CN103243913A - 装配式剪力墙建筑上下层连接处灌浆层的封堵方法 - Google Patents

装配式剪力墙建筑上下层连接处灌浆层的封堵方法 Download PDF

Info

Publication number
CN103243913A
CN103243913A CN2013101833889A CN201310183388A CN103243913A CN 103243913 A CN103243913 A CN 103243913A CN 2013101833889 A CN2013101833889 A CN 2013101833889A CN 201310183388 A CN201310183388 A CN 201310183388A CN 103243913 A CN103243913 A CN 103243913A
Authority
CN
China
Prior art keywords
shear wall
grout
grout blanket
blanket
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101833889A
Other languages
English (en)
Other versions
CN103243913B (zh
Inventor
于彦凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northeast Architectural Design and Research Institute Co Ltd
Original Assignee
China Northeast Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northeast Architectural Design and Research Institute Co Ltd filed Critical China Northeast Architectural Design and Research Institute Co Ltd
Priority to CN201310183388.9A priority Critical patent/CN103243913B/zh
Publication of CN103243913A publication Critical patent/CN103243913A/zh
Application granted granted Critical
Publication of CN103243913B publication Critical patent/CN103243913B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

装配式剪力墙建筑上下层连接处灌浆层的封堵方法,涉及一种建筑结构的制作方法,所述方法包括以下过程:先将木条11用钢钉12固定在灌浆层4两侧将灌浆层4两侧完全封堵,然后再将高强灌浆料5灌满及灌浆层4,待高强灌浆料5完全凝固达到一定强度后,拆除并回收木条11即可。封堵方法适于装配式剪力墙建筑结构的上下层连接处的构造形式。本发明采用木条封堵,可以保证灌浆层一侧表面平整,使高强灌浆料完全填满灌浆层,完整的传递上下层之间的荷载;本发明木条的韧性强于水泥砂浆,有很好的抗冲击力;本发明木条方便预制、便于安装,更适用于装配式建筑施工;木条可回收再利用,节省材料。

Description

装配式剪力墙建筑上下层连接处灌浆层的封堵方法
技术领域
本发明涉及一种建筑施工方法,特别是涉及一种装配式剪力墙建筑上下层连接处灌浆层的封堵方法。
背景技术
装配式剪力墙结构建筑是近年来国家重点发展的的一种结构形式。采用装配式剪力墙结构形式建造建筑有建筑质量高、建造速度快、节省材料、节约人力资源等优点,是我国住宅工业化进程的重要组成部分。这种结构形式的关键技术在于预制剪力墙板之间的连接,尤其是预制剪力墙板的竖向连接。
 我国目前装配式剪力墙上下层之间的连接构造由上层剪力墙1、剪力墙底部套筒2、建筑面层3、灌浆层4、高强灌浆料5、侧向封堵砂浆10、楼板现浇层6、预制楼板7、下层剪力墙8以及剪力墙顶部钢筋9组成。
首先下层剪力墙8、预制楼板以及楼板现浇层浇筑完成。然后把上层剪力墙1固定好(下层剪力墙顶部钢筋9插入上层剪力墙底部套筒2内),上部剪力墙1与楼板现浇层留出一个缝隙—灌浆层4。当进行上下层连接施工时先用侧向封堵砂浆10对灌浆层4两端的开口进行封堵,然后再通过向与灌浆层4相通的上层剪力墙底部套筒2内注入高强灌浆料5填满灌浆层4以传递上下层剪力墙之间的结构荷载。这种砂浆封堵法的弊端在于侧向封堵砂浆10在施工时无法保证灌浆层4一侧的平整度,封堵砂浆10会侵入到灌浆层4内,以至于高强灌浆料5无法保证填满整个灌浆层4,影响整个灌浆层4的强度,无法保证上下层的竖向荷载顺利传递。见图1~图2。
发明内容
本发明的目的在于提供一种装配式剪力墙建筑上下层连接处灌浆层的封堵方法,该方法采用木条封堵,可以保证灌浆层一侧表面平整,使高强灌浆料完全填满灌浆层,并完整的传递上下层之间的荷载。
 本发明的目的是通过以下技术方案实现的:
    装配式剪力墙建筑上下层连接处灌浆层的封堵方法,所述方法包括以下过程:先将木条用钢钉固定在灌浆层两侧将灌浆层两侧完全封堵,然后再将高强灌浆料灌满及灌浆层,待高强灌浆料完全凝固达到一定强度后,拆除并回收木条即可。  
    所述的装配式剪力墙建筑上下层连接处灌浆层的封堵方法,所述封堵方法适于装配式剪力墙建筑结构的上下层连接处的构造形式。
 本发明的优点与效果是:
    1.本发明采用木条封堵,可以保证灌浆层一侧表面平整,使高强灌浆料完全填满灌浆层,完整的传递上下层之间的荷载;
    2.本发明木条的韧性强于水泥砂浆,有很好的抗冲击力;
    3.本发明木条方便预制、便于安装,更适用于装配式建筑施工; 4.木条可回收再利用,节省材料;
    4.本发明可用于凡涉及上下层采用灌浆层连接的装配式剪力墙结构建筑物、构筑物。
附图说明
图1为目前我国在装配式剪力墙建筑上下层连接处灌浆层水泥砂浆侧向封堵法的平面图;
    图2为目前我国在装配式剪力墙建筑上下层连接处灌浆层水泥砂浆侧向封堵法的剖视图;
    图3为本发明装配式剪力墙建筑上下层连接处灌浆层木条侧向封堵法的平面图;
    图4为本发明装配式剪力墙建筑上下层连接处灌浆层木条侧向封堵法的剖面图。
具体实施方式
 下面结合实施例对本发明进行详细说明。
本发明构件包括:剪力墙1、底部套筒2、建筑面层3、灌浆层4、灌浆料5、楼板现浇层6、预制楼板7、下层剪力墙8、剪力墙顶部钢筋9、封堵砂浆10、木条11、钢钉12。
   本发明装配式剪力墙建筑上下层连接处灌浆层木条侧向封堵法是用木条11作为侧向封堵材料替代原有的侧向封堵砂浆10。用钢钉12把木条11钉在灌浆层4两侧作为侧向封堵材料可以保证灌浆层4一侧的平整度,保证高强灌浆料5完全填满灌浆层4,完整的传递上下层之间的荷载。
    实施例:
    先将木条11用钢钉12固定在灌浆层4两侧将灌浆层4两侧完全封堵,然后再将高强灌浆料5灌满及灌浆层4,待高强灌浆料5完全凝固达到一定强度后,拆除并回收木条11。本发明用木条11作为灌浆层4侧向封堵材料可以保证灌浆层4一侧的平整度,保证高强灌浆料5完全填满灌浆层4,完整的传递上下层之间的荷载。应用时,木条11的木材类型、木条11的截面大小、钢钉12的材质,钢钉12的大小根据工程实际受力情况确定,如图3~图4所示。装配式剪力墙建筑上下层连接处的灌浆层用木条作为侧向封堵材料替代原有的侧向封堵砂浆,适于装配式剪力墙建筑结构的上下层连接处的构造形式。采用木条封堵,可以保证灌浆层一侧表面平整,使高强灌浆料完全填满灌浆层,完整的传递上下层之间的荷载;木条的韧性强于水泥砂浆,有很好的抗冲击力;木条方便预制、便于安装,更适用于装配式建筑施工。

Claims (2)

1.装配式剪力墙建筑上下层连接处灌浆层的封堵方法,其特征在于,所述方法包括以下过程:先将木条(11)用钢钉(12)固定在灌浆层(4)两侧将灌浆层(4)两侧完全封堵,然后再将高强灌浆料(5)灌满及灌浆层(4),待高强灌浆料(5)完全凝固达到一定强度后,拆除并回收木条(11)即可。
2.根据权利要求1所述的装配式剪力墙建筑上下层连接处灌浆层的封堵方法,其特征在于,所述封堵方法适于装配式剪力墙建筑结构的上下层连接处的构造形式。
CN201310183388.9A 2013-05-17 2013-05-17 装配式剪力墙建筑上下层连接处灌浆层的封堵方法 Active CN103243913B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310183388.9A CN103243913B (zh) 2013-05-17 2013-05-17 装配式剪力墙建筑上下层连接处灌浆层的封堵方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310183388.9A CN103243913B (zh) 2013-05-17 2013-05-17 装配式剪力墙建筑上下层连接处灌浆层的封堵方法

Publications (2)

Publication Number Publication Date
CN103243913A true CN103243913A (zh) 2013-08-14
CN103243913B CN103243913B (zh) 2015-09-09

Family

ID=48923761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310183388.9A Active CN103243913B (zh) 2013-05-17 2013-05-17 装配式剪力墙建筑上下层连接处灌浆层的封堵方法

Country Status (1)

Country Link
CN (1) CN103243913B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759881A (zh) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 预制柱连接节点灌浆封堵结构及方法
CN109469266A (zh) * 2018-11-02 2019-03-15 中民筑友建设科技集团有限公司 一种预制构件竖向施工节点及其施工方法
CN112267681A (zh) * 2020-11-05 2021-01-26 山东省建筑科学研究院有限公司 一种装配式混凝土灌浆层封堵用成型组件、构件及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7047705B2 (en) * 1997-02-11 2006-05-23 Pregis Innovative Packaging Inc. Laminate film-foam flooring composition
CN101806095A (zh) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 一种全预制装配整体式钢筋混凝土房屋及其建造方法
CN101845821A (zh) * 2009-03-24 2010-09-29 中冶成工上海五冶建设有限公司 大型倾斜设备基础垫铁倾斜度控制方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7047705B2 (en) * 1997-02-11 2006-05-23 Pregis Innovative Packaging Inc. Laminate film-foam flooring composition
CN101845821A (zh) * 2009-03-24 2010-09-29 中冶成工上海五冶建设有限公司 大型倾斜设备基础垫铁倾斜度控制方法
CN101806095A (zh) * 2010-03-15 2010-08-18 中山市快而居房屋预制件有限公司 一种全预制装配整体式钢筋混凝土房屋及其建造方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759881A (zh) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 预制柱连接节点灌浆封堵结构及方法
CN106759881B (zh) * 2016-12-29 2022-07-19 上海建工五建集团有限公司 预制柱连接节点灌浆封堵结构及方法
CN109469266A (zh) * 2018-11-02 2019-03-15 中民筑友建设科技集团有限公司 一种预制构件竖向施工节点及其施工方法
CN109469266B (zh) * 2018-11-02 2021-04-13 中民筑友建设科技集团有限公司 一种预制构件竖向施工节点及其施工方法
CN112267681A (zh) * 2020-11-05 2021-01-26 山东省建筑科学研究院有限公司 一种装配式混凝土灌浆层封堵用成型组件、构件及方法
CN112267681B (zh) * 2020-11-05 2022-04-22 山东省建筑科学研究院有限公司 一种装配式混凝土灌浆层封堵用成型组件、构件及方法

Also Published As

Publication number Publication date
CN103243913B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN105908862B (zh) 一种3d打印配筋砌体剪力墙中的砌体外壳的制作方法
CN207538350U (zh) 一种装配式剪刀楼梯
CN101831970A (zh) 一种装配整体式墙板墙体及其施工方法
CN101858119A (zh) 一种钢筋混凝土空心楼板及施工方法
CN106088327A (zh) 基于3d打印的装配式框架柱的制作方法
CN103243913A (zh) 装配式剪力墙建筑上下层连接处灌浆层的封堵方法
CN101449009B (zh) 使用空心塑料模块的墙体结构
CN106088657A (zh) 一种空斗墙体的加固结构及其施工方法
CN203821625U (zh) 一种纤维布加强的无砂浆配筋砌体剪力墙
CN203961099U (zh) 一种高强度空心构造柱模板砖及其浇筑的构造柱
CN104110096B (zh) 预制建筑板及构成的墙楼件和建筑房及建筑房的施工方法
CN202830952U (zh) 一种新型软土地基结构
CN112575886A (zh) 低、多层全预制装配式混凝土结构及设计生产安装方法
CN105019593A (zh) 建筑保温预制块及其模块式配筋现浇法施工方法
CN201687105U (zh) 一种装配整体式墙板墙体
CN106284999A (zh) 装配式建筑陶粒混凝土内隔墙条板安装工艺
CN104947948A (zh) 一种夯土墙体的加固方法
CN201292590Y (zh) 用可再生资源为填料的带反肋预制楼板
CN209308222U (zh) 一种带企口预制剪力墙的连接结构
CN204225360U (zh) 一种预制柱及与预制梁的连接结构
CN206070550U (zh) 一种装配式建筑预制基础
CN203247750U (zh) 拼装式水泥砖
CN207727784U (zh) 一种用于填充梁底与墙顶间隔缝的砌块
CN202755532U (zh) 一种拉砌组合建筑装配式墙板
CN207260394U (zh) 一种穿筋式全预制单向板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant