CN103411508A - 层门安装工具 - Google Patents
层门安装工具 Download PDFInfo
- Publication number
- CN103411508A CN103411508A CN2013103047170A CN201310304717A CN103411508A CN 103411508 A CN103411508 A CN 103411508A CN 2013103047170 A CN2013103047170 A CN 2013103047170A CN 201310304717 A CN201310304717 A CN 201310304717A CN 103411508 A CN103411508 A CN 103411508A
- Authority
- CN
- China
- Prior art keywords
- secondary bar
- mobile jib
- layer door
- erecting tools
- sill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
本发明公开了一种层门安装工具,包括两个相互平行的测量杆,该测量杆连接于电梯轿厢上横梁,测量杆垂直指向层门安装口所在平面,所述测量杆包括可调长度的杆身,杆身前端连接有地坎固定板。相对于现有的层门装置,本发明简化了层门地坎安装程序,节约工时,适用范围更加广泛。
Description
技术领域
本发明属于升降机层门安装技术领域。
背景技术
国标或者EN81-1中规定电梯层门地坎与轿厢地坎的间距应不大于35mm,在安装层门的时候需要每层层门与轿厢之间的距离保持一致。现有的层门安装方式是通过测量导轨样线和层门样线的水平距离,确定出层门装置的安装位置,再从层门地坎开始安装。由于导轨与层门样线分别放样,受环境因素(如风力)等影响,分别产生误差,最终导致层门的安装位置出现较大误差。
目前市面上出现了一种无需测量导轨放样线和层门放样的层门安装工具,中国专利ZL20110245863.1公开了一种电梯层门地坎的安装测量工具,它包括两组镜像对称的测量杆、机座和与机座可调节地连接的井道导轨;所述机座可调节地固定于所述测量杆;所述测量杆一端设置有限位定位板和紧固定位板;所述限位定位板和紧固定位板与所述测量杆可调节地配合连接。
上述方案存在以下缺点:首先,首次安装时,测量杆通过机座安装于首层层门安装口对应的井道导轨上,该层层门安装完成后需要拆除导轨上的测量杆,将测量杆移至上一层层门安装口对应的轨道位置上,从而确定层门每层的水平安装位置。使用较为麻烦,多次安装拆卸测量杆较为耗费工时;其次,测量杆杆身长度一定,地坎的安装位置由测量杆前端限位定位板和紧固定位板调节确定,由于测量杆调节范围较小,因此不能适于不同梯形、不同尺寸的电梯井道。
发明内容
本发明意在提供一种无需多次安装拆卸、节约工时和适用范围广的层门安装工具。
本发明的目的可以通过以下措施来达到:层门安装工具,包括两个相互平行的测量杆,该测量杆连接于电梯轿厢上横梁,测量杆垂直指向层门安装口所在平面,所述测量杆包括可调长度的杆身,杆身前端连接有地坎固定板。
上述技术方案与现有技术的区别在于:首先,测量杆连接于电梯轿厢上横梁上,随着电梯轿厢的上下移动停止在层门安装口处,工作人员直接站在轿厢顶部,将地坎放置于地坎固定板上,测量杆的杆身可调节长度,使得地坎位于合适的安装位置,再进行地坎的安装,由于测量杆的可调节性,可适用于不同的尺寸的井道,增大了层门安装工具的适用范围,此外,由于测量杆随着轿厢移动,无需像以前将测量杆安装于导轨上,减少了安装拆卸次数,节约工时。
进一步地,所述杆身包括主杆和副杆,主杆与副杆上均开有等距的定位槽孔,副杆前端开有安装槽孔;主杆与副杆通过不同的定位槽孔配合,可以调节杆身长度,安装槽孔与螺栓配合用于连接副杆和地坎固定板。
进一步地,所述主杆和副杆上均设有刻度层,可直接测量地坎的安装距离,无需另外使用卷尺。
进一步地,所述主杆与副杆均为槽钢,副杆滑动置于主杆内,主杆和副杆通过定位槽孔和螺栓的配合相互连接,相比于其他管状钢等,槽钢成本更低,这样的结构更便于调整杆身长度。
进一步地,所述主杆远离副杆一端的槽底外壁设有两个相对的角钢,角钢之间的距离与上横梁梁宽相同,测量杆通过角钢与轿厢上横梁连接,结构更加稳固。
进一步地,所述地坎固定板为槽钢,该槽钢前端切除两侧壁,形成L形的地坎固定部,地坎固定板用于放置层门地坎。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明:
图1为本发明层门安装工具实施例的结构示意图;
图2为图1的俯视图。
具体实施方式
如图1、图2所示:一种层门安装工具,包括两个相互平行的测量杆,该测量杆连接于电梯轿厢上横梁上,测量杆垂直指向层门安装口所在平面。
测量杆包括可调长度的杆身,该杆身可以为管状伸缩式、多段折叠式等,本发明中杆身采用槽钢制成主杆1和副杆2,副杆2置于主杆1的凹槽内并可在凹槽内滑动,主杆1和副杆2底壁上均开有多个等距的定位槽孔3,主杆1和副杆2上的定位槽孔3对齐后,通过拧紧定位槽孔上的定位螺栓将副杆2固定在主杆1上。选择不同的定位槽孔3对齐,可调节副杆2伸入主杆1凹槽内的距离,即可调节杆身的长度。
副杆2前端开有安装槽孔,地坎固定板6通过安装螺栓和安装槽孔的配合固定于副杆2上。地坎固定板6也为槽钢,且置于副杆2的凹槽内并可在凹槽内滑动。地坎固定板6前端切除两侧壁,形成L形的地坎固定部。
主杆1远离副杆2一端的槽底外壁设有两个相对的角钢4,角钢4之间的距离与上横梁梁宽相同,角钢4上带有螺栓,主杆1通过角钢2固定在上横梁上。
主杆1和副杆2上均涂覆有刻度层。
使用时,工作人员将两个测量杆的角钢2拧紧在上横梁上,保持两个测量杆的平行。拧松定位螺栓,调节副杆2伸入主杆1凹槽的长度,由于主杆1和副杆2带有刻度层,操作人员可直观的看到杆身的长度变化,待达到预期的长度(即规定的电梯安装口与轿厢的水平间距),找到主杆1和副杆2上相互对齐的定位槽孔3,拧紧定位螺栓,从而将主杆1和副杆2固定。将地坎安装件放置于地坎固定板6的地坎固定部上,再对地坎进行安装。
以上所述仅为本发明较佳实施例的详细说明,并非用来限制本发明,凡依本发明的创作精神所作的类似变化的实施例,皆应包含于本发明之中。
Claims (6)
1.层门安装工具,包括两个相互平行的测量杆,该测量杆连接于电梯轿厢上横梁,测量杆垂直指向层门安装口所在平面,其特征是:所述测量杆包括可调长度的杆身,杆身前端连接有地坎固定板。
2.根据权利要求1所述的层门安装工具,其特征是:所述杆身包括主杆和副杆,主杆与副杆上分别开有等距的定位槽孔,副杆前端开有安装槽孔。
3.根据权利要求2所述的层门安装工具,其特征是:所述主杆和副杆上均设有刻度层。
4.根据权利要求2或3所述的层门安装工具,其特征是:所述主杆与副杆均为槽钢,副杆滑动置于主杆内,主杆和副杆通过定位槽孔和螺栓的配合相互连接。
5.根据权利要求2或3所述的层门安装工具,其特征是:所述主杆远离副杆一端的槽底外壁设有两个相对的角钢,角钢之间的距离与上横梁梁宽相同。
6.根据权利要求1或5所述的层门安装工具,其特征是:所述地坎固定板为槽钢,该槽钢前端切除两侧壁,形成L形的地坎固定部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103047170A CN103411508A (zh) | 2013-07-19 | 2013-07-19 | 层门安装工具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103047170A CN103411508A (zh) | 2013-07-19 | 2013-07-19 | 层门安装工具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103411508A true CN103411508A (zh) | 2013-11-27 |
Family
ID=49604537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103047170A Pending CN103411508A (zh) | 2013-07-19 | 2013-07-19 | 层门安装工具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103411508A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998040303A1 (en) * | 1997-03-07 | 1998-09-17 | Kone Oyj | Procedure and apparatus for the installation of an elevator |
CN1329573A (zh) * | 1998-11-13 | 2002-01-02 | 通力股份公司 | 电梯层门结构 |
CN101537959A (zh) * | 2009-04-15 | 2009-09-23 | 韦浩 | 一种安装电梯用工具及其使用方法 |
CN202124406U (zh) * | 2011-06-28 | 2012-01-25 | 吴江市德菱电梯配套有限公司 | 层门地坎装置 |
CN102419142A (zh) * | 2011-08-25 | 2012-04-18 | 巨人通力电梯有限公司 | 一种电梯层门地坎的安装测量工具 |
CN202719926U (zh) * | 2012-06-04 | 2013-02-06 | 宁波大学 | 一种直尺 |
CN202785196U (zh) * | 2012-08-23 | 2013-03-13 | 安川双菱电梯有限公司 | 一种轿门地坎托架 |
CN203501939U (zh) * | 2013-07-19 | 2014-03-26 | 重庆迈高电梯有限公司 | 层门安装工具 |
-
2013
- 2013-07-19 CN CN2013103047170A patent/CN103411508A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1998040303A1 (en) * | 1997-03-07 | 1998-09-17 | Kone Oyj | Procedure and apparatus for the installation of an elevator |
CN1329573A (zh) * | 1998-11-13 | 2002-01-02 | 通力股份公司 | 电梯层门结构 |
CN101537959A (zh) * | 2009-04-15 | 2009-09-23 | 韦浩 | 一种安装电梯用工具及其使用方法 |
CN202124406U (zh) * | 2011-06-28 | 2012-01-25 | 吴江市德菱电梯配套有限公司 | 层门地坎装置 |
CN102419142A (zh) * | 2011-08-25 | 2012-04-18 | 巨人通力电梯有限公司 | 一种电梯层门地坎的安装测量工具 |
CN202719926U (zh) * | 2012-06-04 | 2013-02-06 | 宁波大学 | 一种直尺 |
CN202785196U (zh) * | 2012-08-23 | 2013-03-13 | 安川双菱电梯有限公司 | 一种轿门地坎托架 |
CN203501939U (zh) * | 2013-07-19 | 2014-03-26 | 重庆迈高电梯有限公司 | 层门安装工具 |
Non-Patent Citations (1)
Title |
---|
佚名: "《施工方案》", 《百度文库》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9670684B2 (en) | Apparatus and method for lifting and sliding a structure attached to the wall | |
CN103628417B (zh) | 支架法安装钢管拱拱节段坐标调整装置 | |
CN203783165U (zh) | 预埋件多方位精确调节装置 | |
US10101142B2 (en) | Method in the installation of an elevator and tool for use in the method | |
CN203247565U (zh) | 垂直升船机中螺母柱二期埋件安装辅助装置 | |
CN204899252U (zh) | 预埋件精度控制调节器 | |
CN203501939U (zh) | 层门安装工具 | |
CN112374368B (zh) | 滑触线支架定位装置及安装方法 | |
CN203349814U (zh) | 沉降观测辅助装置 | |
CN205955223U (zh) | 一种现浇混凝土楼板一次性浇筑导轨式整平系统 | |
CN105002790B (zh) | 一种轨排调节装置 | |
CN103411508A (zh) | 层门安装工具 | |
CN204142258U (zh) | 一种墙柱模板垂直度检测装置 | |
CN207245243U (zh) | 装配式预制叠合板竖向支撑装置 | |
CN204876519U (zh) | 一种建筑室内装修登高架 | |
CN205465137U (zh) | 电梯轿门安装仪 | |
CN205444889U (zh) | 一种水平预制构件的支撑装置 | |
CN209352470U (zh) | 一种动臂塔吊垂直度调节装置 | |
CN209702256U (zh) | 一种可调式销轴安装平台 | |
CN212455993U (zh) | 一种土木工程用测量装置 | |
CN206459649U (zh) | 一种标高抄测装置及抄测体系 | |
CN205521072U (zh) | 一种自动扶梯的水平段斜扶手立柱定位工装 | |
CN103078260B (zh) | 机构箱安装专用装置 | |
CN216840678U (zh) | 一种预制混凝土墙体组合式快速拼装装置 | |
CN218149639U (zh) | 一种可调节式脚手架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131127 |