CN103216239A - Backfill handling method for activity subsidence area of mine - Google Patents

Backfill handling method for activity subsidence area of mine Download PDF

Info

Publication number
CN103216239A
CN103216239A CN2013101516249A CN201310151624A CN103216239A CN 103216239 A CN103216239 A CN 103216239A CN 2013101516249 A CN2013101516249 A CN 2013101516249A CN 201310151624 A CN201310151624 A CN 201310151624A CN 103216239 A CN103216239 A CN 103216239A
Authority
CN
China
Prior art keywords
backfill
glued
subsidence area
cement
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101516249A
Other languages
Chinese (zh)
Other versions
CN103216239B (en
Inventor
王洪江
吴爱祥
孙伟
王贻明
李涛
韩斌
尹升华
仪海豹
李公成
沈显岭
李佳梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Feny Co Ltd
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201310151624.9A priority Critical patent/CN103216239B/en
Publication of CN103216239A publication Critical patent/CN103216239A/en
Application granted granted Critical
Publication of CN103216239B publication Critical patent/CN103216239B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a backfill handling method for an activity subsidence area of a mine. The backfill handling method is characterized in that mixed slurry is prepared by mixing high-concentration tail mortar which is obtained by densely dehydrating low-concentration tail mortar through a deep cone thickener (1) with rough aggregates and concrete which are discharged by an aggregate silo (2) and a power silo (3) through a mixer (4); and the slurry is pumped to the subsidence area (6) through a pump (5) so as to be discharged. During the discharging, the subsidence area is backfilled by a discharging mode of plane partitioning staggering and vertical cement and non-cement interbedding; according to the plane partitioning staggering discharging, the subsidence area is divided into a plurality of independent discharging areas on a plane according to a spatial distribution state of the subsidence area, and the mixed slurry is discharged in the staggered manner according to different areas; and according to the vertical cement and non-cement interbedding discharging, cement backfill layers (7) and non-cement backfill layers (8) discharge the slurry in the staggered interbedding manner in the vertical direction of the subsidence area. The backfill method has the characteristics of low backfill cost, safety and reliability in backfill and the like.

Description

The movable subsidence area backfill method of disposal in a kind of mine
?
Technical field
The present invention relates to the movable subsidence area backfill method of disposal in a kind of mine, be mainly used in safety, environmental protection, the efficient disposal are carried out in movable subsidence area, mine, belong to mining and geological hazard control field.
?
Background technology
According to statistics, found the state so far certainly, China's mine development causes 10689 of geological disasters, dead about 4779 people.Wherein surface collapse is 8320, dead 535 people.From subsidence area frequency (77.83%) and death toll (11.2%) ratio, it is the most serious mining geology disaster that mining area surface subsides.
The common way of handling surface subsidence district, mine at present is: adopt mine discarded object (gangue, flyash, barren rock etc.) directly backfill to be carried out in the subsidence area and dispose.Some new methods of disposal have also appearred in recent years, as adopt blasting method with subsidence area periphery massif avalanche carrying out backfill, mine tailing is made filter cake be backfilled to the subsidence area, the subsidence area be transformed into mine tailing storehouse etc.Said method can play certain effect to inactivated subsidence area (being that the bottom, subsidence area does not have mining), and have following problems for the subsidence area that is in active state (being still to dig up mine in the bottom, subsidence area): adopt the mine discarded object that backfill is directly carried out in the subsidence area, easily cause secondary disasters such as the backfill body subsides on a large scale, downhole debris flow, groundwater pollution; Shortcoming such as the method for explosion avalanche massif backfill subsidence area has that the scope of application is little, blast working is complicated, explosion backfill lumpiness can't control, blasting vibration, slungshot cause casualties; Adopt tailing cake to dispose to subside have that discharging modes are dumb, problems such as backfill cost height, operating personnel and equipment failure rate height; Movable subsidence area is transformed into the mine tailing storehouse then must causes the mine tailing slurry to pour into mining face under mine and stope, even cause the well accident etc. of flooding.Therefore, be not suitable for the disposal of movable subsidence area for the conventional method of disposing non-movable subsidence area.
In view of the deficiency of present subsidence area backfill method of disposal, need a kind of new subsidence area backfill method of disposal, particularly dispose at the backfill of movable subsidence area, mine.When backfill is disposed; when not influencing the normal mining activity in down-hole, not forming artificial water, extensive backfill body does not take place cave in, do not cause secondary disasters such as downhole debris flow suddenly; can make full use of the mine discarded object, reach control, eliminate the purpose of subsidence area.
?
Summary of the invention
The object of the present invention is to provide movable subsidence area, a kind of mine method of disposal.The essence of this method is mine discarded object (tailings, barren rock etc.) to be prepared into to mix dispose body, make and mix to dispose body and have good flowability, suitable permeability and cooperative transformation ability, effective further expanding of control activity subsidence area when being subjected to mining influence avoids backfill to dispose the generation of secondary disasters such as back downhole debris flow.
The movable subsidence area backfill method of disposal in a kind of mine of the present invention is characterized in that: employing will mix the discharging modes of disposing body " plane subregion alternately, vertical gluing-non-glued alternating layers " the backfill disposal will be carried out in the subsidence area;
Described plane subregion alternately discharges specific as follows: according to subsidence area (6) spatial distribution state the subsidence area is divided into several independent discharge region in the plane, alternately discharging of subregion during discharging;
The glued layering discharging of described vertical gluing-non-is specific as follows: the subsidence area backfill initial stage is adopted glued backfill, forms glued backfill layer (7) in the subsidence area; After glued backfill layer of initial stage (7) forms, just carry out non-glued backfill, non-glued backfill layer (8) carries out glued backfill again when reaching certain thickness, and the operation that so hockets finishes until backfill; Along with the variation of goaf (10) and fragmented rock body (9), the backfill body can in time be controlled the trend that limit, subsidence area group rock mass moves down to the center, subsidence area;
Described gluing, the concrete parameter of non-glued backfill layer are as follows: the initial stage, glued backfill layer thickness should be relatively large, and thickness is 5~10m, and glued backfill layer thickness afterwards reduces gradually, is controlled between 0.5 ~ 5.0m; Non-glued layer thickness 5 ~ 20m.
Further, when adopting non-glued backfill, described mixing is disposed body and is adopted following method preparation:
The full last mortar of low concentration that the ore dressing plant is discharged carries out one section dense dehydration through deep wimble thickener (1), and the full tailings mass concentration in dehydration back is greater than 70%;
The coarse aggregate that high-consistency full auxiliary rotor after dense, aggregate silo (2) are emitted is prepared into uniform non-glued backfill slip through mixer (4), and pulp quality concentration is controlled between 75% ~ 85%, and proportioning is full tailings: the barren rock mass ratio is 9:1 ~ 3:7.
Further, when adopting glued backfill, described mixing is disposed body and is adopted following method preparation:
The full last mortar of low concentration that the ore dressing plant is discharged carries out one section dense dehydration through deep wimble thickener (1), and the full tailings mass concentration in dehydration back is greater than 70%;
The coarse aggregate that high-consistency full auxiliary rotor after dense, aggregate silo (2) are emitted, the cement that powder silo (3) is emitted are prepared into uniform glued backfill slip through mixer (4), pulp quality concentration is controlled between 75% ~ 85%, proportioning is full tailings: the barren rock mass ratio is 9:1 ~ 3:7, and cement-sand ratio is 1:9 ~ 1:99.
The present invention adopts mine discarded object tailings, rubble, jigging sand etc., is prepared into lotion after adding a certain amount of cementitious material as the case may be, adopts pumping mode that ointment pumping is carried out backfill to the subsidence area.Adopt the back-filling way of " plane subregion, vertical layered " during the subsidence area backfill.This method advantage is: made full use of the mine discarded object, reduced its pollution to environment and destroyed; Because the permeability that the backfill body has good flowability and is fit to adopts the alternating layers back-filling way during backfill, the backfill body has good mechanical characteristic and compatible deformation ability.Therefore effective further expanding of control activity subsidence area when being subjected to mining influence can not cause secondary disasters such as downhole debris flow after backfill is disposed.
?
Description of drawings
The vertical layered discharging schematic diagram in Fig. 1-subsidence area, wherein 1-deep wimble thickener; 2-aggregate silo; 3-powder silo; 4-mixer; 5-pump; 6-subsidence area; 7-glued backfill layer; 8-non-glued backfill layer; 9-fragmented rock body; 10-goaf.
Fig. 2-plane, subsidence area subregion discharging schematic diagram, wherein 11-discharge region one; 12-discharge region two; 13-discharge region three; 14-discharge region four.
?
The specific embodiment
Below the present invention is described further, but protection scope of the present invention is not limited to the following scope of describing the specific embodiment.
The embodiment of this method is described in detail in detail below.
Certain mining area has formed the surface subsidence district that is made of tens Collapse Pit in long-term recovery process, its volume up to more than 200 incomparably.Along with the carrying out of underground mining, the subsidence area is constantly expanded, and local people's daily life and mine ordinary production are caused great threat.This ore deposit adopts the method for mixing the backfill of disposal body that the subsidence area is administered, and is specific as follows:
Adopt 1 pair of full tailings of deep wimble thickener to carry out one section dehydration, the full tailings mass concentration in dehydration back is controlled at 72% ~ 76%.Rubble is emitted through aggregate silo 2, mixes in the last mortar of dense back (incorporation 10% ~ 50%), is undertaken evenly mixing continuously by mixer 4.Backfill lotion mass concentration is controlled between 81% ~ 84%.When adopting glued backfill, above-mentioned slip preparation technology is constant, only needs add 1% ~ 5% cement before stirring link, is supplied with by powder silo 3.The backfill slip for preparing is pumped to subsidence area 6 through pump 5 and carries out backfill.
According to subsidence area, the face of land 6 landform and distribution characteristics, tentatively certain surface subsidence district, ore deposit 6 is divided into four backfill discharge region.When discharging, adopt subregion to replace discharging modes.If discharge region 1 is at first discharged, be discharged into certain thickness after, then discharge in discharge region 3 13.Discharge region 3 13 is then carried out discharge region 2 12 dischargings after being discharged into certain thickness, is disposed to discharge region 4 14 at last, carries out so repeatedly.So, can guarantee backfill body in time drying and curing, not cause the stress of regional area fragmented rock body band to concentrate.
" glued-non-glued alternating layers discharging " mode is adopted in the subsidence area when vertical discharging, be about to the subsidence area and be divided into some layerings on vertical section, successively carries out backfill, and glued backfill layer 7 and non-glued backfill layer 8 spaces.Glued backfill layer thickness 7 is between 0.5 ~ 10m, and non-glued backfill layer 8 is between 5 ~ 20m, and glued amount accounts for overall backfill amount about 30%, and cement mixing content should be between 1% ~ 5%.
After tested, mix backfill disposal body and can reach following performance: according to " code for geological investigation of water resources and hydropower engineering " (GB50287-99), mix disposal body permeability and reach medium permeable rank.Glued backfill physical efficiency is condensed in 30 ~ 40h, and uniaxial compressive strength reached 1 ~ 2MPa in 28 days.Non-glued backfill body cohesion is between 40kPa ~ 100kPa.
Adopt above-mentioned back-filling way effectively to administer, tended towards stability gradually in the surface subsidence district, guarantee the carrying out of the normal mining activity in down-hole simultaneously certain surface subsidence district, ore deposit.

