CN103306214A - 一种钢筋混凝土梁与楼板的新型加固装置及其施工方法 - Google Patents

一种钢筋混凝土梁与楼板的新型加固装置及其施工方法 Download PDF

Info

Publication number
CN103306214A
CN103306214A CN2013102005575A CN201310200557A CN103306214A CN 103306214 A CN103306214 A CN 103306214A CN 2013102005575 A CN2013102005575 A CN 2013102005575A CN 201310200557 A CN201310200557 A CN 201310200557A CN 103306214 A CN103306214 A CN 103306214A
Authority
CN
China
Prior art keywords
reinforced concrete
concrete beam
mentioned
floor
bolt part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102005575A
Other languages
English (en)
Other versions
CN103306214B (zh
Inventor
黄群贤
郭子雄
陈建华
陈昆明
洪毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian No1 Road Engineering Co Ltd
Huaqiao University
Original Assignee
Fujian No1 Road Engineering Co Ltd
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian No1 Road Engineering Co Ltd, Huaqiao University filed Critical Fujian No1 Road Engineering Co Ltd
Priority to CN201310200557.5A priority Critical patent/CN103306214B/zh
Priority to CN201510232321.9A priority patent/CN104847129B/zh
Publication of CN103306214A publication Critical patent/CN103306214A/zh
Application granted granted Critical
Publication of CN103306214B publication Critical patent/CN103306214B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提出一种钢筋混凝土梁与楼板的新型加固装置,包括由下向上紧箍钢筋混凝土梁的U形的钢箍部,和两个穿过楼板分别与钢箍部的两端固定连接在一起的螺栓部,此螺栓部的螺母拧紧于螺栓部处于楼板上方的部分。采用上述技术方案后,本发明的钢筋混凝土梁与楼板的新型加固装置,由于其通过钢箍部和螺栓部的配合连接将钢筋混凝土梁与楼板预紧锁固在一起,与现有技术相比,其可有效避免传统加固装置的应力滞后效应产生,保持锚固的有效性,可有效保证加固效果,提高钢筋混凝土梁的抗剪强度,结构简单易于实现,且外观紧凑美观,综合实用性强;本发明还提出一种上述新型加固装置的施工方法,步骤简洁清晰,可有效提高实施所述新型加固装置的效率。

