CN103286640A - Combined tee joint processing machine - Google Patents

Combined tee joint processing machine Download PDF

Info

Publication number
CN103286640A
CN103286640A CN2013101867071A CN201310186707A CN103286640A CN 103286640 A CN103286640 A CN 103286640A CN 2013101867071 A CN2013101867071 A CN 2013101867071A CN 201310186707 A CN201310186707 A CN 201310186707A CN 103286640 A CN103286640 A CN 103286640A
Authority
CN
China
Prior art keywords
workpiece
processing
transfer device
work
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101867071A
Other languages
Chinese (zh)
Inventor
郝玉民
张蔚萍
Original Assignee
郝皓
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郝皓 filed Critical 郝皓
Priority to CN2013101867071A priority Critical patent/CN103286640A/en
Publication of CN103286640A publication Critical patent/CN103286640A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a combined tee joint processing machine and belongs to the technical field of machinery. The combined tee joint processing machine comprises a worktable, and a workpiece conveying device is arranged on the worktable and is provided with workpiece clamps. The worktable is provided with a plurality of workpiece processing units, and each comprises a longitudinal processing device, a first transverse processing device and a second transverse processing device, wherein the longitudinal processing device is arranged above the workpiece conveying device, the first and second transverse processing devices are arranged on two sides of the workpiece conveying device. By the aid of the movable workpiece clamps, repeat loading of workpieces during processing is avoided, the workpices can be conveyed to the workpiece processing units through the workpiece conveying device, different programs can be implanted at each processing position according to specific needs of part technology, processing motion and processing quantity in various directions are operated, product processing efficiency is greatly improved, labor cost and processing time are saved and shortened, and economic benefits are brought for users.

Description

A kind of tee pipe fitting composite processor
Technical field
The present invention relates to a kind of tee pipe fitting composite processor, belong to the novel mechanical technical field.
Background technology
Tee pipe fitting is very general in the hot-water heating sector application, and not only consumption is very big, and model is numerous.But the process technology of generally using in the industry and technology all are to adopt the processing of single stage universal machine tools at present, not only expend a large amount of artificial, and product constantly loads and unloads, both expended man-hour, also can't guarantee the machining accuracy of product, production efficiency is extremely low, and therefore, product can't reach standardized sizeization.Tee pipe fitting of processing generally needs 10 retrofit of machine tools frock clamps in the industry now, and 10 workman's continuous productive processes just can be finished, and automation and digital controlization can't realize at all.
Summary of the invention
For addressing the above problem, the invention provides a kind of easy to operate, the tee pipe fitting composite processor that working (machining) efficiency is high.
The technical scheme that the present invention adopts for its problem of solution is:
A kind of tee pipe fitting composite processor comprises workbench, and workbench is provided with Work transfer device, and described Work transfer device is provided with work piece holder; Also be provided with several Work treatment installations on the workbench, described Work treatment installation comprises the vertical processing machine that is positioned at the Work transfer device top, and the first horizontal processing machine and the second horizontal processing machine that lay respectively at the Work transfer device both sides.
Preferably, described Work transfer device comprises the slide rail be used to the work piece holder that is slidingly installed, and is used for driving the conveyer chain that work piece holder moves.
Preferably, the both sides of described Work transfer device are provided with removable to insert the also anchor clamps fixed block of fixed workpiece-holder.
Preferably, also comprise the workpiece EGR; Described workpiece EGR comprises the workpiece circulation slide rail that is arranged on workbench bottom, also comprises the lowering or hoisting gear that is arranged on workpiece circulation slide rail two ends, by described lowering or hoisting gear with work piece holder Alternating Transportation between Work transfer device and workpiece circulation slide rail.
Further, described lowering or hoisting gear comprises guide rail, is slidingly mounted on the lifting platform on the guide rail, be used for to drive the elevating chain that lifting platform moves and the handover cylinder that is used for work piece holder is transferred to Work transfer device or workpiece circulation slide rail.
The invention has the beneficial effects as follows: adopt full-automatic digital control combination processing, realized finishing at a machine processing of tee pipe fitting major part.Because the present invention is provided with movably work piece holder, need not in the process workpiece is repeated loading and unloading, by Work transfer device workpiece is delivered to each Work treatment installation, on each Working position, can also implant different programs according to the concrete needs of part process, handle processing action and the processing capacity of all directions.Machine is in case start, only need a workman to put into part at first station, need the end face processed on three directions of follow-up tee pipe fitting, endoporus, cylindrical, bottom surface, hole, Deng structures such as branch borehole can both be at the same time between in finished, greatly improved the product working (machining) efficiency, reduced cost of labor and machining period, for the user brings remarkable economic efficiency.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is the structural representation of Work treatment installation of the present invention.
The specific embodiment
A kind of tee pipe fitting composite processor shown in accompanying drawing 1, accompanying drawing 2 comprises workbench 10, and described workbench 10 is provided with Work transfer device, and described Work transfer device is provided with work piece holder 20.Also be provided with several Work treatment installations on the workbench 10, described Work treatment installation comprises the vertical processing machine 31 that is positioned at the Work transfer device top, and the first horizontal processing machine 32 and the second horizontal processing machine 33 that lay respectively at the Work transfer device both sides, the processing machine of each direction is controlled by system, pass through driven by servomotor, can work alone, also can process simultaneously.Therefore, can carry out end face to three directions of workpiece by Work treatment installation, endoporus, cylindrical, various Compound Machining such as branch borehole are waited in the bottom surface, hole, according to user's needs, can install tapper mechanism 70 devices such as grade on the workbench 10 additional.The present invention is delivered to each Work treatment installation by Work transfer device with workpiece, therefore, need not in the whole process workpiece is repeated loading and unloading, both guaranteed machining accuracy, and can improve working (machining) efficiency again, through practical operation, process general tee pipe fitting, the whole cycle only needs 3 to 5 minutes.In addition, on each Working position, can implant different programs according to the concrete needs of part process, handle processing action and the processing capacity of all directions, can also change different cutters, make the machining mode more flexible and changeable.
Wherein, described Work transfer device comprises the slide rail 41 be used to the work piece holder 20 that is slidingly installed, and is used for driving the conveyer chain 42 that work piece holder 20 moves.The both sides of described Work transfer device are provided with removable to insert the also anchor clamps fixed block 50 of fixed workpiece-holder 20.Be not to fixedly connected between conveyer chain 42 and the work piece holder 20, advance but promote work piece holder 20 by the push pedal that is arranged on conveyer chain 42, when work piece holder 20 arrives Work treatment installation, conveyer chain 42 stop motions, anchor clamps fixed block 50 drives by power sources such as cylinder or hydraulic cylinders and inserts in the work piece holders 20, displacement when preventing workpiece processing.
The present invention also comprises the workpiece EGR, described workpiece EGR comprises the workpiece circulation slide rail 61 that is arranged on workbench 10 bottoms, also comprise the lowering or hoisting gear that is arranged on workpiece circulation slide rail 61 two ends, by described lowering or hoisting gear with work piece holder 20 Alternating Transportation between Work transfer device and workpiece circulation slide rail 61.Further, described lowering or hoisting gear comprises guide rail 62, is slidingly mounted on lifting platform 63 on the guide rail 62, is used for driving the elevating chain 64 that lifting platform 63 moves and the handover cylinder 65 that is used for work piece holder 20 is transferred to Work transfer device or workpiece circulation slide rail 61.Certainly, the technical staff also can adopt the EGR of horizontal plane direction, with workpiece circulate slide rail 61 be arranged on slide rail 41 same horizontal planes on, and need not to adopt lowering or hoisting gear, but can increase the floor space of machine like this, it is very huge that the volume of machine also can become.
Concrete operation of the present invention is, after the operator is installed in work piece holder 20 with workpiece, work piece holder 20 by lifting platform 63 from the bottom be promoted to slide rail 41 same horizontal planes on, transferring cylinder 65 startups pushes to work piece holder 20 on the slide rail 41, conveyer chain 42 startups are transferred to Work treatment installation with work piece holder 20 and process, after through all Work treatment installation processing, conveyer chain 42 continues work piece holder 20 is pushed on the lifting platform 63 of the other end, work piece holder 20 be lowered by to workbench bottom and workpiece circulation slide rail 61 at same horizontal plane place, transfer cylinder 65 then work piece holder 20 is transferred to workpiece circulation slide rail 61, the staff takes out processed workpiece, carries out the operation of next circulation.
Above specification is described, only is principle of the present invention and embodiment, everyly carries out any simple modification and variation according to essence of the present invention, all belongs within the protection domain of the presently claimed invention.

Claims (5)

1. a tee pipe fitting composite processor comprises workbench (10), it is characterized in that, workbench (10) is provided with Work transfer device, and described Work transfer device is provided with work piece holder (20); Workbench also is provided with several Work treatment installations on (10), described Work treatment installation comprises the vertical processing machine (31) that is positioned at the Work transfer device top, and the first horizontal processing machine (32) and the second horizontal processing machine (33) that lay respectively at the Work transfer device both sides.
2. a kind of tee pipe fitting composite processor according to claim 1, it is characterized in that, described Work transfer device comprises be used to the slide rail of the work piece holder that is slidingly installed (20) (41), and is used for driving the mobile conveyer chain (42) of work piece holder (20).
3. a kind of tee pipe fitting composite processor according to claim 1 is characterized in that, the both sides of described Work transfer device are provided with removable to insert the also anchor clamps fixed block (50) of fixed workpiece-holder (20).
4. a kind of tee pipe fitting composite processor according to claim 1 is characterized in that, also comprises the workpiece EGR; Described workpiece EGR comprises the workpiece circulation slide rail (61) that is arranged on workbench (10) bottom, also comprise the lowering or hoisting gear that is arranged on workpiece circulation slide rail (61) two ends, by described lowering or hoisting gear with work piece holder (20) Alternating Transportation between Work transfer device and workpiece circulation slide rail (61).
5. a kind of tee pipe fitting composite processor according to claim 4, it is characterized in that described lowering or hoisting gear comprises guide rail (62), is slidingly mounted on the lifting platform (63) on the guide rail (62), the handover cylinder (65) that is used for the mobile elevating chain (64) of driving lifting platform (63) and is used for work piece holder (20) is transferred to Work transfer device or workpiece circulation slide rail (61).
CN2013101867071A 2013-05-20 2013-05-20 Combined tee joint processing machine Pending CN103286640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101867071A CN103286640A (en) 2013-05-20 2013-05-20 Combined tee joint processing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101867071A CN103286640A (en) 2013-05-20 2013-05-20 Combined tee joint processing machine

Publications (1)

Publication Number Publication Date
CN103286640A true CN103286640A (en) 2013-09-11

Family

ID=49088447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101867071A Pending CN103286640A (en) 2013-05-20 2013-05-20 Combined tee joint processing machine

Country Status (1)

Country Link
CN (1) CN103286640A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104551502A (en) * 2014-12-29 2015-04-29 芜湖赛特施工设备有限公司 Automatic clamping and positioning device for tee joint welding
CN105033651A (en) * 2015-09-08 2015-11-11 朱晶瑜 Machine tool used for machining indoor bolt
CN105773154A (en) * 2016-01-29 2016-07-20 乐清市天昌电力科技有限公司 Full-automatic machining equipment
CN107160330A (en) * 2017-07-14 2017-09-15 钦州学院 A kind of rubber hose coupling clamping device
CN107186514A (en) * 2017-07-17 2017-09-22 常州机电职业技术学院 The fixture of threeway workpiece is processed for small lot
CN108971651A (en) * 2018-09-18 2018-12-11 海盐县海塘标准件厂 A kind of oil connection processing unit (plant)
CN115213696A (en) * 2022-06-23 2022-10-21 浙江精艺管件股份有限公司 Processing production system for air conditioner hydraulic T-shaped three-way pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202447949U (en) * 2012-06-21 2012-09-26 齐齐哈尔市金车工业公司 End face clamp for milling process of main tube three-way
CN202622073U (en) * 2012-05-28 2012-12-26 浙江海亮股份有限公司 Machine for flattening port of three-way pipe
CN202639870U (en) * 2012-04-16 2013-01-02 启东凯雷达模具制造有限公司 Quick clamping and positioning device for three-way elbow
CN202780590U (en) * 2012-09-24 2013-03-13 福建省标光阀门科技有限公司 Fixed device for machining three-way valve body
CN203357153U (en) * 2013-05-20 2013-12-25 郝皓 Three-way pipe fitting composite machining machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202639870U (en) * 2012-04-16 2013-01-02 启东凯雷达模具制造有限公司 Quick clamping and positioning device for three-way elbow
CN202622073U (en) * 2012-05-28 2012-12-26 浙江海亮股份有限公司 Machine for flattening port of three-way pipe
CN202447949U (en) * 2012-06-21 2012-09-26 齐齐哈尔市金车工业公司 End face clamp for milling process of main tube three-way
CN202780590U (en) * 2012-09-24 2013-03-13 福建省标光阀门科技有限公司 Fixed device for machining three-way valve body
CN203357153U (en) * 2013-05-20 2013-12-25 郝皓 Three-way pipe fitting composite machining machine

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104551502A (en) * 2014-12-29 2015-04-29 芜湖赛特施工设备有限公司 Automatic clamping and positioning device for tee joint welding
CN104551502B (en) * 2014-12-29 2016-04-13 芜湖赛特施工设备有限公司 A kind of positive automatic clamping and positioning device of three-way welding
CN105033651A (en) * 2015-09-08 2015-11-11 朱晶瑜 Machine tool used for machining indoor bolt
CN105773154A (en) * 2016-01-29 2016-07-20 乐清市天昌电力科技有限公司 Full-automatic machining equipment
CN107160330A (en) * 2017-07-14 2017-09-15 钦州学院 A kind of rubber hose coupling clamping device
CN107186514A (en) * 2017-07-17 2017-09-22 常州机电职业技术学院 The fixture of threeway workpiece is processed for small lot
CN108971651A (en) * 2018-09-18 2018-12-11 海盐县海塘标准件厂 A kind of oil connection processing unit (plant)
CN115213696A (en) * 2022-06-23 2022-10-21 浙江精艺管件股份有限公司 Processing production system for air conditioner hydraulic T-shaped three-way pipe

Similar Documents

Publication Publication Date Title
CN103286640A (en) Combined tee joint processing machine
CN104875243B (en) A kind of Furniture panel full automatic high efficiency draws hole machine
CN103213849B (en) Automatic stacking device of concrete blocks and stacking process thereof
CN202337806U (en) Automatic quenching machine tool with double groups of stations
CN202894118U (en) Cubic element mechanical hand transferring mechanism
CN103203409A (en) Pipe fitting production line
CN103128593A (en) Delivery method and delivery equipment of workpiece on production line for aluminum tube and aluminum bar
CN203357153U (en) Three-way pipe fitting composite machining machine
CN201525641U (en) Automatic feeding machine
CN202780383U (en) Automatic tube sleeving machine
CN204584094U (en) A kind of self-feeding washing pipe flash trimmer
CN103342222A (en) Reciprocating type conveying system and reciprocating type conveying device
CN204486839U (en) Multistation automatic boring machine
CN101913079B (en) Production line for front frame
CN203265382U (en) Production line for machining pipes
CN103551639A (en) Full automatic malleable cast iron pipe fitting flat head machine and processing method thereof
CN103726510A (en) Method for constructing big-size immersed tube steel reinforcement cage
CN202527741U (en) Automatic machine tool for machining pin holes of middle joint main angle steel of tower crane
CN102554309B (en) Automatic machine tool for processing pin hole of main angle steel of middle section of tower crane
CN204280047U (en) The gripping of a kind of fragment of brick secondary frames up compress automatically
CN203095031U (en) Extensible flexible double-column type industrial aluminium profile automatic processing assembly line system
CN202555716U (en) Conveying mechanism of large-size three-dimensional manipulator
CN204748807U (en) Hole machine is drawn to full -automatic high efficiency of furniture board
CN204354224U (en) A kind of upper panel assembly of composite plate Sawing machine
CN203045408U (en) Positioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20161019

C20 Patent right or utility model deemed to be abandoned or is abandoned