CN103362319A - Construction method for strengthening perforated plate and floor slab - Google Patents

Construction method for strengthening perforated plate and floor slab Download PDF

Info

Publication number
CN103362319A
CN103362319A CN2013103347086A CN201310334708A CN103362319A CN 103362319 A CN103362319 A CN 103362319A CN 2013103347086 A CN2013103347086 A CN 2013103347086A CN 201310334708 A CN201310334708 A CN 201310334708A CN 103362319 A CN103362319 A CN 103362319A
Authority
CN
China
Prior art keywords
steel
porous plate
steel strand
plate
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103347086A
Other languages
Chinese (zh)
Other versions
CN103362319B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Shangwei Intellectual Property Operations Co.,Ltd.
Original Assignee
朱奎
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 朱奎 filed Critical 朱奎
Priority to CN201310334708.6A priority Critical patent/CN103362319B/en
Publication of CN103362319A publication Critical patent/CN103362319A/en
Application granted granted Critical
Publication of CN103362319B publication Critical patent/CN103362319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a construction method for strengthening a perforated plate and a floor slab. The construction method is characterized by comprising the following construction steps: (1) a mortar surface layer of the perforated plate and a mortar surface layer of the floor slab are removed; (2) filler in seams between the perforated plate and a wall body is removed, and the removal range reaches the top surface of a ring beam; (3) a steel linear plate is mounted; (4) a hole is drilled in the wall body, and a steel strand passes through the drilled wall hole and is fixed on the steel linear plate through an anchorage device; (5) the steel strand is fixed on the steel linear plate through the anchorage device after being stretched, and a gap between the steel strand and the wall hole is sealed through high-strength epoxy resin; (6) a seam between the perforated plate and the wall body is filled with expansive concrete; (7) a waterproof layer is constructed; (8) a fine aggregate concrete layer is poured on asphalt felt. The construction method for strengthening the perforated plate and the floor slab is convenient to operate and low in construction cost.

Description

A kind of job practices of reinforcing the porous plate floor
Technical field
The present invention relates to a kind of job practices of reinforcing, particularly a kind of job practices of reinforcing the porous plate floor.
Background technology
Some disease, especially factory buildings that adopt the factory building of porous plate to occur in various degree have vibratory equipment particularly evident, and the disease that the porous plate floor occurs mainly contains following several: (1) porous plate floor occurs with the crack along longitudinal joint between plate; (2) bending phenomenon appears in the porous plate floor; (3) the large tracts of land seepage appears in the porous plate floor.The analysis reason is as follows: because the surface layer of porous plate floor adopts the mortar levelling layer usually, the mortar resistance to tension is very poor, is difficult to prevent the generation in crack.Even some engineering adopts steel mesh reinforcement to strengthen, because steel mesh reinforcement is close to the porous plate floor, mortar and pea gravel concreten are difficult to form whole.In addition, usually fill pea gravel concreten between the porous plate, building of pea gravel concreten is not in place, affects the lateral ties between plate.
Summary of the invention
Technical problem to be solved by this invention provides the disease that a kind of job practices of reinforcing the porous plate floor solves porous plate.
Reinforcement mechanism of the present invention is as follows: back-up coat adopts pea gravel concreten, the transverse prestress system is set up in employing, make the horizontal lower edge of back-up coat be in pressured state, balance transverse bending moment, eliminate the weak link that stress is concentrated, can transmit simultaneously vertical shear and moment of flexure between porous plate, become articulated slab form of structure into rigidly connecting the plated construction form, strengthening the transverse splicing ability of porous plate floor, thereby fundamentally prevent the generation of this series disease; Simultaneously since the transverse splicing of plate rigidly connect from hinged becoming, make the porous plate floor in the carrying situation porous plate and above pea gravel concreten jointly share load, therefore can improve the supporting capacity of porous plate floor.
Construction sequence comprises:
(1) mortar surface layer of removing porous plate floor.
(2) the seam inner stuffing between removing porous plate and the body of wall, the removing scope is to the collar tie beam end face.
(3) steel liner plate is installed, steel liner plate thickness is 8~10mm, and steel liner plate is fixed on body of wall by split bolt.
(4) in the body of wall internal drilling, the aperture is 8mm, and steel strand are fixed on steel liner plate by the porthole that bores by ground tackle, and the diameter of steel strand is 6.5mm, and the steel strand setting space is 0.8~1m.
(5) steel strand tension is used by ground tackle after complete and is fixed on steel liner plate, and the space between steel strand and the porthole adopts high-strength epoxy resin-blocked.
(6) fill expansive concrete in the seam between porous plate and the body of wall, expansive concrete intensity is more than the C35.
(7) construction of waterproof layer leaks in order to prevent floor, lays malthoid on porous plate.
(8) build the pea gravel concreten surface layer on malthoid, pea gravel concreten intensity is more than the C30.
The present invention is easy to operate, and construction cost is low.
Description of drawings
Fig. 1 porous plate floor reinforcing construction schematic diagram.
Reference numeral: 1, steel strand, 2, steel liner plate, 3, ground tackle, 4, expansive concrete, 5, porous plate, 6, collar tie beam.
The specific embodiment
Below in conjunction with Reference numeral present embodiment is described in detail.
The present embodiment construction sequence comprises:
(1) mortar surface layer of removing porous plate floor.
(2) the seam inner stuffing between removing porous plate and the body of wall, the removing scope is to the collar tie beam end face.
(3) steel liner plate is installed, steel liner plate thickness is 10mm, and steel liner plate is fixed on body of wall by split bolt.
(4) in the body of wall internal drilling, the aperture is 8mm, and steel strand are fixed on steel liner plate by the porthole that bores by ground tackle, and the diameter of steel strand is 6.5mm, and the steel strand setting space is 0.8m.
(5) steel strand tension is used by ground tackle after complete and is fixed on steel liner plate, and the space between steel strand and the porthole adopts high-strength epoxy resin-blocked.
(6) fill expansive concrete in the seam between porous plate and the body of wall, expansive concrete intensity is more than the C35.
(7) construction of waterproof layer is laid malthoid on porous plate.
(8) build the pea gravel concreten surface layer on malthoid, pea gravel concreten intensity is more than the C30.

Claims (1)

1. job practices of reinforcing the porous plate floor is characterized in that construction sequence comprises:
(1) mortar surface layer of removing porous plate floor;
(2) the seam inner stuffing between removing porous plate and the body of wall, the removing scope is to the collar tie beam end face;
(3) steel liner plate is installed, steel liner plate thickness is 8~10mm, and steel liner plate is fixed on body of wall by split bolt;
(4) in the body of wall internal drilling, the aperture is 8mm, and steel strand are fixed on steel liner plate by the porthole that bores by ground tackle, and the diameter of steel strand is 6.5mm, and the steel strand setting space is 0.8~1m;
(5) steel strand tension is used by ground tackle after complete and is fixed on steel liner plate, and the space between steel strand and the porthole adopts high-strength epoxy resin-blocked;
(6) fill expansive concrete in the seam between porous plate and the body of wall, expansive concrete intensity is more than the C35;
(7) construction of waterproof layer is laid malthoid on porous plate;
(8) build the pea gravel concreten surface layer on malthoid, pea gravel concreten intensity is more than the C30.
CN201310334708.6A 2013-07-26 2013-07-26 A kind of construction method of reinforcing porous plate floor Active CN103362319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310334708.6A CN103362319B (en) 2013-07-26 2013-07-26 A kind of construction method of reinforcing porous plate floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310334708.6A CN103362319B (en) 2013-07-26 2013-07-26 A kind of construction method of reinforcing porous plate floor

Publications (2)

Publication Number Publication Date
CN103362319A true CN103362319A (en) 2013-10-23
CN103362319B CN103362319B (en) 2016-03-16

Family

ID=49364510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310334708.6A Active CN103362319B (en) 2013-07-26 2013-07-26 A kind of construction method of reinforcing porous plate floor

Country Status (1)

Country Link
CN (1) CN103362319B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113806A (en) * 2015-08-03 2015-12-02 台州建筑安装工程公司 Construction method for using concrete floor to replace wood floor and waterproof cloth fixing structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4027855B2 (en) * 2003-06-30 2007-12-26 東急建設株式会社 Structural reinforcement equipment
KR100949440B1 (en) * 2009-04-10 2010-03-25 윤정배 Slab reinforced structure and the form of construction work of concrete structure
CN101929131A (en) * 2010-09-08 2010-12-29 哈尔滨工业大学 Method for reinforcing bonded prestressing force of transversely tensioning epoxy coating reinforcing steel bar of concrete beam slab
CN101942904A (en) * 2010-08-27 2011-01-12 北京工业大学 Steel plate-type tensioning and anchoring system for prestress steel stranded wire reinforced concrete flexural member

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4027855B2 (en) * 2003-06-30 2007-12-26 東急建設株式会社 Structural reinforcement equipment
KR100949440B1 (en) * 2009-04-10 2010-03-25 윤정배 Slab reinforced structure and the form of construction work of concrete structure
CN101942904A (en) * 2010-08-27 2011-01-12 北京工业大学 Steel plate-type tensioning and anchoring system for prestress steel stranded wire reinforced concrete flexural member
CN101929131A (en) * 2010-09-08 2010-12-29 哈尔滨工业大学 Method for reinforcing bonded prestressing force of transversely tensioning epoxy coating reinforcing steel bar of concrete beam slab

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
于建民等: "砌体结构中预制楼板整体性的增强措施", 《建筑技术》 *
毛文华等: "装配式空心板桥加固改造", 《2005年度河南省建筑业行业优秀论文集》 *
马俊: "停缓建工程中混凝土楼板的加固", 《企业科技与发展》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113806A (en) * 2015-08-03 2015-12-02 台州建筑安装工程公司 Construction method for using concrete floor to replace wood floor and waterproof cloth fixing structure

Also Published As

Publication number Publication date
CN103362319B (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN104846810B (en) Self-circulating posterior grouting bored pile construction method
CN206737141U (en) A kind of bolt connection assembled integral node
CN105386778A (en) Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN102146672A (en) Method for constructing pile foundation in karst area
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN103498425A (en) Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN204238395U (en) A kind of prefabricated pair of thin plate cassette ceiling structure
CN109024870A (en) The connection structure and its construction method of assembled underground structure vertical member
CN110258640A (en) A kind of construction method of the overlapping wall system of covered back-digging
CN103938767B (en) Trough type energy-saving bearing wall externally wrapped by steel wire mesh mortar plates and foamed concrete
CN102653946A (en) Waterproof construction method for setting rubber waterstop at bottom of reinforced concrete raft foundation
CN103790176B (en) A kind of construction method of pre-buried manomelia rod structure
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN208717934U (en) A kind of tower-crane foundation structure
CN103161474B (en) Construction method of down hole interchange roadway
CN102286982A (en) Deep foundation pit precast building enclosure for constructing in low environment
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN103362319A (en) Construction method for strengthening perforated plate and floor slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191127

Address after: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: Huzhou xinbeilian Network Technology Co., Ltd

Address before: 325000 snow mountain apartment No. 12, Lucheng District, Zhejiang, Wenzhou

Patentee before: Zhu Kui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191210

Address after: 314300 Guan Tang Town, Qinshan street, Haiyan County, Jiaxing, Zhejiang

Patentee after: HAIYAN MACHINERY EQUIPMENT MANUFACTURING CO., LTD.

Address before: 313000 1-C, building 1, No. 656, Qixing Road, high tech Zone, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: Huzhou xinbeilian Network Technology Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 233000 No.10, building 32, Zone 8, Guangcai market, bengshan District, Bengbu City, Anhui Province

Patentee after: Bengbu Shangwei Intellectual Property Operations Co.,Ltd.

Address before: 314300 Guan Tang Town, Qinshan street, Haiyan County, Jiaxing, Zhejiang

Patentee before: HAIYAN MACHINERY EQUIPMENT MANUFACTURING Co.,Ltd.