Description

一种钢筋混凝土梁与楼板的新型加固装置及其施工方法
技术领域
本发明涉及建筑加固技术领域,具体涉及一种钢筋混凝土梁与楼板的新型加固装置及其施工方法。
背景技术
在工程结构中,往往由于建筑物老化、使用功能变更、结构设计或施工失误、设防标准提高等因素,需对既有建筑物进行加固。钢筋混凝土梁的抗剪加固是建筑物加固的一项重要内容。钢筋混凝土梁抗剪加固方法很多,常用的加固方法有增大截面法、粘贴纤维增强复合材料加固法、粘钢加固法和钢绞线聚合物砂浆加固法等。这些传统加固方法普遍存以下问题:(1)应力滞后效应问题,使得加固材料与原有构件共同工作能力较差,大大影响加固效果。(2)由于楼板的存在,往往造成加固材料锚固长度不够,容易发生锚固端的剥离破坏。(3)传统加固方法不能改变原结构的受力状况,构件内存在的裂缝等内部损伤和缺陷不能弥合或减小,如果不施加预应力,加固材料就无法对既有裂缝发挥作用,大大影响其加固效果,制约了其在损伤构件中加固的使用。
鉴于此,本案发明人对上述问题进行深入研究,遂有本案产生。
发明内容
本发明的目的在于提供一种可有效避免传统加固装置的应力滞后效应产生,保持锚固的有效性的钢筋混凝土梁与楼板的新型加固装置,加固效果好,结构简单易于实现,且外观紧凑美观。
本发明的另一目的在于提供一种上述钢筋混凝土梁与楼板的新型加固装置的施工方法,步骤简洁清晰,实施效率高。
为了达到上述目的,本发明采用这样的技术方案:
一种钢筋混凝土梁与楼板的新型加固装置,包括由下向上紧箍钢筋混凝土梁的U形的钢箍部,和两个穿过楼板分别与钢箍部的两端固定连接在一起的螺栓部,此螺栓部的螺母拧紧于螺栓部处于楼板上方的部分。
上述螺栓部对应上述螺母设有处于螺母与楼板之间相对于螺母面积较大的垫片。
上述钢箍部为宽度沿钢筋混凝土梁长度方向的钢板。
上述钢箍部与上述螺栓部具有连接部,此连接部在水平方向的各向尺寸均大于等于所述钢箍部和所述螺栓部的横截面的各向尺寸,所述连接部分别与所述钢箍部和所述螺栓部焊接在一起。
上述钢箍部的弯折处为平滑弧形。
上述钢箍部在其弯折处对应钢筋混凝土梁设有匹配垫于二者之间相对于弯折处面积较大的钢垫板。
上述钢箍部的竖向部分设有检测此处应力的应力检测装置。
上述应力检测装置为贴设于上述钢箍部上的电阻应变计。
一种钢筋混凝土梁与楼板的新型加固装置的施工方法:
(1)去除钢筋混凝土梁要加固处的粉刷层和楼板相应处的装修层;
(2)确定楼板供螺栓部穿过的孔的位置、钢筋混凝土梁对应上述钢箍部弯折处的位置以及钢筋混凝土梁对应上述连接部的位置;
(3)在楼板上确定的上述孔的位置进行钻孔,在上述钢筋混凝土梁上确定的对应上述钢箍部弯折处的位置进行与此弯折处相匹配的倒角处理,并在此倒角处衬垫上述钢垫板,在钢筋混凝土梁上确定的对应上述连接部的位置敲凿出与此连接部相应的凹坑;
(4)将焊接好的上述钢箍部和上述螺栓部对应上述孔由下向上箍住钢筋混凝土梁,在楼板上方将上述垫片套设在露出的所述螺栓部上,然后用螺母拧紧进行预应力施加安装。
采用上述技术方案后,本发明的钢筋混凝土梁与楼板的新型加固装置,由于其通过钢箍部和螺栓部的配合连接将钢筋混凝土梁与楼板预紧锁固在一起,与现有技术相比,其可有效避免传统加固装置的应力滞后效应产生,保持锚固的有效性,可有效保证加固效果,提高钢筋混凝土梁的抗剪强度,结构简单易于实现,且外观紧凑美观,综合实用性强;
本发明还提出一种上述新型加固装置的施工方法,步骤简洁清晰,可有效提高实施所述新型加固装置的效率。
附图说明
图1为本发明的结构示意图;
图2为本发明的使用状态示意图;
图3为本发明另一角度的使用状态示意图。
图中:
1-钢箍部          11-弯折处
12-钢垫板
2-螺栓部          21-螺母
22-垫片
3-连接部
4-应力监测装置    5-钢筋混凝土梁
6-楼板
具体实施方式
为了进一步解释本发明的技术方案,下面通过具体实施例进行详细阐述。
本发明的一种钢筋混凝土梁与楼板的新型加固装置,如图1-3所示,包括钢箍部1和两个螺栓部2。
钢箍部1呈U形,由下向上紧箍钢筋混凝土梁5,两个螺栓部2穿过楼板6并分别与钢箍部1的两端固定连接在一起,螺栓部2的螺母21拧紧于螺栓部2露出于楼板6上方的部分,通过旋紧螺栓部2实现钢箍部1预应力的张拉,对钢筋混凝土梁5施加横向预应力,且将钢筋混凝土梁5与楼板6牢牢紧箍在一起,实现对钢筋混凝土梁5的抗剪加固。
优选地,螺栓部2对应螺母21设有处于螺母21与楼板6之间并相对于螺母21面积较大的垫片22,垫片22可有效降低螺母21对楼板6的预紧力压强,增强楼板6及整个结构的承载强度。
优选地,钢箍部1为宽度沿钢筋混凝土梁5长度方向的钢板,此结构可增强钢箍部1对钢筋混凝土梁5的紧箍效果。
优选地,钢箍部1与螺栓部2具有连接部3,此连接部3在水平方向的各向尺寸均大于等于钢箍部1和螺栓部2的横截面的各向尺寸,连接部3分别与钢箍部1和螺栓部2焊接在一起,即连接部3与钢箍部1和螺栓部2焊接的面积不小于钢箍部1和螺栓部2各自的横截面积,可有效利用钢箍部1和螺栓部2的横向尺寸,尽可能增大焊接面积,以提高连接的可靠性。
优选地,钢箍部1的弯折处11为平滑弧形,以避免此弯折处11应力集中,提高其承载强度。
优选地,钢箍部1在其弯折处11对应钢筋混凝土梁5设有匹配垫于二者之间并相对于弯折处11面积较大的钢垫板12,钢垫板12可有效降低弯折处11对钢筋混凝土梁5的预紧力压强,增强钢筋混凝土梁5及整个结构的承载强度。
优选地,钢箍部1的竖向部分设有检测此处应力的应力检测装置4,可使人们对钢箍部1的预紧应力水平进行监测,便于更好地进行预紧操作的控制。
优选地,应力检测装置4为贴设于钢箍部1上的电阻应变计。
本发明还提出根据前述各实施例中的钢筋混凝土梁与楼板的新型加固装置的施工方法:
(1)去除钢筋混凝土梁5要加固处的粉刷层和楼板6相应处的装修层;
(2)确定楼板6供螺栓部2穿过的孔的位置、钢筋混凝土梁5对应弯折处11的位置以及钢筋混凝土梁5对应连接部3的位置;
(3)在楼板6上确定的上述孔的位置进行钻孔,在钢筋混凝土梁5上确定的对应弯折处11的位置进行与此弯折处11相匹配的倒角处理,并在此倒角处衬垫钢垫板12,在钢筋混凝土梁5上确定的对应连接部3的位置敲凿出与此连接部3形状和尺寸等相应的凹坑;
(4)将焊接好的钢箍部1和螺栓部2对应上述孔由下向上箍住钢筋混凝土梁5,并在弯折处11与钢筋混凝土梁5的倒角处之间垫设钢垫板12,在楼板6上方将垫片22套设在露出的螺栓部2上,然后用螺母21拧紧进行预应力施加安装安装。
本发明的钢筋混凝土梁与楼板的新型加固装置及其施工方法,应力监测装置有选为电阻应变计,也可根据实际要求选取其它形式;刚垫片在保证面积大于钢箍部的弯折处且与钢筋混凝土梁的倒角相应的情况下,其具体形状和尺寸等可根据实际要求进行调整和设计;钢箍部的弯折处的具体形状可根据实际要求进行调整和设计;连接部的具体尺寸和形状等可根据实际要求进行调整和设计;钢箍部优选为钢板,也可根据实际要求进行选取;垫片在保证面积大于螺母面积的情况下,其具体形状和尺寸等可根据实际要求进行调整和设计。
本发明的产品形式并非限于本案图示和实施例,任何人对其进行类似思路的适当变化或修饰,皆应视为不脱离本发明的专利范畴。

Claims (10)

1.一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:包括由下向上紧箍钢筋混凝土梁的U形的钢箍部,和两个穿过楼板分别与钢箍部的两端固定连接在一起的螺栓部,此螺栓部的螺母拧紧于螺栓部处于楼板上方的部分。
2.根据权利要求1所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述螺栓部对应上述螺母设有处于螺母与楼板之间相对于螺母面积较大的垫片。
3.根据权利要求1或2所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部为宽度沿钢筋混凝土梁长度方向的钢板。
4.根据权利要求3所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部与上述螺栓部具有连接部,此连接部在水平方向的各向尺寸均大于等于所述钢箍部和所述螺栓部的横截面的各向尺寸,所述连接部分别与所述钢箍部和所述螺栓部焊接在一起。
5.根据权利要求3所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部的弯折处为平滑弧形。
6.根据权利要求1、2或4所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部的弯折处为平滑弧形。
7.根据权利要求6所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部在其弯折处对应钢筋混凝土梁设有匹配垫于二者之间相对于弯折处面积较大的钢垫板。
8.根据权利要求1、2、4、5或7所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述钢箍部的竖向部分设有检测此处应力的应力检测装置。
9.根据权利要求8所述的一种钢筋混凝土梁与楼板的新型加固装置,其特征在于:上述应力检测装置为贴设于上述钢箍部上的电阻应变计。
10.一种根据权利要求1-9中任一项所述的一种钢筋混凝土梁与楼板的新型加固装置的施工方法,其特征在于:
(1)去除钢筋混凝土梁要加固处的粉刷层和楼板相应处的装修层;
(2)确定楼板供螺栓部穿过的孔的位置、钢筋混凝土梁对应上述钢箍部弯折处的位置以及钢筋混凝土梁对应上述连接部的位置;
(3)在楼板上确定的上述孔的位置进行钻孔,在上述钢筋混凝土梁上确定的对应上述钢箍部弯折处的位置进行与此弯折处相匹配的倒角处理,并在此倒角处衬垫上述钢垫板,在钢筋混凝土梁上确定的对应上述连接部的位置敲凿出与此连接部相应的凹坑;
(4)将焊接好的上述钢箍部和上述螺栓部对应上述孔由下向上箍住钢筋混凝土梁,在楼板上方将上述垫片套设在露出的所述螺栓部上,然后用螺母拧紧进行预应力施加安装。
CN201310200557.5A 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置 Expired - Fee Related CN103306214B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310200557.5A CN103306214B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置
CN201510232321.9A CN104847129B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310200557.5A CN103306214B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201510232321.9A Division CN104847129B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置的施工方法

Publications (2)

Publication Number Publication Date
CN103306214A true CN103306214A (zh) 2013-09-18
CN103306214B CN103306214B (zh) 2015-11-04

Family

ID=49131901

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310200557.5A Expired - Fee Related CN103306214B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置
CN201510232321.9A Expired - Fee Related CN104847129B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置的施工方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510232321.9A Expired - Fee Related CN104847129B (zh) 2013-05-27 2013-05-27 一种钢筋混凝土梁与楼板的加固装置的施工方法

Country Status (1)

Country Link
CN (2) CN103306214B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672688A (zh) * 2016-02-16 2016-06-15 福州大学 一种续接木结构的预应力增强装置及其施工方法
CN106320189A (zh) * 2016-08-30 2017-01-11 中铁四局集团第四工程有限公司 一种铁路既有线t梁的横向加固施工方法
CN107816218A (zh) * 2017-10-28 2018-03-20 温州威泰建设有限公司 一种混凝土梁与板材的加固装置及其施工方法
CN108343259A (zh) * 2018-02-06 2018-07-31 广东省基础工程集团有限公司 一种预应力加固梁及其施工方法
CN109653533A (zh) * 2019-02-13 2019-04-19 程勇俊 一种混凝土楼板加固施工方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937307A (zh) * 2016-06-07 2016-09-14 江西赣粤高速公路股份有限公司 一种预应力钢丝绳弯剪加固混凝土t梁及其加固方法
CN108894123A (zh) * 2018-09-04 2018-11-27 南京林业大学 一种预应力u型筋快速抗剪加固箱梁结构及方法
CN110593600B (zh) * 2019-10-15 2023-12-22 广东省建筑工程集团有限公司 既有建筑的梁板加固施工方法
CN111305468B (zh) * 2020-03-05 2021-08-31 深圳市第一建筑工程有限公司 一种超强钢筋混凝土梁
CN114753669B (zh) * 2022-04-27 2023-04-21 华中科技大学 一种组合式frp抗剪加固装置及其应用

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4613378A (en) * 1984-11-08 1986-09-23 Lawrence Christy Method of restoring marble and brick surfaces
FR2594871A1 (fr) * 1986-02-25 1987-08-28 Sika Sa Procede permettant de renforcer des structures ou elements de structure, notamment en beton, beton arme, beton precontraint a l'aide d'armatures souples, dispositif de mise en place des armatures, et armatures mises en oeuvre dans ledit procede
CN101570961A (zh) * 2009-05-08 2009-11-04 北京市市政专业设计院有限责任公司 一种对桥梁断裂主梁的加固方法
CN201747077U (zh) * 2010-08-19 2011-02-16 朱奎 一种有裂缝混凝土梁的加固构造
CN202831669U (zh) * 2012-08-13 2013-03-27 黄智辉 钢筋混凝土套加固梁
CN203257121U (zh) * 2013-05-27 2013-10-30 华侨大学 一种钢筋混凝土梁与楼板的新型加固装置

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032530A (ja) * 1999-07-16 2001-02-06 Mitsui Constr Co Ltd コンクリート柱状構造体の補強方法および補強装置
CN2809064Y (zh) * 2005-08-03 2006-08-23 华侨大学 矩形截面混凝土柱加固的预应力钢板箍
JP5308012B2 (ja) * 2007-11-30 2013-10-09 大成建設株式会社 壁付き柱部材の補強構造
CN201588411U (zh) * 2009-12-10 2010-09-22 华侨大学 钢筋混凝土梁柱节点的加固装置
CN101956465A (zh) * 2010-09-06 2011-01-26 华侨大学 提高石结构房屋抗震性能的加固方法
CN202073326U (zh) * 2011-05-23 2011-12-14 国核电力规划设计研究院重庆有限公司 钢筋混凝土梁加固构件
CN102518315B (zh) * 2011-12-02 2015-12-09 北京工业大学 多高层框架空间节点核芯区pc钢棒加固装置
CN202745359U (zh) * 2012-08-06 2013-02-20 中建三局建设工程股份有限公司 悬挑架固定钢梁的u型钢筋螺栓拉环系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4613378A (en) * 1984-11-08 1986-09-23 Lawrence Christy Method of restoring marble and brick surfaces
FR2594871A1 (fr) * 1986-02-25 1987-08-28 Sika Sa Procede permettant de renforcer des structures ou elements de structure, notamment en beton, beton arme, beton precontraint a l'aide d'armatures souples, dispositif de mise en place des armatures, et armatures mises en oeuvre dans ledit procede
CN101570961A (zh) * 2009-05-08 2009-11-04 北京市市政专业设计院有限责任公司 一种对桥梁断裂主梁的加固方法
CN201747077U (zh) * 2010-08-19 2011-02-16 朱奎 一种有裂缝混凝土梁的加固构造
CN202831669U (zh) * 2012-08-13 2013-03-27 黄智辉 钢筋混凝土套加固梁
CN203257121U (zh) * 2013-05-27 2013-10-30 华侨大学 一种钢筋混凝土梁与楼板的新型加固装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672688A (zh) * 2016-02-16 2016-06-15 福州大学 一种续接木结构的预应力增强装置及其施工方法
CN105672688B (zh) * 2016-02-16 2017-12-08 福州大学 一种续接木结构的预应力增强装置及其施工方法
CN106320189A (zh) * 2016-08-30 2017-01-11 中铁四局集团第四工程有限公司 一种铁路既有线t梁的横向加固施工方法
CN107816218A (zh) * 2017-10-28 2018-03-20 温州威泰建设有限公司 一种混凝土梁与板材的加固装置及其施工方法
CN107816218B (zh) * 2017-10-28 2019-11-12 温州威泰建设有限公司 一种混凝土梁与板材的加固装置及其施工方法
CN108343259A (zh) * 2018-02-06 2018-07-31 广东省基础工程集团有限公司 一种预应力加固梁及其施工方法
CN109653533A (zh) * 2019-02-13 2019-04-19 程勇俊 一种混凝土楼板加固施工方法

Also Published As

Publication number Publication date
CN104847129B (zh) 2016-10-05
CN104847129A (zh) 2015-08-19
CN103306214B (zh) 2015-11-04

Similar Documents

Publication Publication Date Title
CN103306214A (zh) 一种钢筋混凝土梁与楼板的新型加固装置及其施工方法
CN102086677A (zh) 预制钢筋砼梁及钢筋砼柱与梁连接节点
CN109113189B (zh) 一种腹板带耗能件的自复位圆钢管混凝土框架梁柱节点
CN102900242A (zh) 一种钢桁架部分约束钢筋混凝土梁加固结构
WO2010021428A1 (en) Opening steel composite girder and method for manufacturing the same
CN104499608B (zh) 预应力型钢加固剪力墙的设计与施工方法
CN103485287B (zh) 混凝土框架箱涵施工中的预应力应用方法
CN110924552A (zh) 一种预制双钢板混凝土组合耗能连梁
CN203257121U (zh) 一种钢筋混凝土梁与楼板的新型加固装置
CN103306216A (zh) 一种钢筋混凝土桥梁与桥面板的新型加固装置及其施工方法
KR102403925B1 (ko) 가설교량 및 이의 시공방법
CN103306215A (zh) 一种钢筋混凝土桥墩的新型加固装置及其施工方法
CN109972499A (zh) 一种中小跨度简支公路桥梁中间无缝伸缩结构及施工方法
CN212773146U (zh) 采用栓钉、环氧砂浆以及螺栓连接的组合梁
CN103614975A (zh) 针对失效后的装配式空心板梁铰缝的剪力键加固方法
CN103437493B (zh) 预制钢筋混凝土梁的连接节点及施工方法
CN203440993U (zh) 预制钢筋混凝土梁的连接节点
CN105951574B (zh) 连续组合梁桥的施工方法
CN105040726A (zh) 一种用于对风机基础连接施加环向预应力的方法
CN207537863U (zh) 一种组合梁预应力施加连接结构
CN203320428U (zh) 一种钢筋混凝土桥梁与桥面板的新型加固装置
CN105672688B (zh) 一种续接木结构的预应力增强装置及其施工方法
CN102605964B (zh) 电梯井道口散装式铁栅及其施工方法
CN113700153A (zh) 装配式叠合板与组合梁的连接结构及其施工方法
CN208803704U (zh) 一种盖梁模板结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151104

CF01 Termination of patent right due to non-payment of annual fee