Summary of the invention
Main purpose of the present invention is to provide a kind of continuous vacuum evaporation coating device, improves plated film efficient, guarantees the consistence of product rete, prevents that rete from being polluted by foreign gas, obtains the more excellent rete of quality.
The present invention proposes a kind of continuous vacuum evaporation coating device, comprising: coating chamber, work rest and coating materials frame;
Described coating chamber one end is communicated with first transition chamber, and the other end is communicated with second transition chamber;
Be respectively equipped with first track that transmits described work rest and second track that transmits described coating materials frame in described first transition chamber, coating chamber, second transition chamber;
But the described first transition chamber two ends and the second transition chamber two ends are respectively equipped with the push-pull valve that is used for separation gas of switch;
Described first transition chamber, coating chamber, second transition chamber dispose independently air-bleed system respectively.
Preferably, first track of described first transition chamber and first track of coating chamber are isolated by the space that accommodates push-pull valve, and the two prolongation is overlapped; First track of coating chamber and first track of second transition chamber are isolated by the space that accommodates push-pull valve, and the two prolongation is overlapped;
Second track of described first transition chamber and second track of coating chamber are isolated by the space that accommodates push-pull valve, and the two prolongation is overlapped; Second track of coating chamber and second track of second transition chamber are isolated by the space that accommodates push-pull valve, and the two prolongation is overlapped.
Preferably, described first transition chamber comprises: last first transition chamber, following first transition chamber that is communicated with last first transition chamber; Be provided with described first track in last first transition chamber; Be provided with described second track in first transition chamber under described;
Described second transition chamber comprises: last second transition chamber, following second transition chamber that is communicated with last second transition chamber; Be provided with described first track in last second transition chamber; Be provided with described second track in second transition chamber under described.
Preferably, described push-pull valve comprises: go up push-pull valve and lower plugboard valve;
The described last first transition chamber two ends and the last second transition chamber two ends are provided with push-pull valve;
The described first transition chamber two ends down and the following second transition chamber two ends are provided with the lower plugboard valve.
Preferably, described first track comprises: first pulley, and a side of this first pulley is provided with first gear;
Described work rest comprises: work rest body, the top of this work rest body are provided with first slide block adaptive with described first pulley, and this first slide block, one side is provided with first tooth bar with described first gear engagement.
Preferably, described second track comprises: second pulley, and a side of this second pulley is provided with second gear; Described coating materials frame comprises: coating materials frame body, the bottom of this coating materials frame body are provided with second slide block adaptive with described second pulley, and a side of described second slide block is provided with second tooth bar with described second gear engagement.
Preferably, continuous vacuum evaporation coating device also comprises first underframe, pan carriage, and second underframe that is used for the transportation pan carriage; Described first transition chamber, coating chamber and second transition chamber place on described first underframe; The described second underframe two ends connect respectively at the two ends of described first underframe, and the outer surface of cupular part of the two is on the same horizontal plane;
Be respectively arranged with first track and second track on the described pan carriage; When described pan carriage places on second underframe when being provided with the end that an end of first transition chamber is connected with first underframe, first track of described pan carriage and first track of first transition chamber are isolated by the space that accommodates push-pull valve, and the two prolongation is overlapped.
Preferably, continuous vacuum evaporation coating device also comprises:
The vaporizer that is used for the evaporation coating materials;
Be used for the well heater to last first transition chamber, coating chamber;
For the ion bombardment device that base material is cleaned.
Preferably, continuous vacuum evaporation coating device also comprises:
The film thickness monitoring instrument that is used for monitoring base material coating film thickness;
The compound vacuum gauge that is used for the vacuum tightness of monitoring first transition chamber, coating chamber, second transition chamber.
A kind of continuous vacuum evaporation coating device provided by the present invention, described coating chamber one end is communicated with first transition chamber, and the other end is communicated with second transition chamber; Be respectively equipped with first and second track of transmission work rest, coating materials frame in first transition chamber, coating chamber, second transition chamber; The first transition chamber two ends and the second transition chamber two ends are equipped with push-pull valve; First transition chamber, coating chamber, second transition chamber dispose the independently mode of air-bleed system respectively, described device is in service, and except the loading and unloading of work rest and coating materials were adopted manually, other operations were finished automatically by device, improve plated film efficient greatly, guaranteed the consistence of product rete.Can keep high vacuum state in the coating chamber simultaneously, foreign gas is few, can prevent effectively that the coating materials steam from being polluted by foreign gas, thereby can obtain the more excellent rete of quality.
Embodiment
Should be appreciated that specific embodiment described herein only in order to explaining the present invention, and be not used in restriction the present invention.
Referring to Fig. 1, a kind of continuous vacuum evaporation coating device 100 1 embodiment of the present invention are proposed, comprising: coating chamber 110, work rest 120 and coating materials frame 130, described coating chamber 110 1 ends are communicated with first transition chamber 140, and the other end is communicated with second transition chamber 150.Be respectively equipped with first track 160 that transmits described work rest 120 and second track 170 that transmits described coating materials frame 130 in described first transition chamber 140, coating chamber 110, second transition chamber 150.But described first transition chamber, 140 two ends and second transition chamber, 150 two ends are provided with the push-pull valve (Fig. 1 is not shown) that is used for separation gas of switch.Described first transition chamber 140, coating chamber 110, second transition chamber 150 dispose independently air-bleed system respectively.
The device 100 that present embodiment provides in the course of the work, described work rest 120 and coating materials frame 130 transporting directions are first transition chamber, 140 → coating chamber, 110 → the second transition chambers 150.Described coating chamber 110 is for the coating materials on the evaporating film bin 130, realizes the base material in the work rest 120 is carried out the working space of plated film.
Described push-pull valve is used for cutting off or being communicated with first transition chamber 140, coating chamber 110 and second transition chamber 150, makes the conversion of finishing first transition chamber 140 and second transition chamber, 150 atmospheric environments and vacuum environment.Guarantee that coating chamber 110 described in described device 100 working process is in the vacuum environment of the vacuum ranges of setting all the time.
Described first transition chamber 140 is used for making work rest 120 and coating materials frame 130 to be changed to vacuum environment by atmospheric environment.Second transition chamber 150 is used for making work rest 120 and coating materials frame 130 to be changed to atmospheric environment by vacuum environment.
In the present embodiment, described first transition chamber 140 is identical with the air-bleed system of the configuration of second transition chamber 150, dried pump+lobe pump unit (being used for slightly taking out), turbomolecular pump+direct connection sliding vane rotary pump unit (being used for essence takes out) have all been adopted, pump group intermittent type is bled, and finishes the conversion between first transition chamber 140 and second transition chamber, 150 atmospheric environments and the vacuum environment.And the air-bleed system of described coating chamber 110 configurations has adopted turbomolecular pump+direct connection sliding vane rotary pump unit (being used for essence takes out), and the pump group continues to bleed, and makes coating chamber 110 keep high vacuum environment always, the better quality of rete during with the assurance plated film.Because described first transition chamber 140, second transition chamber 150, and the off-gas pump that coating chamber 110 adopts is the oil-sealed rotary pump that does not have oil, can be to first transition chamber 140, second transition chamber 150, and coating chamber 110 causes oil pollution, base material is plated film under the vacuum environment of cleaning, can obtain the higher rete of quality.
Further, referring to Fig. 2, Fig. 3, among above-mentioned continuous vacuum evaporation coating device 100 embodiment, described push-pull valve comprises: the push-pull valve VS40 of the push-pull valve VS30 between the push-pull valve VS20 between the push-pull valve VS10 of the end that first transition chamber 140 is not connected with coating chamber 110, first transition chamber 140 and the coating chamber 110, coating chamber 110 and second transition chamber 150, the end that second transition chamber 150 is not connected with coating chamber 110.First track 160 of wherein said first transition chamber 140 is isolated by the space that accommodates push-pull valve VS20 with first track 160 of coating chamber 110, and the two prolongation is overlapped.First track 160 of coating chamber 110 and first track 160 of second transition chamber 150 are isolated by the space that accommodates push-pull valve VS30, and the two prolongation is overlapped.Second track 170 of described first transition chamber 140 is isolated by the space that accommodates push-pull valve VS20 with second track 170 of coating chamber 110, and the two prolongation is overlapped.Second track 170 of coating chamber 110 and second track 170 of second transition chamber 150 are isolated by the space that accommodates push-pull valve VS30, and the two prolongation is overlapped.First track 160, first track 160 of coating chamber 110, second transition chamber, 150 first tracks 160 that have namely guaranteed described first transition chamber 140 are on the same straight line; Work rest 120 runs on first track 160 of coating chamber 110 on first track 160 by first transition chamber 140 reposefully, on first track 160 of second transition chamber 150 that reruns.Guaranteed that in like manner second track 170 of described first transition chamber 140, second track 170 of coating chamber 110, second track 170 of second transition chamber 150 are on the same straight line, coating materials frame 130 runs on second track 170 of coating chamber 110 on second track 170 by first transition chamber 140 reposefully, on second track 170 of second transition chamber 150 that reruns.
Further, referring to Fig. 1 and Fig. 2, above-mentioned continuous vacuum evaporation coating device 100 embodiment, described first transition chamber 140 comprises: last first transition chamber 141, following first transition chamber 142 that is communicated with last first transition chamber 141; Be provided with described first track 160 in last first transition chamber 141; Be provided with described second track 170 in first transition chamber 142 under described.Described second transition chamber 150 comprises: last second transition chamber 151, following second transition chamber 152 that is communicated with last second transition chamber 151; Be provided with described first track 160 in last second transition chamber 151; Be provided with described second track 170 in second transition chamber 152 under described.
Further, above-mentioned continuous vacuum evaporation coating device 100 embodiment, described push-pull valve comprises push-pull valve and lower plugboard valve, wherein said last first transition chamber, 141 two ends and last second transition chamber 151 two ends are provided with push-pull valve; Described first transition chamber, 142 two ends down and following second transition chamber, 152 two ends are provided with the lower plugboard valve.Referring to Fig. 2 and Fig. 3, the push-pull valve VS40 of the push-pull valve VS30 between the push-pull valve VS20 between the push-pull valve VS10, first transition chamber 140 that described push-pull valve comprises the end that first transition chamber 140 is not connected with coating chamber 110 and the coating chamber 110, coating chamber 110 and second transition chamber 150, the end that second transition chamber 150 is not connected with coating chamber 110.Described VS10 comprises push-pull valve VS11 and lower plugboard valve VS12.Described VS20 comprises push-pull valve VS21 and lower plugboard valve VS22.Described VS30 comprises push-pull valve VS31 and lower plugboard valve VS32.Described VS40 comprises push-pull valve VS41 and lower plugboard valve VS42.110 of described last first transition chamber 141 and 110 of coating chambers, last second transition chamber 151 and coating chambers, and an end, last second transition chamber 151 that last first transition chamber 141 is not communicated with described coating chamber 110 are not respectively arranged with push-pull valve VS11, VS21, VS31, VS41 with the end that described coating chamber 110 is communicated with.Described down first transition chamber 142 and 110 of coating chambers, second transition chamber 152 and 110 of coating chambers down, and the end that is not communicated with described coating chamber 110 of following first transition chamber 142, the end that is not communicated with described coating chamber 110 of second transition chamber 142 is provided with lower plugboard valve VS12, VS22, VS32, VS42 down.
Further, referring to Fig. 4, Fig. 5, Fig. 6, among above-mentioned continuous vacuum evaporation coating device 100 embodiment, described first track 160 comprises: first pulley 161, a side of this first pulley 161 is provided with first gear 162.Described work rest 120 comprises: work rest 120 bodies 121, the top of these work rest 120 bodies 121 are provided with first slide block 122 adaptive with described first pulley 161, and these first slide block, 122 1 sides are provided with first tooth bar 123 with 162 engagements of described first gear.After work rest 120 is mounted on first track 160, described first pulley 161 and first slide block 122 slide adaptive, described first gear 162 and 123 engagements of first tooth bar, described first gear 162 rotates under the driving of motor, first tooth bar 123 drives described work rest 120 and moves along the length direction of first tooth bar 123 along with first gear 162 rotates, thereby reaches the purpose of the described work rest 120 of transportation.
In addition, referring to Fig. 4 and Fig. 6, in the present embodiment, first slide block, the 122 top center positions of described work rest 120 are provided with first revolving gear 124, described first revolving gear 124 is fixed with described work rest 120 bodies, be that described work rest 120 rotates synchronously with first revolving gear 124, be provided with second revolving gear 163 with 124 engagements of described first revolving gear in first track 160 of described coating chamber 110.When beginning that after described work rest 120 is transported to coating chamber 110 desired locations the basis on the work rest 120 carried out plated film, described second revolving gear 163 rotates under the startup of motor, first revolving gear 124 is along with described second revolving gear 163 rotates and rotates, thereby make work rest 120 rotate and rotate along with second revolving gear 163, make plated film even film layer on the base material.
Further, referring to Fig. 7 and Fig. 8, among above-mentioned continuous vacuum evaporation coating device 100 embodiment, described second track 170 comprises: second pulley 171, and a side of this second pulley 171 is provided with second gear 172; Described coating materials frame 130 comprises: coating materials frame 130 bodies 131, the bottom of these coating materials frame 130 bodies 131 is provided with second slide block 132 adaptive with described second pulley 171, and a side of described second slide block 132 is provided with second tooth bar 133 with 172 engagements of described second gear.After coating materials frame 130 is mounted on second track 170, described second pulley 171 and second slide block 132 slide adaptive, described second gear 172 and 133 engagements of second tooth bar, described second gear 172 rotates under the driving of motor, because second tooth bar 133 and 172 engagements of described second gear, therefore described coating materials frame 130 moves along the length direction of second tooth bar 133, thereby reaches the purpose of the described coating materials frame 130 of transportation.
In the present embodiment, what described first gear 162 and second gear 172 adopted is that reducing motor drives, and can change the travelling speed of work rest 120 and coating materials frame 130 by the adjusting motor speed.The connection of the connection of the first adjacent gear 162, the second adjacent gear 172 adopts synchronous band to connect respectively, therefore can guarantee the consistence that all first gears rotate, and the consistence of all second gears rotations.Make work rest 120 and 130 transmissions of coating materials frame smooth and easy, steady.
In addition, in the present embodiment, electromagnetic clutch control is all adopted in the clutch of described first gear 162 and first tooth bar 123 and second gear 172 and second tooth bar 133, thereby makes the gear 162 of winning mesh smooth and easy with first tooth bar 123, second gear 172 and second tooth bar 133.This accuracy of mesh height makes that the operation of work rest 120 and coating materials frame 130 is very steady, can not produce the situation that base material or coating materials drop.
Further, referring to Fig. 1, among above-mentioned continuous vacuum evaporation coating device 100 embodiment, said apparatus 100 also comprises first underframe 101, pan carriage 102, is used for second underframe 103 of transportation pan carriage 102.First transition chamber 140, coating chamber 110 and second transition chamber 150 place on described first underframe 101.Described second underframe 103 two ends are connected with the two ends of described first underframe 101 respectively, and the outer surface of cupular part of the two is on the same horizontal plane.Be respectively arranged with first track 160 and second track 170 on the described pan carriage 102.When described pan carriage 102 places on second underframe 103 when being provided with the end that an end of first transition chamber 140 is connected with first underframe 101, first track 160 of described pan carriage 102 and first track 160 of first transition chamber 140 are isolated by the space that accommodates push-pull valve VS10, and the two prolongation is overlapped.
The device 100 that this enforcement provides needs two described pan carriage 102, one of them is in the end that first transition chamber 140 is not connected coating chamber 110 with mounted work rest 120 and coating materials frame 130, pan carriage 102 meanwhile is transported to coating materials frame 130 on second track 170 of first transition chamber 140 by second track 170 by on first track 160 of first track 160 with work rest 120 transportations first transition chamber 140 then.After the base material plated film on the described work rest 120 was finished, described work rest 120 was transported on first track 160 that enters on another empty pan carriage 102 by first track 160 of second transition chamber 150; Meanwhile described coating materials frame 130 is transported on second track 170 that enters on another empty pan carriage 102 by second track 170 of second transition chamber 150.
Further, among above-mentioned continuous vacuum evaporation coating device 100 embodiment, described device 100 also comprises be used to the vaporizer (scheming not shown) that makes the coating materials evaporation, described vaporizer is resistance-type evaporation source or electron beam evaporation source, if adopt the resistance-type evaporation source, then after described coating materials frame 130 enters coating chamber 110, adopt the electrode communication apparatus of air cylinder driven to the evaporation boat connection circuit of resistance-type evaporation source.Described electron beam evaporation source comprises two kinds of structures: electron beam gun and crucible integral type, electron beam gun and crucible are split type.Then adopt the electron beam evaporation source of electron beam gun and crucible integral type when the little coating materials of plated film amount; The coating materials that the plated film amount is big then adopts the split type electron beam evaporation source of electron beam gun and crucible.
In the present embodiment, described device 100 is that first transition chamber 140, coating chamber 110, second transition chamber 150 dispose compound vacuum gauge (scheming not shown) respectively, is respectively applied to monitor in real time the vacuum tightness of first transition chamber 140, coating chamber 110, second transition chamber 150.
In the present embodiment, described device 100 also disposes well heater (scheming not shown) respectively for last first transition chamber 141, coating chamber 110.The well heater of present embodiment can adopt stainless steel tubulose well heater, and this well heater can be realized the big area homogeneous heating, and working stability, long service life.Wherein, described well heater adopts the control of PID temperature control module, and control accuracy can reach ± and 2.5 ℃.
In the present embodiment, described device 100 also comprises the film thickness monitoring instrument (scheming not shown) for monitoring base material coating film thickness, and described monitor can adopt the quartz crystal probe.Wherein according to the difference of base material plated film thicknesses of layers, the quartz crystal probe can be selected single probe, two probe or many probes (two more than the probe, as six probes) for use.
In the present embodiment, described device 100 comprises that also described ion bombardment device can be ion source for the ion bombardment device that base material is cleaned (scheming not shown).
Below 100 pairs of base material coating process of device of providing by above-described embodiment be that example is further detailed the present invention.Referring to Fig. 2 and Fig. 3,100 pairs of base material coating process of described device are specific as follows:
One, start
Close coating chamber 110 gates, and push-pull valve lower plugboard valve VS21, VS22, VS31, VS32 are closed in the pass.
Open the direct connection sliding vane rotary pump, and unlatching molecular pump foreline valve (FV1-FV7); The molecular pump forvacuum is opened molecular pump after reaching the molecular pump trigger pressure.
Start first transition chamber 140, second transition chamber 150, coating chamber 110 internal heaters, make it to reach respectively design temperature (setting according to coating process).
Dried pumping set starts.
Two, advance frame
Open push-pull valve VS11, lower plugboard valve VS12, close and close push-pull valve VS21, lower plugboard valve VS22, make first transition chamber 141, following first transition chamber 142 be in the atmospheric environment state.
With unit one frame 120 and coating materials frame 130 respectively on left end pan carriage 102 linear running enter last first transition chamber 141, stop first transition chamber 142 down, close and close push-pull valve VS11, lower plugboard valve VS12.
After pan carriage has been carried unit one frame 120 and coating materials frame 130, receive second work rest 120 and coating materials frame 130 from 103 of spill circulations, and holding fix is waited for outside last first transition chamber 141, following first transition chamber 142.
Three, vacuum transition
Control heater is to base material heating on the unit one frame 120 in last first transition chamber 141.
Open the dried pumping set of first transition chamber, 140 correspondences and slightly take out valve RV1, dried pumping set is given last first transition chamber 141, first transition chamber 142 is bled down, makes its vacuum pressure reach set(ting)value and (is generally 10
-1The handkerchief order of magnitude).
Close dried pumping set and slightly take out valve RV1, open the molecular pump essence and take out valve HV1, HV2; Molecular pump is bled to last first transition chamber 141, following first transition chamber 142, makes its vacuum pressure reach set(ting)value and (is generally 10
-3The Pa order of magnitude).
Open push-pull valve VS21 and lower plugboard valve VS22, unit one frame 120 and coating materials frame 130 enter and stop the coating chamber 110 from last first transition chamber 141, following first transition chamber, 142 linear runnings respectively, close and close push-pull valve VS21, lower plugboard valve VS22.
First transition chamber 141 is closed in the pass, the molecular pump essence of first transition chamber, 142 correspondences is taken out valve HV1, HV2 down, opens the purging valve of first transition chamber 141, following first transition chamber 142, and last first transition chamber 141, following first transition chamber 142 are exitted to atmospheric condition.
Open push-pull valve VS11, lower plugboard valve VS12, second work rest 120 and coating materials frame 130 respectively on pan carriage 102 linear running enter last first transition chamber 141, stop first transition chamber 142 down, close and close push-pull valve VS11, lower plugboard valve VS12.After this repeat unit one frame 120 and 130 actions of coating materials frame.
Four, plated film
Second revolving gear, 163 engagements in the unit one frame 120 of arrival coating chamber 110 on first track 160 of first revolving gear 124 and coating chamber 110, open electric motor starting second revolving gear 163 and rotate, work rest 120 beginnings are done spinning motion in coating chamber 110.
Arrive first coating materials frame 130 and location, coating chamber 110 interior evaporation source position of coating chamber 110, wherein the electrode communication apparatus is given evaporation boat connection circuit.
Coating chamber 110 internal ion-sources carry out ion to base material on the work rest 120 and clean, and simultaneously base material are heated.
After base material cleans and finishes, according to the coating process needs, by resistance-type evaporation source or the evaporation of electron beam evaporation source coating materials, realize the base material plated film.
Five, vacuum transition
Close and slightly take out valve RV2, open the molecular pump essence and take out valve HV3, HV4, make second transition chamber 151, following second transition chamber 152 be in the state of vacuumizing; Molecular pump is bled to last second transition chamber 151, following second transition chamber 152, makes its vacuum pressure reach set(ting)value and (is generally 10
-3The Pa order of magnitude).
After plated film finished, unit one frame 120 stopped spinning motion.
Open push-pull valve VS31, lower plugboard valve VS32, unit one frame 120 and coating materials frame 130 enter last second transition chamber 151, stop second transition chamber 152 down from the coating chamber linear running, close and close push-pull valve VS31, lower plugboard valve VS32.
Open push-pull valve VS21, lower plugboard valve VS22, second work rest 120 and coating materials frame 130 close and close push-pull valve VS21, lower plugboard valve VS22 from last first transition chamber 141, first transition chamber, 142 linear runnings enter and stop the coating chamber down.After this repeat unit one frame 120 and 130 actions of coating materials frame.
Six, go out frame
Treat that unit one frame 120 and coating materials frame 130 enter second transition chamber 151, following second transition chamber 152 respectively, close and close push-pull valve VS31, lower plugboard valve VS32 that closure molecule pump essence is taken out valve HV3, HV4 then.
Open the purging valve of second transition chamber 151, following second transition chamber 152, last second transition chamber 151, following second transition chamber 152 are exitted to atmospheric condition.
Open push-pull valve VS41, lower plugboard valve VS42, unit one frame 120 and coating materials frame 130 are respectively from last second transition chamber 151, down second transition chamber, 152 linear runnings close and close push-pull valve VS41, lower plugboard valve VS42 to pan carriage.
Open the dried pumping set of second transition chamber 151, following second transition chamber, 1520 correspondences and slightly take out valve RV2, dried pumping set is given last second transition chamber 151, second transition chamber 152 is bled down, makes vacuum pressure reach set(ting)value and (is generally 10
-1The Pa order of magnitude).
Close dried pumping set and slightly take out valve RV2, open the molecular pump essence and take out valve HV3, HV4; Molecular pump is bled to last second transition chamber 151, following second transition chamber 152, makes vacuum pressure reach set(ting)value and (is generally 10
-3The Pa order of magnitude).
Last second transition chamber 151, down second transition chamber 152 is in high vacuum state, waits for that second work rest 120 and coating materials frame 130 plated films finish.
Seven, frame is walked in circulation
Unit one frame 120 and coating materials frame 130 move on the left end pan carriage 102 from right-hand member pan carriage 102 by the transmission mechanism of pan carriage underframe 103.
On left end pan carriage 102, the workman takes off the work rest 120 that base material has plated, changes a work rest 120 that installs base material to be plated.
On left end pan carriage 102, the workman gives the evaporation boat on the coating materials frame 130 or crucible adds or the replacing coating materials.
Ready work rest 120 and coating materials frame 130 are waited for outside last first transition chamber 141, following first transition chamber 142 and being entered on the left end pan carriage 102.
For guaranteeing that described device 100 can turn round continuously, according to the difference of work tempo, the number of work rest and coating materials frame can be respectively two or more; Quantity=single the work rest of minimum work rest or the configuration of coating materials frame or the circular flow of coating materials frame time ÷ work tempo (being that adjacent two work rests or coating materials frame are by the timed interval of production line same position) once.
Each operation steps in the said apparatus 100 adopts industrial computer control interface by the PLC time variable control, and the user can arrange processing parameter and plated film prescription separately.
As from the foregoing: continuous vacuum evaporation coating device 100 provided by the present invention is in operation, and except the loading and unloading of work rest and coating materials were adopted manually, other operations were finished automatically by device, have improved plated film efficient greatly, have guaranteed the consistence of product rete.Can keep high vacuum state in the coating chamber simultaneously, foreign gas is few, can prevent effectively that the coating materials steam from being polluted by foreign gas, thereby can obtain the more excellent rete of quality.
Should be understood that; below only be the preferred embodiments of the present invention; can not therefore limit claim of the present invention; every equivalent structure or equivalent flow process conversion that utilizes specification sheets of the present invention and accompanying drawing content to do; or directly or indirectly be used in other relevant technical fields, all in like manner be included in the scope of patent protection of the present invention.