CN103343608A - Multifunctional steel wire rapid moving calibration bar - Google Patents

Multifunctional steel wire rapid moving calibration bar Download PDF

Info

Publication number
CN103343608A
CN103343608A CN2013103016454A CN201310301645A CN103343608A CN 103343608 A CN103343608 A CN 103343608A CN 2013103016454 A CN2013103016454 A CN 2013103016454A CN 201310301645 A CN201310301645 A CN 201310301645A CN 103343608 A CN103343608 A CN 103343608A
Authority
CN
China
Prior art keywords
fixed
stop
muscle
movable pulley
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103016454A
Other languages
Chinese (zh)
Other versions
CN103343608B (en
Inventor
程英明
尹洪江
毕江寰
尹秀波
翟运良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JINJIAN CONSTRUCTION ENGINEERING DETECTION Co Ltd
TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd
Tianjin Construction Engineering Group (holdings) Ltd
Original Assignee
TIANJIN JINJIAN CONSTRUCTION ENGINEERING DETECTION Co Ltd
TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd
Tianjin Construction Engineering Group (holdings) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JINJIAN CONSTRUCTION ENGINEERING DETECTION Co Ltd, TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd, Tianjin Construction Engineering Group (holdings) Ltd filed Critical TIANJIN JINJIAN CONSTRUCTION ENGINEERING DETECTION Co Ltd
Priority to CN201310301645.4A priority Critical patent/CN103343608B/en
Publication of CN103343608A publication Critical patent/CN103343608A/en
Application granted granted Critical
Publication of CN103343608B publication Critical patent/CN103343608B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Road Paving Machines (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a multifunctional steel wire rapid moving calibration bar which comprises a plurality of fixed supports which are correspondingly arranged at the two sides of the rapid moving calibration bar at equal intervals, a plurality of sliding supports are arranged between every two corresponding fixed supports at intervals and connected with one another through steel wires, the two ends of each steel wire are fixed on fastening spanners of the two fixed supports, the steel wires are supported by the fixed supports and sliding wheels on the sliding supports, and the tip of each steel wire is higher than the wing edge of each sliding wheel. The rapid moving calibration bar can be fixed on a wall surface through the fixed supports at the two ends and tack claws on the bottom surfaces of the sliding supports in the middle. The steel wires are tensioned through fastening devices of the fixed supports at the two ends of the calibration bar, and the effect of controlling the paving thickness and the flatness of mortar can be achieved. The distance between the steel wires and the base layer wall surface is adjusted through the fixed supports and adjusting nuts of the sliding supports in the middle of the calibration bar so that the calibration bar can adapt to the unevenness of the base layer wall surface. The calibration bar is convenient and rapid to arrange and can be repeatedly used.

Description

Multi-functional steel wire Fast Activities mark muscle
Technical field
The present invention relates to mortar paving thickness, planeness control sign---the mark muscle of large tracts of land plastering construction in the building operations, particularly a kind of multi-functional steel wire Fast Activities mark muscle of controlling mortar paving thickness, planeness.
Background technology
In the common buildings construction, the mortar of large tracts of land plastering construction (machinery or artificial) paves and flattens operation is that employing is artificial or machinery paves and levelling process, and the paving thickness of mortar and leveling precision rely on the fixedly mark muscle that sets in advance to control.Should fixingly mark the muscle employing with the mortar of proportioning, the wide 40~50mm of mark muscle, the spacing of mark muscle is (less than the length of darby) about 2000mm.The surface of mark muscle be the finished surface of plastering, and the distance of surface and basic unit's metope of mark muscle is the height of mark muscle, and the height of mark muscle need determine through measuring, and marks after the muscle setting finishes, and need maintenance can carry out plastered work after certain intensity.
In sum, the technology that adopts mortar that the mark muscle is set has following characteristics:
1, technical requirements height: the width requirement of mark muscle is even; The surface of mark muscle is the finished surface of plastering, and the surface is straight, must be higher than code requirement; The mark muscle must be firm with the metope bonding.
2, the skilled worker has high input: mortar mark muscle needs manually-operated to finish, and must be equipped with accordingly manually according to the quantity of mark muscle, and must be skilled professional technique workman.
3, long in time limit: operating time of wet trade that mortar mark muscle manually is set is long, and needs to stagnate the necessary technology intermittent time (maintenance that is mortar) after finishing, and marks muscle and reaches certain intensity to guarantee mortar.
4, can not be prefabricated and reuse: mortar mark muscle be the mark muscle that is fixed on the metope ad-hoc location, must operate in basic unit after basic unit's metope is finished, and be disposable use, and become the part of wall plastering surface layer.
The These characteristics of mortar mark muscle, make this technology can not adapt to current high labour cost, highly-mechanized development trend, particularly in " mechanically spraying plasterer method ", obviously weaken the duration advantage of mechanization, also make the economies of scale advantage of mechanization not demonstrate fully out simultaneously.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the purpose of this invention is to provide a kind of multi-functional steel wire Fast Activities mark muscle, be beneficial to realize shortening the mark muscle time is set, and can be reusable, save construction cost, this mark muscle can be fixed on the metope, as the sign of mortar paving thickness, planeness control, increases work efficiency effectively.
For achieving the above object, the technical solution used in the present invention provides a kind of multi-functional steel wire Fast Activities mark muscle, wherein: described Fast Activities mark muscle includes that both sides are uniformly-spaced corresponding to be provided with a plurality of fixed bearings, uniformly-spaced be provided with a plurality of sliding supports between each corresponding fixed bearing, and connect by wire rope, the two ends of wire rope are fixed on the spanner of two fixed bearings, wire rope supports by the movable pulley on fixed bearing and the sliding support, and the summit of wire rope is higher than the edge of a wing of movable pulley;
Described fixed bearing includes movable pulley, adjusting nut, stop, base-plate, tack claw, spanner, the top of described base-plate connects stop, stop is embedded with adjusting nut, the top of described base-plate connects stop, the embedded adjusting nut of stop, the lower end of the movable pulley on adjusting nut and the stop is connected, and regulates the height that raises or reduce movable pulley by the rotation adjusting nut, and stop carries out spacing to rising or the reduction amplitude of limit slippage wheel; One end of spanner is connected above the base-plate, the wire rope on a side of stop, movable pulley can the tensioning movable pulley by spanner; Uniform tack claw below base-plate, by tack claw with fixed bearing and metope are fixed.
Effect of the present invention is to use, and but this multi-functional steel wire Fast Activities mark muscle has been realized wall-attached simultaneously, can have been fixed, adjustment height, securable multiple function, have four aspect effects: the first, this mark muscle can be fixed in metope by the fixed bearing at two ends and the tack claw on the middle sliding support bottom surface; The second, the fastener of the fixed bearing of this mark muscle by two ends satisfies the effect of control mortar paving thickness, planeness with the steel wire tensioning; The 3rd, this mark muscle is regulated steel wire apart from the height of basic unit's metope, to adapt to the out-of-flatness of basic unit's metope by the adjusting nut of fixed bearing, middle sliding support; The 4th, this mark muscle arranges convenient and swift, and reusable.
Description of drawings
Fig. 1 marks the fixed bearing structural front view of muscle for the present invention;
Fig. 2 marks the fixed bearing structure side view of muscle for the present invention;
Fig. 3 marks the fixed bearing structure vertical view of muscle for the present invention;
Fig. 4 marks the sliding support structural front view of muscle for the present invention;
Fig. 5 marks the sliding support structure side view of muscle for the present invention;
Fig. 6 marks the sliding support structure vertical view of muscle for the present invention;
Fig. 7 arranges schematic diagram for fast moving mark muscle structure of the present invention.
Among the figure:
0, movable pulley 1, adjusting nut 2, stop 3, base-plate 4, tack claw
5, spanner 6, wire rope 7, fixed bearing 8, sliding support 9, the fixing mark of mortar muscle
The specific embodiment
Structure to multi-functional steel wire Fast Activities mark muscle of the present invention is illustrated by reference to the accompanying drawings.
Shown in Fig. 1-7, multi-functional steel wire Fast Activities mark muscle of the present invention, described Fast Activities mark muscle includes that both sides are uniformly-spaced corresponding to be provided with a plurality of fixed bearings 7, uniformly-spaced be provided with a plurality of sliding supports 8 between each corresponding fixed bearing 7, and by wire rope 6 connections, the two ends of wire rope 6 are fixed on the spanner 5 of two fixed bearings 7, and wire rope 6 supports by the movable pulley 0 on fixed bearing 7 and the sliding support 8, and the summit of wire rope 6 is higher than the edge of a wing of movable pulley 0.When plastering, make floating rule strike off plaster skin coat along Steel Wire Surface.
Described fixed bearing 7 includes movable pulley 0, adjusting nut 1, stop 2, base-plate 3, tack claw 4, spanner 5, the top of described base-plate 3 connects stop 2, stop 2 is embedded with adjusting nut 1, the top of described base-plate 3 connects stop 2, stop 2 embedded adjusting nuts 1, the lower end of the movable pulley 0 on adjusting nut 1 and the stop 2 is connected, regulate the height that raises or reduce movable pulley 0 by rotation adjusting nut 1, rising or the reduction amplitude of 2 pairs of limit slippage wheels 0 of stop are carried out spacing; One end of spanner 5 is connected above the base-plate 3, the wire rope 6 on a side of stop 2, movable pulley 0 can tensioning movable pulley 0 by spanner 5; Uniform tack claw 4 below base-plate 3 is fixed with making fixed bearing 7 and metope by tack claw 4.
The spacing of described corresponding two fixed bearings 7 is 1500mm.
Be spaced apart 300mm between described two sliding supports 8.
The spacing of the fixed bearing 7 of multi-functional steel wire Fast Activities mark muscle of the present invention is 1500mm, and middle sliding support 8 spacings are 300mm; Fixed bearing 7 and sliding support 8 are fixed in metope by tack claw 4; Wire rope 6 is held up by movable pulley 0, and through spanner 5 tensioners of fixed bearing 7; Wire rope 6 is regulated by adjusting nut 1 apart from the height of metope, according to the planeness of metope, but the fixed bearing 7 free adjustment height at two ends; Sliding support 8 can reduce wire rope 6 unsettled length, and improves rigidity, to satisfy the requirement of control mortar paving thickness, planeness.
The method of operating of multi-functional steel wire Fast Activities mark muscle of the present invention is as follows:
Adopt the method for this multi-functional steel wire Fast Activities mark muscle to have two kinds, a kind of is the floating screed method that adopts mortar fixing mark muscle 9 and Fast Activities mark muscle to combine; A kind of is the floating screed method that only adopts Fast Activities mark muscle.
General metope floating screed mode has two kinds, and a kind of is towards horizontal bar, between the upper and lower apart from about the 2m; Another kind is to dash perpendicular muscle, about spacing 1.2~1.5m.
The floating screed method that adopts mortar fixing mark muscle and Fast Activities mark muscle to combine: it is main that this multi-functional steel wire Fast Activities mark muscle selects to dash perpendicular muscle, the method that is aided with three road horizontal bars, wherein the perpendicular muscle of horizontal bar and inner corner trim is the fixing mark of mortar muscle, fixedly the spacing of horizontal bar is less than 1500mm, and the spacing of horizontal bar should be less than 1800mm on metope between the bigger function of large bay and floor height.Install between the horizontal bar and mark the muscle device towards vertical Fast Activities, the spacing of Fast Activities mark muscle gets final product less than the length of darby.The construction precision of this method is higher, for this multi-functional steel wire Fast Activities mark muscle preferentially adopts.
Adopt the floating screed method of Fast Activities mark muscle: horizontal bar, perpendicular muscle all adopt Fast Activities mark muscle, and arrange continuously.The construction precision of this method is lower.
Use the operating procedure of this multi-functional steel wire Fast Activities mark muscle:
1) snap the line.Eject the line of ink marker in the position that pre-sets Fast Activities mark muscle.
2) sliding support is installed.The center line of fixing sliding support is aimed at the line of ink marker, with hand hammer tack claw is hammered into metope basic unit.
3) install and fix bearing 7 and wire rope 6.At first will fix the fixed bearing 7 of an end, the center line of fixed bearing 7 is aimed at the line of ink marker, with hand hammer tack claw 4 is hammered into metope basic unit, the fixing fixed bearing 7 of the other end then, wire rope 6 is installed on the movable pulley 0 on the fixed bearing 7, wire rope 6 should overlap with the line of ink marker in the upright projection of metope again.Between two fixed bearings 7, every 300mm a sliding support 8 is installed, to reduce the span of wire rope 6.The mounting method of sliding support 8 is aimed at the line of ink marker with the center line of sliding support 8, with hand hammer tack claw 4 is hammered into metope basic unit, next sliding support 8 is installed successively, until installing.
4) tensioning wire rope.Spanner 5 is pressed, made wire rope 6 tensionings, to support the pressure of darby.
5) regulate height.Adjusting nut makes the surface of steel wire be the finished surface height of plastering.
6) finishing is flat.Adopt pendant, flatten each bearing one by one.
7) plastering construction.Carrying out mortar paves and flattens construction.
8) before the mortar initial set, take off Fast Activities mark muscle, the cleaning back is reused.

Claims (3)

1. a multi-functional steel wire Fast Activities is marked muscle, it is characterized in that: described Fast Activities mark muscle includes the uniformly-spaced corresponding a plurality of fixed bearings (7) that are provided with of both sides, uniformly-spaced be provided with a plurality of sliding supports (8) between each corresponding fixed bearing (7), and by wire rope (6) connection, the two ends of wire rope (6) are fixed on the spanner (5) of two fixed bearings (7), wire rope (6) supports by the movable pulley (0) on fixed bearing (7) and the sliding support (8), and the summit of wire rope (6) is higher than the edge of a wing of movable pulley (0);
Described fixed bearing (7) includes movable pulley (0), adjusting nut (1), stop (2), base-plate (3), tack claw (4), spanner (5), the top of described base-plate (3) connects stop (2), stop (2) is embedded with adjusting nut (1), the top of described base-plate (3) connects stop (2), the embedded adjusting nut of stop (2) (1), the lower end of the movable pulley (0) on adjusting nut (1) and the stop (2) is connected, regulate the height that raises or reduce movable pulley (0) by rotation adjusting nut (1), stop (2) carries out spacing to rising or the reduction amplitude of limit slippage wheel (0); One end of spanner (5) is connected above the base-plate (3), the wire rope (6) on a side of stop (2), movable pulley (0) can tensioning movable pulley (0) by spanner (5); Uniform tack claw (4) below base-plate (3) is fixed with making fixed bearing (7) and metope by tack claw (4).
2. according to the described multi-functional steel wire Fast Activities mark muscle of claim 1, it is characterized in that: the spacing of described corresponding two fixed bearings (7) is 1500mm.
3. according to the described multi-functional steel wire Fast Activities mark muscle of claim 1, it is characterized in that: be spaced apart 300mm between described two sliding supports (8).
CN201310301645.4A 2013-07-18 2013-07-18 Multifunctional steel wire rapid moving calibration bar Expired - Fee Related CN103343608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310301645.4A CN103343608B (en) 2013-07-18 2013-07-18 Multifunctional steel wire rapid moving calibration bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310301645.4A CN103343608B (en) 2013-07-18 2013-07-18 Multifunctional steel wire rapid moving calibration bar

Publications (2)

Publication Number Publication Date
CN103343608A true CN103343608A (en) 2013-10-09
CN103343608B CN103343608B (en) 2015-07-22

Family

ID=49278433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310301645.4A Expired - Fee Related CN103343608B (en) 2013-07-18 2013-07-18 Multifunctional steel wire rapid moving calibration bar

Country Status (1)

Country Link
CN (1) CN103343608B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT399744B (en) * 1993-03-25 1995-07-25 Golob Ernst Device for screeding a plaster layer
DE20011068U1 (en) * 2000-02-07 2001-03-08 Kellner, Peter, 99192 Neudietendorf Device for aligning components
CN2825832Y (en) * 2005-07-22 2006-10-11 中国第二十冶金建设公司 Surface level control device for concrete casting
FR2914673A1 (en) * 2007-04-05 2008-10-10 Sehmus Celebi Automated cement pouring leveler for use on concrete, has transmitting laser reflecting on laser receiver, where horizontality of machine is acquired by handle permitting displacing of scraper on surface of pouring cement
CN203430000U (en) * 2013-07-18 2014-02-12 天津市建工集团(控股)有限公司 Multifunctional steel wire quick movable elevation bar

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT399744B (en) * 1993-03-25 1995-07-25 Golob Ernst Device for screeding a plaster layer
DE20011068U1 (en) * 2000-02-07 2001-03-08 Kellner, Peter, 99192 Neudietendorf Device for aligning components
CN2825832Y (en) * 2005-07-22 2006-10-11 中国第二十冶金建设公司 Surface level control device for concrete casting
FR2914673A1 (en) * 2007-04-05 2008-10-10 Sehmus Celebi Automated cement pouring leveler for use on concrete, has transmitting laser reflecting on laser receiver, where horizontality of machine is acquired by handle permitting displacing of scraper on surface of pouring cement
CN203430000U (en) * 2013-07-18 2014-02-12 天津市建工集团(控股)有限公司 Multifunctional steel wire quick movable elevation bar

Also Published As

Publication number Publication date
CN103343608B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN113272508B (en) Machine for plastering and finishing ceilings, interior walls and exterior walls and method for using same
CN105756332B (en) A kind of movable up-down scaffold
JP4491030B2 (en) Anchor bolt set device
JP2012502204A (en) Floor construction equipment
CN101440664A (en) Flatness and elevation control method for large-area wear-resistant terrace
CN102888977B (en) Inner wall reinforcement punching method
CN205804904U (en) A kind of leveling unit
CN105256973A (en) Method for paving and constructing floor tiles with elevation cushion blocks
CN203430000U (en) Multifunctional steel wire quick movable elevation bar
CN102605938B (en) Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs
CN104631829A (en) Technique for high-precision leveling of structural flooring
KR100728712B1 (en) A fixing device for a out side panel
CN103343608A (en) Multifunctional steel wire rapid moving calibration bar
KR20100045423A (en) Position set-up device of insert plate for pipe supporting tool installation
CN103225394A (en) Big wood template construction method of indoor constructional engineering shear wall
RU2679171C2 (en) Station for automatic alignment of construction mixtures and laying of floor tiles, station for automatic alignment of construction mixtures and station for automatic laying of floor tiles
KR20210002301A (en) Sludge-type mortar with a plaster finish on the screed vibration dapple bar
CN204691249U (en) A kind of with can the stair step steel form of tread
JP2019085722A (en) Finish surface material cutting position marking tool and construction method of finish surface material using it
JP2001159240A (en) Concrete direct finishing method and jig
CN110805278A (en) Method for controlling thickness and flatness of concrete floor
CN111502171A (en) Ground leveling method adopting dotting and rib punching system
CN202391084U (en) Flat-scraping operating vehicle
CN206174356U (en) Assembled ceramic tile wall surface and wall face mould piece
KR20100086167A (en) A fixing device for a out side panel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 300384 Tianjin city Nankai District Huayuan Industrial Zone, Road No. 1

Applicant after: Tianjin Construction Engineering Group (Holdings) Co., Ltd.

Applicant after: Tianjin Yijiang Construction Engineering Co., Ltd.

Applicant after: Tianjin Jinjian Construction Engineering Detection Co., Ltd.

Address before: 300384 Tianjin city Nankai District Huayuan Industrial Zone, Road No. 1

Applicant before: Tianjin Construction Engineering Group (Holdings) Limited

Applicant before: Tianjin Yijiang Construction Engineering Co., Ltd.

Applicant before: Tianjin Jinjian Construction Engineering Detection Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: TIANJIN CONSTRUCTION ENGINEERING GROUP (HOLDING) CO., LTD. TO: TIANJIN CONSTRUCTION ENGINEERING GROUP (HOLDINGS) CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Meng Jin

Inventor after: Liu Yingxin

Inventor after: Shi Weile

Inventor after: Cheng Yingming

Inventor after: Yin Hongjiang

Inventor after: Bi Jianghuan

Inventor after: Yin Xiubo

Inventor after: Di Yunliang

Inventor before: Cheng Yingming

Inventor before: Yin Hongjiang

Inventor before: Bi Jianghuan

Inventor before: Yin Xiubo

Inventor before: Di Yunliang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20180718