CN103291311B - 不良地质结构面横向贯穿水封洞库主洞室的处理方法 - Google Patents

不良地质结构面横向贯穿水封洞库主洞室的处理方法 Download PDF

Info

Publication number
CN103291311B
CN103291311B CN201310268417.1A CN201310268417A CN103291311B CN 103291311 B CN103291311 B CN 103291311B CN 201310268417 A CN201310268417 A CN 201310268417A CN 103291311 B CN103291311 B CN 103291311B
Authority
CN
China
Prior art keywords
connection hole
main cavern
cave
lower connection
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310268417.1A
Other languages
English (en)
Other versions
CN103291311A (zh
Inventor
郭得福
陈海锋
翟飞飞
洪开荣
师传志
魏征
王闯
周正华
辛国平
陈建国
胡宝生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN201310268417.1A priority Critical patent/CN103291311B/zh
Publication of CN103291311A publication Critical patent/CN103291311A/zh
Application granted granted Critical
Publication of CN103291311B publication Critical patent/CN103291311B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种不良地质结构面横向贯穿水封洞库主洞室的处理方法,在不良地质段位置处上下间隔设置有贯通该不良地质段的上连接洞(4)和下连接洞(2),通过上连接洞(4)和下连接洞(2)将不良地质段两端的主洞室(1)连通,且所述上连接洞(4)的顶部高程与主洞室(1)的顶部高程一致,所述下连接洞(2)的底部高程与主洞室(1)的底部高程一致。由于上、下连接洞的断面较小,相比主洞室的断面来说,对围岩的稳定性影响较小,在开挖过程中不易出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。

Description

不良地质结构面横向贯穿水封洞库主洞室的处理方法
技术领域
本发明属于地下工程施工技术,具体涉及一种不良地质结构面横向贯穿水封洞库主洞室的处理方法。
背景技术
地下水封洞库是将石油炼化过程中产生的产品选择异地重新注入地下空间的一种储存方式。地下水封洞库具有占地少、投资小、损耗少、运营管理费用低、安全性能高、污染小、装卸速度快、存储量大、应急能力强、使用寿命长等优点,成为目前国际上石油、天然气等能源的主要储备方式。地下水封洞库一般选择在坚硬、完整性好的块状岩体区,并具有弱透水性区域修建,但在实际操作过程中,局部岩体会出现不良地质情况。若按照常规的主洞室大断面开挖,因围岩破碎,自稳能力较差,极易发生坍塌,使施工难度增大、支护强度高,因此,有必要针对上述情况开发一种适用于不良地质结构面横向贯穿水封洞库主洞室的处理方法。
发明内容
本发明的目的是提供一种不良地质结构面横向贯穿水封洞库主洞室的处理方法,以降低施工难度,并能减少施工成本。
为了达到上述目的,本发明提供的一种不良地质结构面横向贯穿水封洞库主洞室的处理方法,在不良地质段位置处上下间隔设置有贯通该不良地质段的上连接洞(4)和下连接洞(2),通过上连接洞(4)和下连接洞(2)将不良地质段两端的主洞室(1)连通,且所述上连接洞(4)的顶部高程与主洞室(1)的顶部高程一致,所述下连接洞(2)的底部高程与主洞室(1)的底部高程一致。
在在所述上连接洞和下连接洞之间的中部台阶的底部设置有贯通所述不良地质段的中连接洞,将不良地质段两端的主洞室连通,以便于后续施工。
所述上连接洞和下连接洞的轴线分别与主洞室的轴线平行,所述上连接洞和下连接洞的断面宽度均为6~9m,所述上连接洞和下连接洞的断面高度均为6~9m。该断面尺寸能满足凿岩台车钻孔爆破的要求,也能满足装载机与自卸汽车并行装渣的要求,同时还满足在顶部挂一根直径在2m以内的通风管的要求。
所述上连接洞和下连接洞的断面宽度均为7m,所述上连接洞和下连接洞的断面高度均为7m。
所述中连接洞的轴线与主洞室的轴线平行,所述中连接洞断面宽度为6~9m,所述中连接洞的断面高度为6~9m。该断面尺寸能满足凿岩台车钻孔爆破的要求,也能满足装载机与自卸汽车并行装渣的要求,同时还满足在顶部挂一根直径在2m以内的通风管的要求。
所述中连接洞断面宽度为7m,所述中连接洞的断面高度为7m。
本发明的有益效果:采用上、下连接洞穿过该不良地质段,由于上、下连接洞的断面较小,相比主洞室的断面来说,对围岩的稳定性影响较小,在开挖过程中不易出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。且上连接洞的顶部高程与主洞室的顶部高程一致,能够确保运营期主洞室内的气相平衡;同时,下连接洞的底部高程与主洞室的底部高程一致,也能够确保运营期主洞室内的液相平衡,并在上连接洞和下连接洞之间设置有贯通所述不良地质段的中连接洞,以便于后续的施工。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体说明:
如图1所示的一种不良地质结构面横向贯穿水封洞库主洞室的处理方法,在不良地质段位置处设置有上连接洞4和下连接洞2,上连接洞4和下连接洞2上下间隔设置,并分别贯通该不良地质段,通过上连接洞4和下连接洞2将不良地质段两端的主洞室1连通。由于上连接洞4、下连接洞2的断面较小,相比主洞室1的断面来说,对围岩的稳定性影响较小,在开挖过程中不易出现坍塌现象,从而大大降低了施工难度,并减少了施工成本。为了确保运营期主洞室1内的气相平衡,上连接洞4的顶部高程与主洞室1的顶部高程一致;为了确保运营期主洞室1内的液相平衡,下连接洞2的底部高程与主洞室1的底部高程一致。
为了便于后续施工,在上连接洞4和下连接洞2之间的中部台阶5的底部设置有贯通不良地质段的中连接洞3,将不良地质段两端的主洞室1连通。
所述上连接洞4、中连接洞3和下连接洞2的断面宽度均为6~9m,所述上连接洞4、中连接洞3和下连接洞2的断面高度均为6~9m。优选为,上连接洞4、中连接洞3和下连接洞2的断面高度均为7m,上连接洞4、中连接洞3和下连接洞2的断面宽度均为7m,该断面尺寸满足凿岩台车钻孔爆破的要求,也能满足装载机与自卸汽车并行装渣的要求,同时满足顶部挂一趟直径2m以内的通风管的要求。
最好是,上连接洞4、中连接洞3和下连接洞2的轴线分别与主洞室1的轴线平行;上连接洞4、中连接洞3和下连接洞2亦可根据围岩的地质情况、岩层走向等因素将上连接洞4、中连接洞3和下连接洞2的平面布局设计为曲线或折线,但要确保上连接洞4、中连接洞3和下连接洞2以较短的距离穿过主洞室1内的不良地质段。

Claims (6)

1.一种不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:在不良地质段位置处上下间隔设置有贯通该不良地质段的上连接洞(4)和下连接洞(2),通过上连接洞(4)和下连接洞(2)将不良地质段两端的主洞室(1)连通,且所述上连接洞(4)的顶部高程与主洞室(1)的顶部高程一致,所述下连接洞(2)的底部高程与主洞室(1)的底部高程一致。
2.按照权利要求1所述的不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:在所述上连接洞(4)和下连接洞(2)之间的中部台阶(5)的底部设置有贯通所述不良地质段的中连接洞(3),将不良地质段两端的主洞室(1)连通。
3.按照权利要求1或2所述的不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:所述上连接洞(4)和下连接洞(2)的轴线分别与主洞室(1)的轴线平行,且所述上连接洞(4)和下连接洞(2)的断面宽度均为6~9m,所述上连接洞(4)和下连接洞(2)的断面高度均为6~9m。
4.按照权利要求3所述的不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:所述上连接洞(4)和下连接洞(2)的断面宽度均为7m,所述上连接洞(4)和下连接洞(2)的断面高度均为7m。
5.按照权利要求2所述的不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:所述中连接洞(3)的轴线与主洞室(1)的轴线平行,且所述中连接洞(3)断面宽度为6~9m,所述中连接洞(3)的断面高度为6~9m。
6.按照权利要求5所述的不良地质结构面横向贯穿水封洞库主洞室的处理方法,其特征在于:所述中连接洞(3)断面宽度为7m,所述中连接洞(3)的断面高度为7m。
CN201310268417.1A 2013-06-28 2013-06-28 不良地质结构面横向贯穿水封洞库主洞室的处理方法 Active CN103291311B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310268417.1A CN103291311B (zh) 2013-06-28 2013-06-28 不良地质结构面横向贯穿水封洞库主洞室的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310268417.1A CN103291311B (zh) 2013-06-28 2013-06-28 不良地质结构面横向贯穿水封洞库主洞室的处理方法

Publications (2)

Publication Number Publication Date
CN103291311A CN103291311A (zh) 2013-09-11
CN103291311B true CN103291311B (zh) 2015-07-08

Family

ID=49092773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310268417.1A Active CN103291311B (zh) 2013-06-28 2013-06-28 不良地质结构面横向贯穿水封洞库主洞室的处理方法

Country Status (1)

Country Link
CN (1) CN103291311B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612725B (zh) * 2014-12-26 2016-10-19 中铁二局工程有限公司 一种地下洞库中层换装施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201121431Y (zh) * 2007-10-24 2008-09-24 曾建军 大容量地下储油库
JP4374528B2 (ja) * 2004-01-08 2009-12-02 清水建設株式会社 地下式低温タンク施設およびそれに適用する地盤凍結防止方法
CN101922155A (zh) * 2010-08-18 2010-12-22 中国海洋石油总公司 一种地下水封洞库选址评价方法
CN103121566A (zh) * 2011-11-18 2013-05-29 中国石油化工集团公司 一种用于地下水封石洞油库的洞罐氮气置换方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4374528B2 (ja) * 2004-01-08 2009-12-02 清水建設株式会社 地下式低温タンク施設およびそれに適用する地盤凍結防止方法
CN201121431Y (zh) * 2007-10-24 2008-09-24 曾建军 大容量地下储油库
CN101922155A (zh) * 2010-08-18 2010-12-22 中国海洋石油总公司 一种地下水封洞库选址评价方法
CN103121566A (zh) * 2011-11-18 2013-05-29 中国石油化工集团公司 一种用于地下水封石洞油库的洞罐氮气置换方法

Also Published As

Publication number Publication date
CN103291311A (zh) 2013-09-11

Similar Documents

Publication Publication Date Title
Kong et al. A sequential approach to control gas for the extraction of multi-gassy coal seams from traditional gas well drainage to mining-induced stress relief
AU2015377024B2 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
CN103902780B (zh) 固体充填采煤地表变形预计方法
Liu et al. The elimination of coal and gas outburst disasters by ultrathin protective seam drilling combined with stress-relief gas drainage in Xinggong coalfield
CN103510958B (zh) 一种缓倾斜特厚煤层石门揭煤方法
CA2986062A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103726858A (zh) 地下大型洞库工程球柱组合体开挖方法
Gu et al. Research and application of hydraulic punching pressure relief antireflection mechanism in deep “Three-Soft” outburst coal seam
CN102926753B (zh) 一种人工冻结采场顶板深孔崩矿嗣后充填采矿法
CN103291311B (zh) 不良地质结构面横向贯穿水封洞库主洞室的处理方法
CN104750940B (zh) 一种地下采场胶结充填体强度动态设计方法
Li et al. Study on the failure characteristics of coal wall spalling in thick coal seam with gangue
CN102777205B (zh) 一种确定水平井在采空区瓦斯抽放的空间位置的方法
CN113804071A (zh) 一种地下矿山中深孔爆破成井技术
US2810263A (en) Cavern storage for natural gas
CN103291310B (zh) 水封洞库的主洞室与竖井连接处存在不良地质的处理方法
CN103291309B (zh) 水封洞库主洞室轴线一侧存在不良地质体的处理方法
He Considerations on CO 2 storage in abandoned coal mines in China
CN106285677A (zh) 超前上向进路扩帮回采分区充填间柱开采方法
CN110675272A (zh) 一种煤炭超大工作面地下开采减损关键参数的确定方法
CN109598029A (zh) 一种应用于高瓦斯煤巷co2高压气体致裂的设计方法
CN105507902A (zh) 煤岩同采工作面分级开采方法
Zhang et al. Ground subsidence prediction model and parameter analysis for underground gas storage in horizontal salt caverns
Yan et al. Ground subsidence evolution from 1000 m deep mining: a case study in Fengfeng mining area
Wang et al. Coal and gas comining in the high-gas detong mine, China: analytical and numerical parameter optimization of gas extraction boreholes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant