CN215829185U - A modified structure of the existing sidewalk - Google Patents

A modified structure of the existing sidewalk Download PDF

Info

Publication number
CN215829185U
CN215829185U CN202121883038.XU CN202121883038U CN215829185U CN 215829185 U CN215829185 U CN 215829185U CN 202121883038 U CN202121883038 U CN 202121883038U CN 215829185 U CN215829185 U CN 215829185U
Authority
CN
China
Prior art keywords
layer
permeable
laid
sidewalk
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121883038.XU
Other languages
Chinese (zh)
Inventor
谭福官
李儒涛
黄神忠
孔鑫铭
聂宗乾
蒋叶成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hualan Design Group Co ltd
Original Assignee
Hualan Design Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hualan Design Group Co ltd filed Critical Hualan Design Group Co ltd
Priority to CN202121883038.XU priority Critical patent/CN215829185U/en
Application granted granted Critical
Publication of CN215829185U publication Critical patent/CN215829185U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

A transformation structure of a current sidewalk comprises a blind road, wherein a curb is arranged at the edge, close to a roadway, of a region between the blind road and the roadway, and a plurality of tree pools are arranged in a surrounding manner of the region between the blind road and the roadway; the area between the blind sidewalk, the kerb and the tree pool sequentially comprises a soil base layer, a graded gravel layer, a sand-free water-permeable cement concrete layer, a water-permeable geotechnical material layer, a sand leveling layer and water-permeable bricks from bottom to top, wherein the graded gravel layer is laid on the soil base layer, the sand-free water-permeable cement concrete layer is laid on the graded gravel layer, the water-permeable soil material layer is laid on the sand-free water-permeable cement concrete layer, the sand leveling layer is laid on the water-permeable geotechnical material layer, and the water-permeable bricks are laid on the sand leveling layer; and a horizontal seepage and drainage pipe is laid in the soil foundation layer at the lower part of the graded gravel layer, and the bottom of the horizontal seepage and drainage pipe is communicated with a plurality of vertical seepage and drainage pipes. The improved structure of the sidewalk at the current situation is improved into a permeable pavement structure according to the requirements of the size of the sidewalk at the current situation and the indexes of sponge cities, and the permeation rate is improved.

Description

Current sidewalk transformation structure
Technical Field
The utility model relates to the technical field of road construction, in particular to a modified structure of a sidewalk in the current situation.
Background
Sidewalks refer to the portion of a road that is separated by curbs or guardrails and other similar facilities and is dedicated to pedestrian traffic, typically having a width of about four meters.
Drainage is often only considered to current pavement structure, through discharging into the both sides escape canal with the road surface rainwater, alleviates the rainwater pressure on pavement, but the dual rivers that come from lane and pavement need be born to the escape canal, often can cause ponding because the drainage is not urgent in time.
Along with the development of society, people have higher and higher requirements on urban roads, and in order to ensure the safety and comfort of sidewalks, prolong the service life of sidewalks, improve the requirements of pedestrian outgoing, urban sanitary environment and sponge urban indexes, the drainage structure of the sidewalks needs to be improved.
Disclosure of Invention
The utility model aims to provide a modified structure of a current sidewalk, which confirms that the modified structure needs to be modified into a permeable pavement structure according to the current sidewalk size and sponge city index requirements, and improves the permeation rate of the sidewalk.
In order to realize the purpose of the utility model, the technical scheme is as follows:
a reconstruction structure of a sidewalk under the current situation comprises a blind road, wherein a curb is arranged at the edge, close to a roadway, of a region between the blind road and the roadway, the curb is 20 cm higher than the pavement of the roadway, and a plurality of tree pools are surrounded in the region between the blind road and the roadway; the area between the sidewalk, the kerb and the tree pool sequentially comprises a soil base layer, a graded gravel layer, a sand-free permeable cement concrete layer, a permeable geotechnical material layer, a sand leveling layer and permeable bricks from bottom to top, wherein the graded gravel layer is laid on the soil base layer, the sand-free permeable cement concrete layer is laid on the graded gravel layer, the permeable soil material layer is laid on the sand-free permeable cement concrete layer, the sand leveling layer is laid on the permeable geotechnical material layer, the permeable bricks are laid on the sand leveling layer, the height of the tops of the permeable bricks is matched with the sidewalk, and the sidewalk design requirements are compounded; the water permeability coefficient of the water permeable brick is not less than 25mm/h, the porosity is preferably 20%, the water retention capacity is 10000Cc/m in a normal use state, the compressive strength is not less than Cc30, the flexural strength is not less than Cf4.0, the antiskid grade is R3, the corresponding antiskid performance index BPN is not less than 65, the paving width requirement of the water permeable brick is 0.2 cm-0.3 cm, and after paving, the dry lime fine sand is sprayed to seal the seam. And a horizontal seepage and drainage pipe is laid in the soil foundation layer at the lower part of the graded gravel layer, and the bottom of the horizontal seepage and drainage pipe is communicated with a plurality of vertical seepage and drainage pipes. During rainfall, rainwater can flow to the permeable pavement surface layer according to the cross slope of the sidewalk after falling to the original sidewalk structural layer, and then infiltration can be effectively improved due to the existence of the vertical infiltration and drainage pipe.
Further preferred is: the tree pool is surrounded by the barren rock. The tree pool is surrounded by the barren rock, and the tree pool is more beautiful and is easily surrounded.
Further preferred is: the transverse seepage and drainage pipe is also communicated with a seepage and drainage pipe extending to a rainwater port on the side of the roadway. The seepage and drainage pipe can drain part of the downward seepage water to the rainwater port.
Further preferred is: and the peripheries of the transverse seepage and drainage pipe and the vertical seepage and drainage pipe are paved with a permeable geotextile material wrapping layer. The setting of geotechnological material parcel layer that permeates water can more do benefit to the rainwater infiltration.
Further preferred is: the side of the blind road far away from the traffic lane is an original pedestrian lane structural layer. Whether the pavement structure layer is trimmed or not can be determined according to the condition of the original pavement structure layer. If the original sidewalk has the defects of sludge pumping, face brick damage and the like, synchronous transformation is needed. The side of the original sidewalk structural layer far away from the blind sidewalk is provided with a stone, and the stone is flush with the step bricks of the original sidewalk structural layer.
The improved structure of the sidewalk at the current situation confirms that the sidewalk structure needing to be improved into a permeable pavement structure according to the current situation sidewalk size and the sponge city index requirement, so that the traditional sidewalk has the required infiltration function in the sponge city, the infiltration rate of the sidewalk is improved, and the investment is small.
Drawings
Fig. 1 is a schematic structural view of a modified structure of the present sidewalk;
FIG. 2 is a schematic view taken along line A-A of FIG. 1;
the names corresponding to the sequence numbers in the figure are:
1. tree pool, 2, barren rock, 3, curb, 4, roadways, 5, inlet for stom water, 6, ooze the drain pipe, 7, the brick that permeates water, 8, vertical infiltration drain pipe, 9, horizontal infiltration drain pipe, 10, the blind road, 11, former pedestrian way structural layer, 12, sand screed-coat, 13, the geotechnological material layer that permeates water, 14, no sand cement concrete layer that permeates water, 15, graded gravel layer, 16, the soil matrix layer, 17, the geotechnological material parcel layer that permeates water.
Detailed Description
In order to make the technical solutions and advantages of the present application clearer, the following describes the technical solutions clearly and completely with reference to the embodiments.
Example 1
A reconstruction structure of a current sidewalk comprises a blind road 10, wherein a curb 3 is arranged at the edge, close to a roadway 4, of a region between the blind road 10 and the roadway 4, and a plurality of tree pools 1 are surrounded by a boulder 2 in the region between the blind road 10 and the roadway 4; the area between the blind sidewalk 10, the kerbstone 3 and the tree pool 1 sequentially comprises a soil base layer 16, a graded gravel layer 15, a sand-free permeable cement concrete layer 14, a permeable soil material layer 13, a sand leveling layer 12 and permeable bricks 7 from bottom to top, wherein the graded gravel layer 15 is laid on the soil base layer 16, the sand-free permeable cement concrete layer 14 is laid on the graded gravel layer 15, the permeable soil material layer 13 is laid on the sand-free permeable cement concrete layer 14, the sand leveling layer 12 is laid on the permeable soil material layer 13, the permeable bricks 7 are laid on the sand leveling layer 12, the height of the tops of the permeable bricks 7 is matched with that of the blind sidewalk 10, and the design requirements of the blind sidewalk 10 are compounded; a horizontal seepage and drainage pipe 9 is laid in the soil base layer 16 at the lower part of the graded gravel layer 15, and the bottom of the horizontal seepage and drainage pipe 9 is communicated with a plurality of vertical seepage and drainage pipes 8.
Example 2
A reconstruction structure of a current sidewalk comprises a blind road 10, wherein a curb 3 is arranged at the edge, close to a roadway 4, of a region between the blind road 10 and the roadway 4, and a plurality of tree pools 1 are surrounded by a boulder 2 in the region between the blind road 10 and the roadway 4; the side of the blind road 10 far away from the roadway 4 is an original pedestrian road structural layer 11. The side, far away from the blind sidewalk 10, of the original sidewalk structural layer 11 is provided with a strip stone 2 in a blocking mode, and the strip stone 2 is flush with the step bricks of the original sidewalk structural layer 11. The area between the blind sidewalk 10, the kerbstone 3 and the tree pool 1 sequentially comprises a soil base layer 16, a graded gravel layer 15, a sand-free permeable cement concrete layer 14, a permeable soil material layer 13, a sand leveling layer 12 and permeable bricks 7 from bottom to top, wherein the graded gravel layer 15 is laid on the soil base layer 16, the sand-free permeable cement concrete layer 14 is laid on the graded gravel layer 15, the permeable soil material layer 13 is laid on the sand-free permeable cement concrete layer 14, the sand leveling layer 12 is laid on the permeable soil material layer 13, the permeable bricks 7 are laid on the sand leveling layer 12, the height of the tops of the permeable bricks 7 is matched with that of the blind sidewalk 10, and the design requirements of the blind sidewalk 10 are compounded; a horizontal seepage and drainage pipe 9 is laid in the soil base layer 16 at the lower part of the graded gravel layer 15, and the bottom of the horizontal seepage and drainage pipe 9 is communicated with a plurality of vertical seepage and drainage pipes 8. The periphery of the horizontal seepage and drainage pipe 9 and the vertical seepage and drainage pipe 8 is paved with a permeable earthen material wrapping layer 17. The transverse seepage and drainage pipe 9 is also communicated with a seepage and drainage pipe 6 which extends to the rainwater port 5 at the side of the roadway 4.
The above description is not intended to limit the present application, and the present application is not limited to the above examples, and those skilled in the art should understand that they can make various changes, modifications, additions or substitutions within the spirit and scope of the present application.

Claims (6)

1.一种现状人行道的改造结构,包括盲道(10),所述的盲道(10)与车行道(4)之间的区域的靠近车行道(4)的边缘设置有路缘石(3),盲道(10)与车行道(4)之间的区域围设有多个树池(1);其特征在于:盲道(10)与路缘石(3)和树池(1)之间的区域从下往上依次为土基层(16)、级配碎石层(15)、无砂透水水泥混凝土层(14)、透水土工材料层(13)、砂找平层(12)和透水砖(7),级配碎石层(15)铺设在土基层(16)上,无砂透水水泥混凝土层(14)铺设在级配碎石层(15)上,透水土工材料层(13)铺设在无砂透水水泥混凝土层(14)上,砂找平层(12)铺设在透水土工材料层(13)上,透水砖(7)铺设在砂找平层(12)上;级配碎石层(15)下部的土基层(16)内铺设有横向渗排水管(9),横向渗排水管(9)的底部连通有多根竖向渗排水管(8)。1. An existing sidewalk reconstruction structure, comprising a blind road (10), and a curb (3) is provided on the edge of the area between the blind road (10) and the roadway (4) close to the roadway (4). ), the area between the blind road (10) and the roadway (4) is surrounded by a plurality of tree pools (1); it is characterized in that: between the blind road (10) and the curb stone (3) and the tree pool (1) The area from bottom to top is the soil base layer (16), the graded gravel layer (15), the non-sand permeable cement concrete layer (14), the permeable geotechnical material layer (13), the sand leveling layer (12) and the permeable brick layer. (7), the graded gravel layer (15) is laid on the soil base (16), the sand-free permeable cement concrete layer (14) is laid on the graded gravel layer (15), and the permeable geotechnical material layer (13) is laid On the non-sand permeable cement concrete layer (14), the sand leveling layer (12) is laid on the permeable geotechnical material layer (13), the permeable bricks (7) are laid on the sand leveling layer (12); the graded gravel layer ( 15) A lateral seepage and drainage pipe (9) is laid in the lower soil base layer (16), and a plurality of vertical seepage and drainage pipes (8) are connected to the bottom of the transverse seepage and drainage pipe (9). 2.根据权利要求1所述的现状人行道的改造结构,其特征在于:所述的树池(1)通过条石(2)围设。2 . The reconstructed structure of the existing sidewalk according to claim 1 , wherein the tree pool ( 1 ) is surrounded by strip stones ( 2 ). 3 . 3.根据权利要求1所述的现状人行道的改造结构,其特征在于:所述的横向渗排水管(9)还连通有伸至车行道(4)边的雨水口(5)处的渗排水管(6)。3. The reconstruction structure of the existing sidewalk according to claim 1, characterized in that: the lateral seepage and drainage pipe (9) is also connected with the seepage at the rainwater inlet (5) extending to the side of the roadway (4). Drain (6). 4.根据权利要求1所述的现状人行道的改造结构,其特征在于:所述的横向渗排水管(9)和竖向渗排水管(8)的外周铺设有透水土工材料包裹层(17)。4. The reconstruction structure of the existing sidewalk according to claim 1, characterized in that: the outer periphery of the lateral seepage and drainage pipes (9) and the vertical seepage and drainage pipes (8) are covered with permeable geotechnical material wrapping layers (17) . 5.根据权利要求1所述的现状人行道的改造结构,其特征在于:所述的盲道(10)的远离车行道(4)侧为原人行道结构层(11)。The reconstruction structure of the existing sidewalk according to claim 1, characterized in that: the side of the blind road (10) away from the roadway (4) is the original sidewalk structure layer (11). 6.根据权利要求5所述的现状人行道的改造结构,其特征在于:所述的原人行道结构层(11)的远离盲道(10)侧挡设有条石(2),条石(2)与原人行道结构层(11)的步砖平齐。6. The reconstruction structure of the existing sidewalk according to claim 5, characterized in that: the side of the original sidewalk structure layer (11) away from the blind road (10) is blocked with a stone (2), and the stone (2) It is flush with the step bricks of the original sidewalk structure layer (11).
CN202121883038.XU 2021-08-12 2021-08-12 A modified structure of the existing sidewalk Expired - Fee Related CN215829185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121883038.XU CN215829185U (en) 2021-08-12 2021-08-12 A modified structure of the existing sidewalk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121883038.XU CN215829185U (en) 2021-08-12 2021-08-12 A modified structure of the existing sidewalk

Publications (1)

Publication Number Publication Date
CN215829185U true CN215829185U (en) 2022-02-15

Family

ID=80195759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121883038.XU Expired - Fee Related CN215829185U (en) 2021-08-12 2021-08-12 A modified structure of the existing sidewalk

Country Status (1)

Country Link
CN (1) CN215829185U (en)

Similar Documents

Publication Publication Date Title
CN206616423U (en) Concave herbaceous field system based on sponge city
CN112726325B (en) Sidewalk drainage structure and combined drainage method of sidewalk drainage structure and drainage curb
CN204875416U (en) Porous pavement structure
CN209293141U (en) Water permeable sidewalk drainage system in sponge city
CN205171305U (en) Bituminous paving with drainage structures
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN104480829A (en) Pavement structure internal draining system for eliminating road surface water seepage
CN108342943B (en) A sponge city permeable pavement suitable for prefabricated roadbed
CN209024909U (en) A Sponge City Multifunctional Pavement Structure
CN107044081B (en) Ecological street drainage structure
CN209759918U (en) A Pavement Structure Suitable for Sponge City
CN207295367U (en) A kind of asphalt highway edge drainage structure
CN107794822B (en) Permeable pavement based on sponge city idea
CN206581379U (en) A kind of garden way tooth drainage system
CN214033246U (en) A road anti-seepage structure for sponge city design
CN215829185U (en) A modified structure of the existing sidewalk
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN209759936U (en) Permeable pavement structure based on building rubbish crushed aggregates
CN208201555U (en) A kind of sponge urban water-through paved road suitable for assembled roadbed
CN218373102U (en) Assembled retaining road surface structure with water purification effect
CN218951878U (en) A sunken green belt structure for municipal roads
CN217104534U (en) Brick structure of mating formation permeates water suitable for high ground water level region
CN105019329A (en) Water storage type road structure
CN206448131U (en) Pavement underdrain structure
CN215593563U (en) Pavement permeable structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220215

CF01 Termination of patent right due to non-payment of annual fee