Claims (3)

1. the movable subsidence area backfill method of disposal in a mine is characterized in that:
To mix and dispose body and adopt the discharging modes of " plane subregion alternately, vertical gluing-non-glued alternating layers " that the backfill disposal is carried out in the subsidence area;
It is as follows that described plane subregion replaces drain steps: according to the spatial distribution state of subsidence area (6), the subsidence area is divided into several independent discharge region in the plane, carries out alternately discharging of subregion during discharging;
Described vertical gluing-non-glued alternating layers drain steps is as follows: the subsidence area backfill initial stage is adopted glued backfill, forms glued backfill layer (7) in the subsidence area; After glued backfill layer of initial stage (7) forms, just carry out non-glued backfill, non-glued backfill layer (8) carries out glued backfill again when reaching certain thickness, and the operation that so hockets finishes until backfill;
Described gluing, non-glued backfill layer structure are as follows: glued backfill layer thickness should be relatively large, and initial stage thickness is 5~10m, and other lift height reduces gradually, until 0.5 ~ 5m; Non-glued layer thickness 5 ~ 20m.
2. method according to claim 1 is characterized in that, when adopting non-glued backfill, described mixing is disposed body and adopted following method preparation:
The full last mortar of low concentration that the ore dressing plant is discharged carries out dense dehydration formation high-consistency full auxiliary rotor through deep wimble thickener (1), and the full tailings mass concentration in dehydration back is greater than 70%;
The full last mortar in dense back, coarse aggregate are prepared into uniform non-glued backfill slip through mixer (4), and pulp quality concentration is controlled between 75% ~ 85%, and proportioning is full tailings: the barren rock mass ratio is 9:1 ~ 3:7.
3. method according to claim 1 is characterized in that, when adopting glued backfill, described mixing is disposed body and adopted following method preparation:
The full last mortar of low concentration that the ore dressing plant is discharged carries out one section dense dehydration through deep wimble thickener (1), and the full tailings mass concentration in dehydration back is greater than 70%;
The full last mortar in dense back, cement, coarse aggregate are prepared into uniform glued backfill slip through mixer (4), and pulp quality concentration is controlled between 75% ~ 85%, and proportioning is full tailings: the barren rock mass ratio is 9:1 ~ 3:7, and cement-sand ratio is 1:9 ~ 1:99.
CN201310151624.9A 2013-04-27 2013-04-27 Backfill handling method for activity subsidence area of mine Expired - Fee Related CN103216239B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310151624.9A CN103216239B (en) 2013-04-27 2013-04-27 Backfill handling method for activity subsidence area of mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310151624.9A CN103216239B (en) 2013-04-27 2013-04-27 Backfill handling method for activity subsidence area of mine

Publications (2)

Publication Number Publication Date
CN103216239A true CN103216239A (en) 2013-07-24
CN103216239B CN103216239B (en) 2015-06-17

Family

ID=48814354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310151624.9A Expired - Fee Related CN103216239B (en) 2013-04-27 2013-04-27 Backfill handling method for activity subsidence area of mine

Country Status (1)

Country Link
CN (1) CN103216239B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106097126A (en) * 2016-06-20 2016-11-09 中钢集团马鞍山矿山研究院有限公司 Caving Method with Large Space produces the quantization method of cave-in areas hole heap row's solidification mine tailing Rational Thickness
CN106194257A (en) * 2016-07-05 2016-12-07 东北大学秦皇岛分校 A kind of in the method for tailing disposal mastic at the bottom of the open-air pit of activity sedimentation
CN107975044A (en) * 2016-10-24 2018-05-01 南京梅山冶金发展有限公司 A kind of method that Caving Method with Large Space mine is backfilled using tailing surface subsidence hole
CN108501221A (en) * 2018-04-09 2018-09-07 长沙矿山研究院有限责任公司 Filling slurry Preparation equipment, technique and filling system
CN108915765A (en) * 2018-07-02 2018-11-30 北京科技大学 A kind of underground crude tailings-barren rock Paste-filling System and placement method
CN110566207A (en) * 2019-09-10 2019-12-13 东北大学 covering layer full-tailings piling method for open-air to underground non-bottom-pillar sublevel caving method
CN110876290A (en) * 2019-11-18 2020-03-13 西安科技大学 Comprehensive configuration method for mountainous, watery, forest, field, lake and grass in sand area with consideration of mining subsidence
CN111436243A (en) * 2020-01-21 2020-07-24 新疆盛洁环境技术有限责任公司 Method for treating pit mining geological environment by utilizing planting soil prepared from solid waste
CN114293990A (en) * 2022-01-04 2022-04-08 长沙有色冶金设计研究院有限公司 Method for filling open pit
CN114382068A (en) * 2022-02-08 2022-04-22 江苏昌泰建设工程有限公司 Closed-warehouse construction method for target site mould bag block
CN115059025A (en) * 2022-06-22 2022-09-16 中国恩菲工程技术有限公司 Combined treatment system and method for tailings and waste rocks
WO2023109378A1 (en) * 2021-12-14 2023-06-22 万宝矿产有限公司 Waste rock and dry tailings combined treatment method for open pit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2274749C1 (en) * 2005-04-15 2006-04-20 Общество с ограниченной ответственностью "Экостройресурс" Method for land reclamation in the case of land corruption by opened deposit development
CN101215975A (en) * 2008-01-09 2008-07-09 云南驰宏锌锗股份有限公司 Whole tailings depth controllable homogeneous concentration method
CN101713291A (en) * 2009-12-09 2010-05-26 煤炭科学研究总院唐山研究院 Filling-reclaiming method for building land in coal mining subsidence areas
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN102678124A (en) * 2012-05-29 2012-09-19 武汉科技大学 Method for back-filling surface subsidence area based on underground metal mineral deposit mining

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2274749C1 (en) * 2005-04-15 2006-04-20 Общество с ограниченной ответственностью "Экостройресурс" Method for land reclamation in the case of land corruption by opened deposit development
CN101215975A (en) * 2008-01-09 2008-07-09 云南驰宏锌锗股份有限公司 Whole tailings depth controllable homogeneous concentration method
CN101713291A (en) * 2009-12-09 2010-05-26 煤炭科学研究总院唐山研究院 Filling-reclaiming method for building land in coal mining subsidence areas
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN102678124A (en) * 2012-05-29 2012-09-19 武汉科技大学 Method for back-filling surface subsidence area based on underground metal mineral deposit mining

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘付高: "细砂水砂非胶结充填法的研究与应用", 《世界采矿快报》, vol. 16, no. 12, 31 December 2000 (2000-12-31), pages 443 - 447 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106097126B (en) * 2016-06-20 2019-08-06 中钢集团马鞍山矿山研究院有限公司 Caving Method with Large Space production cave-in areas hole heap row solidifies the quantization method of tailing Rational Thickness
CN106097126A (en) * 2016-06-20 2016-11-09 中钢集团马鞍山矿山研究院有限公司 Caving Method with Large Space produces the quantization method of cave-in areas hole heap row's solidification mine tailing Rational Thickness
CN106194257A (en) * 2016-07-05 2016-12-07 东北大学秦皇岛分校 A kind of in the method for tailing disposal mastic at the bottom of the open-air pit of activity sedimentation
CN106194257B (en) * 2016-07-05 2019-05-28 东北大学秦皇岛分校 A method of in the open-air pit bottom tailing disposal lotion of activity sedimentation
CN107975044A (en) * 2016-10-24 2018-05-01 南京梅山冶金发展有限公司 A kind of method that Caving Method with Large Space mine is backfilled using tailing surface subsidence hole
CN107975044B (en) * 2016-10-24 2021-03-12 南京梅山冶金发展有限公司 Method for backfilling collapse method mine by utilizing tailing surface collapse pits
CN108501221A (en) * 2018-04-09 2018-09-07 长沙矿山研究院有限责任公司 Filling slurry Preparation equipment, technique and filling system
CN108915765B (en) * 2018-07-02 2020-10-09 北京科技大学 Underground full tailing-waste stone paste filling system and filling method
CN108915765A (en) * 2018-07-02 2018-11-30 北京科技大学 A kind of underground crude tailings-barren rock Paste-filling System and placement method
CN110566207A (en) * 2019-09-10 2019-12-13 东北大学 covering layer full-tailings piling method for open-air to underground non-bottom-pillar sublevel caving method
CN110876290A (en) * 2019-11-18 2020-03-13 西安科技大学 Comprehensive configuration method for mountainous, watery, forest, field, lake and grass in sand area with consideration of mining subsidence
CN111436243A (en) * 2020-01-21 2020-07-24 新疆盛洁环境技术有限责任公司 Method for treating pit mining geological environment by utilizing planting soil prepared from solid waste
WO2023109378A1 (en) * 2021-12-14 2023-06-22 万宝矿产有限公司 Waste rock and dry tailings combined treatment method for open pit
CN114293990A (en) * 2022-01-04 2022-04-08 长沙有色冶金设计研究院有限公司 Method for filling open pit
CN114382068A (en) * 2022-02-08 2022-04-22 江苏昌泰建设工程有限公司 Closed-warehouse construction method for target site mould bag block
CN114382068B (en) * 2022-02-08 2023-11-10 江苏昌泰建设工程有限公司 Construction method for closing warehouse of target site bag block
CN115059025A (en) * 2022-06-22 2022-09-16 中国恩菲工程技术有限公司 Combined treatment system and method for tailings and waste rocks

Also Published As

Publication number Publication date
CN103216239B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN103216239B (en) Backfill handling method for activity subsidence area of mine
Yilmaz Advances in reducing large volumes of environmentally harmful mine waste rocks and tailings
CN105317458B (en) A kind of metallic ore crude tailings Grading And Zoning Paste-filling System and method
CN110924967B (en) Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum
CN101792291B (en) High-water expansion filling material
CN101215976B (en) Down-hole gangue pump packing system and method
CN107975044B (en) Method for backfilling collapse method mine by utilizing tailing surface collapse pits
CN107965349B (en) Water consolidates mixed slurry load precompressed process for dewatering and coagulating
CN110671147B (en) Construction system and construction process for filling goafs of different scales by utilizing waste concrete
CN102562068B (en) Mine subsequent cemented and non-cemented filling mining method
CN109898992A (en) It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance
CN114472462B (en) Underground-aboveground linkage coal gangue disposal system and disposal method
CN215520873U (en) Coal gangue powder overlying strata compaction grouting filling mining system
CN105971605B (en) A kind of underground mines exploration without waster method
CN114622953A (en) Coal mine gangue and CO2Mining overburden rock isolation grouting filling emission reduction method
CN114294056A (en) Open pit treatment method combining waste rock and dry tailings
CN110355174A (en) The technological improvement of solid waste pyramid heap building technology
CN106939165A (en) A kind of soil body curing agent and its preparation method and its gunnite method
CN102775105A (en) Mine paste filling aggregate prepared from building waste materials and preparation method of mine paste filling aggregate
CN103938651B (en) The stake of Large stone porous concrete and treatment process of composite foundation thereof under water
CN216477459U (en) Open pit filling structure
CN105780737B (en) A kind of super-high rockfill dam structure and its construction method for being applicable Hydraulic and Hydro-Power Engineering
KR100959410B1 (en) Cement filler for filling mine hole
Pusch Backfilling with mixtures of bentonite/ballast materials or natural smectitic clay?
CN202467923U (en) Continuous stirring and filling device for preparing mining paste by utilizing building wastes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Hongjiang

Inventor after: Li Gongcheng

Inventor after: Shen Xianling

Inventor after: Li Jiameng

Inventor after: Jiang Ji

Inventor after: Xiao Chongchun

Inventor after: Zhang Zewu

Inventor after: Wu Aixiang

Inventor after: Sun Wei

Inventor after: Wang Yiming

Inventor after: Li Tao

Inventor after: Han Bin

Inventor after: Yin Shenghua

Inventor after: Yi Haibao

Inventor before: Wang Hongjiang

Inventor before: Shen Xianling

Inventor before: Li Jiameng

Inventor before: Wu Aixiang

Inventor before: Sun Wei

Inventor before: Wang Yiming

Inventor before: Li Tao

Inventor before: Han Bin

Inventor before: Yin Shenghua

Inventor before: Yi Haibao

Inventor before: Li Gongcheng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180327

Address after: 100083 Haidian District, Xueyuan Road, No. 30,

Co-patentee after: Feny Co., Ltd.

Patentee after: University of Science and Technology Beijing

Address before: 100083 Haidian District, Xueyuan Road, No. 30,

Patentee before: University of Science and Technology Beijing

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20190427