CN103216239B - Backfill handling method for activity subsidence area of mine - Google Patents
Backfill handling method for activity subsidence area of mine Download PDFInfo
- Publication number
- CN103216239B CN103216239B CN201310151624.9A CN201310151624A CN103216239B CN 103216239 B CN103216239 B CN 103216239B CN 201310151624 A CN201310151624 A CN 201310151624A CN 103216239 B CN103216239 B CN 103216239B
- Authority
- CN
- China
- Prior art keywords
- backfill
- cementing
- subsidence area
- cement
- crude tailings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310151624.9A CN103216239B (en) | 2013-04-27 | 2013-04-27 | Backfill handling method for activity subsidence area of mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310151624.9A CN103216239B (en) | 2013-04-27 | 2013-04-27 | Backfill handling method for activity subsidence area of mine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103216239A CN103216239A (en) | 2013-07-24 |
CN103216239B true CN103216239B (en) | 2015-06-17 |
Family
ID=48814354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310151624.9A Expired - Fee Related CN103216239B (en) | 2013-04-27 | 2013-04-27 | Backfill handling method for activity subsidence area of mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103216239B (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106097126B (en) * | 2016-06-20 | 2019-08-06 | 中钢集团马鞍山矿山研究院有限公司 | Caving Method with Large Space production cave-in areas hole heap row solidifies the quantization method of tailing Rational Thickness |
CN106194257B (en) * | 2016-07-05 | 2019-05-28 | 东北大学秦皇岛分校 | A method of in the open-air pit bottom tailing disposal lotion of activity sedimentation |
CN107975044B (en) * | 2016-10-24 | 2021-03-12 | 南京梅山冶金发展有限公司 | Method for backfilling collapse method mine by utilizing tailing surface collapse pits |
CN108501221A (en) * | 2018-04-09 | 2018-09-07 | 长沙矿山研究院有限责任公司 | Filling slurry Preparation equipment, technique and filling system |
CN108915765B (en) * | 2018-07-02 | 2020-10-09 | 北京科技大学 | Underground full tailing-waste stone paste filling system and filling method |
CN110566207A (en) * | 2019-09-10 | 2019-12-13 | 东北大学 | covering layer full-tailings piling method for open-air to underground non-bottom-pillar sublevel caving method |
CN110876290A (en) * | 2019-11-18 | 2020-03-13 | 西安科技大学 | Comprehensive configuration method for mountainous, watery, forest, field, lake and grass in sand area with consideration of mining subsidence |
CN111436243B (en) * | 2020-01-21 | 2022-08-16 | 新疆盛洁环境技术有限责任公司 | Method for treating pit mining geological environment by using planting soil prepared from solid wastes |
CN114294056A (en) * | 2021-12-14 | 2022-04-08 | 万宝矿产有限公司 | Open pit treatment method combining waste rock and dry tailings |
CN114293990A (en) * | 2022-01-04 | 2022-04-08 | 长沙有色冶金设计研究院有限公司 | Method for filling open pit |
CN114382068B (en) * | 2022-02-08 | 2023-11-10 | 江苏昌泰建设工程有限公司 | Construction method for closing warehouse of target site bag block |
CN115059025A (en) * | 2022-06-22 | 2022-09-16 | 中国恩菲工程技术有限公司 | Combined treatment system and method for tailings and waste rocks |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2274749C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
CN101215975A (en) * | 2008-01-09 | 2008-07-09 | 云南驰宏锌锗股份有限公司 | Whole tailings depth controllable homogeneous concentration method |
CN101713291A (en) * | 2009-12-09 | 2010-05-26 | 煤炭科学研究总院唐山研究院 | Filling-reclaiming method for building land in coal mining subsidence areas |
CN101858217A (en) * | 2010-05-18 | 2010-10-13 | 中南大学 | House pillar changeable panel upward demix filling mining method |
CN102678124A (en) * | 2012-05-29 | 2012-09-19 | 武汉科技大学 | Method for back-filling surface subsidence area based on underground metal mineral deposit mining |
-
2013
- 2013-04-27 CN CN201310151624.9A patent/CN103216239B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2274749C1 (en) * | 2005-04-15 | 2006-04-20 | Общество с ограниченной ответственностью "Экостройресурс" | Method for land reclamation in the case of land corruption by opened deposit development |
CN101215975A (en) * | 2008-01-09 | 2008-07-09 | 云南驰宏锌锗股份有限公司 | Whole tailings depth controllable homogeneous concentration method |
CN101713291A (en) * | 2009-12-09 | 2010-05-26 | 煤炭科学研究总院唐山研究院 | Filling-reclaiming method for building land in coal mining subsidence areas |
CN101858217A (en) * | 2010-05-18 | 2010-10-13 | 中南大学 | House pillar changeable panel upward demix filling mining method |
CN102678124A (en) * | 2012-05-29 | 2012-09-19 | 武汉科技大学 | Method for back-filling surface subsidence area based on underground metal mineral deposit mining |
Non-Patent Citations (1)
Title |
---|
细砂水砂非胶结充填法的研究与应用;刘付高;《世界采矿快报》;20001231;第16卷(第12期);第443-447页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103216239A (en) | 2013-07-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103216239B (en) | Backfill handling method for activity subsidence area of mine | |
Yilmaz | Advances in reducing large volumes of environmentally harmful mine waste rocks and tailings | |
CN101792291B (en) | High-water expansion filling material | |
CN105317458B (en) | A kind of metallic ore crude tailings Grading And Zoning Paste-filling System and method | |
CN110924967B (en) | Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum | |
CN107965349B (en) | Water consolidates mixed slurry load precompressed process for dewatering and coagulating | |
CN107975044B (en) | Method for backfilling collapse method mine by utilizing tailing surface collapse pits | |
CN109898992A (en) | It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance | |
CN102101788A (en) | Red mud-based fluid swelling filling material | |
WO2023109378A1 (en) | Waste rock and dry tailings combined treatment method for open pit | |
Yin et al. | Active roof-contact: The future development of cemented paste backfill | |
CN215520873U (en) | Coal gangue powder overlying strata compaction grouting filling mining system | |
CN102775105A (en) | Mine paste filling aggregate prepared from building waste materials and preparation method of mine paste filling aggregate | |
CN114472462B (en) | Underground-aboveground linkage coal gangue disposal system and disposal method | |
CN216477459U (en) | Open pit filling structure | |
CN110566207A (en) | covering layer full-tailings piling method for open-air to underground non-bottom-pillar sublevel caving method | |
CN202467923U (en) | Continuous stirring and filling device for preparing mining paste by utilizing building wastes | |
CN108868854A (en) | Expansion shell type friction bolt-anchor cable combined support structure | |
CN114182748A (en) | Jointless continuous in-situ impervious wall construction device and curtain construction method | |
CN203614129U (en) | Underground waste rock concrete preparation, pumping and filling system | |
CN108374468B (en) | Method for blocking damage of old flood drainage system of tailing pond | |
CN115504723B (en) | Plastic slurry suitable for anti-seepage grouting of karst development stratum | |
Wang et al. | Investigation on the Nanjing gypsum mine flooding | |
CN219951579U (en) | Loess traping hole treatment structure under road | |
CN208885324U (en) | Expansion shell type friction bolt-anchor cable combined support structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Hongjiang Inventor after: Li Gongcheng Inventor after: Shen Xianling Inventor after: Li Jiameng Inventor after: Jiang Ji Inventor after: Xiao Chongchun Inventor after: Zhang Zewu Inventor after: Wu Aixiang Inventor after: Sun Wei Inventor after: Wang Yiming Inventor after: Li Tao Inventor after: Han Bin Inventor after: Yin Shenghua Inventor after: Yi Haibao Inventor before: Wang Hongjiang Inventor before: Shen Xianling Inventor before: Li Jiameng Inventor before: Wu Aixiang Inventor before: Sun Wei Inventor before: Wang Yiming Inventor before: Li Tao Inventor before: Han Bin Inventor before: Yin Shenghua Inventor before: Yi Haibao Inventor before: Li Gongcheng |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180327 Address after: 100083 Haidian District, Xueyuan Road, No. 30, Co-patentee after: Feny Co., Ltd. Patentee after: University of Science and Technology Beijing Address before: 100083 Haidian District, Xueyuan Road, No. 30, Patentee before: University of Science and Technology Beijing |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 Termination date: 20190427 |