CN103075157B - 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法 - Google Patents

缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法 Download PDF

Info

Publication number
CN103075157B
CN103075157B CN201310052481.6A CN201310052481A CN103075157B CN 103075157 B CN103075157 B CN 103075157B CN 201310052481 A CN201310052481 A CN 201310052481A CN 103075157 B CN103075157 B CN 103075157B
Authority
CN
China
Prior art keywords
ore
stope
back production
cutting
bench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310052481.6A
Other languages
English (en)
Other versions
CN103075157A (zh
Inventor
周科平
雷涛
杨念哥
邓红卫
吕国新
江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Tin Group (holding) Co Ltd
Central South University
Original Assignee
Yunnan Tin Group (holding) Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Tin Group (holding) Co Ltd, Central South University filed Critical Yunnan Tin Group (holding) Co Ltd
Priority to CN201310052481.6A priority Critical patent/CN103075157B/zh
Publication of CN103075157A publication Critical patent/CN103075157A/zh
Application granted granted Critical
Publication of CN103075157B publication Critical patent/CN103075157B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明涉及缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法。将每个采场在宽度方向上划分为两个回采单元,在采场宽度和高度方向上均按梯段式进行回采;在矿体下盘围岩中布置中段运输平巷,在间柱内布置出矿巷道并通过溜井和出矿进路与中段运输平巷和采场连通;在矿体上盘围岩与矿体交界处布置充填巷道和切顶进路;回采时切顶护顶并钻向下孔爆破落矿;将崩落矿石送到溜井经中段运输平巷送出;出矿后废石通过送入充填矿房并与矿石分离。本发明适用于顶底板围岩不稳固的缓倾斜中厚矿体的地下开采,具有采准工艺简单、采切比小、爆破块度均匀、回采工艺连续性好、矿石贫损指标优的特点。

Description

缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法
技术领域
本发明属于金属矿山地下开采领域,是一种地下采矿方法,适用于缓倾斜中厚及厚矿体的开采,尤其适用于顶、底板稳固性较差的缓倾斜中厚及厚矿体的开采。
背景技术
在金属矿山地下开采中,对于缓倾斜中厚及厚矿体,目前以“空场采矿法”开采为主,也有少部分矿山采用“分层充填法”。
“空场采矿法”中,常用的方法包括“有底部结构的分段空场法”、“全面法”和“房柱法”等。这些方法存在的问题是采切工程量大,采场建设周期长,回采工艺复杂,采装运设备水平低,生产效率不高,矿石损失、贫化大等。同时,对于一些顶、底板围岩稳固性较差的矿体,这类方法还面临两个难题:一是由于对顶板未加处理,难以保证顶板的稳定性,从而对生产安全带来威胁;二是由于底板围岩破碎,在底板围岩中不能形成稳固的底部结构,出矿困难,导致大量的矿石残留,带来较大的矿石损失。
对于顶、底板稳定性较差的问题,分层充填法可以加以解决,但是分层充填法的工艺非常复杂,生产效率极其低下且充填成本较高影响企业的经济效益,不利于大规模的开采。
因此,如何对这类顶板或底板稳固性较差的缓倾斜中厚及厚矿体进行安全、高效、低成本的开采是目前面临的一个技术难题。
发明内容
本发明所要解决的技术问题是对一类顶、底板稳固性较差的缓倾斜中厚及厚矿体提供一种安全、高效、低成本的超前切顶无底部结构梯段落矿连续采矿法。
为了解决上述技术问题,本发明的技术方案是:将采场按矿体走向布置,每个采场在宽度方向上划分为两个回采单元,在采场宽度和高度方向上均按梯段式进行回采;在矿体下盘围岩中布置中段运输平巷,在间柱内布置出矿巷道,出矿巷道分别通过溜井和出矿进路与中段运输平巷和采场连通;在矿体上盘围岩与矿体交界处布置充填巷道和切顶进路;回采时首先进行全面超前切顶护顶,然后在切顶层钻凿向下的平行中深孔进行爆破落矿;铲运机通过出矿进路进入采场将崩落矿石经出矿巷道运送到采场溜井,矿石经溜井通过中段运输平巷送出:出矿完成后即进行废石回填工作,废石通过井下矿用汽车或铲运机通过充填巷道送入充填矿房并与矿石分离。
采场按每个采场宽度30~50m布置,采场厚度为矿体厚度,在出矿巷道中每隔90~110m左右布置一个连接中段运输平巷的溜井,在出矿巷道中每隔10~15m布置连通采场的出矿进路,在采场长度方向的中心线上矿体上盘围岩与矿体交界处布置充填巷道和切顶进路。
回采时,首先在矿体上部边界采用进行浅孔爆破的方式进行全面超前切顶,切顶层高度为3~4m,在已切顶的顶板围岩中打入护顶锚杆来保证顶板的稳固,切顶应回收顶板矿石。
回采时应先在采场的端部做切割立槽,切割立槽的高度为矿体厚度,宽度以3~5m;然后以切割立槽为自由面,将采场按划分好的回采单元在采场宽度和高度方向上均以梯段爆破的形式进行回采;崩矿时钻凿的中深孔超深约0.9~1m,崩矿步距5~10m。
切顶作业采用凿岩台车进行,护顶作业可采用锚杆台车进行;在回采时矿体厚度方向将每个回采单元布置为2个阶梯,每个阶梯的高度相等,在15~25m。
废石回填时采用矿用汽车或铲运机,矿房回填步距滞后回采25~35m。
本发明的有益效果是:通过超前切顶护顶,可有效保障采场顶板的稳定性,为凿岩和出矿工作提供安全的作业空间;通过超前切顶,可摸清采场顶板的稳定性和矿体品位的变化情况,对选择在采场顶板质量差和矿石品位低的部位布置矿柱有利;采场内回采单元在宽度和高度方向上均按梯段推进,可为生产爆破提供更多的自由面,并能保证各回采工序间的连续进行;在切顶层凿下向平行中深孔进行回采,作业效率高、矿石爆破块度好;在安全顶板下采用铲运机平底出矿,出矿效率高,且避免了工序复杂、耗费时间长和费用高的底部结构作业;将废石回填采场,在处理采矿区保证生产安全的同时,也实现了无废开采。
综上所述,本发明具有采准工艺简单、采切比小、爆破块度均匀、回采工艺连续性好、矿石贫损指标优的特点,是一种安全、高效、低成本的针对顶、底板围岩不稳固的缓倾斜中厚到厚矿体的地下采矿方法。
附图说明
图1为本发明采矿方法的主视图(俯视)。
图2为本发明采矿方法的Ⅰ-Ⅰ剖面图。
图3为本发明采矿方法的Ⅱ-Ⅱ剖面图。
图中:1—中段运输平巷,2—出矿巷道,3—出矿进路,4—矿体,5—中深孔,6—切顶层,7—切顶进路,8—护顶锚杆,9—充填巷道,10—联络道,11—充填废石,12—溜井,13—崩落矿石,14—炮孔超深段,15—回采单元Ⅰ,16—回采单元Ⅱ,17—间柱。
具体实施方式
实施例:下面根据附图并结合具体实施方式对本发明作进一步说明,本实例仅作为个例对本发明技术方案进行解释,不对保护范围限制。
(1)由图所示,将采场按矿体走向布置,每个采场的宽度30~50m之间;采场长度不固定,根据顶板稳定性和矿体品位变化情况布置矿柱来确定;采场厚度为矿体厚度。每个采场在宽度方向上划分为两个回采单元Ⅰ15和回采单元Ⅱ16,回采单元工作面之间按阶梯状布置。在实例中,厚度方向将每个回采单元布置为2个阶梯,每个阶梯的高度相等,可在15~25m之间。
(2)在矿体下盘围岩中布置中段运输平巷1,在间柱17内布置出矿巷道2,在出矿巷道2中每隔100m左右布置一个连接中段运输平巷1的溜井12,同时在出矿巷道2中每隔10~15m布置连通采场的出矿进路3。在采场长度方向的中心线上矿体上盘围岩与矿体交界处布置充填巷道10和切顶进路7。
(3)首先用凿岩台车形成切顶层6,切顶层高度为3~4m,在已切顶的顶板围岩中打入护顶锚杆8以保证顶板的稳固性。切顶采用凿岩台车以全面超前切顶的方式进行浅孔爆破进行。切顶过程中应充分回收顶板矿石,以避免资源浪费。
(4)回采时先在采场的端部做切割立槽,切割立槽的高度为矿体厚度,宽度以3~5m为宜。
(5)以切割立槽为自由面,将采场按划分好的回采单元在采场宽度和高度方向上均以梯段爆破的形式进行回采;崩矿是从切顶层内钻凿向下的平行中深孔5爆破实施,中深孔5超深约1m左右,崩矿步距5~10m。
(6)出矿时,采用铲运机通过出矿进路3进入采场将崩落矿石13经出矿巷道2运送到采场溜井12,矿石经溜井12即可通过中段运输平巷1送出。
(7)出矿完成后即进行废石回填作业,废石通过井下矿用汽车或铲运机,由坑内废石或废石储存井运到充填巷道9,从充填巷道9卸入充填矿房,矿房回填步距滞后回采30m,以保证回填废石不混入采场崩矿矿石内。

Claims (6)

1.一种缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征是:将采场按矿体走向布置,每个采场在宽度方向上划分为两个回采单元,在采场宽度和高度方向上均按梯段式进行回采;在矿体下盘围岩中布置中段运输平巷,在间柱内布置出矿巷道,出矿巷道分别通过溜井和出矿进路与中段运输平巷和采场连通;在矿体上盘围岩与矿体交界处布置充填巷道和切顶进路;回采时首先进行全面超前切顶护顶,然后在切顶层钻凿向下的平行中深孔进行爆破落矿;铲运机通过出矿进路进入采场将崩落矿石经出矿巷道运送到采场溜井,矿石经溜井通过中段运输平巷送出:出矿完成后即进行废石回填工作,废石通过井下矿用汽车或铲运机通过充填巷道送入充填矿房。
2.根据权利要求1所述的缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征在于:采场按每个采场宽度30~50m布置,采场厚度为矿体厚度,在出矿巷道中每隔90~110m布置一个连接中段运输平巷的溜井,在出矿巷道中每隔10~15m布置连通采场的出矿进路,在采场长度方向的中心线上矿体上盘围岩与矿体交界处布置充填巷道和切顶进路。
3.根据权利要求2所述的缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征在于:回采时,首先在矿体上部边界采用凿岩台车进行浅孔爆破的方式进行全面超前切顶,切顶层高度为3~4m,在已切顶的顶板围岩中打入护顶锚杆来保证顶板的稳固,切顶应回收顶板矿石。
4.根据权利要求2所述的缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征在于:回采时应先在采场的端部做切割立槽,切割立槽的高度为矿体厚度,宽度以3~5m;然后以切割立槽为自由面,将采场按划分好的回采单元在采场宽度和高度方向上均以梯段爆破的形式进行回采;崩矿时钻凿的中深孔超深0.9~1m,崩矿步距5~10m。
5.根据权利要求2所述的缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征在于:切顶作业采用凿岩台车进行,护顶作业可采用锚杆台车进行;在回采时矿体厚度方向将每个回采单元布置为2个阶梯,每个阶梯的高度相等,在15~25m。
6.根据权利要求2所述的缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法,其特征在于:废石回填时采用矿用汽车或铲运机,矿房回填步距滞后回采25~35m。
CN201310052481.6A 2013-02-18 2013-02-18 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法 Expired - Fee Related CN103075157B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310052481.6A CN103075157B (zh) 2013-02-18 2013-02-18 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310052481.6A CN103075157B (zh) 2013-02-18 2013-02-18 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法

Publications (2)

Publication Number Publication Date
CN103075157A CN103075157A (zh) 2013-05-01
CN103075157B true CN103075157B (zh) 2014-09-10

Family

ID=48151838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310052481.6A Expired - Fee Related CN103075157B (zh) 2013-02-18 2013-02-18 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法

Country Status (1)

Country Link
CN (1) CN103075157B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590831B (zh) * 2013-11-22 2015-10-07 北京科技大学 一种缓倾斜薄-中厚矿体的新型采矿方法
CN104088644A (zh) * 2014-06-11 2014-10-08 湖北尧治河化工股份有限公司 一种特别厚大磷矿的开采方法
CN104712337A (zh) * 2015-02-25 2015-06-17 韦立坚 一种采矿方法
CN105370280B (zh) * 2015-11-23 2017-12-29 武汉理工大学 一种地下缓倾斜双层薄玉石矿无损爆破采矿方法
CN105370283B (zh) * 2015-11-23 2018-03-20 武汉理工大学 一种缓倾斜薄层状玉石矿机械预切缝爆破采矿方法
CN105649629B (zh) * 2015-12-28 2017-10-31 金诚信矿业管理股份有限公司 一种适用于中深孔崩矿采场预切顶的方法
CN105626071B (zh) * 2015-12-30 2018-03-20 北京矿冶研究总院 一种缓倾斜薄矿体采矿方法
CN105626074B (zh) * 2016-02-04 2018-04-10 湖北杉树垭矿业科技开发有限公司 一种厚大矿体采矿方法
CN107762511B (zh) * 2017-09-26 2019-06-11 山东科技大学 一种切顶充填临近采空区的类条带式采煤方法
CN111779485A (zh) * 2020-07-01 2020-10-16 长沙矿山研究院有限责任公司 一种组合孔分段空场嗣后充填采矿法
CN111706331B (zh) * 2020-07-07 2022-03-15 酒泉钢铁(集团)有限责任公司 一种井下脉外沿脉巷施工方法
CN114000880A (zh) * 2021-10-14 2022-02-01 中南大学 一种适用于缓倾斜薄矿脉的中深孔落矿机械化分采工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707307A (en) * 1970-12-11 1972-12-26 Harry Kristoffersson Methods in mining by sublevel caving
CN101737053A (zh) * 2009-11-18 2010-06-16 灵宝市金源矿业有限责任公司 适用于缓倾斜厚大矿体的自然崩落采矿法
RU2433267C1 (ru) * 2010-04-07 2011-11-10 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Способ разработки рудных месторождений подэтажным обрушением
CN102434161A (zh) * 2011-12-02 2012-05-02 瓮福(集团)有限责任公司 缓倾斜中厚矿体无阶段沿走向分条连续嗣后充填采矿法
CN102493806A (zh) * 2011-12-01 2012-06-13 中南大学 一种壁式缓倾斜薄矿体机械化连续采矿方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3707307A (en) * 1970-12-11 1972-12-26 Harry Kristoffersson Methods in mining by sublevel caving
CN101737053A (zh) * 2009-11-18 2010-06-16 灵宝市金源矿业有限责任公司 适用于缓倾斜厚大矿体的自然崩落采矿法
RU2433267C1 (ru) * 2010-04-07 2011-11-10 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Способ разработки рудных месторождений подэтажным обрушением
CN102493806A (zh) * 2011-12-01 2012-06-13 中南大学 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN102434161A (zh) * 2011-12-02 2012-05-02 瓮福(集团)有限责任公司 缓倾斜中厚矿体无阶段沿走向分条连续嗣后充填采矿法

Also Published As

Publication number Publication date
CN103075157A (zh) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103075157B (zh) 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法
CN102619513B (zh) 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法
CN101725352B (zh) 一种固体充填综采回收房式煤柱方法
CN100554642C (zh) 一种长壁综采回收房式开采煤柱的方法
CN104481539B (zh) 自拉槽挤压爆破崩落采矿法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN101967973B (zh) 空场—崩落组合采矿方法
CN107829742B (zh) 一种崩落-充填-空场-崩落采矿方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN103527196B (zh) 一种黄土充填回收房式煤柱的方法
CN103590831A (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN105952450B (zh) 一种地下矿山井下双采场协同开采的新方法
CN110029998B (zh) 适用于急倾斜薄中厚矿体的分段凿岩阶段出矿嗣后充填法
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN104481543A (zh) 阶段留矿崩落采矿法
CN103437766B (zh) 一种原地碎裂采矿方法
CN102979526B (zh) 中深孔分段采矿出矿堑沟充填法构筑工艺
CN104358573A (zh) 厚大矿体的阶段空场与阶段崩落联合采矿法
CN107829740A (zh) 一种极薄急倾斜矿体的开采方法
CN101737051A (zh) 一种盲矿体覆盖层形成方法
CN105863727A (zh) 间柱采空区处理方法
CN109026003B (zh) 一种缓倾斜极薄矿脉软岩矿体的螺旋钻采矿机连续采矿法
CN114183143B (zh) 破碎矿岩条件下低品位厚大矿体安全高效的采矿方法
CN110886612A (zh) 一种适合缓倾斜中厚矿体连续开采的采矿方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20220218

CF01 Termination of patent right due to non-payment of annual fee