CN103365309A - Operation monitoring system of river channel check gate - Google Patents

Operation monitoring system of river channel check gate Download PDF

Info

Publication number
CN103365309A
CN103365309A CN201310296317XA CN201310296317A CN103365309A CN 103365309 A CN103365309 A CN 103365309A CN 201310296317X A CN201310296317X A CN 201310296317XA CN 201310296317 A CN201310296317 A CN 201310296317A CN 103365309 A CN103365309 A CN 103365309A
Authority
CN
China
Prior art keywords
operation monitoring
monitoring system
check gate
equipment
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310296317XA
Other languages
Chinese (zh)
Inventor
仲金梅
侍高坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Original Assignee
ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd filed Critical ZHENJIANG XINCHUANG COMPUTER SYSTEM INTEGRATION CO Ltd
Priority to CN201310296317XA priority Critical patent/CN103365309A/en
Publication of CN103365309A publication Critical patent/CN103365309A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an operation monitoring system of a river channel check gate. The operation monitoring system comprises a data collection and processing device, an operation monitoring and accident warning device, a control and adjustment device and a data communication device. The operation monitoring system has the advantages that the advanced, reliable and open type automatic monitoring system which is distributed in a layering mode is provided for operation of the river channel check gate, functions and resources of nodes are relatively independent and conveniently shared by other nodes, operation of other parts of the system is not affected when one part of devices on a network does not work or fails, automatic control of gate station equipment is achieved, the requirement for 'no man on duty or few men attending' is met, and the level of remote monitoring and data sharing is achieved.

Description

River course check gate operation monitoring system
Technical field
The present invention relates to a kind of Automatic monitoring systems, particularly a kind of river course check gate operation monitoring system.
Background technology
The river course check gate is to regulate upper pond level, the sluice of control letdown flow.Check gate utilizes gate opening/closing, regulates upper pond level and letdown flow, to satisfy the needs that divide water or control to the next stage river course, block current.
Along with the development of automatic technology, the demand that also has to the automation direction development is controlled in the operation of check gate, can improve execution efficient like this, realize the automatic control of lock station equipment, satisfy the requirement of " unattended, few man on duty ".
Summary of the invention
Goal of the invention: for the problems referred to above, the purpose of this invention is to provide high, the reliable river course check gate operation monitoring system of a kind of automaticity.
Technical scheme: a kind of river course check gate operation monitoring system comprises data acquisition and treatment facility, operation monitoring and accident alarming equipment, control and conditioning equipment, data communications equipment.
Described data acquisition and treatment facility comprise water level acquisition device, current collector, voltage collector.
Described operation monitoring and accident alarming equipment comprise the off-limit alarm device.
Beneficial effect: compared with prior art, advantage of the present invention is to provide advanced, reliable, the open Automatic monitoring systems of layer distributed for the operation of river course check gate, nodal function, resource is relatively independent and be convenient to be other nodes sharing, arbitrary part is not worked or fault in the each several part equipment on the network, do not affect the operation of system's other parts, realize the automatic control of lock station equipment, satisfy the requirement of " unattended, few man on duty ", reach the level of remote monitoring, data sharing.
Embodiment
Below in conjunction with specific embodiment, further illustrate the present invention, should understand these embodiment only is used for explanation the present invention and is not used in and limits the scope of the invention, after having read the present invention, those skilled in the art all fall within the application's claims limited range to the modification of the various equivalent form of values of the present invention.
A kind of river course check gate operation monitoring system comprises data acquisition and treatment facility, operation monitoring and accident alarming equipment, control and conditioning equipment, data communications equipment.
1, data acquisition and processing
(1) collection and the processing of digital quantity (analog quantity): the cycle collection is carried out in parameter, the off-limit alarms such as water levels of upstream and downstream, electric current, voltage, formed real time data and deposit real-time data base in after processing finally by format.
(2) collection of switching value and processing:
To switching value signals such as the trouble-signals such as motor overload, motor start-stops, computer automatic control system should be able to respond rapidly these signals and make reaction and the automatic operation of a series of necessity with interrupt mode.Interrupt switch amount signal is input as passive contact input, and interrupt mode receives;
To the non-interrupt switch amount signals such as position signalling that all kinds of fault-signals, utility appliance operating state signal, manual automated manner are selected, computer supervisory control system is regular scanning to the acquisition mode of these signals.To the processing of signal comprise photoelectricity isolation, the anti-shake processing of contact, hardware and software filtering, compensation reference time, data validity rationality judge, start the correlative function (as start sequential accident recording, send out the accident alarming sound equipment, picture is released automatically and auto stop etc.), deposit real-time data base in after processing finally by format.
(3) accumulative total of pulsed quantity and processing: the acquisition process of pulsed quantity comprises the anti-shake processing of contact, the judgement of data validity rationality, scale transformation, error-detection error-correction processing, after processing, format deposits real-time data base in, and also can be directly by the serial communication collection.
(4) switching value output: refer to various operational orders, computing machine should carry out verification before these signals of output, can deliver to topworks through judging after errorless.For guaranteeing electric independence and the accuracy of signal, switch output signal also should be isolated through photoelectricity, sends after the anti-shake processing of contact.
(5) signal quantity and setting state: the semaphore that the signal that causes owing to Equipment is made mistakes and will be carried out where necessary artificial setting value analyzing and processing, computer automatic control system should allow operator and system operators that it is manually set, and when processing, they are equal to the normal signal that gathers and treat, computer automatic control system can be distinguished them and provide corresponding sign.
2, operation monitoring and accident alarming
(1) operation real time monitoring: computer automatic control system can make the operations staff by screen the running status of each main equipment of hinge, parameter and each gate be carried out real time monitoring.All contents that will monitor comprise operation and the stoppage in transit situation of current each equipment, and each operational factor is shown in real time.
(2) parameter off-limit alarm record: computer automatic control system will be monitored some parameter and computational data, can preset its limited field to these parameter values, will be correspondingly processed in limited time when they are out-of-limit and multiple.These processing comprise off-limit alarm, more multiple automatic demonstration, record and printing of prescribing a time limit; Also should carry out the data storage of out-of-limit rear extremely multiple limit and call demonstration for important parameter and data; Start the correlative analytic function, do the failure cause prompting, for the warning that will warm up of some important parameters.
(3) fault journal: when the operation troubles situation occured, automatic control system should be immediately with interrupt mode response and automatically demonstration, record and printing problem title and time; Record and print the action situation of relevant device, automatically release dependent picture, make analysis on accident cause and prompting disposal route, system should be able to record the accident that occurs and the action situation of equipment by the sequencing of its generation.
(4) malfunction shows record: computer automatic control system is each fault status signal of scanning regularly, in case occur shape become will be on screen instant playback out, simultaneously record trouble and time of origin thereof, and use audio alert.System is no more than 2 seconds to the polling cycle of fault status signal.
(5) emergency review and correlative record: when having an accident, gather the quantity of state of each equipment and send the pulpit by each field control unit, finish event sequence ordered arrangement, demonstration, printing and file.The resolution of the record of each event and print point title, state description and markers, record is not more than 2ms, should be able to the record accident occurs front 10 seconds and the situation of change of important real-time parameter in rear 20 second time.The operations staff can call, shows or print these data.
3, control and adjusting
(1) control and controlled plant: control and controlled plant are mainly motor, Inlet and outlet water gate, integrated hydraulic hoists and the electrical equipment of pump station engineering; The headstock gear of check gate and gate etc.
(2) control and regulative mode: when control mode switching to computer controlled when being made as master mode, the pulpit operator on duty monitors equipment by the industrial computer man-machine interface, should be able to finish:
Should install the switch of headstock gear operation terrain, a distant place, three kinds of control modes of debugging on the check gate power cabinet, and provide the hard contact of three kinds of states to supply collection able to programme.Install the equipment such as isolating switch, contactor and electrothermal relay in the switch board, realize the gate hoist ascending, descending, stop control;
By water level automatically finish out, the have a power failure procedure operation of machine;
The electrical equipment switch closes/divides operation;
The operation of various utility appliance;
The setting of various setting valves and limit value;
Other functions.
(3) statistics and tabulation: the data and the detection event that gather are carried out in line computation the various running logs of printout and form.
(4) man-machine interface: show online real-time graph, make the operator on duty carry out security monitoring to operational process, and adjust online picture, demonstration data and state, throwing by the pulpit computer keyboard and move back measuring point, revise parameter, control operation etc.Different according to staff's authority of office, different operation authority is set.
(5) picture disply: picture disply is the major function of computer automatic control system, and picture calls permission is automatic and the calling mode realizes.Automated manner refers to when having accident to occur or the automatic release of relevant picture when carrying out some operation, and the calling mode refers to operate some function key or calls required picture with menu mode.The picture kind comprises dynamic demonstration figure, line chart, elevation drawing, curve, various statement, form etc.The requirement picture disply is steady and audible, and picture structure is reasonable, and refresh rate is fast and simple to operate.
(6) sound prompt function: should be able to voice suggestion when operating appears in each picture, and have an accident and during fault, should be able to be with accurately, language sends warning to the relevant personnel clearly.
(7) System self-test and autoboot are moving: comprise that main frame self check and procedure fault detect.Should comprise I/0 process channel online automatic detection by detection, have channel data validity, rationality in the detection and judge, search and the function such as automatic failure alarm automatically the trouble spot.
4, data communication
(1) with the communicating by letter of higher level department: relevant data, information and the image of engineering are sent to higher level's network; Receive the various command that higher level department issues; The communication protocol text is provided, is responsible for interface and cooperates.
(2) data communication of computing machine and equipment: the data communication between computing machine and each equipment, its principle are that speed is fast, data-handling capacity is strong, safe reliability is high.

Claims (3)

1. a river course check gate operation monitoring system is characterized in that: comprise data acquisition and treatment facility, operation monitoring and accident alarming equipment, control and conditioning equipment, data communications equipment.
2. river course according to claim 1 check gate operation monitoring system, it is characterized in that: described data acquisition and treatment facility comprise water level acquisition device, current collector, voltage collector.
3. river course according to claim 1 check gate operation monitoring system, it is characterized in that: described operation monitoring and accident alarming equipment comprise the off-limit alarm device.
CN201310296317XA 2013-07-16 2013-07-16 Operation monitoring system of river channel check gate Pending CN103365309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310296317XA CN103365309A (en) 2013-07-16 2013-07-16 Operation monitoring system of river channel check gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310296317XA CN103365309A (en) 2013-07-16 2013-07-16 Operation monitoring system of river channel check gate

Publications (1)

Publication Number Publication Date
CN103365309A true CN103365309A (en) 2013-10-23

Family

ID=49366876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310296317XA Pending CN103365309A (en) 2013-07-16 2013-07-16 Operation monitoring system of river channel check gate

Country Status (1)

Country Link
CN (1) CN103365309A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700204A (en) * 2015-01-31 2015-06-10 淮海工学院 River gate station monitoring and intelligent scheduling system
CN106774110A (en) * 2016-11-29 2017-05-31 福建四创软件有限公司 Water Conservancy Information equipment remote diagnosis and method for early warning

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080183336A1 (en) * 2007-01-31 2008-07-31 Halliburton Energy Services Inc. Methods for managing flow control valves in process systems
CN101403929A (en) * 2008-11-06 2009-04-08 清华大学 Method and system for automatically controlling shutter drainage
CN101887254A (en) * 2009-05-14 2010-11-17 上海上自电气控制有限公司 Automatic control system of underwater horizontal gate
CN202177820U (en) * 2011-08-17 2012-03-28 天津市光彩自控工程有限公司 Remote monitoring system for river pumping station
CN102778874A (en) * 2012-07-12 2012-11-14 贵州乌江水电开发有限责任公司 Joint optimization regulation system for cascade hydropower stations
CN202758212U (en) * 2012-04-13 2013-02-27 深圳达实智能股份有限公司 Integrated automatic monitoring system of pumping station

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080183336A1 (en) * 2007-01-31 2008-07-31 Halliburton Energy Services Inc. Methods for managing flow control valves in process systems
CN101403929A (en) * 2008-11-06 2009-04-08 清华大学 Method and system for automatically controlling shutter drainage
CN101887254A (en) * 2009-05-14 2010-11-17 上海上自电气控制有限公司 Automatic control system of underwater horizontal gate
CN202177820U (en) * 2011-08-17 2012-03-28 天津市光彩自控工程有限公司 Remote monitoring system for river pumping station
CN202758212U (en) * 2012-04-13 2013-02-27 深圳达实智能股份有限公司 Integrated automatic monitoring system of pumping station
CN102778874A (en) * 2012-07-12 2012-11-14 贵州乌江水电开发有限责任公司 Joint optimization regulation system for cascade hydropower stations

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
徐涵: "苏州河河口水闸监控系统", 《水利水电科技进展》 *
徐涵: "苏州河河口水闸监控系统", 《水利水电科技进展》, vol. 27, no. 1, 30 April 2007 (2007-04-30), pages 87 - 90 *
惠力等: "临沂市小埠东橡胶拦河坝调节闸门控制系统改造", 《水电自动化与大坝监测》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700204A (en) * 2015-01-31 2015-06-10 淮海工学院 River gate station monitoring and intelligent scheduling system
CN106774110A (en) * 2016-11-29 2017-05-31 福建四创软件有限公司 Water Conservancy Information equipment remote diagnosis and method for early warning

Similar Documents

Publication Publication Date Title
CN108873842B (en) One-stop unattended pump station automatic control system
CN105163091B (en) Pump station engineering management integrated linkage system
US6532550B1 (en) Process protection system
CN102042909A (en) Locomotive fault diagnosis method and system
CN105573243A (en) Pump station monitoring system based on PLC
CN103309334A (en) Man-machine interface display operation method and configuration system for factory control system
CN106451789A (en) Power system monitoring method, communication management equipment and power system monitoring system
CN109802355B (en) Method and device for preventing misoperation of relay protection soft pressing plate
CN105629934B (en) The multistage band transmission more CAN plates parallel connection long distance centralized control equipments of multi-touch screen in coal washery
CN207926282U (en) A kind of wisdom Electrical Safety system
CN202583839U (en) Gate group comprehensive dispatching and monitoring system
CN204485168U (en) A kind of fire-fighting automatic inspection device
CN103365309A (en) Operation monitoring system of river channel check gate
CN204965697U (en) Clamp plate state is kept watch on and is prevented mistake management system
CN100544476C (en) The gprs service intelligence control method
CN201364482Y (en) Integrated measurement, monitoring alarm and control system
US11079826B2 (en) Control apparatus, control method, and program
CN201369607Y (en) Electric equipment cabinet door opening-and-closing alarm system
CN203621109U (en) Cold rolling hydraulic roll gap control pressure detection redundancy switch system
CN202632078U (en) SCADA (supervisory control and data acquisition) system and security system integrated control system
CN202888959U (en) High and low-voltage transformer station control system apparatus
CN107562011A (en) A kind of cast tube production line security protection control system and its control method
CN201993642U (en) Multi-mode safety monitoring device of equipment
CN107181243B (en) A kind of control switch
CN205080408U (en) High accuracy intelligence rack with self -checking function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131023