CN103255774A - 围堰的拼装方法 - Google Patents
围堰的拼装方法 Download PDFInfo
- Publication number
- CN103255774A CN103255774A CN2013102052877A CN201310205287A CN103255774A CN 103255774 A CN103255774 A CN 103255774A CN 2013102052877 A CN2013102052877 A CN 2013102052877A CN 201310205287 A CN201310205287 A CN 201310205287A CN 103255774 A CN103255774 A CN 103255774A
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- watertight shutter
- watertight
- shutter
- mouth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310205287.7A CN103255774B (zh) | 2013-05-28 | 2013-05-28 | 围堰的拼装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310205287.7A CN103255774B (zh) | 2013-05-28 | 2013-05-28 | 围堰的拼装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103255774A true CN103255774A (zh) | 2013-08-21 |
CN103255774B CN103255774B (zh) | 2015-07-08 |
Family
ID=48959958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310205287.7A Active CN103255774B (zh) | 2013-05-28 | 2013-05-28 | 围堰的拼装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103255774B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2682701A1 (fr) * | 1991-10-17 | 1993-04-23 | Morillon Corvol Courbot | Caisson flottant. |
CN101435201A (zh) * | 2008-12-17 | 2009-05-20 | 中铁大桥局股份有限公司 | 一种大型浅水浮运围堰 |
KR20120011120A (ko) * | 2010-07-28 | 2012-02-07 | 홍문표 | 수중교각설치공사를 위한 방수커튼의 제작과 설치 |
CN102852152A (zh) * | 2012-09-29 | 2013-01-02 | 中铁八局集团第一工程有限公司 | 一种适用于浅水区域的钢围堰下水施工方法 |
-
2013
- 2013-05-28 CN CN201310205287.7A patent/CN103255774B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2682701A1 (fr) * | 1991-10-17 | 1993-04-23 | Morillon Corvol Courbot | Caisson flottant. |
CN101435201A (zh) * | 2008-12-17 | 2009-05-20 | 中铁大桥局股份有限公司 | 一种大型浅水浮运围堰 |
KR20120011120A (ko) * | 2010-07-28 | 2012-02-07 | 홍문표 | 수중교각설치공사를 위한 방수커튼의 제작과 설치 |
CN102852152A (zh) * | 2012-09-29 | 2013-01-02 | 中铁八局集团第一工程有限公司 | 一种适用于浅水区域的钢围堰下水施工方法 |
Non-Patent Citations (2)
Title |
---|
周光华: "《浅谈汇泉角至象嘴海湾大桥》", 《海岸工程》 * |
皮建设: "《沉箱制作与下水》", 《河岸工程》 * |
Also Published As
Publication number | Publication date |
---|---|
CN103255774B (zh) | 2015-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476326B (zh) | 一种承台预制及施工方法 | |
CN104480865B (zh) | 一种大型钢沉井精确定位方法 | |
KR101354383B1 (ko) | 수중 발파작업용 작업선 | |
CN103912721A (zh) | 一种水下开槽、沉管穿越河流的施工方法 | |
CN102979039B (zh) | 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法 | |
CN207314329U (zh) | 一种水下灌注桩的钢筋笼定位装置 | |
CN105350526A (zh) | 钢平台的搭设方法 | |
CN105544575A (zh) | 一种采用钢桁架加筋的水下封底混凝土施工方法 | |
CN113585302A (zh) | 用于深水裸岩地质无封底混凝土双壁钢围堰的施工方法 | |
CN103015442B (zh) | 分体围堰施工方法 | |
CN107169215A (zh) | 应对锚害的海底电缆埋深要求的设计方法 | |
CN109853531A (zh) | 一种钻孔灌注桩的桩基施工工艺 | |
CN103603364A (zh) | 深水用吸力式重力基础及其深水安装装置和深水安装方法 | |
CN109707002B (zh) | 大型取水头精确定位沉放安装装置及方法 | |
CN103255775B (zh) | 围堰的安装方法 | |
CN103243727B (zh) | 围堰的竖转方法 | |
CN203462479U (zh) | 一种围堰结构 | |
CN104912093A (zh) | 一种深水桩基定位、导向结构及施工方法 | |
CN103266619B (zh) | 一种围堰结构 | |
LU501867B1 (en) | Method for rapidly constructing a large passageway underwater through shallow burial and cut-and-cover with no dry dock | |
CN103485356A (zh) | 一种水上铺排架及利用此水上铺排架填充砂袋的围堰方法 | |
CN203583509U (zh) | 深水用吸力式重力基础及其深水安装装置 | |
CN103255774B (zh) | 围堰的拼装方法 | |
CN207452738U (zh) | 深水高墩大跨度桥梁施工用坚石裸岩河床栈桥 | |
CN207143999U (zh) | 一种水下沉管及架设水下沉管的装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CCCC ROAD AND BRIDGE CONSTRUCTION CO., LTD. Effective date: 20131112 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Ling Yunfeng Inventor after: Zhao Fuli Inventor after: Xia Jiangnan Inventor after: Liang Zhen Inventor after: Qin Pengfei Inventor after: Xue Zhanwen Inventor after: Chen Liang Inventor before: Ling Yunfeng Inventor before: Zhao Fuli Inventor before: Xia Jiangnan Inventor before: Liang Zhen Inventor before: Qin Pengfei Inventor before: Xue Zhanwen Inventor before: Wei Chao Inventor before: Chen Liang Inventor before: Sun Zongwei |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LING YUNFENG ZHAO FULI XIA JIANGNAN LIANG ZHEN QIN PENGFEI XUE ZHANWEN WEICHAO CHEN LIANG SUN ZONGWEI TO: LING YUNFENG ZHAO FULI XIA JIANGNAN LIANG ZHEN QIN PENGFEI XUE ZHANWEN CHEN LIANG |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20131112 Address after: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 17 Applicant after: Road & Bridge South China Engineering Co., Ltd. Applicant after: Road & Bridge International Co., Ltd. Address before: 528400 Guangdong city of Zhongshan Province East Xing Zheng Road No. 1 Central Plaza 3 floor 17 Applicant before: Road & Bridge South China Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |