CN103266549B - Road surface drainage system for construction period of highway reconstruction and extension project - Google Patents

Road surface drainage system for construction period of highway reconstruction and extension project Download PDF

Info

Publication number
CN103266549B
CN103266549B CN201310202442.XA CN201310202442A CN103266549B CN 103266549 B CN103266549 B CN 103266549B CN 201310202442 A CN201310202442 A CN 201310202442A CN 103266549 B CN103266549 B CN 103266549B
Authority
CN
China
Prior art keywords
construction period
new embankment
embankment
road
extension project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310202442.XA
Other languages
Chinese (zh)
Other versions
CN103266549A (en
Inventor
张军辉
郑健龙
周宇
姚永胜
肖硕
王艳岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201310202442.XA priority Critical patent/CN103266549B/en
Publication of CN103266549A publication Critical patent/CN103266549A/en
Application granted granted Critical
Publication of CN103266549B publication Critical patent/CN103266549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a road surface drainage system in the construction period of a highway reconstruction and extension project. Firstly, building a temporary water blocking stem with the height of 0.1m along the outer side of an old road curb, connecting an old road rapid trough at the opening of the temporary water blocking ridge, connecting the lower end of the old road rapid trough with a temporary drainage channel on the surface of a new road embankment, and connecting a new road embankment side ditch with the temporary drainage channel on the surface of the new road embankment. The invention can effectively remove the surface water of the old road, the slope water of the embankment side of the old road and the surface water of the new embankment outside the range of the roadbed, avoids the diseases of roadbed scouring, water damage and the like caused by unsmooth drainage in the construction period of the highway reconstruction and extension project, ensures the construction quality of the highway reconstruction and extension, and has the advantages of simple implementation, low cost and convenient removal.

Description

A kind of Expressway Extension Project construction period Pavement surface drainage system
Technical field
The invention belongs to construction period Pavement surface drainage field, particularly relate to Expressway Extension Project construction period Pavement surface drainage system.
Background technology
Along with the fast development of national economy, the construction of China's speedway is very swift and violent.Due to the restriction by social economy's level, technical level and construction thought when building, in the speedway completed for use, the overwhelming majority is two-way Four-Lane Road, six-lane and eight lane highway proportions lower.There is quite a few can not adapt to the requirement of traffic volume growth and social development at present, in the urgent need to expanding road passage capability.As everyone knows, the drainability rapidly of speedway is lower, and in time occurring compared with heavy showers process, the road surface of speedway just there will be more ponding.At present, generally adopt concrete directly to construct at the road drainage system of the reorganization and expansion construction period of speedway, or construct with prefabricated units and mortar bonding.
Though the completed Expressway Extension Project of China mentions the importance of construction period draining, but not yet effective measures are proposed, and existing Expressway Extension Project construction period drainage system can not effectively by falling into face, old road, the rainfall on old side slope of embankment and new embankment surface collects and discharges beyond roadbed scope smoothly, effectively can not avoid the disadvantageous problem of Expressway Extension Project construction period draining.
Summary of the invention
The object of the present invention is to provide a kind of Expressway Extension Project construction period Pavement surface drainage system, for old road surface water, old side slope of embankment water and new embankment surface water are got rid of beyond roadbed scope, be intended to solve existing Expressway Extension Project construction period drainage system can not effectively by falling into face, old road, the rainfall on old side slope of embankment and new embankment surface collects and discharges beyond roadbed scope smoothly, effectively can not avoid the disadvantageous problem of Expressway Extension Project construction period draining.
The present invention is achieved in that a kind of Expressway Extension Project construction period Pavement surface drainage system comprises and blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment temporarily.First outside the road kerb of old road, build the interim water bar of high 0.1m, block water ridge opening part temporarily and connect old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and the outer gutter of new embankment is connected to new embankment surface temporary drainage groove.
Further, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, be of a size of 0.2m × 0.6m × 0.2m (× upper base × height of going to the bottom), this pvc pipe one end is connected with old road chute, and the other end stretches out gutter outside new embankment to new embankment;
Further, new embankment surface arranges outside 2%-4% horizontal wall inscription;
Further, the outer gutter size of new embankment is determined according to water force.
Provided by the inventionly a kind ofly comprise the Expressway Extension Project construction period Pavement surface drainage system of temporarily blocking Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment, can effectively old road surface water, old side slope of embankment water and new embankment surface water be got rid of beyond roadbed scope, avoid the disease such as subgrade erosion, damaged or destroyed by flood that Expressway Extension Project construction period impeded drainage causes, ensure that highway extension project construction quality, implement simple, with low cost, be convenient to remove.
Accompanying drawing explanation
Fig. 1 is a kind of Expressway Extension Project construction period Pavement surface drainage system architecture schematic diagram provided by the invention.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1, the present invention is achieved in that a kind of Expressway Extension Project construction period Pavement surface drainage system comprises and blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, new embankment gutter temporarily.A kind of Expressway Extension Project construction period Pavement surface drainage system builds the interim water bar of high 0.1m outside the road kerb of old road, block water ridge opening part temporarily and connect old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and new embankment gutter is connected to new embankment surface temporary drainage groove.
Further, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, be of a size of 0.2m × 0.6m × 0.2m (× upper base × height of going to the bottom), this pvc pipe one end is connected with old road chute, and the other end stretches out gutter outside new embankment to new embankment;
Further, new embankment surface arranges outside 2%-4% horizontal wall inscription;
Further, the outer gutter size of new embankment is determined according to water force.
As shown in Figure 1, build inside the road kerb of old road and block the water ridge temporarily, block the construction of the water ridge and terminate rear dismounting, block water ridge opening part temporarily and connect old road chute, the rainwater blocking the old road road table intercepted on the water ridge is used for be discharged to new embankment surface temporary drainage groove, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, this pvc pipe one end is connected with chute, the other end stretches out gutter outside new embankment to new embankment, thus the water falling into face, old road scope is discharged beyond roadbed scope, simultaneously, new embankment surface arranges the horizontal wall inscription of outside 2%-4%, get rid of the water on old road side slope and new embankment surface.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. an Expressway Extension Project construction period Pavement surface drainage system, it is characterized in that, described Expressway Extension Project construction period Pavement surface drainage system comprises blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment temporarily;
Outside the road kerb of old road, build the interim water bar of high 0.1m, block water ridge opening part temporarily and connect old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and the outer gutter of new embankment is connected to new embankment surface temporary drainage groove.
2. Expressway Extension Project construction period Pavement surface drainage system as claimed in claim 1, is characterized in that, described new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, is of a size of 0.2m × 0.6m × 0.2m.
3. Expressway Extension Project construction period Pavement surface drainage system as claimed in claim 2, it is characterized in that, described pvc pipe one end is connected with old road chute, and the other end stretches out gutter outside new embankment to new embankment.
4. Expressway Extension Project construction period Pavement surface drainage system as claimed in claim 1, is characterized in that, described new embankment surface arranges outside 2%-4% horizontal wall inscription.
5. Expressway Extension Project construction period Pavement surface drainage system as claimed in claim 1, is characterized in that, the outer gutter size of described new embankment is determined according to water force.
CN201310202442.XA 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project Active CN103266549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310202442.XA CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310202442.XA CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Publications (2)

Publication Number Publication Date
CN103266549A CN103266549A (en) 2013-08-28
CN103266549B true CN103266549B (en) 2015-09-16

Family

ID=49010203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310202442.XA Active CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Country Status (1)

Country Link
CN (1) CN103266549B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297564B (en) * 2015-10-13 2017-06-30 山东高速科技发展集团有限公司 A kind of guarantor's circulation method of highway extension project construction time main line road
CN107237390A (en) * 2017-06-26 2017-10-10 江苏中路交通科学技术有限公司 A kind of highway curve section Quick drainage structure
CN107893471B (en) * 2017-11-15 2018-08-31 孟宪山 Expressway Extension Project construction time Pavement surface drainage system
CN111894104B (en) * 2020-06-10 2022-02-01 河北交通职业技术学院 Drainage system for expressway reconstruction and expansion construction and drainage method thereof
CN111705590B (en) * 2020-06-28 2021-10-19 山东省交通规划设计院集团有限公司 Drainage system and method for road surface in traffic protection stage of highway reconstruction and extension project
CN112663767A (en) * 2020-12-07 2021-04-16 唐从荣 Drainage system on highway extension project construction road surface
CN112647400B (en) * 2021-01-20 2022-02-18 佛山市交通科技有限公司 Processing method for additionally-paved and improved road surface water retaining ditch
CN114411479B (en) * 2022-01-13 2023-06-13 中铁十二局集团第三工程有限公司 Cross-gully section mountain-side construction channel and construction method thereof
CN115288168A (en) * 2022-08-24 2022-11-04 中建三局集团(江苏)有限公司 Sand soil subgrade construction period slope comprehensive anti-scouring structure and protection method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN202925420U (en) * 2012-12-07 2013-05-08 戴泽涛 Novel highway drainage system
CN203498724U (en) * 2013-05-28 2014-03-26 长沙理工大学 Road surface drainage system for construction period of highway reconstruction and extension project

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0236729B2 (en) * 1985-01-31 1990-08-20 Fukuho Burotsuku Kogyo Kk ROKATANON ORIMENSEKOHOHO

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN202925420U (en) * 2012-12-07 2013-05-08 戴泽涛 Novel highway drainage system
CN203498724U (en) * 2013-05-28 2014-03-26 长沙理工大学 Road surface drainage system for construction period of highway reconstruction and extension project

Also Published As

Publication number Publication date
CN103266549A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN103266549B (en) Road surface drainage system for construction period of highway reconstruction and extension project
CN201459905U (en) Urban rainwater drainage system
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN210827513U (en) Self-adaptation side slope drainage seepage prevention structure
CN204356615U (en) Permeable pavement structure
CN203498724U (en) Road surface drainage system for construction period of highway reconstruction and extension project
CN204039866U (en) A kind of embed-type permeable flush curb of porous asphalt pavement roadside drainage
CN210856844U (en) Sewage intercepting and draining system suitable for sunken type pedestrian ways beside greenbelts
CN204898464U (en) Highway curb drainage device
CN205319665U (en) Curbstone with escape canal and cable pit
CN104005352A (en) Roadside guardrail base for road and construction method for same
CN208748463U (en) A kind of town road rainwater infiltration storage row's integral system
CN203821274U (en) Base assembly for protective fence on side of highway
CN210288620U (en) Prefabricated resin concrete escape canal
CN210238206U (en) Combined type side ditch convenient to desilting
CN209836709U (en) Prevent subsiding formula highway subgrade
CN203034335U (en) Silty soil section highway drainage system
CN209741874U (en) Ecological bank protection of prefabricated brick
CN203625739U (en) Embankment made of red sandstone filler
CN105514912A (en) Paving stones with drainage channel and cable channel
CN203284880U (en) Gutter inlet with regulation and storage functions
CN221000411U (en) Roadbed capable of preventing roadbed from softening
CN204783109U (en) Wear drainage mechanism in formula tunnel down
CN110607796A (en) Arch fixing frame for public and railway tunnel
CN210458852U (en) Water accumulation preventing road structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant