CN103353045A - 重层式管路再生化工法及其结构 - Google Patents
重层式管路再生化工法及其结构 Download PDFInfo
- Publication number
- CN103353045A CN103353045A CN2013102856727A CN201310285672A CN103353045A CN 103353045 A CN103353045 A CN 103353045A CN 2013102856727 A CN2013102856727 A CN 2013102856727A CN 201310285672 A CN201310285672 A CN 201310285672A CN 103353045 A CN103353045 A CN 103353045A
- Authority
- CN
- China
- Prior art keywords
- pipe
- double
- pipeline
- safeguard
- safeguarding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明涉及一种重层式管路再生化工法及其结构,用于维护已有的下水管路,在所述的已有的下水管路的外圈设置有多段维护管;所述的每段维护管由上下两个半弧形的钢片组成;两个钢片之前通过连接部件密封连接;所述的维护管的前端连接向前掘进的维护机头,维护管通过液压推动装置向前推进。本发明在既存管道的外侧重层化,维护人员不需要进入到管道内部进行维修;这样也不存在水灾,缺氧等安全隐患;而且所有的动作均可由控制室控制完成,不仅节省了人工成本而且缩短了工作周期。
Description
技术领域
本发明涉及一种管路的维护,尤其是一种重层式管路再生化工法及其结构。
背景技术
目前,对于已有、既存的地下管路的维护方法普遍为:工作人员进入地下管道内进行检测维修。这样的方式不仅存在潜在的安全隐患,例如:水灾,缺氧等;而且需要很大的维修成本,包括人工,维护周期等。
发明内容
本发明要解决的技术问题是:提出一种在现有管路外侧增加套管的重层式管路再生化工法及其结构。
本发明所采用的技术方案为:一种重层式管路再生化工法,用于维护已有的下水管路,包括以下步骤:
1)将维护机头放入地下,并套于已有下水管路的外圈;
2)由液压推动装置推动维护机头向前,液压推动装置完成第一次的推进动作后,推动杆回到初始位置;
3)在维护机头的末端放置维护管,并由液压推动装置推动维护管向前推进,完成此次推进动作后,推动杆再次回到初始位置;
4)在前一段维护管的末端放置另一段维护管,液压推动装置重复完成步骤3)的推进工作;
5)依次类推直到维护工作完成。
其中,所述的步骤2)中维护管由上下两个半弧形的钢片组成,维护管的放置方式为:
1)由起吊装置放置其中的一个钢片至已有下水管路外圈的上方;
2)通过设置在已有下水管下方的转动装置将已放置好的钢片旋转至下水管路的下方;
3)由起吊装置将另一个钢片放置下水管路外圈的上方;
4)两个钢片之间通过连接部件密封连接。
为了快速的向前掘进,本发明所述的维护机头为盾构机头,其上设置有刀盘,所述的维护机头由控制室控制工作状态。
另外,本发明所述的维护管的上下两个半弧形的钢片中分别设置多个管路,包括送气管、排气管、送泥管以及准直管。
同时,本发明还提供了一种重层式管路再生化工法所形成的再生化结构,是在所述的已有的下水管路的外圈设置有多段维护管;所述的每段维护管由上下两个半弧形的钢片组成;两个钢片之前通过连接部件密封连接;所述的维护管的前端连接向前掘进的维护机头,维护管通过液压推动装置向前推进。
为了增加重层式管路的密封性,本发明所述的每两段维护管之间密封溶接。
本发明所述的液压推动装置为现有技术中常用的液压千斤顶。
本发明的施工过程为:
控制室发出指令,维护机头收到指令后,维护管经千斤顶的推力沿既存管向前推进;推进前车上设备应接通送泥管和排土管,形成一个循环设备。
本发明的有益效果是:在既存管道的外侧重层化,维护人员不需要进入到管道内部进行维修;这样也不存在水灾,缺氧等安全隐患;而且所有的动作均可由控制室控制完成,不仅节省了人工成本而且缩短了工作周期。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明重层式管路的施工状态图;
图2是本发明重层式管路的结构示意图;
图3是维护管的结构示意图;
图中:1、维护管;2、钢片;3、维护机头;4、液压千斤顶;5、已有管路;6、送气管;7、排气管;8、送泥管;9、准直管;10、注入管;11、排土管;12、连接螺钉。
具体实施方式
现在结合附图和优选实施例对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示一种重层式管路再生化工法的施工状态,用于维护已有的下水管路,1)将维护机头3放入地下,并套于已有下水管路5的外圈;2)由液压推动装置推动维护机头向前,液压推动装置完成第一次的推进动作后,推动杆回到初始位置;3)在维护机头的末端放置维护管1,并由液压推动装置推动维护管向前推进,完成此次推进动作后,推动杆再次回到初始位置;4)在前一段维护管的末端放置另一段维护管,液压推动装置重复完成步骤3)的推进工作;5)依次类推直到维护工作完成。
其中,所述的步骤2)中维护管由上下两个半弧形的钢片2组成,维护管的放置方式为:1)由起吊装置放置其中的一个钢片至已有下水管路外圈的上方;2)通过设置在已有下水管下方的转动装置将已放置好的钢片旋转至下水管路的下方;3)由起吊装置将另一个钢片放置下水管路外圈的上方;4)两个钢片之间通过连接螺钉12密封连接。完成后如图2~3所示。
为了快速的向前掘进,本发明所述的维护机头为盾构机头,其上设置有刀盘,所述的维护机头由控制室控制工作状态。
另外,本发明所述的维护管的上下两个半弧形的钢片中分别设置多个管路,上钢片包括送气管6、排气管7、送泥管8以及准直管9,下钢片包括准直管9、排土管11以及注入管10。
为了增加重层式管路的密封性,本发明所述的每两段维护管之间密封溶接。
本发明所述的液压推动装置为现有技术中常用的液压千斤顶4。
本发明的施工过程为:
控制室发出指令,维护机头收到指令后,维护管经千斤顶的推力沿既存管向前推进;推进前车上设备应接通送泥管和排土管,形成一个循环设备。
以上说明书中描述的只是本发明的具体实施方式,各种举例说明不对本发明的实质内容构成限制,所属技术领域的普通技术人员在阅读了说明书后可以对以前所述的具体实施方式做修改或变形,而不背离发明的实质和范围。
Claims (8)
1.一种重层式管路再生化工法,用于维护已有的下水管路,其特征在于包括以下步骤:
1)将维护机头放入地下,并套于已有下水管路的外圈;
2)由液压推动装置推动维护机头向前,液压推动装置完成第一次的推进动作后,推动杆回到初始位置;
3)在维护机头的末端放置维护管,并由液压推动装置推动维护管向前推进,完成此次推进动作后,推动杆再次回到初始位置;
4)在前一段维护管的末端放置另一段维护管,液压推动装置重复完成步骤3)的推进工作;
5)依次类推直到维护工作完成。
2.如权利要求1所述的重层式管路再生化工法,其特征在于:所述的步骤2)中维护管由上下两个半弧形的钢片组成,维护管的放置方式为:
1)由起吊装置放置其中的一个钢片至已有下水管路外圈的上方;
2)通过设置在已有下水管下方的转动装置将已放置好的钢片旋转至下水管路的下方;
3)由起吊装置将另一个钢片放置下水管路外圈的上方;
4)两个钢片之间通过连接部件密封连接。
3.如权利要求1所述的重层式管路再生化工法,其特征在于:所述的维护机头为盾构机头,其上设置有刀盘。
4.如权利要求1所述的重层式管路再生化工法,其特征在于:所述的维护管的上下两个半弧形的钢片中分别设置多个管路,包括送气管、排气管、送泥管以及准直管。
5.一种如权利要求1所述的重层式管路再生化工法所形成的再生化结构,其特征在于:在所述的已有的下水管路的外圈设置有多段维护管;所述的每段维护管由上下两个半弧形的钢片组成;两个钢片之前通过连接部件密封连接;所述的维护管的前端连接向前掘进的维护机头,维护管通过液压推动装置向前推进。
6.如权利要求5所述的重层式管路再生化结构,其特征在于:所述的维护机头为盾构机头,其上设置有刀盘。
7.如权利要求5所述的重层式管路再生化结构,其特征在于:所述的维护管的上下两个半弧形的钢片中分别设置多个管路,包括送气管、排气管、送泥管以及准直管。
8.如权利要求5所述的重层式管路再生化结构,其特征在于:所述的每两段维护管之间密封溶接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310285672.7A CN103353045B (zh) | 2013-07-08 | 2013-07-08 | 重层式管路再生化工法及其结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310285672.7A CN103353045B (zh) | 2013-07-08 | 2013-07-08 | 重层式管路再生化工法及其结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103353045A true CN103353045A (zh) | 2013-10-16 |
CN103353045B CN103353045B (zh) | 2014-06-18 |
Family
ID=49309442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310285672.7A Active CN103353045B (zh) | 2013-07-08 | 2013-07-08 | 重层式管路再生化工法及其结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103353045B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104676193A (zh) * | 2013-11-27 | 2015-06-03 | 积通管道顾问及工程有限公司 | 一种顶管法修复管道所用的顶管装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3762174A (en) * | 1972-07-17 | 1973-10-02 | Pamco Const | Protective inching shield for pipe-laying |
US5743676A (en) * | 1995-03-29 | 1998-04-28 | Meyer & John Gmbh & Co Tief- Und Rohrleitungsbau | Method and device for keeping outfall drainage in service during sewerage construction |
CN100523435C (zh) * | 2002-11-08 | 2009-08-05 | 罗伯特·J·韦科克 | 安装地下套管的方法 |
CN101749486B (zh) * | 2008-12-22 | 2012-04-25 | 上海广联建设发展有限公司 | 用于地下管道暗挖的管节预应力连接方法 |
CN101852311B (zh) * | 2009-04-03 | 2013-05-15 | 五冶集团上海有限公司 | 过路管道的顶管安装方法 |
-
2013
- 2013-07-08 CN CN201310285672.7A patent/CN103353045B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3762174A (en) * | 1972-07-17 | 1973-10-02 | Pamco Const | Protective inching shield for pipe-laying |
US5743676A (en) * | 1995-03-29 | 1998-04-28 | Meyer & John Gmbh & Co Tief- Und Rohrleitungsbau | Method and device for keeping outfall drainage in service during sewerage construction |
CN100523435C (zh) * | 2002-11-08 | 2009-08-05 | 罗伯特·J·韦科克 | 安装地下套管的方法 |
CN101749486B (zh) * | 2008-12-22 | 2012-04-25 | 上海广联建设发展有限公司 | 用于地下管道暗挖的管节预应力连接方法 |
CN101852311B (zh) * | 2009-04-03 | 2013-05-15 | 五冶集团上海有限公司 | 过路管道的顶管安装方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104676193A (zh) * | 2013-11-27 | 2015-06-03 | 积通管道顾问及工程有限公司 | 一种顶管法修复管道所用的顶管装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103353045B (zh) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9995086B2 (en) | Center-pillared full-face shaft drilling machine | |
CN103510957B (zh) | 一种组合式石门揭煤方法 | |
CN103321654A (zh) | 柔性气囊处理煤矿巷道冒顶的方法 | |
CN103590833A (zh) | 螺旋出土顶管管幕施工方法及设备 | |
CN104314572B (zh) | 一种由外侧倒角两半矩形管节构筑的隧道的施工方法 | |
CN106368714A (zh) | 一种用于隧道开挖施工的轮胎式自动升降组装台架 | |
CN204002832U (zh) | 一种盾构隧道洞门结构 | |
CN202181907U (zh) | 一种无榫管幕结构 | |
CN103353045B (zh) | 重层式管路再生化工法及其结构 | |
CN208441848U (zh) | 联络通道施工用类矩形顶管机 | |
CN105863673B (zh) | 顶推机机身可返回式顶管施工方法及施工结构 | |
CN103726670B (zh) | 采用钢梁混凝土板在原有建筑物上增加隔层的方法 | |
CN206902717U (zh) | 一种用于地基工程的注浆管 | |
CN111322075B (zh) | 一种竖井掘进机用壁后回填注浆系统 | |
CN203533081U (zh) | 一种重层式管路再生化结构 | |
CN204212180U (zh) | 一种用于地下室降水井封堵的钢筋笼 | |
CN106241234A (zh) | 一种用于预制综合管廊的自行式运输拼装车 | |
CN113090275B (zh) | 适用于双线盾构始发和出渣运料的隧道结构及施工方法 | |
CN102434168A (zh) | 接管器 | |
CN102644477A (zh) | 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法 | |
CN102174823A (zh) | 单轴斜式开槽机 | |
CN109538823B (zh) | 一种双管错位交替顶进的施工方法 | |
CN103850247B (zh) | 一种地下连续墙接头保护板及施工机具及施工方法 | |
CN103883120B (zh) | 一种带自锁功能的爬模结构 | |
CN206328760U (zh) | 一种基坑施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |