CN103334763A - 一种盾构穿越硬质岩层对临近桩基影响的控制方法 - Google Patents

一种盾构穿越硬质岩层对临近桩基影响的控制方法 Download PDF

Info

Publication number
CN103334763A
CN103334763A CN2013102273600A CN201310227360A CN103334763A CN 103334763 A CN103334763 A CN 103334763A CN 2013102273600 A CN2013102273600 A CN 2013102273600A CN 201310227360 A CN201310227360 A CN 201310227360A CN 103334763 A CN103334763 A CN 103334763A
Authority
CN
China
Prior art keywords
pile foundation
shield
rock stratum
hard rock
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102273600A
Other languages
English (en)
Other versions
CN103334763B (zh
Inventor
钟小春
王媛
王慧洁
叶文龙
王红飞
倪小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201310227360.0A priority Critical patent/CN103334763B/zh
Publication of CN103334763A publication Critical patent/CN103334763A/zh
Application granted granted Critical
Publication of CN103334763B publication Critical patent/CN103334763B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供了一种盾构穿越硬质岩层对临近桩基影响的控制方法,包括以下步骤:步骤一,建立盾构掘进有限元数值分析模型,分析在硬质岩层中盾构推力和扭矩对临近桩基的影响,并对影响程度作出评价;步骤二,在桩基临近盾构掘进侧竖向开槽,开槽深度为从桩基顶部至盾构掘进的隧道下方2-3m,在槽中放入测斜管并伸出地面,槽中填充软体材料,槽顶加盖保护;步骤三,盾构低速掘进,利用测斜管对桩基水平位移监控并根据监测数据进行反馈调整盾构掘进参数。该方法工艺简单、操作方便,通过从桩基顶至隧道底下2-3m竖向开槽并填充软体材料,将盾构掘进对桩基的挤压变形消耗在槽中填充的软体材料中,从而达到保护临近桩基的目的,确保桩基安全,解决了硬质岩层中盾构临近施工对建筑物影响问题,更加有效地利用地下空间。

Description

一种盾构穿越硬质岩层对临近桩基影响的控制方法
技术领域
本发明属于地下工程施工技术领域,特别涉及一种盾构穿越硬质岩层对临近桩基影响的控制方法。
背景技术
随着城市基础建设的发展,对地下空间开发的需求也逐渐增长,盾构法隧道施工是一种在底面下暗挖建造隧道的施工方法,具有自动化程度高、不同地质条件适宜性强、对城市居民和建筑物的影响小、在软弱地层中有利于控制地表沦陷、安全性高等优点。
随着地下空间开发强度越来越高,施工环境日益复杂,盾构掘进有时不得不近距离穿过建筑物及其桩基。目前常用的方法是对受盾构施工影响范围内的土体进行注浆加固,采取注浆加固的办法将盾构掘进传来的挤压力进行隔断,从而保护临近的桩基。然而,这种注浆加固的方法不仅施工周期长、成本高,而且往往只是针对软土中的桩基,应用范围窄。对于硬质岩层中的桩基,由于本身硬质岩层具有很高的强度,注浆加固后只是进一步提高了硬质岩层介质的强度,盾构掘进传过来的挤压力会更大,对桩基的影响更大,没有达到注浆加固的预期,反而适得其反。
发明内容
发明目的:本发明的目的是提供一种盾构穿越硬质岩层对临近桩基影响的控制方法。
技术方案:本发明提供的一种盾构穿越硬质岩层对临近桩基影响的控制方法,包括以下步骤:
步骤一,建立盾构掘进有限元数值分析模型,分析在硬质岩层中盾构推力和扭矩作用对临近桩基的影响程度,并作出评价;
步骤二,在桩基临近盾构掘进侧竖向开槽,开槽深度为从桩基顶部至盾构掘进的隧道下方2-3m,在槽中放入测斜管并伸出地面,槽中填充软体材料,槽顶加盖保护;
步骤三,盾构低速掘进,通过测斜管监测桩基水平位移,根据监测数据进行反馈调整盾构掘进速度、推力和扭矩。
其中,步骤(2)中,所述软体材料为粉细砂和陶粒中的一种或两种。
其中,步骤(3)中,盾构掘进速度在10mm/min以内。
有益效果:本发明提供的盾构穿越硬质岩层对临近桩基影响的控制方法工艺简单、操作方便,通过从桩基顶至隧道底下2-3m竖向开槽并填充软体材料,将盾构掘进对桩基的挤压变形消耗在槽中填充的软体材料中,从而达到保护临近桩基的目的,确保桩基安全,解决了硬质岩层中盾构临近施工对建筑物影响问题,更加有效地利用地下空间。
本发明提供的盾构穿越硬质岩层对临近桩基影响的控制方法,旨在解决越来越多的盾构近距离穿越建筑物和地下管线的施工方法,最大限度降低对建筑物影响的问题;在硬质岩层中桩基通常都是端承桩,桩头压力通过桩直接传导至桩端,本发明通过切开桩侧与硬质岩层之间的联系,能够将硬岩传来的压力和变形进行隔断,将传导过来的能量全部消耗在软体材料隔离层上,从而确保硬质岩层中桩基安全。
具体实施方式
根据下述实施例,可以更好地理解本发明。然而,本领域的技术人员容易理解,实施例所描述的具体的物料配比、工艺条件及其结果仅用于说明本发明,而不应当也不会限制权利要求书中所详细描述的本发明。
实施例1
某地铁盾构埋深14.5m,盾构直径6.34m,粉质粘土层、粘土、强风化岩层、中风化岩层组成,地下水位在地表以下2.3m。在紧邻盾构隧道建有一框架结构(地上12层,地下2层),采用钢筋混凝土钻孔灌注桩结构形式,主要依靠端承阻力提供桩基的承载力,桩径1.5m,混凝土等级C40,单桩竖向抗压承载力特征值16000kN,该桩全部进入中风化闪长岩。
利用本发明盾构穿越硬质岩层对临近桩基影响的控制方法进行施工,步骤如下:
步骤一,建立盾构掘进有限元数值分析模型,分析在硬质岩层中盾构推力和扭矩对临近桩基影响,并对影响程度作出评价;
所建立的数值分析模型包含了地基岩层单元、桩基单元、建筑物结构单元和隧道单元等,可以考虑盾构施工过程中相关参数对桩基的影响,如盾构推力、扭矩和掘进速度等施工参数。
经计算分析,没有布设软隔离层之前,桩的最大水平位移1.7mm,最大附加弯矩265kN·m;在桩基临近隧道侧布设0.2m厚的软隔离层后,桩的最大水平位移0.9mm,最大附加弯矩73kN·m。
步骤二,在桩基临近盾构掘进侧竖向开槽,开槽深度为从桩基顶部至盾构掘进的隧道下方2-3m,在槽中放入测斜管并伸出地面,槽中填充软体材料,槽顶加盖保护;软体材料为粉细砂,可选地,软体材料也可以根据需要合理选择,优选地为陶粒、或者粉细砂和陶粒的混合物;
步骤三,盾构速度控制在10mm/min以内低速掘进,通过测斜管监测桩基水平位移,根据监测数据降低盾构掘进速度、推力和扭矩,从而减少了对临近桩基的影响;
监测数据表明:桩侧向最大水平位移为0.5mm,该框架结构没有出现墙体裂缝,盾构近距离穿越基本上没有对建筑物造成影响。

Claims (3)

1.一种盾构穿越硬质岩层对临近桩基影响的控制方法,其特征在于:包括以下步骤:
步骤一,建立盾构掘进有限元数值分析模型,分析在硬质岩层中盾构推力和扭矩作用对临近桩基的影响程度,并作出评价;
步骤二,在桩基临近盾构掘进侧竖向开槽,开槽深度为从桩基顶部至盾构掘进的隧道下方2-3m,在槽中放入测斜管并伸出地面,槽中填充软体材料,槽顶加盖保护;步骤三,盾构低速掘进,通过测斜管监测桩基水平位移,根据监测数据进行反馈调整盾构掘进速度、推力和扭矩。
2.根据权利要求1所述的一种盾构穿越硬质岩层对临近桩基影响的控制方法,其特征在于:所述软体材料为粉细砂和陶粒中的一种或两种。
3.根据权利要求1所述的一种盾构穿越硬质岩层对临近桩基影响的控制方法,其特征在于:盾构掘进速度在10mm/min以内。
CN201310227360.0A 2013-06-07 2013-06-07 一种盾构穿越硬质岩层对临近桩基影响的控制方法 Active CN103334763B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310227360.0A CN103334763B (zh) 2013-06-07 2013-06-07 一种盾构穿越硬质岩层对临近桩基影响的控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310227360.0A CN103334763B (zh) 2013-06-07 2013-06-07 一种盾构穿越硬质岩层对临近桩基影响的控制方法

Publications (2)

Publication Number Publication Date
CN103334763A true CN103334763A (zh) 2013-10-02
CN103334763B CN103334763B (zh) 2015-07-29

Family

ID=49242966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310227360.0A Active CN103334763B (zh) 2013-06-07 2013-06-07 一种盾构穿越硬质岩层对临近桩基影响的控制方法

Country Status (1)

Country Link
CN (1) CN103334763B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510962A (zh) * 2013-10-22 2014-01-15 北京交通大学 一种软土地层盾构穿越建筑物的分阶段变形控制方法
CN104120677A (zh) * 2014-07-04 2014-10-29 河海大学 考虑盾构穿越影响的堤防边坡二维安全稳定性分析方法
CN111411971A (zh) * 2020-03-25 2020-07-14 中铁三局集团有限公司 一种富水粉砂地层盾构下穿建筑物群沉降控制施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136692A (ja) * 1998-10-30 2000-05-16 Kumagai Gumi Co Ltd 地下鉄道用トンネルの築造方法
CN101126319A (zh) * 2007-10-09 2008-02-20 中铁二局股份有限公司 盾构隧道侧向穿越桩基施工方法
CN101598023A (zh) * 2009-07-16 2009-12-09 上海交通大学 临近侧面有地下结构时的盾构隧道轴线的控制方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136692A (ja) * 1998-10-30 2000-05-16 Kumagai Gumi Co Ltd 地下鉄道用トンネルの築造方法
CN101126319A (zh) * 2007-10-09 2008-02-20 中铁二局股份有限公司 盾构隧道侧向穿越桩基施工方法
CN101598023A (zh) * 2009-07-16 2009-12-09 上海交通大学 临近侧面有地下结构时的盾构隧道轴线的控制方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
伊萍,贾富贵,候昭光: "软土地区桥梁桩基位移监测与性状分析", 《公路与汽运》, no. 154, 31 January 2013 (2013-01-31), pages 157 - 160 *
李明阳,杨海涛,邹高明: "复合地层土压平衡盾构掘进参数模拟分析研究", 《隧道建设》, vol. 32, no. 3, 30 June 2012 (2012-06-30) *
袁大军,伊凡,王华伟,黄清飞,肖衡: "超大直径泥水盾构掘进对土体的扰动研究", 《岩石力学与工程学报》, vol. 28, no. 10, 31 October 2009 (2009-10-31) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510962A (zh) * 2013-10-22 2014-01-15 北京交通大学 一种软土地层盾构穿越建筑物的分阶段变形控制方法
CN103510962B (zh) * 2013-10-22 2016-01-20 北京交通大学 一种软土地层盾构穿越建筑物的分阶段变形控制方法
CN104120677A (zh) * 2014-07-04 2014-10-29 河海大学 考虑盾构穿越影响的堤防边坡二维安全稳定性分析方法
CN104120677B (zh) * 2014-07-04 2016-01-06 河海大学 考虑盾构穿越影响的堤防边坡二维安全稳定性分析方法
CN111411971A (zh) * 2020-03-25 2020-07-14 中铁三局集团有限公司 一种富水粉砂地层盾构下穿建筑物群沉降控制施工方法
CN111411971B (zh) * 2020-03-25 2021-12-14 中铁三局集团有限公司 一种富水粉砂地层盾构下穿建筑物群沉降控制施工方法

Also Published As

Publication number Publication date
CN103334763B (zh) 2015-07-29

Similar Documents

Publication Publication Date Title
Wang et al. Analysis of ground surface settlement induced by the construction of a large-diameter shallow-buried twin-tunnel in soft ground
CN203308470U (zh) 一种适用于大断面偏压隧道洞口段的套拱结构型式
Fan et al. Case study of the effect of rainfall infiltration on a tunnel underlying the roadbed slope with weak inter-layer
CN103530522B (zh) 软土地层盾构穿越建筑物的风险分级控制方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
Sun et al. Analysis of deformation mechanism of landslide in complex geological conditions
Zhang et al. Displacement characteristics of an urban tunnel in silty soil by the shallow tunnelling method
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN103321233B (zh) 滑坡深层排水及滑坡体内地下水资源回收装置的制作方法
Li et al. Mechanism of water inrush driven by grouting and control measures—a case study of Chensilou mine, China
CN104329093A (zh) 一种盾构区间隧道组段划分方法
CN103334763B (zh) 一种盾构穿越硬质岩层对临近桩基影响的控制方法
CN203463016U (zh) 一种适用于穿透圆砾层土质的三轴搅拌机钻头
CN108071110A (zh) 复杂地质条件下旋挖钻机嵌岩桩施工方法
CN102966109A (zh) 软土地基带状深基坑封底施工方法
CN106812147B (zh) 一种砂卵石地层保泉回灌井施工方法
CN103437774A (zh) 一种盾构掘进的加工方法
CN103437712B (zh) 一种适用于穿透圆砾层土质的三轴搅拌机钻头
CN206873466U (zh) 一种用于平硐明槽段防护结构
CN110284924A (zh) 综放工作面沿空留巷多层位充填体承载结构及支护方法
Zhou et al. Design of enclosure for subway station foundation pit in southward extension line of Chengdu metro line one
CN114993248A (zh) 地面沉降监测方法
CN204877485U (zh) 基岩隆起区盾构换刀原位加固结构
Wu et al. Field studies of a technique to mitigate ground settlement of operating highways
Bao et al. Integrated treatment technology of storage-mining inclined goaf under expressway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HEHAI UNIV.

Free format text: FORMER OWNER: SOWTHEAST UNIV.

Effective date: 20140507

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 211189 NANJING, JIANGSU PROVINCE TO: 211106 NANJING, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140507

Address after: 211106 Jiangsu City, Jiangning Province Development Zone, West Road, No. 8 Buddha

Applicant after: Hohai University

Address before: Four pailou Nanjing Xuanwu District of Jiangsu Province, No. 2 211189

Applicant before: Southeast University

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200630

Address after: 062550 Renqiu Industrial Park, Cangzhou, Hebei

Patentee after: Renqiu Huabei Oilfield jinkailong petroleum additives Co.,Ltd.

Address before: 211106 No. 8 West Buddha Road, Jiangning Development Zone, Jiangsu, Nanjing, China

Patentee before: HOHAI University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210119

Address after: 211106 No.8, Fucheng West Road, Jiangning Development Zone, Nanjing City, Jiangsu Province

Patentee after: HOHAI University

Address before: 062550 Dazheng Industrial Zone, Renqiu City, Cangzhou City, Hebei Province

Patentee before: Renqiu Huabei Oilfield jinkailong petroleum additives Co.,Ltd.

TR01 Transfer of patent right
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20131002

Assignee: China Railway (Shanghai) Investment Group Co.,Ltd.

Assignor: HOHAI University

Contract record no.: X2021320000016

Denomination of invention: A control method for influence of shield tunneling through hard rock on adjacent pile foundation

Granted publication date: 20150729

License type: Common License

Record date: 20210121