CN103291310B - 水封洞库的主洞室与竖井连接处存在不良地质的处理方法 - Google Patents

水封洞库的主洞室与竖井连接处存在不良地质的处理方法 Download PDF

Info

Publication number
CN103291310B
CN103291310B CN201310268306.0A CN201310268306A CN103291310B CN 103291310 B CN103291310 B CN 103291310B CN 201310268306 A CN201310268306 A CN 201310268306A CN 103291310 B CN103291310 B CN 103291310B
Authority
CN
China
Prior art keywords
connection hole
main cavern
lower connection
vertical shaft
described upper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310268306.0A
Other languages
English (en)
Other versions
CN103291310A (zh
Inventor
陈海锋
郭得福
翟飞飞
洪开荣
师传志
魏征
王闯
周正华
辛国平
陈建国
胡宝生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN201310268306.0A priority Critical patent/CN103291310B/zh
Publication of CN103291310A publication Critical patent/CN103291310A/zh
Application granted granted Critical
Publication of CN103291310B publication Critical patent/CN103291310B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种水封洞库的主洞室与竖井连接处存在不良地质的处理方法,在主洞室与竖井连接处的不良地质段沿上下方向间隔设置有上连接洞和下连接洞,所述上连接洞、下连接洞的一端分别与主洞室连通,所述上连接洞、下连接洞的另一端分别与竖井连通,且所述上连接洞的顶部高程与主洞室的顶部高程一致,所述下连接洞的底部高程与主洞室的底部高程一致。本发明由于上、下连接洞的断面较小,相比主洞室的断面来说,对围岩的稳定性影响较小,在开挖过程中不易出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。

Description

水封洞库的主洞室与竖井连接处存在不良地质的处理方法
技术领域
本发明属于地下工程施工技术,具体涉及一种水封洞库的主洞室与竖井连接处存在不良地质的处理方法。
背景技术
地下水封洞库是将石油炼化过程中产生的产品选择异地重新注入地下空间的一种储存方式。地下水封洞库具有占地少、投资小、损耗少、运营管理费用低、安全性能高、污染小、装卸速度快、存储量大、应急能力强、使用寿命长等优点,成为目前国际上石油、天然气等能源的主要储备方式。地下水封洞库一般选择在坚硬、完整性好的块状岩体区,并具有弱透水性区域修建,但在实际操作过程中,局部岩体会出现不良地质情况。若按照常规的主洞室大断面开挖,因围岩破碎,自稳能力较差,极易发生坍塌,使施工难度增大、支护强度高,特别是在水封洞库的主洞室与竖井的连接处。因此,有必要针对上述情况开发一种适用于水封洞库的主洞室与竖井连接处存在不良地质结构面的处理方法。
发明内容
本发明的目的是提供一种水封洞库的主洞室与竖井连接处存在不良地质的处理方法,以降低施工难度,并能减少施工成本。
为了达到上述目的,本发明提供的一种主洞室与竖井连接处存在不良地质结构面的处理方法,在主洞室与竖井连接处的不良地质段沿上下方向间隔设置有上连接洞和下连接洞,所述上连接洞、下连接洞的一端分别与主洞室连通,所述上连接洞、下连接洞的另一端分别与竖井连通,且所述上连接洞的顶部高程与主洞室的顶部高程一致,所述下连接洞的底部高程与主洞室的底部高程一致。
所述上连接洞和下连接洞的轴线与主洞室的轴线平行。
所述上连接洞和下连接洞的断面宽度均为6~9m,所述上连接洞和下连接洞的断面高度均为6~9m。该断面尺寸能满足凿岩台车钻孔爆破的要求,也能满足装载机与自卸汽车并行装渣的要求,同时还满足在顶部挂一根直径在2m以内的通风管的要求。
所述上连接洞和下连接洞的断面宽度均为7m,所述上连接洞、下连接洞的断面高度均为7m。
本发明的有益效果:采用上、下连接洞穿过该不良地质段,由于上、下连接洞的断面较小,相比大断面的主洞室来说,对围岩的稳定性影响更小,避免了在开挖过程中出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。且上连接洞的顶部高程与主洞室的顶部高程一致,能够确保运营期主洞室内的气相平衡;同时,下连接洞的底部高程与主洞室的底部高程一致,也能够确保运营期主洞室内的液相平衡。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体说明:
如图1所示的水封洞库的主洞室与竖井连接处存在不良地质的处理方法,在主洞室1与竖井3连接处的不良地质段沿上下方向间隔设置有上连接洞4和下连接洞2,所述上连接洞4、下连接洞2的一端分别与主洞室1连通,所述上连接洞4、下连接洞2的另一端分别与竖井3连通,由于上连接洞4、下连接洞2的断面较小,相比大断面的主洞室1来说,对围岩的稳定性影响较小,避免了在开挖过程中出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。为了确保运营期主洞室1内的气相平衡,所述上连接洞4的顶部高程与主洞室1的顶部高程一致,为了确保运营期主洞室1内的液相平衡,所述下连接洞2的底部高程与主洞室1的底部高程一致。
所述上连接洞4和下连接洞2的断面宽度均为6~9m,所述上连接洞4和下连接洞2的断面高度均为6~9m。优选为,上连接洞4和下连接洞2的断面高度均为7m,上连接洞4和下连接洞2的断面宽度均为7m,该断面尺寸满足凿岩台车钻孔爆破的要求,也能满足装载机与自卸汽车并行装渣的要求,同时满足顶部挂一趟直径2m以内的通风管的要求。
最好是,上连接洞4和下连接洞2的轴线与主洞室1的轴线平行,以便于施工。但是,也可以根据围岩的地质情况、岩层走向等因素将上连接洞4、下连接洞2的平面布局设计为曲线或折线,但要确保上连接洞4和下连接洞2以较短的距离穿过不良地质段。

Claims (4)

1.一种水封洞库的主洞室与竖井连接处存在不良地质的处理方法,其特征在于:在主洞室(1)与竖井(3)连接处的不良地质段沿上下方向间隔设置有上连接洞(4)和下连接洞(2),所述上连接洞(4)、下连接洞(2)的一端分别与主洞室(1)连通,上连接洞(4)、下连接洞(2)的另一端分别与竖井(3)连通,且所述上连接洞(4)的顶部高程与主洞室(1)的顶部高程一致,所述下连接洞(2)的底部高程与主洞室(1)的底部高程一致。
2.按照权利要求1所述的水封洞库的主洞室与竖井连接处存在不良地质的处理方法,其特征在于:所述上连接洞(4)和下连接洞(2)的轴线与主洞室(1)的轴线平行。
3.按照权利要求1或2所述的水封洞库的主洞室与竖井连接处存在不良地质的处理方法,其特征在于:所述上连接洞(4)和下连接洞(2)的断面宽度均为6~9m,所述上连接洞(4)和下连接洞(2)的断面高度均为6~9m。
4.按照权利要求3所述的水封洞库的主洞室与竖井连接处存在不良地质的处理方法,其特征在于:所述上连接洞(4)和下连接洞(2)的断面宽度均为7m,所述上连接洞(4)和下连接洞(2)的断面高度均为7m。
CN201310268306.0A 2013-06-28 2013-06-28 水封洞库的主洞室与竖井连接处存在不良地质的处理方法 Active CN103291310B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310268306.0A CN103291310B (zh) 2013-06-28 2013-06-28 水封洞库的主洞室与竖井连接处存在不良地质的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310268306.0A CN103291310B (zh) 2013-06-28 2013-06-28 水封洞库的主洞室与竖井连接处存在不良地质的处理方法

Publications (2)

Publication Number Publication Date
CN103291310A CN103291310A (zh) 2013-09-11
CN103291310B true CN103291310B (zh) 2015-08-19

Family

ID=49092772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310268306.0A Active CN103291310B (zh) 2013-06-28 2013-06-28 水封洞库的主洞室与竖井连接处存在不良地质的处理方法

Country Status (1)

Country Link
CN (1) CN103291310B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612725B (zh) * 2014-12-26 2016-10-19 中铁二局工程有限公司 一种地下洞库中层换装施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2268693Y (zh) * 1994-07-12 1997-11-26 潞安矿务局 水封式储油装置
JP3956278B2 (ja) * 2001-11-19 2007-08-08 清水建設株式会社 水封式地下岩盤内圧力貯蔵構造
JP4374528B2 (ja) * 2004-01-08 2009-12-02 清水建設株式会社 地下式低温タンク施設およびそれに適用する地盤凍結防止方法
US20130000760A1 (en) * 2011-06-29 2013-01-03 Ti Group Automotive Systems, L.L.C. Fluid distribution system and components thereof
CN103121566B (zh) * 2011-11-18 2015-05-13 中国石油化工集团公司 一种用于地下水封石洞油库的洞罐氮气置换方法

Also Published As

Publication number Publication date
CN103291310A (zh) 2013-09-11

Similar Documents

Publication Publication Date Title
CN103075157B (zh) 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法
CN103883304B (zh) 一种构建气化炉通道的地下煤炭气化方法
AU2015377024A1 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
CN103510958B (zh) 一种缓倾斜特厚煤层石门揭煤方法
CA2986062A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103726858A (zh) 地下大型洞库工程球柱组合体开挖方法
CN102852367A (zh) 置于地下安全隐蔽的大容量油库
CN102748064A (zh) 一种大采高综放工作面瓦斯治理方法
CN102926753B (zh) 一种人工冻结采场顶板深孔崩矿嗣后充填采矿法
CN103291310B (zh) 水封洞库的主洞室与竖井连接处存在不良地质的处理方法
Gu et al. Research and application of hydraulic punching pressure relief antireflection mechanism in deep “Three-Soft” outburst coal seam
CN103291311B (zh) 不良地质结构面横向贯穿水封洞库主洞室的处理方法
CN103291309B (zh) 水封洞库主洞室轴线一侧存在不良地质体的处理方法
He Considerations on CO 2 storage in abandoned coal mines in China
CN102777205A (zh) 一种确定水平井在采空区瓦斯抽放的空间位置的方法
CN201198666Y (zh) 超低温液化天然气地下储气库
CN102493805A (zh) 高瓦斯矿井高效井筒揭煤方法
Fryanov et al. Prospects for application of robotic mechano-hydraulical excavation of gas-bearing coal layers at great depths
CN109598029A (zh) 一种应用于高瓦斯煤巷co2高压气体致裂的设计方法
CN105041315B (zh) 一种露天转地下挂帮矿采动岩移控制方法
CN204126665U (zh) 智能型瓦斯治理压裂泵组
CN103410514A (zh) 深部受压矿体卸压回采方法
Onal Stability analyses of differently shaped salt caverns for underground natural gas storage
Gavrilov et al. Influence of hydrodynamic impact on degassing of steep coal seam at the top of the overhead longwall
Yang et al. Study on Optimization of Gas Drainage Methods in High-burst Mines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant