CN103407872A - 核电厂钢安全壳模块自平衡式吊具 - Google Patents

核电厂钢安全壳模块自平衡式吊具 Download PDF

Info

Publication number
CN103407872A
CN103407872A CN2013103592389A CN201310359238A CN103407872A CN 103407872 A CN103407872 A CN 103407872A CN 2013103592389 A CN2013103592389 A CN 2013103592389A CN 201310359238 A CN201310359238 A CN 201310359238A CN 103407872 A CN103407872 A CN 103407872A
Authority
CN
China
Prior art keywords
pulley
suspension centre
containment module
hoisting
metal containment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103592389A
Other languages
English (en)
Other versions
CN103407872B (zh
Inventor
奚梅英
郑崇裕
翁晨阳
毛星明
钱浩
张可丰
高雷
黄然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Nuclear Engineering Research and Design Institute Co Ltd filed Critical Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Priority to CN201310359238.9A priority Critical patent/CN103407872B/zh
Publication of CN103407872A publication Critical patent/CN103407872A/zh
Application granted granted Critical
Publication of CN103407872B publication Critical patent/CN103407872B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供一种核电厂钢安全壳模块自平衡式吊具,其在钢安全壳模块上设置3个固定吊点,在相邻两个固定吊点之间的弧线上均匀间隔设置n个滑轮吊点;分配器的吊板焊接在圆筒体内侧,每个平衡滑轮通过一个分支梁固定在圆筒体的圆周上;平衡滑轮的数量为3n+3个,即每一个平衡滑轮对应一个滑轮吊点或者固定吊点;钢丝绳依次穿过分配器上的平衡滑轮、以及设置在钢安全壳模块上、与平衡滑轮相对应的滑轮吊点的滑轮或者固定吊点,实现将分配器与钢安全壳模块相连接。本发明取消了吊梁,从而避免了与之相关的储存、运输等问题;吊具自重大大降低,释放了吊车的起吊能力;可自动实现各吊点受力均衡,可大大降低吊装的难度以及吊装所需的时间。

Description

核电厂钢安全壳模块自平衡式吊具
技术领域
本发明涉及吊装运输技术,具体涉及一种核电厂钢安全壳模块自平衡式吊具。
背景技术
钢安全壳是AP1000核电厂的重要构筑物,直径约
Figure BDA0000367768950000011
40m,总高约70m,壁厚约45mm,可分为底封头、筒体环段、顶封头等模块,每个钢安全壳模块的重量600t~800t不等。钢安全壳模块具有体积大、重量大、易变形的特点,为了实现这类特殊物品的吊装,需要设计专门的吊具。
现有的钢安全壳模块吊具采用如图2所示的吊梁式结构,由分配器1、钢丝绳2、八角吊梁4及可调拉杆4等组成。吊车吊钩与分配器顶部吊孔相连,从分配器上分出8根钢丝绳与下方的八角吊梁相连,八角吊梁通过8根可调拉杆与被吊的钢安全壳模块相连。
吊装过程中首先起升吊钩,使其承载起被吊钢安全模块的部分重量,确认各吊点的受力是否均衡;如果不均衡则调节可调拉杆进行纠正,再试吊更重的载荷。通过以上过程,确认各吊点的受力偏差在容许范围内后,吊车承载起钢安全壳的全部重量,进行正式吊装作业。
但上述吊梁式吊具存在以下不足之处:(1)吊梁体积大,核电厂施工现场储存运输不便;(2)吊梁重量大(约100t),占用了相当的吊车起吊能力;(3)为保证各吊点受力均衡,需要反复试吊-调节,吊装过程繁琐费时;(4)吊装顶封头时难以设置吊点。
发明内容
本发明的目的在于提供一种核电厂钢安全壳模块自平衡式吊具,其用于AP1000核电厂钢安全壳模块的吊装,可自动实现各吊点的受力均衡。
实现本发明目的的技术方案:一种核电厂钢安全壳模块自平衡式吊具,其包括分配器、钢丝绳、多个滑轮吊点以及3个固定吊点;其中,在钢安全壳模块上设置3个固定吊点,3个固定吊点呈间隔120°环形布置;在相邻两个固定吊点之间的弧线上均匀间隔设置n个滑轮吊点,n为整数,滑轮吊点上带有滑轮;
分配器包括吊板、圆筒体、分支梁、多个平衡滑轮;吊板焊接在圆筒体内侧,吊板上端设有与吊装设备相连接的轴孔;每个平衡滑轮通过一个分支梁固定在圆筒体的圆周上;平衡滑轮的数量为3n+3个,即每一个平衡滑轮对应一个滑轮吊点或者固定吊点;
钢丝绳依次穿过分配器上的平衡滑轮、以及设置在钢安全壳模块上、与平衡滑轮相对应的滑轮吊点的滑轮或者固定吊点,实现将分配器与钢安全壳模块相连接。
如上所述的一种核电厂钢安全壳模块自平衡式吊具,其所述的钢丝绳先穿过设置在钢安全壳模块上的固定吊点,再穿过分配器上的一个平衡滑轮,折返再穿过设置在钢安全壳模块上的滑轮吊点的滑轮,再折返穿过分配器上的一个平衡滑轮,依次类推实现钢丝绳穿过分配器上的每一个平衡滑轮、设置在钢安全壳模块上的每一个滑轮吊点的滑轮及固定吊点。
如上所述的一种核电厂钢安全壳模块自平衡式吊具,其所述的分支梁的前端通过螺栓固定在圆筒体的圆周上,每个平衡滑轮通过销轴与分支梁的末端相连,并可绕该销轴摆动。
如上所述的一种核电厂钢安全壳模块自平衡式吊具,其所述的在相邻两个固定吊点之间的弧线上均匀间隔设置n个滑轮吊点,n为2或3或4。
本发明的效果在于:本发明的核电厂钢安全壳模块自平衡式吊具取消了吊梁结构,通过平衡滑轮实现了各吊点载荷的自动均衡,克服了吊梁式吊具的上述不足之处。具体为:(a)取消了吊梁,从而避免了与之相关的储存、运输等问题;(b)吊具自重大大降低,释放了吊车的起吊能力;(c)可自动实现各吊点受力均衡,避免了繁琐的调节过程,可大大降低吊装的难度以及吊装所需的时间;(d)吊具整体重量及尺寸大大降低,同时施工的多个厂址可共用一套吊具,从而提高了设备的利用率。
附图说明
图1为AP1000钢安全壳模块示意图;
图2为现有吊梁式吊具示意图;
图3为本发明所述的核电厂钢安全壳模块自平衡式吊具示意图;
图4为本发明所述的核电厂钢安全壳模块自平衡式吊具俯视图;
图5为本发明所述的核电厂钢安全壳模块自平衡式吊具钢丝绳卷绕示意图(钢安全壳模块结构展开示意图最右侧与最左侧固定吊点为同一个);
图6为本发明所述的核电厂钢安全壳模块自平衡式吊具分配器示意图;
图7为本发明所述的核电厂钢安全壳模块自平衡式吊具分配器示意图;
图中:1-分配器;2-钢丝绳;3-八角吊梁;4-可调拉杆;5-滑轮吊点;6-固定吊点;7-钢安全壳模块;8-吊板;9-圆筒体;10-分支梁;11-平衡滑轮;12-顶封头;13-环段一;14-环段二;15-环段三;16-底封头。
具体实施方式
下面结合附图和具体实施例对本发明所述的一种核电厂钢安全壳模块自平衡式吊具作进一步描述。
如图2和图3所示,本发明所述的一种核电厂钢安全壳模块自平衡式吊具,主要包括分配器1,钢丝绳2,滑轮吊点5,固定吊点6。
滑轮吊点5有多个,例如:共9个。固定吊点6有3个。滑轮吊点5和固定吊点6均设置在钢安全壳模块7上。
如图1所示,钢安全壳模块7可以为顶封头12、环段一13、环段二14、环段三15或者底封头16。在钢安全壳模块7上设置3个固定吊点6,3个固定吊点6呈间隔120°环形布置;在相邻两个固定吊点6之间的弧线上均匀间隔设置n个滑轮吊点5,例如:n=3;总共9个滑轮吊点5,每个滑轮吊点5上带有滑轮。
如图6和图7所示,分配器包括吊板8、圆筒体9、分支梁10、3n+3个平衡滑轮11(即总共12个平衡滑轮11)。吊板8焊接在圆筒体9内侧,吊板8上端设有与吊装设备相连接的轴孔;每个平衡滑轮11通过一个分支梁10固定在圆筒体9的圆周上,即分支梁10的前端通过螺栓固定在圆筒体9的圆周上,每个平衡滑轮11通过销轴与分支梁10的末端相连,并可绕该销轴摆动。平衡滑轮11的数量应满足每一个平衡滑轮11对应一个滑轮吊点5或者固定吊点6。
如图5所示,钢丝绳2先穿过设置在钢安全壳模块7上的固定吊点6,再穿过分配器1上的一个平衡滑轮11,折返再穿过设置在钢安全壳模块7上的滑轮吊点5的滑轮,再折返穿过分配器1上的一个平衡滑轮11,依次类推实现钢丝绳2穿过每一个分配器1上的平衡滑轮11、每一个设置在钢安全壳模块7上的滑轮吊点5的滑轮及固定吊点6,实现将分配器1与钢安全壳模块7相连接。
本发明将现有的吊梁式吊具中的吊梁取消,在分配器1上设置平衡滑轮11,在钢安全壳模块7上设置滑轮吊点5和固定吊点6,通过钢丝绳2将分配器上的平衡滑轮11与钢安全壳模块7上的滑轮吊点5和固定吊点6相连。钢丝绳-滑轮结构可自动实现各吊点受力均衡。
本发明中如不考虑滑轮的效率,进出滑轮的钢丝绳拉力总是相等的,利用这一特性并合理布置分配器上平衡滑轮及被吊钢安全壳模块上的吊点滑轮的位置,即可自动实现各吊点的载荷均衡。在钢安全壳模块上每隔120°设置一个固定吊点,可以避免钢安全壳模块倾覆的可能性。本发明中依据实际情况在相邻两个固定吊点6之间的弧线上均匀间隔设置n个滑轮吊点5,n优选2或3或4。

Claims (4)

1.一种核电厂钢安全壳模块自平衡式吊具,其特征在于:该吊具包括分配器(1)、钢丝绳(2)、多个滑轮吊点(5)以及3个固定吊点(6);其中,
在钢安全壳模块(7)上设置3个固定吊点(6),3个固定吊点(6)呈间隔120°环形布置;在相邻两个固定吊点(6)之间的弧线上均匀间隔设置n个滑轮吊点(5),n为整数,滑轮吊点(5)上带有滑轮;
分配器包括吊板(8)、圆筒体(9)、分支梁(10)、多个平衡滑轮(11);吊板(8)焊接在圆筒体(9)内侧,吊板(8)上端设有与吊装设备相连接的轴孔;每个平衡滑轮(11)通过一个分支梁(10)固定在圆筒体(9)的圆周上;平衡滑轮(11)的数量为3n+3个,即每一个平衡滑轮(11)对应一个滑轮吊点(5)或者固定吊点(6);
钢丝绳(2)依次穿过分配器(1)上的平衡滑轮(11)、以及设置在钢安全壳模块(7)上、与平衡滑轮(11)相对应的滑轮吊点(5)的滑轮或者固定吊点(6),实现将分配器(1)与钢安全壳模块(7)相连接。
2.根据权利要求1所述的一种核电厂钢安全壳模块自平衡式吊具,其特征在于:所述的钢丝绳(2)先穿过设置在钢安全壳模块(7)上的固定吊点(6),再穿过分配器(1)上的一个平衡滑轮(11),折返再穿过设置在钢安全壳模块(7)上的滑轮吊点(5)的滑轮,再折返穿过分配器(1)上的一个平衡滑轮(11),依次类推实现钢丝绳(2)穿过分配器(1)上的每一个平衡滑轮(11)、设置在钢安全壳模块(7)上的每一个滑轮吊点(5)的滑轮及固定吊点(6)。
3.根据权利要求1所述的一种核电厂钢安全壳模块自平衡式吊具,其特征在于:所述的分支梁(10)的前端通过螺栓固定在圆筒体(9)的圆周上,每个平衡滑轮(11)通过销轴与分支梁(10)的末端相连,并可绕该销轴摆动。
4.根据权利要求1所述的一种核电厂钢安全壳模块自平衡式吊具,其特征在于:所述的在相邻两个固定吊点(6)之间的弧线上均匀间隔设置n个滑轮吊点(5),n为2或3或4。
CN201310359238.9A 2013-08-16 2013-08-16 核电厂钢安全壳模块自平衡式吊具 Active CN103407872B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310359238.9A CN103407872B (zh) 2013-08-16 2013-08-16 核电厂钢安全壳模块自平衡式吊具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310359238.9A CN103407872B (zh) 2013-08-16 2013-08-16 核电厂钢安全壳模块自平衡式吊具

Publications (2)

Publication Number Publication Date
CN103407872A true CN103407872A (zh) 2013-11-27
CN103407872B CN103407872B (zh) 2015-11-25

Family

ID=49600935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310359238.9A Active CN103407872B (zh) 2013-08-16 2013-08-16 核电厂钢安全壳模块自平衡式吊具

Country Status (1)

Country Link
CN (1) CN103407872B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104098017A (zh) * 2014-01-24 2014-10-15 浙江大学 吊装大型薄壁安全壳和非能动水箱的分配器及传力方法
CN104843582A (zh) * 2015-04-01 2015-08-19 中国核工业华兴建设有限公司 一种核电站钢制安全壳底封头吊装方法及其专用吊索具
CN107285181A (zh) * 2017-06-09 2017-10-24 中国核工业二三建设有限公司 核电站中钢制安全壳的吊装方法
CN107915114A (zh) * 2017-12-22 2018-04-17 大连华锐重工集团股份有限公司 环梁及环轨用整体吊装工具
CN108137290A (zh) * 2015-10-01 2018-06-08 维斯塔斯风力系统有限公司 用于提升风轮机部件的提升装置
CN108275559A (zh) * 2017-11-09 2018-07-13 中国核工业第五建设有限公司 一种核电钢制安全壳吊装分配器
CN110271949A (zh) * 2018-03-14 2019-09-24 中国核工业第五建设有限公司 核岛环吊的环梁和环轨安装工艺
CN111634793A (zh) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 一种用于卫星的起吊装置及起吊方法
CN112320594A (zh) * 2020-11-25 2021-02-05 中船重工重庆液压机电有限公司 一种大面积吊具负载平衡系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1360190A (en) * 1971-06-14 1974-07-17 Harland Wolff Ltd Lifting beam
CN101967886A (zh) * 2010-11-16 2011-02-09 中国核工业第五建设有限公司 核电站钢制安全壳的组装和安装方法
CN201834663U (zh) * 2010-10-29 2011-05-18 太原重工股份有限公司 一种多吊点受力自动均衡的吊具
CN102701066A (zh) * 2011-10-11 2012-10-03 国家核电技术有限公司 用于吊装大型容器的组装模块的吊装方法
CN103241644A (zh) * 2013-05-28 2013-08-14 中国核工业中原建设有限公司 大型薄壁钢制安全壳的装配方法及其起吊辅助件
CN203461680U (zh) * 2013-08-16 2014-03-05 上海核工程研究设计院 核电厂钢安全壳模块自平衡式吊具

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1360190A (en) * 1971-06-14 1974-07-17 Harland Wolff Ltd Lifting beam
CN201834663U (zh) * 2010-10-29 2011-05-18 太原重工股份有限公司 一种多吊点受力自动均衡的吊具
CN101967886A (zh) * 2010-11-16 2011-02-09 中国核工业第五建设有限公司 核电站钢制安全壳的组装和安装方法
CN102701066A (zh) * 2011-10-11 2012-10-03 国家核电技术有限公司 用于吊装大型容器的组装模块的吊装方法
CN103241644A (zh) * 2013-05-28 2013-08-14 中国核工业中原建设有限公司 大型薄壁钢制安全壳的装配方法及其起吊辅助件
CN203461680U (zh) * 2013-08-16 2014-03-05 上海核工程研究设计院 核电厂钢安全壳模块自平衡式吊具

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104098017B (zh) * 2014-01-24 2015-12-09 浙江大学 吊装大型薄壁安全壳和非能动水箱的分配器及传力方法
CN104098017A (zh) * 2014-01-24 2014-10-15 浙江大学 吊装大型薄壁安全壳和非能动水箱的分配器及传力方法
CN104843582A (zh) * 2015-04-01 2015-08-19 中国核工业华兴建设有限公司 一种核电站钢制安全壳底封头吊装方法及其专用吊索具
CN104843582B (zh) * 2015-04-01 2017-01-04 中国核工业华兴建设有限公司 一种核电站钢制安全壳底封头吊装方法及其专用吊索具
EP3356278B1 (en) 2015-10-01 2020-09-16 Vestas Wind Systems A/S A lifting arrangement for lifting a wind turbine component
CN108137290A (zh) * 2015-10-01 2018-06-08 维斯塔斯风力系统有限公司 用于提升风轮机部件的提升装置
US10577224B2 (en) 2015-10-01 2020-03-03 Vestas Wind Systems A/S Lifting arrangement for lifting a wind turbine component
CN108137290B (zh) * 2015-10-01 2020-06-02 维斯塔斯风力系统有限公司 用于提升风轮机部件的提升装置
CN107285181A (zh) * 2017-06-09 2017-10-24 中国核工业二三建设有限公司 核电站中钢制安全壳的吊装方法
CN108275559A (zh) * 2017-11-09 2018-07-13 中国核工业第五建设有限公司 一种核电钢制安全壳吊装分配器
CN108275559B (zh) * 2017-11-09 2020-03-27 中国核工业第五建设有限公司 一种核电钢制安全壳吊装分配器
CN107915114A (zh) * 2017-12-22 2018-04-17 大连华锐重工集团股份有限公司 环梁及环轨用整体吊装工具
CN110271949A (zh) * 2018-03-14 2019-09-24 中国核工业第五建设有限公司 核岛环吊的环梁和环轨安装工艺
CN110271949B (zh) * 2018-03-14 2022-10-18 中国核工业第五建设有限公司 核岛环吊的环梁和环轨安装工艺
CN111634793A (zh) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 一种用于卫星的起吊装置及起吊方法
CN112320594A (zh) * 2020-11-25 2021-02-05 中船重工重庆液压机电有限公司 一种大面积吊具负载平衡系统
CN112320594B (zh) * 2020-11-25 2022-05-31 中船重工重庆液压机电有限公司 一种大面积吊具负载平衡系统

Also Published As

Publication number Publication date
CN103407872B (zh) 2015-11-25

Similar Documents

Publication Publication Date Title
CN103407872B (zh) 核电厂钢安全壳模块自平衡式吊具
CN203461680U (zh) 核电厂钢安全壳模块自平衡式吊具
CN104444762B (zh) 风电基础环翻转装置及使用该装置进行基础环翻转的方法
CN103241644A (zh) 大型薄壁钢制安全壳的装配方法及其起吊辅助件
JP5548636B2 (ja) クレーン用吊具
CN205204612U (zh) 一种重型塔段的起吊翻身装置
CN103072899B (zh) 超大型筒体分段吊装工艺
CN202346640U (zh) 一种海洋平台起重机
CN107887044B (zh) 一种反应堆下部堆内构件远距离水下对中装置
CN206720558U (zh) 一种可调节式钢筋笼吊具
CN202072386U (zh) 一种用于吊装核电站安全壳筏基钢筋笼模块的吊具
CN103979442B (zh) 6400吨液压复式起重机吊装费托反应器的方法
CN202558444U (zh) 压力钢管吊装平衡梁装置
CN202625662U (zh) 一种自平衡调幅抱杆
CN210117158U (zh) 大吨位架桥机用吊杆螺母安装装置
CN105417344A (zh) 超大吨位干式平波电抗器线圈脱模起吊吊钩及其起吊方法
CN202754692U (zh) 一组风力发电基础环制造吊装装置
CN201207602Y (zh) 定子铁心翻身装置
CN110240063B (zh) 大吨位架桥机用吊杆螺母安装装置及其方法
CN207608203U (zh) 一种t梁吊具
CN103058083B (zh) 螺栓球桁架提升机
CN206128606U (zh) 超大型集束多边形煤仓群的圆锥体钢煤斗安装用平台
CN202912565U (zh) 大型圆盘状构件专用吊具
CN206553056U (zh) 一种用于钢结构模块化单元的吊装装置
CN206126652U (zh) 一种核电站钢制穹顶平衡吊装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee after: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee before: Shanghai Nuclear Engineering Research & Design Institute

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd.