CN103321405A - Large-formwork lifting-type construction method for shear wall or cylinder concrete structure - Google Patents

Large-formwork lifting-type construction method for shear wall or cylinder concrete structure Download PDF

Info

Publication number
CN103321405A
CN103321405A CN2013102518627A CN201310251862A CN103321405A CN 103321405 A CN103321405 A CN 103321405A CN 2013102518627 A CN2013102518627 A CN 2013102518627A CN 201310251862 A CN201310251862 A CN 201310251862A CN 103321405 A CN103321405 A CN 103321405A
Authority
CN
China
Prior art keywords
operating platform
concrete
formwork
built
large form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102518627A
Other languages
Chinese (zh)
Other versions
CN103321405B (en
Inventor
陈明宝
刘祖国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201310251862.7A priority Critical patent/CN103321405B/en
Publication of CN103321405A publication Critical patent/CN103321405A/en
Application granted granted Critical
Publication of CN103321405B publication Critical patent/CN103321405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a large-formwork lifting-type construction method for a shear wall or cylinder concrete structure. A formwork system is allowed to replace a traditional plywood by a specialized large formwork. Meanwhile, a poured concrete wall is adopted as a support point, operation platforms are arranged and lifted by a tower crane, so that construction on a shear wall or a cylinder concrete wall is completed. The large-formwork lifting-type construction method is characterized by including mounting the tower crane, producing the large formwork and an upper-portion operation platform, mounting a pre-embedded member, pouring and maintaining concrete, disassembling the large formwork and a supporting system thereof, producing a middle operation platform and a lower-portion operation platform, mounting steel bars on the middle operation platform, moving the cleaned large formwork, mounting the formwork on the middle operation platform at a new position, straightening the device, and pouring concrete on the upper-portion operation platform at a new position. The large-formwork lifting-type construction method has the advantages of convenience and practicality, labor hours are saved, and cost is lowered.

Description

Shear wall, cylindrical shell concrete structure large form lift-type job practices
Technical field
The present invention relates to technical field of building construction, relate in particular to shear wall, cylindrical shell concrete structure large form lift-type job practices.
Background technology
Along with building is more and more higher, shear wall and cylindrical shell concrete structure are more and more, and the domestic traditional job practices of shear wall and cylindrical shell concrete is to set up two steel pipe scaffolds that efflux around building, concrete wall adopts veneer formwork, tower crane vertical transport.This job practices exists artificial amount large owing to need to set up two exterior scaffolds, and the tower crane utilization ratio is low, the shortcoming that the veneer waste is serious.
Summary of the invention
Purpose of the present invention is exactly the deficiency that exists for prior art, shear wall, cylindrical shell concrete structure large form lift-type job practices are provided, template system is changed into the large form of customization by traditional veneer, simultaneously, with concreting wall as the strong point, setting operation platform, and promoted by tower crane, thus the construction of shear wall, cylindrical shell concrete wall finished.
The object of the present invention is achieved like this: shear wall, cylindrical shell concrete structure large form lift-type job practices is characterized in that: carry out according to the following steps:
1, arrange the installation tower crane, its radius can cover whole building.
2, making the large form panel with the thick veneer of 18mm, highly is floor height, and width is 6m, makes vertical back cord with 50 * 100mm lumps of wood, and the 8# channel-section steel is made horizontal back cord, reinforces with split bolt.The steel tripod of width 0.9m is set on large form top, lays plank, railing above the steel tripod, be configured for the upper operating platform of concrete construction to be built.
3, built-in fitting is installed, wait build the concrete wall reinforcement installation complete after, in concrete wall to be built, install and be used for the built-in fitting that next step installs middle part operating platform and bottom operating platform.
4, build and curing concrete, reach some strength after, remove large form and support system thereof, and winch to cleaning on the newly placed concrete flooring, trimming with tower crane.Wherein, the panel of large form and support system thereof, vertical back cord, laterally back cord, and the steel tripod in the upper operating platform, plank, railing all promote together.
5, middle part operating platform and the bottom operating platform on the pouring concrete, preparation method is with the top operating platform, namely lay plank, railing at the steel tripod, with tower crane movable lifting middle part and bottom operating platform, with former treat two built-in fittings burying underground in the pouring concrete reinstall respectively fix in the middle part of and the bottom operating platform.
6, the middle part operating platform of constructor on reposition installed reinforcing bar.
7, move the good large form of cleaning and support system thereof to concreting position next time with tower crane.
8, constructor's installation form and machine straightening device on the middle part operating platform on the reposition, concreting on the upper operating platform on the reposition.
According to this circulation is until finish the concrete construction of wall.
Compared with prior art, advantage of the present invention is: not only simple and practical, and save man-hour, and reduce cost.
Description of drawings
Fig. 1: shear wall, cylindrical shell concrete structure large form lift-type construction profile.
Among the figure: 1, split bolt 2, concrete to be built 3, built-in fitting 4, concreting 5, steel tripod 6, railing 7, plank 8, panel 9, vertical back cord 10, laterally back cord 11, middle part operating platform 12, machine straightening device 13, bottom operating platform.
The specific embodiment
For further describing the present invention, the invention will be further described below in conjunction with embodiment and accompanying drawing.
As shown in the figure, shear wall, cylindrical shell concrete structure large form lift-type job practices is characterized in that: carry out according to the following steps:
1, arrange the installation tower crane, its radius can cover whole building.
2, making large form panel 8 with the thick veneer of 18mm, highly is floor height, and width is 6m, makes vertical back cord 9 with 50 * 100mm lumps of wood, and the 8# channel-section steel is made horizontal back cord 10, reinforces with split bolt 1.The steel tripod 5 of width 0.9m is set on large form top, lays plank 7, railing 6 above the steel tripod 5, be configured for the upper operating platform of concrete 2 constructions to be built.
3, built-in fitting is installed
Wait build concrete 2 wall reinforcement installation complete after, in concrete 2 walls to be built, install to be used for the built-in fitting 3 that next step installs middle part operating platform 11 and bottom operating platform 13.
4, build and curing concrete, reach some strength after, remove large form and support system thereof, and winch to cleaning on newly placed concrete 2 floorings, trimming with tower crane.Wherein, the panel 8 of large form and support system thereof, vertical back cord 9, laterally back cord 10, and the steel tripod 5 in the upper operating platform, plank 7, railing 6 all promote together.
5, middle part operating platform 11 and the bottom operating platform 13 on the pouring concrete 4, preparation method is with the top operating platform, namely lay plank 7, railing 6 at steel tripod 5, with tower crane movable lifting middle part and bottom operating platform 11,13, with former treat two built-in fittings 3 burying underground in the pouring concrete 2 reinstall respectively fix in the middle part of 11 and bottom operating platform 13.
6, the middle part operating platform 11 of constructor on reposition installed reinforcing bar.
7, move the good large form of cleaning and support system thereof to concreting position next time with tower crane.
8, constructor's installation form and machine straightening device 12 on the middle part operating platform 11 on the reposition, concreting on the upper operating platform on the reposition.
According to this circulation is until finish the concrete construction of wall.

Claims (1)

1. shear wall, cylindrical shell concrete structure large form lift-type job practices is characterized in that: carry out according to the following steps:
1). arrange tower crane is installed, its radius can cover whole building;
2). making large form panel (8) with the thick veneer of 18mm, highly is floor height, and width is 6m, makes vertical back cord (9) with 50 * 100mm lumps of wood, and the 8# channel-section steel is made horizontal back cord (10), reinforces with split bolt (1); The steel tripod (5) of width 0.9m is set on large form top, lays plank (7), railing (6) above the steel tripod (5), be configured for the upper operating platform of concrete construction to be built;
3). built-in fitting (3) is installed, wait build concrete (2) wall reinforcement installation complete after, in concrete to be built (2) wall, install and be used for the built-in fitting (3) that next step installs middle part operating platform (11) and bottom operating platform (13);
4). build and curing concrete, reach some strength after, remove large form and support system thereof, and winch to cleaning on newly placed concrete (2) flooring, trimming with tower crane; Wherein, the panel of large form and support system thereof (8), vertical back cord (9), laterally back cord (10), and the steel tripod (5) in the upper operating platform, plank (7), railing (6) all promote together;
5). the middle part operating platform (11) on the pouring concrete (4) and bottom operating platform (13), preparation method is with the top operating platform, namely lay plank (7), railing (6) at steel tripod (5), with tower crane movable lifting middle part (11) and bottom operating platform (13), with former treat two built-in fittings (3) of burying underground in the pouring concrete (2) reinstall respectively fix in the middle part of (11) and bottom operating platform (13);
6). the middle part operating platform (11) of constructor on reposition installed reinforcing bar;
7). move the good large form of cleaning and support system thereof to concreting position next time with tower crane;
8). the upper installation form of the middle part operating platform (11) of constructor on reposition and machine straightening device (12), concreting on the upper operating platform on the reposition; According to this circulation is until finish the concrete construction of wall.
CN201310251862.7A 2013-06-24 2013-06-24 Shear wall, cylindrical shell concrete structure large form lift-type construction method Active CN103321405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310251862.7A CN103321405B (en) 2013-06-24 2013-06-24 Shear wall, cylindrical shell concrete structure large form lift-type construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310251862.7A CN103321405B (en) 2013-06-24 2013-06-24 Shear wall, cylindrical shell concrete structure large form lift-type construction method

Publications (2)

Publication Number Publication Date
CN103321405A true CN103321405A (en) 2013-09-25
CN103321405B CN103321405B (en) 2015-11-04

Family

ID=49190427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310251862.7A Active CN103321405B (en) 2013-06-24 2013-06-24 Shear wall, cylindrical shell concrete structure large form lift-type construction method

Country Status (1)

Country Link
CN (1) CN103321405B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869153A (en) * 2019-02-26 2019-06-11 中铁十局集团第一工程有限公司 The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN110965756A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Integrated operation platform for cast-in-situ shear wall and construction method thereof
CN111188489A (en) * 2019-12-31 2020-05-22 广西建工集团第五建筑工程有限责任公司 External frame-free safety protection structure of fabricated building and construction method thereof
CN114687467A (en) * 2022-02-18 2022-07-01 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall
CN114687467B (en) * 2022-02-18 2024-04-26 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2653044Y (en) * 2003-09-02 2004-11-03 江都市庆华机械制造厂 Formwork lifting device for building wall
KR100862737B1 (en) * 2008-04-23 2008-10-10 이정학 Cage apparatus of gang form system for a building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2653044Y (en) * 2003-09-02 2004-11-03 江都市庆华机械制造厂 Formwork lifting device for building wall
KR100862737B1 (en) * 2008-04-23 2008-10-10 이정학 Cage apparatus of gang form system for a building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
建筑施工手册(第5版)编委会: "《建筑施工手册(第5版)第2册》", 31 March 2013, article "《建筑施工手册(第5版)第2册》", pages: 934-936 - 13-72 *
沈振武: "《西门子大厦液压滑模板、整体外爬架设计与施工》", 《中国学位论文全文数据库》, 15 January 2009 (2009-01-15) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869153A (en) * 2019-02-26 2019-06-11 中铁十局集团第一工程有限公司 The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN110965756A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Integrated operation platform for cast-in-situ shear wall and construction method thereof
CN111188489A (en) * 2019-12-31 2020-05-22 广西建工集团第五建筑工程有限责任公司 External frame-free safety protection structure of fabricated building and construction method thereof
CN114687467A (en) * 2022-02-18 2022-07-01 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall
CN114687467B (en) * 2022-02-18 2024-04-26 洛阳城市建设勘察设计院有限公司 Vertical connection pouring method and correction support tool for assembled prefabricated shear wall

Also Published As

Publication number Publication date
CN103321405B (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN109339220B (en) Assembled integral stairwell and production and construction method thereof
CN201649633U (en) Steel formwork for forming building stair treads
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN104746435A (en) Wide-angle Y-shaped pier column construction method
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN103104091B (en) Sliding mold whole lifting platform and construction method
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN201962944U (en) Hydraulic climbing formwork for building construction
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
CN106638947A (en) Prefabricated frame structure and cascaded prefabrication construction method thereof
CN105908965A (en) Assembly type concrete wall board, assembly type building and assembly method
CN202990391U (en) Multifunctional template supporting frame
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN203394027U (en) Semi-assembled construction system for frame-shear wall tube structure
CN202324606U (en) U-shaped force bearing seat
CN104389432A (en) Integral lifting equipment of steel truss-supported concrete house roof system and construction method
CN205348761U (en) Basement does not have reinforced structure of no basic lift of installation on back board
CN103321405A (en) Large-formwork lifting-type construction method for shear wall or cylinder concrete structure
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN103255866A (en) Manufacturing method of roof circular arc-shaped dome structure
CN207032468U (en) Assembled architecture
CN109629714A (en) A kind of prefabricated partition wall of the staircase with installation base and its installation method
KR101140884B1 (en) Gangform device constructed for wall and constructing method this using

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant