CN103266549A CN201310202442XA CN201310202442A CN103266549A CN 103266549 A CN103266549 A CN 103266549A CN 201310202442X A CN201310202442X A CN 201310202442XA CN 201310202442 A CN201310202442 A CN 201310202442A CN 103266549 A CN103266549 A CN 103266549A
Authority
CN
China
Prior art keywords
road
construction period
new embankment
reconstruction
speedway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310202442XA
Other languages
Chinese (zh)
Other versions
CN103266549B (en
Inventor
张军辉
郑健龙
周宇
姚永胜
肖硕
王艳岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201310202442.XA priority Critical patent/CN103266549B/en
Publication of CN103266549A publication Critical patent/CN103266549A/en
Application granted granted Critical
Publication of CN103266549B publication Critical patent/CN103266549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a road surface drainage system in the construction period of a highway reconstruction and extension project. Firstly, building a temporary water blocking stem with the height of 0.1m along the outer side of an old road curb, connecting an old road rapid trough at the opening of the temporary water blocking ridge, connecting the lower end of the old road rapid trough with a temporary drainage channel on the surface of a new road embankment, and connecting a new road embankment side ditch with the temporary drainage channel on the surface of the new road embankment. The invention can effectively remove the surface water of the old road, the slope water of the embankment side of the old road and the surface water of the new embankment outside the range of the roadbed, avoids the diseases of roadbed scouring, water damage and the like caused by unsmooth drainage in the construction period of the highway reconstruction and extension project, ensures the construction quality of the highway reconstruction and extension, and has the advantages of simple implementation, low cost and convenient removal.

Description

A kind of speedway reconstruction and extension project construction period road table drainage system
Technical field
The invention belongs to the construction period road and show the draining field, relate in particular to speedway reconstruction and extension project construction period road table drainage system.
Background technology
Along with fast development of national economy, China's expressway construction is very swift and violent.Because the restriction of social economy's level, technical level and construction thought when being built, in the speedway that has completed for use, the overwhelming majority is two-way Four-Lane Road, and six-lane and eight track speedway proportions are lower.There is quite a few can not adapt to the requirement of traffic volume growth and social development at present, presses for the expansion road passage capability.As everyone knows, the drainability rapidly of speedway is lower, and when occurring than the heavy showers process, more ponding will appear in the road surface of speedway.At present, the road drainage system in reorganization and expansion construction period of speedway generally adopts concrete directly to construct, or constructs with prefabricated units and mortar bonding.
Though the completed speedway reconstruction and extension project of China is mentioned the importance of construction period draining, but effective measures are not proposed as yet, and existing speedway reconstruction and extension project construction period drainage system can not effectively compile the rainfall that falls into old road face, old road dike side slope and new embankment surface and discharge smoothly beyond the roadbed scope, can not effectively avoid the disadvantageous problem of speedway reconstruction and extension project construction period draining.
Summary of the invention
The object of the present invention is to provide a kind of speedway reconstruction and extension project construction period road table drainage system, be used for old road surface water, old road dike side slope water and new embankment surface water are got rid of beyond the roadbed scope, being intended to solve existing speedway reconstruction and extension project construction period drainage system can not effectively compile the rainfall that falls into old road face, old road dike side slope and new embankment surface and discharge smoothly beyond the roadbed scope, can not effectively avoid the disadvantageous problem of speedway reconstruction and extension project construction period draining.
The present invention is achieved in that table drainage system in a kind of speedway reconstruction and extension project construction period road comprises and blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment temporarily.At first build the interim water bar of high 0.1m along the old road road kerb outside, block water ridge opening part temporarily and connect the old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and the outer gutter of new embankment is connected in new embankment surface temporary drainage groove.
Further, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, is of a size of 0.2m * 0.6m * 0.2m (going to the bottom * upper base * height), and this pvc pipe one end is connected with the old road chute, and the other end stretches out new embankment to new embankment outside gutter;
Further, new embankment surface arranges outside 2%-4% horizontal wall inscription;
Further, the outer gutter size of new embankment is calculated according to waterpower and is determined.
A kind of speedway reconstruction and extension project construction period road table drainage system that temporarily blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment that comprises provided by the invention, can effectively old road surface water, old road dike side slope water and new embankment surface water be got rid of beyond the roadbed scope, diseases such as subgrade erosion that speedway reconstruction and extension project construction period impeded drainage causes, damaged or destroyed by flood have been avoided, guaranteed speedway reorganization and expansion construction quality, implement simple, with low cost, be convenient to remove.
Description of drawings
Fig. 1 is a kind of speedway reconstruction and extension project provided by the invention construction period road table drainage system structural representation.
The specific embodiment
In order to make purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the present invention, and be not used in restriction the present invention.
As shown in Figure 1, the present invention is achieved in that table drainage system in a kind of speedway reconstruction and extension project construction period road comprises and blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, new embankment gutter temporarily.A kind of speedway reconstruction and extension project construction period road table drainage system is built the interim water bar of high 0.1m along the old road road kerb outside, block water ridge opening part temporarily and connect the old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and new embankment gutter is connected in new embankment surface temporary drainage groove.
Further, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, is of a size of 0.2m * 0.6m * 0.2m (going to the bottom * upper base * height), and this pvc pipe one end is connected with the old road chute, and the other end stretches out new embankment to new embankment outside gutter;
Further, new embankment surface arranges outside 2%-4% horizontal wall inscription;
Further, the outer gutter size of new embankment is calculated according to waterpower and is determined.
As shown in Figure 1, block the water ridge inboard build of old road road kerb temporarily, block the construction of the water ridge and finish the back dismounting, block water ridge opening part temporarily and connect the old road chute, the rainwater that is used for blocking the old road road table of intercepting on the water ridge is discharged to new embankment surface temporary drainage groove, new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, this pvc pipe one end is connected with chute, the other end stretches out new embankment to new embankment outside gutter, thereby the water that will fall into old road face scope is discharged beyond the roadbed scope, simultaneously, new embankment surface arranges the horizontal wall inscription of outside 2%-4%, gets rid of the water on old road side slope and new embankment surface.
The above only is preferred embodiment of the present invention, not in order to limiting the present invention, all any modifications of doing within the spirit and principles in the present invention, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. drainage system is shown on a speedway reconstruction and extension project construction period road, it is characterized in that table drainage system in described speedway reconstruction and extension project construction period road comprises and blocks Shui Geng, new embankment surface temporary drainage groove, new embankment surface horizontal wall inscription, the outer gutter of new embankment temporarily;
Build the interim water bar of high 0.1m along the old road road kerb outside, block water ridge opening part temporarily and connect the old road chute, chute lower end, old road is connected with new embankment surface temporary drainage groove, and the outer gutter of new embankment is connected in new embankment surface temporary drainage groove.
2. drainage system is shown on speedway reconstruction and extension project construction period road according to claim 1, it is characterized in that, described new embankment surface temporary drainage groove adopts the pvc pipe of uncovered trapezoidal cross-section, is of a size of 0.2m * 0.6m * 0.2m.
3. as table drainage system in speedway reconstruction and extension project construction period road as described in the claim 2, it is characterized in that described pvc pipe one end is connected with the old road chute, the other end stretches out new embankment gutter to the new embankment.
4. drainage system is shown on speedway reconstruction and extension project construction period road according to claim 1, it is characterized in that described new embankment surface arranges outside 2%-4% horizontal wall inscription.
5. drainage system is shown on speedway reconstruction and extension project construction period road according to claim 1, it is characterized in that, the outer gutter size of described new embankment is calculated according to waterpower and determined.
CN201310202442.XA 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project Active CN103266549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310202442.XA CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310202442.XA CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Publications (2)

Publication Number Publication Date
CN103266549A true CN103266549A (en) 2013-08-28
CN103266549B CN103266549B (en) 2015-09-16

Family

ID=49010203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310202442.XA Active CN103266549B (en) 2013-05-28 2013-05-28 Road surface drainage system for construction period of highway reconstruction and extension project

Country Status (1)

Country Link
CN (1) CN103266549B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297564A (en) * 2015-10-13 2016-02-03 青岛林川工程技术咨询有限公司 Guarantee method of unobstructed main road during highway reconstruction and expansion construction period
CN107237390A (en) * 2017-06-26 2017-10-10 江苏中路交通科学技术有限公司 A kind of highway curve section Quick drainage structure
CN107893471A (en) * 2017-11-15 2018-04-10 孟宪山 Expressway Extension Project construction time Pavement surface drainage system
CN111705590A (en) * 2020-06-28 2020-09-25 山东省交通规划设计院有限公司 Drainage system and method for road surface in traffic protection stage of highway reconstruction and extension project
CN111894104A (en) * 2020-06-10 2020-11-06 河北交通职业技术学院 Drainage system for expressway reconstruction and expansion construction and drainage method thereof
CN112647400A (en) * 2021-01-20 2021-04-13 佛山市交通科技有限公司 Processing method for additionally-paved and improved road surface water retaining ditch
CN112663767A (en) * 2020-12-07 2021-04-16 唐从荣 Drainage system on highway extension project construction road surface
CN114411479A (en) * 2022-01-13 2022-04-29 中铁十二局集团第三工程有限公司 Mountain-crossing construction access road of crossing trench section and construction method thereof
CN115288168A (en) * 2022-08-24 2022-11-04 中建三局集团(江苏)有限公司 Sand soil subgrade construction period slope comprehensive anti-scouring structure and protection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61176718A (en) * 1985-01-31 1986-08-08 Fukuhou Block Kogyo Kk Slope construction work for road shoulder
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN202925420U (en) * 2012-12-07 2013-05-08 戴泽涛 Novel highway drainage system
CN203498724U (en) * 2013-05-28 2014-03-26 长沙理工大学 Road surface drainage system for construction period of highway reconstruction and extension project

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61176718A (en) * 1985-01-31 1986-08-08 Fukuhou Block Kogyo Kk Slope construction work for road shoulder
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN202925420U (en) * 2012-12-07 2013-05-08 戴泽涛 Novel highway drainage system
CN203498724U (en) * 2013-05-28 2014-03-26 长沙理工大学 Road surface drainage system for construction period of highway reconstruction and extension project

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297564A (en) * 2015-10-13 2016-02-03 青岛林川工程技术咨询有限公司 Guarantee method of unobstructed main road during highway reconstruction and expansion construction period
CN105297564B (en) * 2015-10-13 2017-06-30 山东高速科技发展集团有限公司 A kind of guarantor's circulation method of highway extension project construction time main line road
CN107237390A (en) * 2017-06-26 2017-10-10 江苏中路交通科学技术有限公司 A kind of highway curve section Quick drainage structure
CN107893471A (en) * 2017-11-15 2018-04-10 孟宪山 Expressway Extension Project construction time Pavement surface drainage system
CN107893471B (en) * 2017-11-15 2018-08-31 孟宪山 Expressway Extension Project construction time Pavement surface drainage system
CN111894104A (en) * 2020-06-10 2020-11-06 河北交通职业技术学院 Drainage system for expressway reconstruction and expansion construction and drainage method thereof
CN111894104B (en) * 2020-06-10 2022-02-01 河北交通职业技术学院 Drainage system for expressway reconstruction and expansion construction and drainage method thereof
CN111705590A (en) * 2020-06-28 2020-09-25 山东省交通规划设计院有限公司 Drainage system and method for road surface in traffic protection stage of highway reconstruction and extension project
CN111705590B (en) * 2020-06-28 2021-10-19 山东省交通规划设计院集团有限公司 Drainage system and method for road surface in traffic protection stage of highway reconstruction and extension project
CN112663767A (en) * 2020-12-07 2021-04-16 唐从荣 Drainage system on highway extension project construction road surface
CN112647400A (en) * 2021-01-20 2021-04-13 佛山市交通科技有限公司 Processing method for additionally-paved and improved road surface water retaining ditch
CN114411479A (en) * 2022-01-13 2022-04-29 中铁十二局集团第三工程有限公司 Mountain-crossing construction access road of crossing trench section and construction method thereof
CN115288168A (en) * 2022-08-24 2022-11-04 中建三局集团(江苏)有限公司 Sand soil subgrade construction period slope comprehensive anti-scouring structure and protection method

Also Published As

Publication number Publication date
CN103266549B (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN103266549B (en) Road surface drainage system for construction period of highway reconstruction and extension project
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN213508818U (en) Face-row type waterlogging-preventing urban drainage system
CN201459905U (en) Urban rainwater drainage system
CN206616423U (en) Concave herbaceous field system based on sponge city
CN204474499U (en) A kind of ecological multidimensional gaseous-waste holdup system for the treatment of bank, river course rain-water drainage
CN110158650A (en) A kind of underground structure that waterproof and drainage system are set
CN203498724U (en) Road surface drainage system for construction period of highway reconstruction and extension project
CN208748463U (en) A kind of town road rainwater infiltration storage row's integral system
CN204898464U (en) Highway curb drainage device
CN205319665U (en) Curbstone with escape canal and cable pit
CN205369737U (en) Roof rainwater drainage breaking of contact structure
CN202440922U (en) Infiltration system capable of reducing discharge intensity of house surface rainwater
CN210288013U (en) Interim drainage facility of central authorities' median convenient to construction
CN203625739U (en) Embankment made of red sandstone filler
CN203034335U (en) Silty soil section highway drainage system
CN105839771A (en) Intercepting-type rainwater grate
CN203284880U (en) Gutter inlet with regulation and storage functions
CN103266659B (en) Gutter inlet with regulation and storage functions
CN203923928U (en) Highway subgrade underground drainage facility combining structure
CN210458852U (en) Water accumulation preventing road structure
CN204783109U (en) Wear drainage mechanism in formula tunnel down
CN213114162U (en) Road drainage system
CN217299204U (en) Smooth open channel drainage system
CN215829185U (en) Current sidewalk transformation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant