CN103397659A CN201310369987XA CN201310369987A CN103397659A CN 103397659 A CN103397659 A CN 103397659A CN 201310369987X A CN201310369987X A CN 201310369987XA CN 201310369987 A CN201310369987 A CN 201310369987A CN 103397659 A CN103397659 A CN 103397659A
Authority
CN
China
Prior art keywords
wall
groove
sections
grooving
hydraulic grab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310369987XA
Other languages
English (en)
Other versions
CN103397659B (zh
Inventor
刘忠池
姚海明
陈兴华
梁艳文
姚健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Original Assignee
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd filed Critical SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority to CN201310369987.XA priority Critical patent/CN103397659B/zh
Publication of CN103397659A publication Critical patent/CN103397659A/zh
Application granted granted Critical
Publication of CN103397659B publication Critical patent/CN103397659B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种超深地下连续墙成槽垂直度控制工艺,利用液压抓斗挖掘形成槽,在挖掘之前,首先按照槽的宽度设置两段导墙,两段导墙之间的距离与槽的宽度相同;导墙自地面向地下延伸指定的深度;利用钢丝绳吊挂液压抓斗,使液压抓斗在两段导墙之间挖掘;其特征在于,成槽过程中,槽深小于5-15米时,利用量尺测量两段导墙与钢丝绳的距离,如钢丝绳与两段导墙的距离相等或者相差不超过30厘米,则垂直度符合要求,继续掘进;槽深大于5-15米后,每掘进一定深度,采用超声测壁仪测量槽壁垂直度,若侧壁垂直度满足要求,继续掘进。本发明中的超深地下连续墙成槽垂直度控制工艺,可将施工深度超过60米的地下连续墙最终将成槽垂直度控制在1/1000以内,可保证两端带工字钢接头的超长钢筋笼顺利下放到设计深度,缩短超深地下连续墙的施工时间。

Description

超深地下连续墙成槽垂直度控制工艺
技术领域
本发明涉及一种超深地下连续墙成槽垂直度控制工艺。
背景技术
地下连续墙施工时,首先挖掘成槽。在挖槽时,首先自地面起向地下延伸修建两段导墙,导墙深度一般为1-1.5米。利用液压抓斗在两段导墙之间挖掘形成槽,槽的宽度与两段导墙之间的距离相同。
挖掘成槽通常采用液压抓斗完成。液压抓斗利用钢丝绳吊挂,不断掘进成槽。虽然液压抓斗重量较重,在自然悬垂时利用其自身重量可以保持竖直。但在挖掘时,由于进入土层后,挖掘时会受到土层的阻力及碰撞,利用液压抓斗自身重量难以保持液压抓斗一直直线向下行进。因此,成槽过程中,非常容易造成槽的垂直度无法满足要求的情况。
现有地下连续墙施工规范规定:地下连续墙的成槽垂直度,临时结构≤1/200;永久结构≤1/300。在实际施工中,这些规定对于成槽深度不大于40m的地下连续墙是适用的,但是一旦成槽深度超过40m,特别是接头采用刚性接头的情况下,钢筋笼很难顺利下放到位。而对于成槽深度大于60m的超深地下连续墙,若成槽垂直度仍然按照现有规范控制,则无法进行施工。
发明内容
本发明的目的是为了克服现有技术中的不足,提供一种成槽垂直度高的超深地下连续墙成槽垂直度控制工艺。
为实现上述目的,本发明通过以下技术方案实现:
超深地下连续墙成槽垂直度控制工艺,利用液压抓斗挖掘形成槽,在挖掘之前,首先按照槽的宽度设置两段导墙,两段导墙之间的距离与槽的宽度相同;导墙自地面向地下延伸指定的深度;利用钢丝绳吊挂液压抓斗,使液压抓斗在两段导墙之间挖掘;其特征在于,成槽过程中,槽深小于5-15米时,利用量尺测量两段导墙与钢丝绳的距离,如钢丝绳与两段导墙的距离相等或者相差不超过30厘米,则垂直度符合要求,继续掘进;槽深大于5-15米后,每掘进一定深度,采用超声测壁仪测量槽壁垂直度,若侧壁垂直度满足要求,继续掘进。
优选地是,槽深小于5-15米时,如使用量尺测量槽壁与成槽机钢丝绳的距离超过标准距离10厘米,则先进行纠偏;纠偏使的槽壁与成槽机的距离低于标准距离10厘米后,再继续掘进。
优选地是,所述的槽深大于5-15米后,每掘进10-20米后使用超声测壁仪测量一次;如垂直度满足要求,继续掘进;如垂直度不能满足要求,首先进行纠偏,纠偏完成后再继续掘进。
优选地是,垂直度无法满足要求时,则在竖直方向上,其中一侧槽壁相对于导墙向槽内突出;纠偏时,在另一侧槽壁设置一平板;液压抓斗设置有可伸缩的推杆;所述的推杆伸出后抵在平板上,利用平板的阻力使液压抓斗移向一侧槽壁,液压抓斗移动至指定位置后,继续掘进可使在竖直方向上突出于导墙的槽壁与导墙齐平。
本发明中的超深地下连续墙成槽垂直度控制工艺,可将施工深度超过60米的地下连续墙最终将成槽垂直度控制在1/1000以内,可保证两端带工字钢接头的超长钢筋笼顺利下放到设计深度,缩短超深地下连续墙的施工时间。
附图说明
图1为本发明中的成槽工艺示意图。
图2为本发明中的纠偏工艺示意图。
具体实施方式
以下结合实施例对本发明做进一步说明。
超深地下连续墙成槽垂直度控制工艺,利用液压抓斗挖掘形成槽。如图1所示,在挖掘之前,首先按照槽1的宽度设置两段导墙2,两段导墙2之间的距离与槽1的宽度相同。导墙2自地面向地下延伸1-1.5米深。利用钢丝绳3吊挂液压抓斗4,使液压抓斗4在两段导墙2之间挖掘。成槽过程中,槽深小于5-15米时,利用量尺测量两段导墙2与钢丝绳3的距离。如钢丝绳3与两段导墙2的距离相等或者相差不超过30厘米,则垂直度符合要求,继续掘进。
槽深大于5-15米后,每掘进10米深度,采用超声测壁仪测量槽壁垂直度,若侧壁垂直度满足要求,继续掘进。
如图2所示,如果垂直度不满足要求时,则在竖直方向上,其中一侧槽壁2相对于导墙2向槽内突出。成槽过程中,如垂直度不满足要求时,首先进行纠偏。纠偏时,在另一侧槽壁2设置一平板5。液压抓斗4设置有可伸缩的推杆6。推杆6伸出后抵在平板5上,利用平板5的阻力使液压抓斗4移向一侧槽壁,液压抓斗4移动至指定位置后,继续掘进可使在竖直方向上突出于导墙2的槽壁与导墙2齐平。
本发明中的实施例仅用于对本发明进行说明,并不构成对权利要求范围的限制,本领域内技术人员可以想到的其他实质上等同的替代,均在本发明保护范围内。

Claims (4)

1.超深地下连续墙成槽垂直度控制工艺,利用液压抓斗挖掘形成槽,在挖掘之前,首先按照槽的宽度设置两段导墙,两段导墙之间的距离与槽的宽度相同;导墙自地面向地下延伸指定的深度;利用钢丝绳吊挂液压抓斗,使液压抓斗在两段导墙之间挖掘;其特征在于,成槽过程中,槽深小于5-15米时,利用量尺测量两段导墙与钢丝绳的距离,如钢丝绳与两段导墙的距离相等或者相差不超过30厘米,则垂直度符合要求,继续掘进;槽深大于5-15米后,每掘进一定深度,采用超声测壁仪测量槽壁垂直度,若侧壁垂直度满足要求,继续掘进。
2.根据权利要求1所述的超深地下连续墙成槽垂直度控制工艺,其特征在于,槽深小于5-15米时,如使用量尺测量槽壁与成槽机钢丝绳的距离超过标准距离10厘米,则先进行纠偏;纠偏使的槽壁与成槽机的距离低于标准距离10厘米后,再继续掘进。
3.根据权利要求1所述的超深地下连续墙成槽垂直度控制工艺,其特征在于,所述的槽深大于5-15米后,每掘进10-20米后使用超声测壁仪测量一次;如垂直度满足要求,继续掘进;如垂直度不能满足要求,首先进行纠偏,纠偏完成后再继续掘进。
4.根据权利要求2或3所述的超深地下连续墙成槽垂直度控制工艺,其特征在于,垂直度无法满足要求时,则在竖直方向上,其中一侧槽壁相对于导墙向槽内突出;纠偏时,在另一侧槽壁设置一平板;液压抓斗设置有可伸缩的推杆;所述的推杆伸出后抵在平板上,利用平板的阻力使液压抓斗移向一侧槽壁,液压抓斗移动至指定位置后,继续掘进可使在竖直方向上突出于导墙的槽壁与导墙齐平。
CN201310369987.XA 2013-08-22 2013-08-22 超深地下连续墙成槽垂直度控制工艺 Active CN103397659B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310369987.XA CN103397659B (zh) 2013-08-22 2013-08-22 超深地下连续墙成槽垂直度控制工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310369987.XA CN103397659B (zh) 2013-08-22 2013-08-22 超深地下连续墙成槽垂直度控制工艺

Publications (2)

Publication Number Publication Date
CN103397659A true CN103397659A (zh) 2013-11-20
CN103397659B CN103397659B (zh) 2016-12-28

Family

ID=49561354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310369987.XA Active CN103397659B (zh) 2013-08-22 2013-08-22 超深地下连续墙成槽垂直度控制工艺

Country Status (1)

Country Link
CN (1) CN103397659B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638745A (zh) * 2017-02-10 2017-05-10 宁夏百辰工业产品设计有限公司 一种成槽机双向均衡垂度纠偏辅助装置
CN108592742A (zh) * 2018-05-03 2018-09-28 中山铁王流体控制设备有限公司 三偏心蝶阀阀座及蝶板密封圈专用测量工具
CN109898523A (zh) * 2019-03-27 2019-06-18 中建四局第一建筑工程有限公司 一种超深地连墙垂直度控制方法
CN116043916A (zh) * 2023-03-02 2023-05-02 中铁二院工程集团有限责任公司 装配式地下结构盖挖逆作施工方法以及装配式地下结构

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1143703A (zh) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 三合一地下连续墙及其施工方法
US20090191009A1 (en) * 2008-01-24 2009-07-30 Kei-Chien Yu Water and soil conservation method and a retaining wall for performing the same
JP4545774B2 (ja) * 2007-04-23 2010-09-15 日特建設株式会社 地下埋設体の切断方法と引上げ方法
CN201588236U (zh) * 2009-12-01 2010-09-22 河南省三力机械制造有限公司 用于地下连续墙施工的液压抓斗及抓斗机
CN102322064A (zh) * 2011-06-30 2012-01-18 中铁二十局集团有限公司 湿陷性黄土地区地铁车站深基坑地下连续墙施工方法
CN102691294A (zh) * 2012-05-15 2012-09-26 安宜建设集团有限公司 一种地下连续墙的施工方法
CN102852158A (zh) * 2012-09-25 2013-01-02 浙江省地质矿产工程公司 一种非标准地下连续墙的施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1143703A (zh) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 三合一地下连续墙及其施工方法
JP4545774B2 (ja) * 2007-04-23 2010-09-15 日特建設株式会社 地下埋設体の切断方法と引上げ方法
US20090191009A1 (en) * 2008-01-24 2009-07-30 Kei-Chien Yu Water and soil conservation method and a retaining wall for performing the same
CN201588236U (zh) * 2009-12-01 2010-09-22 河南省三力机械制造有限公司 用于地下连续墙施工的液压抓斗及抓斗机
CN102322064A (zh) * 2011-06-30 2012-01-18 中铁二十局集团有限公司 湿陷性黄土地区地铁车站深基坑地下连续墙施工方法
CN102691294A (zh) * 2012-05-15 2012-09-26 安宜建设集团有限公司 一种地下连续墙的施工方法
CN102852158A (zh) * 2012-09-25 2013-01-02 浙江省地质矿产工程公司 一种非标准地下连续墙的施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638745A (zh) * 2017-02-10 2017-05-10 宁夏百辰工业产品设计有限公司 一种成槽机双向均衡垂度纠偏辅助装置
CN108592742A (zh) * 2018-05-03 2018-09-28 中山铁王流体控制设备有限公司 三偏心蝶阀阀座及蝶板密封圈专用测量工具
CN109898523A (zh) * 2019-03-27 2019-06-18 中建四局第一建筑工程有限公司 一种超深地连墙垂直度控制方法
CN116043916A (zh) * 2023-03-02 2023-05-02 中铁二院工程集团有限责任公司 装配式地下结构盖挖逆作施工方法以及装配式地下结构

Also Published As

Publication number Publication date
CN103397659B (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN108916467B (zh) 大口径s形曲线顶管施工方法
CN103292035B (zh) 一种地下顶管的施工方法
CN102996143B (zh) 一种隧道仰拱整幅浇筑的施工方法
CN101775988A (zh) 软弱围岩斜井转正洞的施工方法
CN106123776B (zh) 一种顶管智能顶进测量系统以及测量方法
CN104612700B (zh) 一种纵向沉降变形引起盾构隧道附加内力的确定方法
CN103397659A (zh) 超深地下连续墙成槽垂直度控制工艺
CN101701646B (zh) 地下管道的泥水平衡式拉管施工方法
CN105696550B (zh) 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN110307004A (zh) 一种利用钢绞线张拉的隧道防隆沉加固结构及施工方法
CN204040035U (zh) 一种钢护筒的定位导向结构
CN110362932B (zh) 一种复杂环境条件下浅埋暗挖隧道管幕结构计算模型
CN103276899B (zh) 钢筋环绕钢柱脚施工方法
CN103867209A (zh) 一种地铁竖井分层、分段转横通道施工开挖进洞的方法
CN108180018B (zh) 一种浅埋湿陷性黄土隧道核心土与玻纤锚杆加固施工方法
CN104047607B (zh) 盾构机围护结构条件下吊出工法
CN102561387A (zh) 地下室核心筒连续墙逆作法施工方法
CN107780443A (zh) 一种垂直防渗专用gcl复合构件及其铺设方法
CN214747897U (zh) 一种建筑施工监测系统
CN105200994A (zh) 预留盾构穿越复合式基坑围护装置的施工工法
CN204849720U (zh) 海上对接平台对接定位施工结构
CN206529812U (zh) 一种直埋式测试系统
CN104314069B (zh) 逆作法施工中侧墙预留钢筋定位施工方法
CN204085524U (zh) 一种采用爬模工艺的超高层建筑核心筒轴线竖向投测装置
CN203808517U (zh) 钢筋混凝土过梁中穿电管施工结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant