CN103228841A - Combined isolation fence - Google Patents

Combined isolation fence Download PDF

Info

Publication number
CN103228841A
CN103228841A CN2011800208979A CN201180020897A CN103228841A CN 103228841 A CN103228841 A CN 103228841A CN 2011800208979 A CN2011800208979 A CN 2011800208979A CN 201180020897 A CN201180020897 A CN 201180020897A CN 103228841 A CN103228841 A CN 103228841A
Authority
CN
China
Prior art keywords
bearing
lateral isolation
isolation bar
combined type
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011800208979A
Other languages
Chinese (zh)
Other versions
CN103228841B (en
Inventor
孙希贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201180020897.9A priority Critical patent/CN103228841B/en
Publication of CN103228841A publication Critical patent/CN103228841A/en
Application granted granted Critical
Publication of CN103228841B publication Critical patent/CN103228841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/02Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic specially adapted for sustaining vegetation or for accommodating plants ; Embankment-type or crib-type noise barriers; Retaining walls specially adapted to absorb or reflect noise
    • E01F8/021Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic specially adapted for sustaining vegetation or for accommodating plants ; Embankment-type or crib-type noise barriers; Retaining walls specially adapted to absorb or reflect noise with integral support structure
    • E01F8/022Crib-type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Plants (AREA)
  • Cultivation Of Plants (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Disclosed is a combined isolation fence which includes a bracket (1) and a transversal isolation rod (2). The bracket (1) and the transversal isolation rod (2) are axial symmetry structures about horizontal axis and vertical axis, a planting room is provided in the upper part and a water channel (3) which can be an impounding reservoir simultaneously is provided in the lower part of the transversal isolation rod. A transversal through hole (5) is provided in the bracket (1), and holes (4) for connection and drain are provided in the left and right end faces of the transversal isolation rod (2). Any part of the exterior surface of the transversal isolation rod (2) is surrounded in the through hole (5) of the bracket and the transversal isolation rods are spliced aerially so that the bracket (1) can be spliced and moved on the exterior surface of the transversal isolation rod (2) freely. The adjacent transversal isolation rods are connected by connection holes (4) directly or by a bolt or a hollow tube bolt with plastic gasket indirectly, and the water channels (3) of the adjacent transversal isolation rods (2) are intercommunicated. The structure between two adjacent brackets (1) and the transversal isolation rod (2) is symmetric.

Description

Combine isolated column
Specification
Combine isolated column
Technical field
The present invention relates to a kind of isolated column, a kind of Combined type green isolating railing in its interior planting plants or laying flowerpot is related specifically to.
Background technology
Chinese patent CN2542716 support is exactly guardrail or isolated column, it, which is utilized on the guardrail itself do not afforested or isolated column on the i.e. support of number of patent application 02220331. 1, is arranged on flower trough on guardrail or flower stand with fixedly connected part, flowers and plants are planted in flower trough again, the result is that flower trough, which makes the scale of construction and load of steel construction guardrail or flower stand guardrail is produced turning torque greatly, does not have security and stability, i.e. it is top-heavy be very easy to tumble collapse, and take up an area wide, external irrigation pipe makes its guard bar structure complicated, unsightly and cost is higher, more importantly external additional flower trough and irrigation pipe have severely compromised road traffic and the safety of pedestrian, if this technology is applied on skyscraper, it is very easy to be fallen by wind and endangers the life security of people.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of Combined type green isolating railing, and Combined type green isolating railing tool has the advantage that:1. make the lateral isolation bar of Combined type green isolating railing not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself;2. Combined type green isolating railing only needs replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic;It is the Combined type green isolating railing with greening function of stabilization and safeguard construction of the center of gravity on the plane of symmetry 3. bearing is only by vertical pressure without turning torque;4. simple in construction, installation and convenient disassembly, the Combined type green isolating railing with greening function with low cost;5. the bottom Nature Link of lateral isolation bar is formed with the water supply and sewage pouring management maintenance system of the whole Combined type green isolating railing of insertion;6. the structure in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is all support force on two adjacent bearings and is symmetrical rock-steady structure.
The present invention solves above-mentioned technical problem and adopted the technical scheme that:Combined type green isolating railing, including bearing and lateral isolation bar, described bearing and lateral isolation bar appearance profile is front and rear and bilateral symmetry, described lateral isolation bar top is plantation space, bottom is cistern and pipelined channel, there are the corresponding water supply and sewage in position and connecting hole on lateral isolation bar or so end face, bearing has by the through hole of a side to another side, the vertically symmetrical face of through hole is parallel with the vertically symmetrical face of bearing and distance is in 6 centimetres, any one section of the whole outer surface of described lateral isolation bar is enclosed in the through hole of bearing and built on stilts splicing, its bearing can arbitrarily splice and mobile on the whole outer surface of lateral isolation bar, the end face of adjacent transverse spacer bar directly or adds plastic cement sealing gasket to be indirectly connected in series with bolt or hollow tube bolt by water supply and sewage and connecting hole, the cistern of lateral isolation bar bottom and pipelined channel insertion are into Combined type green isolating railing simultaneously, described Combined greening every Part between the bearing adjacent from the interconnection part any two that adjacent transverse spacer bar is removed in column and lateral isolation bar is symmetrical structure.The Combined type green isolating railing makes the lateral isolation bar of isolated column not only have isolation features in itself but also with the greening function of direct planting plants or laying flowerpot in it, and only need replacing time or lateral isolation bar just to meet different insulation requests and greening aesthetic, this is the function that prior art does not have, realize simultaneously simple in construction, install and convenient disassembly, it is with low cost, the profile of bearing and lateral isolation bar is front and rear and bilateral symmetry, it ensure that bearing only by vertical pressure without turning torque, it is stabilization and safeguard construction of the center of gravity on the plane of symmetry, the water supply and sewage that cistern and pipelined channel and water supply and sewage and connecting hole form the whole Combined type green isolating railing of insertion pours management maintenance system, the deviation in the vertically symmetrical face of through hole and the vertically symmetrical face of bearing is effectively protected the safety of a wherein side in 6 centimetres, any one section of the whole outer surface of lateral isolation bar is enclosed in the through hole of bearing and built on stilts splicing, its bearing, which can arbitrarily splice and slide on the whole outer surface of lateral isolation bar, arbitrarily can effectively adjust span and the adaptation rugged installation requirement of Different Ground, part in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is all support force on two bearings and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
Combined type green isolating railing,Including bearing and lateral isolation bar,Described bearing and lateral isolation bar appearance profile is front and rear and bilateral symmetry,Described lateral isolation bar top is plantation space,Bottom is cistern and pipelined channel,The symmetrical outer face of two, lateral isolation bar has position is corresponding to be used to splice the straight pipe with flowing water,Bearing has having for the clear opening or top surface for splicing and supporting to recessed groove from a side to another side,It is parallel with the vertically symmetrical face of bearing and distance is in 6 centimetres to the vertically symmetrical face of recessed groove for the clear opening or top surface that splice and support,Lateral isolation bar two ends are used to splice and the straight pipe of flowing water need to be only inserted directly into along horizontal direction or clear opening or top surface that embedded left and right bearing is used to splice and support splice to recessed groove,The empty structure division between two bearings of its lateral isolation bridge is symmetrical structure,Continuous alternately series connection is spliced into Combined type green isolating railing again successively for bearing and lateral isolation bar,The adjacent lateral isolation bar of left and right two and bearing three are connected by the straight pipe for being used for splicing and flowing water through the lateral isolation bar of left and right two on same bearing with bolt or hollow tube bolt again,The cistern and pipelined channel of adjacent transverse spacer bar pass through for splicing the straight pipe insertion with flowing water simultaneously,Structure division between two bearings and lateral isolation bar of described Combined type green isolating railing is symmetrical structure,Its advantage is that the lateral isolation bar for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself,And only need replacing time 1 or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing and lateral isolation bar is front and rear and bilateral symmetry,It ensure that bearing only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,Cistern and pipelined channel and for splice and flowing water straight pipe form the whole Combined type green isolating railing of insertion water supply and sewage pour management maintenance system,The deviation in the vertically symmetrical face of through hole and the vertically symmetrical face of bearing is effectively protected the safety of a wherein side in 6 centimetres,In the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar Part be all support force on two bearings and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
Combined type green isolating railing,Including bearing and lateral isolation bar,Described bearing and lateral isolation bar appearance profile is front and rear and bilateral symmetry,Described lateral isolation bar top is plantation space,Bottom is cistern and pipelined channel,There are the corresponding water supply and sewage in position and connecting hole on lateral isolation bar or so end face,Bearing has by the clear opening having for splicing and supporting of a side to another side,The vertically symmetrical face of clear opening for splicing and supporting is parallel with the vertically symmetrical face of bearing and distance is in 6 centimetres,Lateral isolation bar is fastened on two bearings through bearing by bolt or hollow tube bolt for the clear opening for splicing and supporting and being maked somebody a mere figurehead for water supply and sewage and connecting hole for lateral isolation bar,The empty structure division between two bearings of its lateral isolation bridge is symmetrical structure,The cistern and pipelined channel of the lateral isolation bar of bearing left and right side two pass through water supply and sewage and connecting hole insertion simultaneously,Continuous alternately series connection is spliced into Combined type green isolating railing again successively for bearing and lateral isolation bar,Structure division between described Combined type green isolating railing any two bearing and lateral isolation bar is symmetrical structure,Its advantage is that the lateral isolation bar for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself,And only need replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing and lateral isolation bar is front and rear and bilateral symmetry,It ensure that bearing only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,The water supply and sewage that cistern and pipelined channel and water supply and sewage and connecting hole form the whole Combined type green isolating railing of insertion pours management maintenance system,The safety of a wherein side is effectively protected in 6 centimetres for the vertically symmetrical face of clear opening spliced and supported and the deviation in the vertically symmetrical face of bearing,Part in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is all support force on two bearings and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
It is used as the optimization to above-mentioned technical proposal, described bearing at least splices the lateral isolation bar for having two layers of consistency from top to bottom, and there is penetrating plant growth space before and after the lateral isolation bar for making bearing and two layers of consistency from top to bottom, its advantage is to form more preferable landscape effect and be conducive to plant growth.
It is used as the optimization to above-mentioned technical proposal, there is the splicing construction being mutually matched on the top surface of described bearing and bottom surface, bearing 1 above and below the splicing construction that is mutually matched by being connected in series, splicing has lateral isolation bar between the same layer for the bearing being connected in series up and down, and its advantage is that the lateral isolation bar and bearing of standardized production can just realize the Combined type green isolating railing for being desirably combined into all size and height.
It is used as the optimization to above-mentioned technical proposal, between described adjacent transverse spacer bar supply and discharge water hole and connecting hole or for splicing sealing gasket is connected between the straight pipe of flowing water, space between described supply and discharge water hole and connecting hole or splicing and the straight pipe and bolt of flowing water is pipelined channel, and its advantage is creative to be merged connection and pipelined channel.
As the optimization to above-mentioned technical proposal, planting groove or cistern are arranged at the top of described bearing, and its advantage is to fill The space taken using bearing is divided to become a part for planting plants.
Combined type green isolating railing,Including bearing and lateral isolation railing,Described bearing and lateral isolation bar appearance profile is front and rear and bilateral symmetry,Described bearing is hexahedron or cylinder,Described lateral isolation bar top is plantation space,Bottom is cistern and pipelined channel,There are the corresponding water supply and sewage in position and connecting hole on lateral isolation bar or so end face or for splicing the straight pipe with flowing water,Any one section of the outer surface of lateral isolation bar is any mobile in the horizontal top surface or concave top surface of at least one bearing and splices at an arbitrary position,Water supply and sewage and connecting hole or for splice and flowing water straight pipe vertically symmetrical face it is parallel with the vertically symmetrical face of bearing and distance is in 6 centimetres,The lateral isolation bar connection assist or bonding agent spliced at an arbitrary position is connected with bearing,Connection assist is bolt or inverted U-shaped component,Adjacent transverse spacer bar is by water supply and sewage and connecting hole or for splicing and the straight pipe of flowing water directly or adds plastic cement sealing gasket is indirect with bolt or hollow tube bolt to be serially connected in Combined type green isolating railing,The cistern and pipelined channel of adjacent transverse spacer bar bottom are by water supply and sewage and connecting hole or for splicing the straight pipe insertion with flowing water simultaneously,Between the adjacent bearing of any two and lateral isolation bar in addition to the coupling part of adjacent transverse spacer bar it is symmetrical structure in described Combined type green isolating railing,Its advantage is that the lateral isolation bar for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself,And only need replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing and lateral isolation bar is front and rear and bilateral symmetry,It ensure that bearing only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,Cistern and pipelined channel and water supply and sewage and connecting hole or for splice and flowing water straight pipe form the whole Combined type green isolating railing of insertion water supply and sewage pour management maintenance system,Water supply and sewage and connecting hole or for splice and flowing water straight pipe vertically symmetrical face and bearing vertically symmetrical face deviation centimetre in be effectively protected the safety of a wherein side,Part in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is all support force on two bearings and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
Combined type green isolating railing, including bearing and lateral isolation bar, described bearing and lateral isolation bar appearance profile is front and rear and bilateral symmetry, described bearing is hexahedron or cylinder, described lateral isolation bar is the continuous groove from an end face to other end, continuous groove top is plantation space, bottom is cistern and pipelined channel, any one section of the outer surface of lateral isolation bar is any mobile in the horizontal top surface or concave top surface of at least one bearing and splices at an arbitrary position, the vertically symmetrical face of lateral isolation bar is parallel with the vertically symmetrical face of bearing and distance is in 6 centimetres, the lateral isolation bar connection assist or bonding agent spliced at an arbitrary position is connected with bearing, connection assist is bolt or inverted U-shaped component, two adjacent lateral isolation bar part is overlapping or alignment is connected in series with bolt or bonding agent, the vertical cut-off of connection in the lateral isolation bar being laterally connected in series on Combined type green isolating railing, except the structure division separated vertically between the lateral isolation bar adjacent bearing of the outer any two of connection adjacent with two and lateral isolation bar is symmetrical in described Combined type green isolating railing Structure, its advantage is that the lateral isolation bar for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself, and only need replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic, this is the function that prior art does not have, realize simultaneously simple in construction, install and convenient disassembly, it is with low cost, the profile of bearing and lateral isolation bar is front and rear and bilateral symmetry, it ensure that bearing only by vertical pressure without turning torque, it is stabilization and safeguard construction of the center of gravity on the plane of symmetry, the water supply and sewage of cistern and the whole Combined type green isolating railing of pipelined channel insertion pours management maintenance system, the deviation in the vertically symmetrical face of lateral isolation bar and the vertically symmetrical face of bearing is effectively protected the safety of a wherein side in 6 centimetres, part in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is all support force on two bearings and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
It is used as the optimization to above-mentioned technical proposal, there is the attachment structure that the top and bottom with bearing are mutually matched the top and bottom of described lateral isolation bar, cistern is arranged at the top of described bearing, and bearing and lateral isolation bar are serially connected in the Combined type green isolating railing of multilayer lateral isolation bar alternatively up and down.
It is used as the optimization to above-mentioned technical proposal, described bearing and lateral isolation bar material are metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing is with the horizontal 0 ° of 90 ° of installation, the section of described lateral isolation bar is V-arrangement, U-shaped, on have the rectangle of opening, on have the trapezoidal of opening, circular arc or polygon, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is water immersion part planting medium, make medium quickly absorb moisture to meet demand of plant growth to plant offer nutrient and the pouring efficiency of management is provided.
As the optimization to above-mentioned technical proposal, there is connected in series or in parallel with flexible pipe or hard tube between discharge water hole, discharge water hole on described lateral isolation bar wall, its advantage is to realize quick unified pouring management.
As the optimization to above-mentioned technical proposal, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
It is used as the optimization to above-mentioned technical proposal, the top edge of described lateral isolation bar has horizontal flange outwardly or inwardly or level to add compound flange vertically, its advantage is that flanging strengthens the intensity of lateral isolation bar, and in-flanges makes to which reduce the moisture evaporation area in plantation space and the intensity of lateral isolation bar.
The lateral isolation bar of the Combined type green isolating railing of the present invention not only has isolation features but also with the function of direct planting plants or laying flowerpot in it in itself, only need replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic, bearing is only by vertical pressure without turning torque, it is the safeguard construction of stabilization of the center of gravity on the plane of symmetry, and the part support force in the integral Combined type green isolating railing of splicing between the adjacent bearing of any two and lateral isolation bar is on two adjacent bearings and is symmetrical rock-steady structure, its is simple in construction, it is easy to loading and unloading, it is with low cost, the water supply and sewage of the whole Combined type green isolating railing greening of attachment structure self-assembling formation insertion between lateral isolation bar bottom and lateral isolation bar pours management maintenance system, it is achieved thereby that of the invention. The present invention has advantages below compared with prior art:1. make the lateral isolation bar of Combined type green isolating railing not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself;2. bearing can be arbitrarily adjusted according to different mounting conditions installs stitching position or the Combined type green isolating railing of span with lateral isolation bar, Combined type green isolating railing is the structure of stabilization of the center of gravity on the plane of symmetry and safety, its is simple in construction, install and convenient disassembly, it is with low cost, have pouring management maintenance system, afforestation effect good;3. can industrial flow-line large-scale production bearing and lateral isolation bar completely, and the cost such as production, storage and transport is low;4. beautification of landscape effect can be changed by changing any one physical dimension or position in lateral isolation bar and bearing, it is possible to reach different use requirements;5. the water storage structure of Combined type green isolating railing self-assembling formation, pipelined channel and water overflowing structure meet the growth requirement of plant;6. taking up an area big small, green coverage, any moulding, releasing oxygen, absorbing carbon dioxide, heat energy, noise, dust, light pollution, because soil can be placed in container without being lost in, so that afforestation effect is very good, is beautified the environment.
Brief description of the drawings
Fig. 1 is a kind of schematic perspective view of the lateral isolation bar of structure type of the embodiment of the present invention 1.
Fig. 2 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 1.
Fig. 3 is the bearing schematic perspective view of another structure type of the embodiment of the present invention 1.
Fig. 4 is a kind of schematic perspective view of the Combined type green isolating railing of combination of the embodiment of the present invention 1.
Fig. 5 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 1.
Fig. 6 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 2.
Fig. 7 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 2.
Fig. 8 is a kind of schematic perspective view of the Combined type green isolating railing of combination of the embodiment of the present invention 2.
Fig. 9 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 2.
Figure 10 is the bearing schematic perspective view of another structure type of the embodiment of the present invention 2.
Figure 11 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 2.Figure 12 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 2.
Figure 13 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 2.
Figure 14 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 2.Figure 15 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 16 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 17 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 3.Figure 18 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 19 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 20 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 3. Figure 21 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 22 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 3.
Figure 23 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 24 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 3.
Figure 25 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 3.
Figure 26 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 4.
Figure 27 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 4.
Figure 28 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 4.
Figure 29 is a kind of bearing schematic perspective view of structure type of the embodiment of the present invention 5.
Figure 30 is a kind of lateral isolation bar schematic perspective view of structure type of the embodiment of the present invention 5.
Figure 31 is the schematic perspective view of the Combined type green isolating railing of another combination of the embodiment of the present invention 5.
Parts title in figure corresponding to reference is:1 bearing, 2 lateral isolation bars, 3 cisterns and pipelined channel, 4 one water supply and sewages and connecting hole, 5-through hole, 6-be used to splice and flowing water straight pipe, 7-clear opening that is used to splicing and support, 8-planting groove, 9 one cisterns, 10-vertical cut-off, 11 1 discharge water holes, 12 grooves.
Embodiment
With reference to embodiment and accompanying drawing, the present invention is described in further detail, but the implementation of the present invention is not limited to this.
Embodiment 1:As shown in Figure 1, Figure 2, Fig. 4, is used as a kind of Combined type green isolating railing of embodiment 1 of this, including bearing 1 and lateral isolation bar 2, it is characterised in that:Described bearing 1 and the appearance profile of lateral isolation bar 2 is front and rear and bilateral symmetry,The described top of lateral isolation bar 2 is plantation space,Bottom is cistern and pipelined channel 3,There are the corresponding water supply and sewage in position and connecting hole 4 on the end face of lateral isolation bar 2 or so,Bearing 1 has by the through hole 5 of a side to another side,The vertically symmetrical face of through hole 5 is parallel with the vertically symmetrical face of bearing 1 and distance is in 6 centimetres,Any one section of the whole outer surface of described lateral isolation bar 2 is enclosed in the through hole 5 of bearing 1 and built on stilts splicing,Its bearing 1 can arbitrarily splice and mobile on the whole outer surface of lateral isolation bar 2,The end face of adjacent transverse spacer bar 2 directly or adds plastic cement sealing gasket to be indirectly connected in series with bolt or hollow tube bolt by water supply and sewage and connecting hole 4,The cistern of the bottom of lateral isolation bar 2 and the insertion of pipelined channel 3 are into Combined type green isolating railing simultaneously,Except the part between the adjacent bearing 1 of the interconnection part any two of adjacent transverse spacer bar 2 and lateral isolation bar 2 is symmetrical structure in described Combined type green isolating railing,Its advantage is that the lateral isolation bar 2 itself for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it,And only need replacing time 1 or lateral isolation bar 2 just to meet different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing 1 and lateral isolation bar 2 is front and rear and bilateral symmetry,It ensure that bearing Only by vertical pressure without turning torque, it is stabilization and safeguard construction of the center of gravity on the plane of symmetry, the water supply and sewage that cistern and pipelined channel 3 and water supply and sewage and connecting hole 4 form the whole Combined type green isolating railing of insertion pours management maintenance system, the deviation in the vertically symmetrical face of through hole 5 and the vertically symmetrical face of bearing 1 is effectively protected the safety of a wherein side in 6 centimetres, any one section of the whole outer surface of lateral isolation bar 2 is enclosed in the through hole 5 of bearing 1 and built on stilts splicing, its bearing 1, which can arbitrarily splice and slide on the whole outer surface of lateral isolation bar 2, arbitrarily can effectively adjust span and the adaptation rugged installation requirement of Different Ground, part in the integral Combined type green isolating railing of splicing between the adjacent bearing 1 of any two and lateral isolation bar 2 is all support force on two bearings 1 and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
Planting groove 8 or cistern 9 are arranged at the optimization to above-mentioned technical proposal, the top of described bearing 1, and its advantage is the part that the space for making full use of bearing 1 to take becomes planting plants.
Such as Fig. 1, Fig. 3, Fig. 5, it is used as the another embodiment of this, this embodiment and embodiment 1 are essentially identical, difference has the splicing construction being mutually matched on the top surface of described bearing 1 and bottom surface, bearing 1 above and below the splicing construction that is mutually matched by being connected in series, splicing has lateral isolation bar 2 between the same layer for the bearing 1 being connected in series up and down, and its advantage is that the lateral isolation bar 2 and bearing 1 of standardized production can just realize the Combined type green isolating railing for being desirably combined into all size and height.
It is used as the optimization to above-mentioned technical proposal, described bearing 1 splices the lateral isolation bar 2 for having two layers of consistency from top to bottom, and make penetrating plant growth space before and after the lateral isolation bar 2 of bearing 1 and two layers of consistency from top to bottom, its advantage is to form more preferable landscape effect and be conducive to plant growth.
It is used as the optimization to above two embodiment, sealing gasket is connected between the described supply and discharge water hole of adjacent transverse spacer bar 2 and connecting hole 4, described supply and discharge water hole and connecting hole 4 or splicing and space between the straight pipe 6 and bolt of flowing water are pipelined channel, and its advantage is creative to be merged connection and pipelined channel.
Optimization to above two embodiment, described bearing 1 and the material of lateral isolation bar 2 are metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing 1 is with the horizontal 0 ° of 90 ° of installation, the section of lateral isolation bar 2 is the rectangle for above having opening, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is water immersion part planting medium, medium is quickly absorbed moisture and meets demand of plant growth to plant offer nutrient and provide the pouring efficiency of management.
Have connected in series or in parallel with flexible pipe or hard tube between discharge water hole 11, discharge water hole 11 on optimization to above two embodiment, the described wall of lateral isolation bar 2, its advantage is to realize quick unified pouring management.
Optimization to above two embodiment, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
Optimization to above two embodiment, the top edge of described lateral isolation bar 2 has horizontal flange outwardly or inwardly or level to add compound flange vertically, and its advantage is the intensity of flanging enhancing lateral isolation bar 2, and in-flanges reduces it The moisture evaporation area in plantation space and the intensity of lateral isolation bar 2.
Embodiment 2:Such as Fig. 6, Fig. 7, Fig. 8, a kind of Combined type green isolating railing of embodiment 1 of this, including bearing 1 and lateral isolation bar 2 are used as, it is characterised in that:Described bearing 1 and the appearance profile of lateral isolation bar 2 is front and rear and bilateral symmetry,The described top of lateral isolation bar 2 is plantation space,Bottom is cistern and pipelined channel 3,The symmetrical outer face of 2 two, lateral isolation bar has position is corresponding to be used to splice the straight pipe 6 with flowing water,Bearing 1 has having for the clear opening 7 and top surface for splicing and supporting to recessed groove 12 from a side to another side,It is parallel with the vertically symmetrical face of bearing 1 and distance is in 6 centimetres to the vertically symmetrical face of recessed groove 12 for the clear opening 7 or top surface that splice and support,The two ends of lateral isolation bar 2 are used to splice up and down and the straight pipe 6 of flowing water only need to directly insertion left and right bearing 1 be used to splice respectively and the downward groove 12 of the clear opening 7 and top surface that support splices along horizontal direction,The structure division that its lateral isolation bar 2 is maked somebody a mere figurehead between two bearings 1 is symmetrical structure,Continuous alternately series connection is spliced into Combined type green isolating railing again successively for bearing 1 and lateral isolation bar 2,The adjacent lateral isolation bar 2 of left and right two and the three of bearing 1 are connected by the straight pipe 6 for being used for splicing and flowing water through the lateral isolation bar 2 of left and right two on same bearing 1 with bolt or hollow tube bolt again,The cistern and pipelined channel 3 of adjacent transverse spacer bar 2 pass through for splicing the insertion of straight pipe 6 with flowing water simultaneously,Structure division between two bearings 1 and lateral isolation bar 2 of described Combined type green isolating railing is symmetrical structure,Its advantage is that the lateral isolation bar 2 itself for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it,And only need replacing time 1 or lateral isolation bar 2 just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing 1 and lateral isolation bar is front and rear and bilateral symmetry,It ensure that bearing 1 only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,Cistern and pipelined channel 3 and for splice and flowing water straight pipe 6 form the whole Combined type green isolating railing of insertion water supply and sewage pour management maintenance system,The deviation in the vertically symmetrical face of through hole 5 and the vertically symmetrical face of bearing 1 is effectively protected the safety of a wherein side in 6 centimetres,Part in the integral Combined type green isolating railing of splicing between the adjacent bearing 1 of any two and lateral isolation bar 2 is all support force on two bearings 1 and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
It is used as the optimization to above-mentioned technical proposal, described bearing 1 splices the lateral isolation bar 2 for having two layers of consistency from top to bottom, and there is penetrating plant growth space before and after the lateral isolation bar 2 for making bearing 1 and two layers of consistency from top to bottom, its advantage is to form more preferable landscape effect and be conducive to plant growth.
It is used as the optimization to above-mentioned technical proposal, there can be the splicing construction being mutually matched on the top surface of described bearing 1 and bottom surface, bearing 1 above and below the splicing construction that is mutually matched by being connected in series, splicing has lateral isolation bar 2 between the same layer for the bearing 1 being connected in series up and down, and its advantage is that the lateral isolation bar 2 and bearing 1 of standardized production can be just realized according to need It is combined into all size and the Combined type green isolating railing of height.
It is used as the optimization to above-mentioned technical proposal, it is used to splice between described adjacent transverse spacer bar 2 to be connected with sealing gasket between the straight pipe 6 of flowing water, space between described splicing and the straight pipe 6 and bolt of flowing water is pipelined channel, and its advantage is creative to be merged connection and pipelined channel.
Such as Fig. 9, Figure 10, Figure 11, it is used as the another embodiment of this, this embodiment and embodiment 1 are essentially identical, and difference need to only be directly embedded into the interior splicing of clear opening 7 that left and right bearing 1 is used to splice and support for the straight pipe 6 spliced with flowing water at the described two ends of lateral isolation bar 2 along horizontal direction.
Such as Figure 12, Figure 13, Figure 14, it is used as another embodiment of this, this embodiment and embodiment 1 are essentially identical, difference has planting groove 8 or cistern 9 on the top of described bearing 1, and its advantage is the part that the space for making full use of bearing 1 to take becomes planting plants.
Optimization to above-mentioned three kinds of embodiments, described bearing 1 and the material of lateral isolation bar 2 are metal, plastics, plastic-steel, fiberglass or armored concrete, bearing 1 is with the horizontal 90 ° of installations, the section of described lateral isolation bar 2 is the rectangle for above having opening, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is that having water section to soak planting medium, medium is quickly absorbed moisture and meets demand of plant growth to plant offer nutrient and provide the pouring efficiency of management.
There are discharge water hole 11, discharge water hole on optimization to above-mentioned three kinds of embodiments, the described wall of lateral isolation bar 2
Connected in series or in parallel with flexible pipe or hard tube between 11, its advantage is to realize quick unified pouring management.
Optimization to above-mentioned three kinds of embodiments, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
Optimization to above-mentioned three kinds of embodiments, the top edge of described lateral isolation bar 2 has horizontal flange outwardly or inwardly or level to add compound flange vertically, its advantage is the intensity of flanging enhancing lateral isolation bar 2, and in-flanges makes to which reduce the moisture evaporation area in plantation space and the intensity of lateral isolation bar 2.
Embodiment 3:Such as Figure 15, Figure 16, Figure 17, a kind of Combined type green isolating railing of embodiment 1 of this, including bearing 1 and lateral isolation bar 2 are used as, it is characterised in that:Described bearing 1 and the appearance profile of lateral isolation bar 2 is front and rear and bilateral symmetry, the described top of lateral isolation bar 2 is plantation space, bottom is cistern and pipelined channel 3, there are the corresponding water supply and sewage in position and connecting hole 4 on the end face of lateral isolation bar 2 or so, bearing 1 has the clear opening 7 having for splicing and supporting by a side to another side, the vertically symmetrical face of clear opening 7 for splicing and supporting is parallel with the vertically symmetrical face of bearing 1 and distance is in 6 centimetres, lateral isolation bar 2 is fastened on two bearings 1 through bearing 1 by bolt or hollow tube bolt for the clear opening 7 for splicing and supporting and being maked somebody a mere figurehead for water supply and sewage and connecting hole 4 for lateral isolation bar 2, the structure division that its lateral isolation bar 2 is maked somebody a mere figurehead between two bearings 1 is symmetrical structure, the cistern and pipelined channel 3 of bearing 1 left and right side two lateral isolation bar 2 pass through water supply and sewage and the insertion of connecting hole 4 simultaneously, continuous alternately series connection is spliced into Combined type green isolating railing again successively for bearing 1 and lateral isolation bar 2, described Combined type green isolating railing Structure division between any two bearing 1 and lateral isolation bar 2 is symmetrical structure, its advantage is that the lateral isolation bar 2 itself for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it, and only need replacing time 1 or lateral isolation bar 2 just can be while meeting different insulation requests and greening aesthetic, this is the function that prior art does not have, realize simultaneously simple in construction, install and convenient disassembly, it is with low cost, the profile of bearing 1 and lateral isolation bar 2 is front and rear and bilateral symmetry, it ensure that bearing 1 only by vertical pressure without turning torque, it is stabilization and safeguard construction of the center of gravity on the plane of symmetry, the water supply and sewage that cistern and pipelined channel 3 and water supply and sewage and connecting hole 4 form the whole Combined type green isolating railing of insertion pours management maintenance system, the safety of a wherein side is effectively protected in 6 centimetres for the vertically symmetrical face of clear opening 7 spliced and supported and the deviation in the vertically symmetrical face of bearing 1, part in the integral Combined type green isolating railing of splicing between the adjacent bearing 1 of any two and lateral isolation bar 2 is all support force on two bearings 1 and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
It is used as the optimization to above-mentioned technical proposal, there is the splicing construction being mutually matched on the top surface of described bearing 1 and bottom surface, bearing 1 above and below the splicing construction that is mutually matched by being connected in series, splicing has lateral isolation bar 2 between the same layer for the bearing 1 being connected in series up and down, and its advantage is that the lateral isolation bar 2 and bearing 1 of standardized production can just realize the Combined type green isolating railing for being desirably combined into all size and height.
It is used as the optimization to above-mentioned technical proposal, sealing gasket is connected between the described supply and discharge water hole of adjacent transverse spacer bar 2 and connecting hole 4, space between described supply and discharge water hole and connecting hole 4 and bolt is pipelined channel, and its advantage is creative to be merged connection and pipelined channel.
It is used as the optimization to above-mentioned technical proposal, described bearing 1 and the material of lateral isolation bar 2 are metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing 1 is with the horizontal 0 ° of 90 ° of installation, the section of described lateral isolation bar 2 is the rectangle for above having opening, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is water immersion part planting medium, medium is quickly absorbed moisture and meets demand of plant growth to plant offer nutrient and provide the pouring efficiency of management.
As the optimization to above-mentioned technical proposal, there is connected in series or in parallel with flexible pipe or hard tube between discharge water hole 11, discharge water hole 11 on the described wall of lateral isolation bar 2, its advantage is to realize quick unified pouring management.
As the optimization to above-mentioned technical proposal, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
It is used as the optimization to above-mentioned technical proposal, the top edge of described lateral isolation bar 2 has horizontal flange outwardly or inwardly or level to add compound flange vertically, its advantage is the intensity of flanging enhancing lateral isolation bar 2, and in-flanges makes to which reduce the moisture evaporation area in plantation space and the intensity of lateral isolation bar 2.
Such as Figure 18, Figure 19, Figure 20, as the another embodiment of this, this embodiment and embodiment 1 are essentially identical, the different T-shaped structures in bearing 1 to stand upside down. Such as Figure 19, Figure 21, Figure 22, it is used as another embodiment of this, this embodiment and embodiment 1 are essentially identical, difference has the splicing construction being mutually matched on the top surface of described bearing 1 and bottom surface, bearing 1 above and below the splicing construction that is mutually matched by being connected in series, splicing has lateral isolation bar 2 between the same layer for the bearing 1 being connected in series up and down, and its advantage is that the lateral isolation bar 2 and bearing 1 of standardized production can just realize the Combined type green isolating railing for being desirably combined into all size and height.
Embodiment 4:Such as Figure 23, Figure 24, Figure 25, the Combined type green isolating railing of the embodiment 1 of this, including bearing 1 and lateral isolation railing 2 are used as, it is characterised in that:Described bearing 1 and the appearance profile of lateral isolation bar 2 is front and rear and bilateral symmetry,Described bearing 1 is hexahedron,The described top of lateral isolation bar 2 is plantation space,Bottom is cistern and pipelined channel 3,There is position is corresponding to be used to splice the straight pipe 6 with flowing water on the end face of lateral isolation bar 2 or so,Any one section of the outer surface of lateral isolation bar 2 is any mobile in the horizontal top surface of two bearings 1 and splices at an arbitrary position,Vertically symmetrical face for splicing and the straight pipe 6 of flowing water is parallel with the vertically symmetrical face of bearing 1 and distance is in 6 centimetres,The lateral isolation bar 2 of splicing at an arbitrary position is connected with connection assist or bonding agent with bearing 1,Connection assist is bolt or inverted U-shaped component,Adjacent transverse spacer bar 2 directly or adds plastic cement sealing gasket is indirect to be serially connected in Combined type green isolating railing with bolt or hollow tube bolt by the square straight pipe 6 for splicing and flowing water,The cistern and pipelined channel 3 of the bottom of adjacent transverse spacer bar 2 are used for splicing and the insertion of straight pipe 6 of flowing water by square simultaneously,Between the adjacent bearing 1 of any two and lateral isolation bar 2 in addition to the coupling part of adjacent transverse spacer bar 2 it is symmetrical structure in described Combined type green isolating railing,Its advantage is that the lateral isolation bar 2 itself for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it,And only need replacing time 1 or lateral isolation bar 2 just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing 1 and lateral isolation bar 2 is front and rear and bilateral symmetry,It ensure that bearing 1 only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,Cistern and pipelined channel 3 and for splice and flowing water straight pipe 6 form the whole Combined type green isolating railing of insertion water supply and sewage pour management maintenance system,Deviation for the vertically symmetrical face in the vertically symmetrical face and bearing 1 of splicing and the straight pipe 6 of flowing water is effectively protected the safety of a wherein side in 6 centimetres,Part in the integral Combined type green isolating railing of splicing between the adjacent bearing 1 of any two and lateral isolation bar 2 is all support force on two bearings 1 and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.
Such as Figure 26, Figure 27, Figure 28, it is used as the another embodiment of this, this embodiment and embodiment 1 are essentially identical, and the straight pipe 6 that difference has position corresponding for splicing with flowing water on the end face of lateral isolation bar 2 or so is changed to water supply and sewage and connecting hole 4.
As the optimization to above-mentioned technical proposal, there is the attachment structure that the top and bottom with bearing 1 are mutually matched the top and bottom of described lateral isolation bar 2, and cistern 9 is arranged at the top of described bearing 1, and bearing 1 and lateral isolation bar 2 are connected alternatively up and down Connect into the Combined type green isolating railing of multilayer lateral isolation bar 2.
Optimization to above two embodiment, described bearing 1 and the material of lateral isolation bar 2 are metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing 1 is with the horizontal 0 ° of 90 ° of installation, the section of described lateral isolation bar 2 is the rectangle for above having opening, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is water immersion part planting medium, medium is quickly absorbed moisture and meets demand of plant growth to plant offer nutrient and provide the pouring efficiency of management.
Have connected in series or in parallel with flexible pipe or hard tube between discharge water hole 11, discharge water hole 11 on optimization to above two embodiment, the described wall of lateral isolation bar 2, its advantage is to realize quick unified pouring management.
Optimization to above two embodiment, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
Optimization to above two embodiment, the top edge of described lateral isolation bar 2 has horizontal flange outwardly or inwardly or level to add compound flange vertically, its advantage is the intensity of flanging enhancing lateral isolation bar 2, and in-flanges makes to which reduce the moisture evaporation area in plantation space and the intensity of lateral isolation bar 2.
Embodiment 5:Such as Figure 29, Figure 30, Figure 31, a kind of Combined type green isolating railing of embodiment of this, including bearing 1 and lateral isolation bar 2 are used as, it is characterised in that:Described bearing 1 and the appearance profile of lateral isolation bar 2 is front and rear and bilateral symmetry,Described bearing 1 is hexahedron,Described lateral isolation bar 2 is the continuous groove from an end face to other end,Continuous groove top is plantation space,Bottom is cistern and pipelined channel 3,Any one section of the outer surface of lateral isolation bar 2 is any mobile in the horizontal top surface of two bearings 1 and splices at an arbitrary position,The vertically symmetrical face of lateral isolation bar 2 is parallel with the vertically symmetrical face of bearing 1 and distance is in 6 centimetres,The lateral isolation bar 2 of splicing at an arbitrary position is connected with connection assist or bonding agent with bearing 1,Connection assist is bolt or inverted U-shaped component,Two adjacent alignment of lateral isolation bar 2 are connected in series with bolt or bonding agent,Vertical cut-off 10 is connected with the lateral isolation bar 2 being laterally connected in series on Combined type green isolating railing,I.e. two ends and middle part are connected with vertical cut-off 10,Except 10 lateral isolation bars 2 adjacent with two of cut-off vertically, to connect the structure division between the adjacent bearing 1 of outer any two and lateral isolation bar 2 be symmetrical structure in described Combined type green isolating railing,Its advantage is that the lateral isolation bar for making isolated column not only has isolation features but also with the greening function of direct planting plants or laying flowerpot in it in itself,And only need replacing time or lateral isolation bar just can be while meeting different insulation requests and greening aesthetic,This is the function that prior art does not have,Realize simultaneously simple in construction,Install and convenient disassembly,It is with low cost,The profile of bearing 1 and lateral isolation bar 1 is front and rear and bilateral symmetry,It ensure that bearing only by vertical pressure without turning torque,It is stabilization and safeguard construction of the center of gravity on the plane of symmetry,Cistern and the whole Combined type green isolating railing of the insertion of pipelined channel 3, which are conducive to pouring, to be managed,The deviation in the vertically symmetrical face of lateral isolation bar 2 and the vertically symmetrical face of bearing 1 is effectively protected the safety of a wherein side in 6 centimetres,Part in the integral Combined type green isolating railing of splicing between the adjacent bearing 1 of any two and lateral isolation bar 2 All it is support force on two bearings 1 and symmetrical rock-steady structure part ensure that the overall security and stability of isolated column.It is used as the optimization to above-mentioned technical proposal, there is the attachment structure that the top and bottom with bearing 1 are mutually matched the top and bottom of described lateral isolation bar 2, cistern 9 is arranged at the top of described bearing 1, and bearing 1 and lateral isolation bar 2 are serially connected in the Combined type green isolating railing of multilayer lateral isolation bar 2 alternatively up and down.
It is used as the optimization to above-mentioned technical proposal, described bearing 1 and the material of lateral isolation bar 2 are metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing 1 is with the horizontal 0 ° of 90 ° of installation, the section of described lateral isolation bar 2 is the rectangle for above having opening, water-stop sheet is installed in described cistern and pipelined channel 3, its advantage is water immersion part planting medium, medium is quickly absorbed moisture and meets demand of plant growth to plant offer nutrient and provide the pouring efficiency of management.
As the optimization to above-mentioned technical proposal, there are discharge water hole 11, discharge water hole on the described wall of lateral isolation bar 2
Connected in series or in parallel with flexible pipe or hard tube between 11, its advantage is to realize quick unified pouring management.
As the optimization to above-mentioned technical proposal, the described part of bearing 1 is embedded in concrete or is joined with bolts on concrete structure, and its advantage is to be applied to architecture greening.
It is used as the optimization to above-mentioned technical proposal, the top edge of described lateral isolation bar 2 has horizontal flange outwardly or inwardly or level to add compound flange vertically, its advantage is the intensity of flanging enhancing lateral isolation bar 2, and in-flanges makes to which reduce the moisture evaporation area in plantation space and the intensity of lateral isolation bar 2.
As described above, just can preferably realize the present invention.

Claims (1)

  1. Claim
    1. Combined type green isolating railing, including bearing(1) with lateral isolation bar(2), it is characterised in that:Described bearing(1) with lateral isolation bar(2) appearance profile is front and rear and bilateral symmetry, described lateral isolation bar(2) top is plantation space, and bottom is cistern and pipelined channel(3), lateral isolation bar(2) there are the corresponding water supply and sewage in position and connecting hole on the end face of left and right(4), bearing(1) have by the through hole of a side to another side(5), through hole(5) vertically symmetrical face and bearing(1) vertically symmetrical face is parallel and distance is in 6 centimetres, described lateral isolation bar(2) any one section of whole outer surface is enclosed in bearing(1) through hole(5) in and built on stilts splicing, its bearing(1) can arbitrarily it splice on the whole outer surface of lateral isolation bar (2) and mobile, adjacent transverse spacer bar(2) end face directly or adds plastic cement sealing gasket to be indirectly connected in series with bolt or hollow tube bolt by water supply and sewage and connecting hole (4), while by the cistern and pipelined channel of lateral isolation bar (2) bottom(3) insertion removes adjacent transverse spacer bar into Combined type green isolating railing in described Combined type green isolating railing(2) be connected with each other the adjacent bearing of part any two(1) with lateral isolation bar(2) part between is symmetrical structure.
    2. Combined type green isolating railing, including bearing(1) with lateral isolation bar(2), it is characterised in that:Described bearing(1) with lateral isolation bar(2) appearance profile is front and rear and bilateral symmetry, described lateral isolation bar(2) top is plantation space, and bottom is cistern and pipelined channel(3), lateral isolation bar(2) two symmetrical outer faces have position is corresponding to be used to splice the straight pipe with flowing water(6), bearing(1) have by the clear opening having for splicing and supporting of a side to another side(Or top surface is to recessed groove 7)(12), the clear opening for splicing and supporting(Or top surface is to recessed groove 7)(12) vertically symmetrical face and bearing(1) vertically symmetrical face is parallel and distance is in 6 centimetres, lateral isolation bar(2) two ends are used to splice the straight pipe with flowing water(6) it need to be only inserted directly into along horizontal direction or embedded left and right bearing(1) it is used for the clear opening for splicing and supporting(Or top surface is to recessed groove 7)(12) splice, its lateral isolation bar(2) make somebody a mere figurehead in two bearings(1) structure division between is symmetrical structure, bearing(1) with lateral isolation bar(2) continuous alternately series connection is spliced into Combined type green isolating railing again successively, then passes through same bearing with bolt or hollow tube bolt(1) the lateral isolation bar of left and right two on(2) it is used to splice the straight pipe with flowing water(6) by the adjacent lateral isolation bar of left and right two(And bearing 2)(1) three is connected, while adjacent transverse spacer bar(2) cistern and pipelined channel(3) by for splicing the straight pipe with flowing water(6) insertion, two bearings of described Combined type green isolating railing(1) with lateral isolation bar(2) structure division between is symmetrical structure.
    3. Combined type green isolating railing, including bearing(1) with lateral isolation bar(2), it is characterised in that:Described bearing(1) with lateral isolation bar(2) appearance profile is front and rear and bilateral symmetry, described lateral isolation bar(2) top is plantation space, and bottom is cistern and pipelined channel(3), lateral isolation bar(2) there are the corresponding water supply and sewage in position and connecting hole on the end face of left and right(4), bearing(1) have by the clear opening having for splicing and supporting of a side to another side(7), the clear opening for splicing and supporting(7) vertically symmetrical face and bearing(1) vertically symmetrical face is parallel and distance is 6 In centimetre, lateral isolation bar(2) bearing is passed through by bolt or hollow tube bolt(1) it is used for the clear opening (7) and lateral isolation bar for splicing and supporting(2) be used for water supply and sewage and connecting hole(4) make somebody a mere figurehead and be fastened on two bearings(1) on, its lateral isolation bar(2) make somebody a mere figurehead in two bearings(1) structure division between is symmetrical structure, while bearing(1) the lateral isolation bar of left and right side two(2) cistern and pipelined channel(3) water supply and sewage and connecting hole are passed through(4) insertion, bearing(1) with lateral isolation bar(2) continuous alternately series connection is spliced into Combined type green isolating railing, described Combined type green isolating railing any two bearing again successively(1) with lateral isolation bar(2) structure division between is symmetrical structure.
    4. the Combined type green isolating railing according to one of claims 1 to 3, it is characterised in that:Described bearing(1) at least splicing has the lateral isolation bar of two layers of consistency from top to bottom(2), and bearing is made(1) with the lateral isolation bar of two layers of consistency from top to bottom(2) there is penetrating plant growth space before and after.
    5. the Combined type green isolating railing according to one of claims 1 to 3, it is characterised in that:Described bearing(1) there are the splicing construction being mutually matched, bearing on top surface and bottom surface(1) by being connected in series above and below the splicing construction that is mutually matched, the bearing being connected in series up and down(1) splicing has lateral isolation bar between same layer(2).
    6. the Combined type green isolating railing according to one of claims 1 to 3, it is characterised in that:Described adjacent transverse spacer bar(2) water supply and sewage and connecting hole(4) between or for splicing the straight pipe with flowing water(6) sealing gasket, described water supply and sewage and connecting hole are connected between(4) or for splicing the straight pipe with flowing water(6) space between bolt is pipelined channel.
    7. the Combined type green isolating railing according to one of claims 1 to 3, it is characterised in that:Described bearing(1) planting groove is arranged at top(Or cistern 8)(9).
    8. Combined type green isolating railing, including bearing(1) with lateral isolation railing(2), it is characterised in that:Described bearing(1) with lateral isolation bar(2) appearance profile is front and rear and bilateral symmetry, described bearing(1) it is hexahedron or cylinder, described lateral isolation bar(2) top is plantation space, and bottom is cistern and pipelined channel(3), lateral isolation bar(2) there are the corresponding water supply and sewage in position and connecting hole on the end face of left and right(4) or for splicing the straight pipe with flowing water(6), lateral isolation bar(2) any one section of outer surface is at least one bearing(1) it is any mobile and splice at an arbitrary position, water supply and sewage and connecting hole in horizontal top surface or concave top surface(4) or for splicing the straight pipe with flowing water(6) vertically symmetrical face and bearing(1) vertically symmetrical face is parallel and distance is in 6 centimetres, lateral isolation bar (2) connection assist or bonding agent and the bearing of splicing at an arbitrary position(1) connect, adjacent transverse spacer bar(2) water supply and sewage and connecting hole are passed through(4) or for splicing the straight pipe with flowing water(6) directly or add plastic cement sealing gasket be indirectly serially connected in Combined type green isolating railing with bolt or hollow tube bolt, while adjacent transverse spacer bar(2) cistern and pipelined channel of bottom(3) water supply and sewage and connecting hole are passed through(4) or for splicing the straight pipe with flowing water(6) the adjacent bearing of any two in insertion, described Combined type green isolating railing(1) with lateral isolation bar(2) adjacent transverse spacer bar is removed between(2) it is symmetrical structure outside coupling part.
    9. Combined type green isolating railing, including bearing(1) with lateral isolation bar(2), it is characterised in that:Described bearing(1) with lateral isolation bar(2) appearance profile is front and rear and bilateral symmetry, described bearing(1) it is hexahedron or cylinder, described lateral isolation bar(2) it is continuous groove from an end face to other end, continuous groove top is plantation space, and bottom is cistern and pipelined channel(3), lateral isolation bar(2) any one section of outer surface is at least one bearing(1) it is any mobile and splice at an arbitrary position, lateral isolation bar in horizontal top surface or concave top surface(2) vertically symmetrical face and bearing(1) vertically symmetrical face is parallel and distance is in 6 centimetres, the lateral isolation bar of splicing at an arbitrary position(2) connection assist or bonding agent and bearing are used(1) connect, two adjacent lateral isolation bars(2) partly overlap or alignment is connected in series with bolt or bonding agent, the lateral isolation bar being laterally connected in series on Combined type green isolating railing(2) vertical cut-off is connected with(10), except vertical cut-off in described Combined type green isolating railing(10) the lateral isolation bar adjacent with two(2) the adjacent bearing of outer any two is connected(1) with lateral isolation bar(2) structure division between is symmetrical structure.
    10. Combined type green isolating railing according to claim 8 or claim 9, it is characterised in that:Described lateral isolation bar(2) top and bottom have and bearing(1) attachment structure that top and bottom are mutually matched, described bearing(1) cistern is arranged at top
    (9), bearing(1) with lateral isolation bar(2) multilayer lateral isolation bar has been serially connected in alternatively up and down(2) Combined type green isolating railing.
    11. the greening wire mesh grating according to one of claim 1,2,3,8 and 9, it is characterised in that:Described bearing(1) with lateral isolation bar(2) material is metal, plastics, plastic-steel, fiberglass or armored concrete, described bearing(1) with the horizontal 0 ° of 90 ° of installation, described lateral isolation bar(2) section be V-arrangement, U-shaped, on have opening rectangle, on have the trapezoidal of opening, circular arc or polygon, described cistern and pipelined channel(3) water-stop sheet is installed in.12. the Combined type green isolating railing according to one of claim 1,2,3,8 and 9, it is characterised in that:Described lateral isolation bar(2) there is discharge water hole on wall(11), discharge water hole(11) it is connected in series or in parallel with flexible pipe or hard tube between.
    13. the Combined type green isolating railing according to one of claim 1,2,3,8 and 9, it is characterised in that:Described bearing(1) partly it is embedded in concrete or is joined with bolts on concrete structure.
CN201180020897.9A 2010-05-11 2011-04-29 Combination isolated column Active CN103228841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201180020897.9A CN103228841B (en) 2010-05-11 2011-04-29 Combination isolated column

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
CN2010101689189 2010-05-11
CN201010168918.9 2010-05-11
CN201010168918 2010-05-11
PCT/CN2011/073540 WO2011140935A1 (en) 2010-05-11 2011-04-29 Combined isolation fence
CN201180020897.9A CN103228841B (en) 2010-05-11 2011-04-29 Combination isolated column

Publications (2)

Publication Number Publication Date
CN103228841A true CN103228841A (en) 2013-07-31
CN103228841B CN103228841B (en) 2016-08-24

Family

ID=44703024

Family Applications (7)

Application Number Title Priority Date Filing Date
CN2010206400999U Expired - Fee Related CN202000279U (en) 2010-05-11 2010-11-26 Spliced greening isolation barrier
CN201010572212.9A Active CN102242574B (en) 2010-05-11 2010-11-26 Spliced greening isolation barrier
CN201110104295.3A Active CN102251705B (en) 2010-05-11 2011-04-26 Combined type green isolating railing
CN2011201246585U Expired - Lifetime CN202055616U (en) 2010-05-11 2011-04-26 Combined type green isolating railing
CN201180020897.9A Active CN103228841B (en) 2010-05-11 2011-04-29 Combination isolated column
CN2011201462372U Expired - Lifetime CN202298515U (en) 2010-05-11 2011-05-10 Combined greening isolation fence
CN201110119986.0A Active CN102278001B (en) 2010-05-11 2011-05-10 Combination greening wire mesh grating

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN2010206400999U Expired - Fee Related CN202000279U (en) 2010-05-11 2010-11-26 Spliced greening isolation barrier
CN201010572212.9A Active CN102242574B (en) 2010-05-11 2010-11-26 Spliced greening isolation barrier
CN201110104295.3A Active CN102251705B (en) 2010-05-11 2011-04-26 Combined type green isolating railing
CN2011201246585U Expired - Lifetime CN202055616U (en) 2010-05-11 2011-04-26 Combined type green isolating railing

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN2011201462372U Expired - Lifetime CN202298515U (en) 2010-05-11 2011-05-10 Combined greening isolation fence
CN201110119986.0A Active CN102278001B (en) 2010-05-11 2011-05-10 Combination greening wire mesh grating

Country Status (2)

Country Link
CN (7) CN202000279U (en)
WO (1) WO2011140935A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556869A (en) * 2013-08-19 2014-02-05 国家电网公司 Box-type electric power security tensile fence mesh
CN111877861A (en) * 2020-08-25 2020-11-03 临沂市政集团有限公司 Safety isolation fence is used in road and bridge construction

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202000279U (en) * 2010-05-11 2011-10-05 孙希贤 Spliced greening isolation barrier
CN103205946A (en) * 2012-01-13 2013-07-17 成都创新景观工程有限公司 Movable greening guardrail provided with irrigation system
CN103283519A (en) * 2012-03-05 2013-09-11 孙希贤 Series-wounded and over-headed multi-level green long isolation groove with irrigation system
CN105544436A (en) * 2012-06-17 2016-05-04 苏州汇诚智造工业设计有限公司 Manufacturing method of greening guardrail
CN102704422A (en) * 2012-06-17 2012-10-03 张朝峰 Guardrail plate with greening groove and manufacturing method for guardrail plate
CN105369755A (en) * 2012-06-17 2016-03-02 苏州汇诚智造工业设计有限公司 Afforest guardrail pier manufacture method
CN103563669B (en) * 2012-07-25 2017-07-25 上海市政工程设计研究总院(集团)有限公司 A kind of anticollision barrier greening method
CN104213524A (en) * 2013-05-30 2014-12-17 孙希贤 Small movable simple greening guard bar convenient to assemble and disassemble
CN103875514A (en) * 2014-03-04 2014-06-25 安徽机电职业技术学院 Road fence with water tanks and flowerpots
CN105766428A (en) * 2014-12-23 2016-07-20 孙希贤 Flowerpot
CN104772185A (en) * 2015-04-01 2015-07-15 刘银明 Bilateral protection rack for running water channel
CN107558317B (en) * 2017-10-14 2019-12-06 东阳市琰安建筑工程有限公司 Road with greenbelt
CN107905622A (en) * 2017-10-30 2018-04-13 湖南诚友绿色建材科技有限公司 A kind of prefabricated reinforced concrete Green protection fence
CN108343009B (en) * 2018-01-15 2020-06-05 安徽雄风防护设施有限公司 Guardrail with crashproof function
CN110318346A (en) * 2019-06-05 2019-10-11 成都建工工业化建筑有限公司 Go slowly bollard and its construction method based on building industrialization product
CN111772433A (en) * 2020-07-23 2020-10-16 郴州展翔绿色农业有限公司 Multifunctional backing plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1545700A (en) * 1976-06-17 1979-05-10 Fjeldhammer Brug As Walls or fences
CN2441856Y (en) * 2000-10-12 2001-08-08 李传将 Multifuncltion overlap through closure and isolation guard rail flower bed and potted landscape beautifying device
CN2579159Y (en) * 2002-11-14 2003-10-15 赖元俊 Stereo panel type pant cultivating device
KR20080000778U (en) * 2006-10-26 2008-04-30 주식회사 신흥산업 Balustrade for Street
KR20100038826A (en) * 2008-10-07 2010-04-15 주식회사 건목 Middle separation support having a flowerpot
CN102017874A (en) * 2009-09-14 2011-04-20 孙希贤 Building method of combined-type greening body

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1485939A (en) * 1976-02-19 1977-09-14 Shell Int Research Preparation of alkyl chlorides
DE8903817U1 (en) * 1989-03-28 1989-05-18 Riedel, Eckard, 7630 Lahr Kit for plantable noise barriers
CN2265729Y (en) * 1995-11-09 1997-10-29 金荣柱 Combined stepped flower pot stand
JP3464887B2 (en) * 1997-06-02 2003-11-10 福岡丸本株式会社 Elevated cultivation container
JPH1146588A (en) * 1997-08-05 1999-02-23 Hiroshima Mikado:Kk Guard fence for planting
CN2860055Y (en) * 2005-12-26 2007-01-24 韩山师范学院 Automatic drip irrigation greening groove
CN201156900Y (en) * 2008-02-22 2008-12-03 刘旭东 Plants cultivation frame
KR20100034434A (en) * 2008-09-24 2010-04-01 유지현 Watering device for hence with hanging flower pot and control method thereof
WO2011029332A1 (en) * 2009-09-14 2011-03-17 Sun Xixian Construction method of combined greening body
WO2011047641A1 (en) * 2009-10-23 2011-04-28 Sun Xixian Combined greening body
CN202000279U (en) * 2010-05-11 2011-10-05 孙希贤 Spliced greening isolation barrier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1545700A (en) * 1976-06-17 1979-05-10 Fjeldhammer Brug As Walls or fences
CN2441856Y (en) * 2000-10-12 2001-08-08 李传将 Multifuncltion overlap through closure and isolation guard rail flower bed and potted landscape beautifying device
CN2579159Y (en) * 2002-11-14 2003-10-15 赖元俊 Stereo panel type pant cultivating device
KR20080000778U (en) * 2006-10-26 2008-04-30 주식회사 신흥산업 Balustrade for Street
KR20100038826A (en) * 2008-10-07 2010-04-15 주식회사 건목 Middle separation support having a flowerpot
CN102017874A (en) * 2009-09-14 2011-04-20 孙希贤 Building method of combined-type greening body

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556869A (en) * 2013-08-19 2014-02-05 国家电网公司 Box-type electric power security tensile fence mesh
CN103556869B (en) * 2013-08-19 2016-09-07 国家电网公司 A kind of box-type electric power security tensile fence mesh
CN111877861A (en) * 2020-08-25 2020-11-03 临沂市政集团有限公司 Safety isolation fence is used in road and bridge construction

Also Published As

Publication number Publication date
CN102251705A (en) 2011-11-23
CN102251705B (en) 2016-03-30
WO2011140935A1 (en) 2011-11-17
CN102278001B (en) 2016-04-20
CN202055616U (en) 2011-11-30
CN102278001A (en) 2011-12-14
CN202298515U (en) 2012-07-04
CN202000279U (en) 2011-10-05
CN102242574A (en) 2011-11-16
CN103228841B (en) 2016-08-24
CN102242574B (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN103228841A (en) Combined isolation fence
ES2246734B1 (en) PREFABRICATED MODULAR TOWER.
EP1771062B1 (en) Structure for vegetated wall
CN203938946U (en) Modular unit and the matrix that is positioned at load-supporting part below
CN102484972A (en) Three-dimensional green planting trough used overhead
CN104652214A (en) Paving method of water-permeable pavement
KR101010730B1 (en) A greening panel for planting
CN103669261A (en) Movable combined afforestation fence with irrigation system
CN204608538U (en) A kind of water permeable pavement
CN108496625B (en) Arbor planting structure for saline-alkali soil in arid region and construction method thereof
CN203129048U (en) Greening isolation rail
JP2014095216A (en) Unitized sandbag
CN103114540A (en) Greening partition fence
CN104067859B (en) A kind of edible fungi breeds booth
JP4301447B2 (en) Wall greening planter and mounting method and watering method of the wall greening planter
CN215421854U (en) Be used for overpass lateral wall planting technique flower case
CN202759874U (en) Movable combined type gardening isolation fence with irrigation system
CN202068784U (en) Economic, practical and multi-purpose greenhouse shed
CN111972170A (en) Landscape isolated column can plant
CN103669260A (en) Movable combined afforestation guardrail with irrigation system
CN104074150A (en) Maintenance-free combined-type greening barrier
ES1072313U (en) Modular deposit for the drainage or storage of rainwater (Machine-translation by Google Translate, not legally binding)
CN221218618U (en) Greening guardrail
CN213709318U (en) Road barrier
CN220140273U (en) Container type greening structure with sponge characteristic

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant