的说明:
图1-6为本发明的动梁安装流程示意图。
具体实施方式
如图1-6所示,2台步进梁设计位置特殊,恰恰位于厂房内A和B行车两台垂直布置行车的交界处,同时步进梁位置上部设有位置较低的走行平台,导致垂直高度不足12m,单台步进梁动梁部分,包括走行轨道、走行轮、走行升降机构及传动连杆组成,单重约28吨。二台步进梁运输机是连续布置。
根据2台步进梁的布置形式和结构,先将二台步进梁运输机定梁施工完毕,根据定梁上的下轨道尺寸,选用腹板宽度选用相同的型钢使其连接起来,型钢根部采用满焊,待临时轨道焊接完毕后,首先安装2#步进梁运输机动梁,由A行车将2#步进梁运输机动梁吊装到1#步进梁运输机定梁轨道上,随后由行车控制一端,保持动梁稳定,另一端使用手拉葫芦自1#步进梁定梁轨道位置沿1#与2#步进梁运输机间的临时轨道一直将1#步进梁运输机动梁拖拽到2#步进梁梁上前端,随后改由B行车对其进行拖拽,直至安装至2#步进梁动梁上,至此完成2#步进梁动梁的安装。
1#步进梁动梁采用相同的方法进行安装。全部动梁就位后,安装定梁下部液压缸等其它附属构件完成二台步进梁运输机的安装。

Claims (2)

1.一种步进梁运输机临时轨道安装方法,其特征在于,它包括下列步骤:
步骤一,定梁安装后根据定梁上的下轨道尺寸,选用腹板宽度相同的型钢使其连接起来作为临时轨道,型钢根部采用满焊;
步骤二,使用行车吊装安装一个动梁;
步骤三,安装另一个动梁,由一个行车将另一个步进梁运输机动梁吊装到已安装的定梁轨道上,随后由该行车控制一端,保持动梁稳定,另一端使用手拉葫芦自已安装定梁轨道位置沿所述临时轨道一直将该动梁拖拽到所述步进梁梁上前端,随后改由另一台行车对其进行拖拽,直至安装至步进另一个定梁上,至此完成另一个动梁的安装;
步骤四,全部动梁就位后,安装定梁下部液压缸和附属构件完成二台步进梁运输机的安装,最后拆除临时轨道。
2.根据权利要求1所述的步进梁运输机的动梁临时轨道安装方法,其特征在于,所述步骤二是参照步骤三的方法安装该动梁的。
CN201210148681.7A 2012-05-15 2012-05-15 步进梁运输机临时轨道安装方法 Active CN103418986B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210148681.7A CN103418986B (zh) 2012-05-15 2012-05-15 步进梁运输机临时轨道安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210148681.7A CN103418986B (zh) 2012-05-15 2012-05-15 步进梁运输机临时轨道安装方法

Publications (2)

Publication Number Publication Date
CN103418986A true CN103418986A (zh) 2013-12-04
CN103418986B CN103418986B (zh) 2015-09-30

Family

ID=49644630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210148681.7A Active CN103418986B (zh) 2012-05-15 2012-05-15 步进梁运输机临时轨道安装方法

Country Status (1)

Country Link
CN (1) CN103418986B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105345285A (zh) * 2015-09-30 2016-02-24 中国二十二冶集团有限公司 狭小空间上轨道仰位安装方法及安装工具

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1082712A1 (ru) * 1982-07-30 1984-03-30 Sergeev Gennadij N Шаговый конвейер
US4730722A (en) * 1987-01-16 1988-03-15 Emerson Electric Co. Walking beam drive apparatus
US4928811A (en) * 1988-12-07 1990-05-29 Glenn Waineo Walking beam apparatus
WO2007002996A1 (en) * 2005-07-01 2007-01-11 Realcold Milmech Pty Ltd Walking beam conveyor
CN101158145A (zh) * 2007-11-08 2008-04-09 中国第一冶金建设有限责任公司 高架桥节段箱梁的安装方法
CN101637860A (zh) * 2009-08-21 2010-02-03 二重集团(德阳)重型装备股份有限公司 轧机压下阶梯垫的拆卸方法及辅助工具
CN102267664A (zh) * 2011-05-27 2011-12-07 中国一冶集团有限公司 梁吊法安装桥式起重机的方法和该方法的用途

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1082712A1 (ru) * 1982-07-30 1984-03-30 Sergeev Gennadij N Шаговый конвейер
US4730722A (en) * 1987-01-16 1988-03-15 Emerson Electric Co. Walking beam drive apparatus
US4928811A (en) * 1988-12-07 1990-05-29 Glenn Waineo Walking beam apparatus
WO2007002996A1 (en) * 2005-07-01 2007-01-11 Realcold Milmech Pty Ltd Walking beam conveyor
CN101158145A (zh) * 2007-11-08 2008-04-09 中国第一冶金建设有限责任公司 高架桥节段箱梁的安装方法
CN101637860A (zh) * 2009-08-21 2010-02-03 二重集团(德阳)重型装备股份有限公司 轧机压下阶梯垫的拆卸方法及辅助工具
CN102267664A (zh) * 2011-05-27 2011-12-07 中国一冶集团有限公司 梁吊法安装桥式起重机的方法和该方法的用途

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张红亮等: "钢卷运输线步进梁调试与改造", 《电气应用》 *
张莉芬等: "热轧带钢生产线钢卷运输系统设备设计与开发", 《重型机械》 *
朱明震: "镀锌线钢卷吊运装置的自动化控制", 《起重运输机械》 *
李建平: "96m铁路钢桁梁膺架拼装与拖拉安装施工方案", 《四川建材》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105345285A (zh) * 2015-09-30 2016-02-24 中国二十二冶集团有限公司 狭小空间上轨道仰位安装方法及安装工具
CN105345285B (zh) * 2015-09-30 2017-07-11 中国二十二冶集团有限公司 狭小空间上轨道仰位安装方法及安装工具

Also Published As

Publication number Publication date
CN103418986B (zh) 2015-09-30

Similar Documents

Publication Publication Date Title
CN106638687B (zh) 一种预制拼装综合管廊精准快速拼装工艺
CN103924529B (zh) 一种滚动拖拉装置及其施工方法
JP2004232426A (ja) 床版架設装置
CN103726421B (zh) 地铁施工用高度及跨度可调式轨道铺设机
CN202899040U (zh) 穿越隧道箱梁运架一体机
CN104179090B (zh) 一种地铁铺轨系统
CN103074829B (zh) 一种铁路道岔换铺工法及其铁路道岔铺轨机组
CN213328698U (zh) 一种高速铁路桥面系预制件安装设备
JP2006265884A (ja) 跨道橋の既設橋脚撤去方法
CN112323644B (zh) 运梁车、运梁系统、钢箱梁装配系统及钢箱梁装配方法
WO2022088053A1 (zh) 运梁车、运梁系统、钢箱梁装配系统及钢箱梁装配方法
CN103924985A (zh) 一种与tbm掘进同步施工的现浇仰拱衬砌台车及混凝土养护系统
CN201284462Y (zh) 公铁两用架桥机
CN106761856A (zh) 一种用于盾构机同步箱涵施工的箱涵吊机
CN204023336U (zh) 一种地铁铺轨机
CN102162219B (zh) 一种移梁方法
CN103662704A (zh) 跨轨运输装配车
CN203684019U (zh) 地铁施工用高度及跨度可调式轨道铺设机
CN103418986A (zh) 步进梁运输机临时轨道安装方法
CN106192761A (zh) 一种在桥隧狭短过渡段拆解移动模架的方法
CN102849394A (zh) 一种自动转接移位装置及其运作方法
CN201849911U (zh) 重型设备运输装置
CN204023325U (zh) 一种地铁铺轨系统
CN214459645U (zh) 一种过隧运梁车
CN112356759B (zh) 一种低位运梁车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant