CN103215893A - 大型盖梁中分节段预制拼装方法及其拼装结构 - Google Patents

大型盖梁中分节段预制拼装方法及其拼装结构 Download PDF

Info

Publication number
CN103215893A
CN103215893A CN2013101503501A CN201310150350A CN103215893A CN 103215893 A CN103215893 A CN 103215893A CN 2013101503501 A CN2013101503501 A CN 2013101503501A CN 201310150350 A CN201310150350 A CN 201310150350A CN 103215893 A CN103215893 A CN 103215893A
Authority
CN
China
Prior art keywords
prefabricated
capping beam
bridge pier
bent cap
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101503501A
Other languages
English (en)
Inventor
周振兴
闫兴非
王勇
吴连盛
葛景春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN2013101503501A priority Critical patent/CN103215893A/zh
Publication of CN103215893A publication Critical patent/CN103215893A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种大型盖梁中分节段预制拼装方法,包括以下步骤:将所述盖梁由中部划分为两段预制节段进行预制,两所述预制节段上均设置有横向套管以及纵向套管;采用吊机将所述预制节段吊装至所述桥墩上,在所述纵向套管内穿设连接件,完成所述预制节段与所述桥墩的预制拼接,同时设置稳定索连接所述预制节段与所述桥墩;将另一所述预制节段吊装固定到另一所述桥墩上;浇筑现浇段,将两所述预制节段进行混凝土浇筑完成对接,同时横向贯穿两所述预制节段和所述现浇段导入预应力筋。本发明还公开了一种大型盖梁中分节段预制拼装结构,包括两预制节段和一现浇段。本发明对盖梁预制和现场吊装施工要求较低,十分适用于大型盖梁的施工构筑。

Description

大型盖梁中分节段预制拼装方法及其拼装结构
技术领域
本发明涉及预制盖梁施工的技术领域,尤其涉及一种大型盖梁中分节段预制拼装方法及其拼装结构。
背景技术
桥梁中的盖梁施工是桥梁施工的重点之一,传统盖梁主要采用的施工方法为托架法,在桥墩上部设置模具以浇筑混凝土,通过混凝土养护凝固后将模具拆除,这种方法存在以下缺点:1、搭设周期长;2、耗费人工及材料;3、在城市桥梁施工中,会限制地面交通;4、对于地质条件较差的场地支架地基处理成本高;5、对场地要求较高。
因此,为了克服上述托架法施工存在的不足,现多采用预制盖梁再现场吊装的快速施工方法,具体根据施工要求先预制盖梁,再将盖梁运至施工现场进行整体吊装。该方法十分适合中小型盖梁的构筑,但是对于大型盖梁(如超过400吨)的构筑,在现场很难有匹配的吊具进行吊装作业,且由于体积与重量过大,施工要求较高,且存在安全隐患。
因此,本领域的技术人员一直致力于开发一种对盖梁预制和现场吊装施工要求较低,适用于大型盖梁施工的大型盖梁中分节段预制拼装方法及其拼装结构。
发明内容
有鉴于上述现有技术的不足,本发明提出一种对盖梁预制和现场吊装施工要求较低,适用于大型盖梁施工的大型盖梁中分节段预制拼装方法及其拼装结构。
为实现上述目的,本发明提供了一种大型盖梁中分节段预制拼装方法,所述盖梁吊装在两桥墩上,包括以下步骤:
步骤一:根据设计要求,将所述盖梁由中部划分为两段预制节段进行预制,两所述预制节段上均设置有用于穿设预应力筋的横向套管以及用于穿设与所述桥墩连接的连接件的纵向套管。
步骤二:采用吊机将所述预制节段吊装至所述桥墩上,在所述纵向套管内穿设连接件,完成所述预制节段与所述桥墩的预制拼接,同时设置稳定索连接所述预制节段与所述桥墩。
步骤三:重复步骤二,将另一所述预制节段吊装固定到另一所述桥墩上。
步骤四:在两所述预制节段相向端面之间浇筑现浇段,将两所述预制节段进行混凝土浇筑完成对接,同时通过所述横向套管横向贯穿两所述预制节段和所述现浇段导入预应力筋。
上述技术方案尤其适合大型盖梁的施工,该拼装方法利用一分为二的预制节段通过现浇段对接构筑大型盖梁,并且在预制节段上预埋纵向套管和横向套管,使得能够快速地在桥墩上进行预制拼接,同时克服了托架法和现有现场吊装法存在的缺点,达到了快速施工、吊装方便、降低预制要求和施工要求的目的。
本发明还提出一种大型盖梁中分节段预制拼装结构,包括两预制节段和一现浇段,两所述预制节段通过所述现浇段进行对接,两所述预制节段和所述现浇段之间贯穿设置有预应力筋。
作为本发明的进一步改进,两所述预制节段内设置有用于穿设所述预应力筋的横向套管,便于所述预应力筋的现场穿设。
作为本发明的进一步改进,所述预制节段上设置有用于穿设与桥墩连接的连接件的纵向套管,便于完成所述预制节段与所述桥墩的预制拼接,进一步降低施工难度,提高其结构可靠性。
可见,本发明的大型盖梁中分节段预制拼装结构,结构简单可靠,构筑难度较低,尤其适用于大型盖梁的构筑,大大的降低了构筑难度,缩短了施工工期,便于现场施工。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1为大型盖梁中分节段预制拼装方法的流程示意框图。
图2为完成步骤S2的拼装结构示意图。
图3为图2的俯视图。
图4为图2的左视图。
图5为大型盖梁中分节段预制拼装结构的应用示意图。
图6为图5的俯视图。
具体实施方式
实施例一:
图1为大型盖梁中分节段预制拼装方法的流程示意框图。本实施例提出一种大型盖梁中分节段预制拼装方法,实现将超过400吨的大型盖梁成功吊装至两桥墩上,如图1所示,其具体包括以下步骤:
步骤S1:根据设计要求,将所述盖梁由中部划分为两段预制节段1进行预制,两预制节段1上均设置有用于穿设预应力筋5的横向套管以及用于穿设与桥墩2连接的连接件3的纵向套管;示例性的,本实施例连接件3为JL32精轧螺纹钢。
步骤S2:结合图2-4所示,采用吊机将预制节段1吊装至桥墩2上,在所述纵向套管内穿设连接件3,完成预制节段1与桥墩2的预制拼接,同时设置稳定索4连接预制节段1与桥墩2。
步骤S3:重复步骤S2,将另一所述预制节段吊装固定到另一所述桥墩上。
步骤S4:结合图5和图6所示,在两预制节段1相向端面之间浇筑现浇段6,将两预制节段1进行混凝土浇筑完成对接,同时通过所述横向套管横向贯穿两预制节段1和现浇段6导入预应力筋5。
本实施例的拼装方法尤其适合双桥墩的盖梁预制拼装,相较于现有技术的托架法,本实施例所需工期更短,对地面交通以及环境影响更小;相较于现有预制吊装法,本实施例克服了整体吊装盖梁过重无法吊装的问题,且本实施例的两预制节段均是先单独设置在相应桥墩上再通过现浇段进行对接,其施工更加方便,对施工的要求也被大大的降低,而现浇段的施工由于两端已经固定的预制节段的存在也变得更加简单,如直接采用模具搭接在两预制节段相向的两端面上,然后进行浇筑即可。
实施例二:
图5为大型盖梁中分节段预制拼装结构的应用示意图。本实施例可按照上述实施例一的施工步骤构筑一种大型盖梁中分节段预制拼装结构,如图5所示,该拼装结构包括两预制节段1和一现浇段6,两预制节段1通过现浇段6进行对接,两预制节段1和现浇段6之间贯穿设置有预应力筋5。
作为本实施例的进一步具体实施方式,如图5和图6所示,在两预制节段1内设置有用于穿设预应力筋5的横向套管,以及在预制节段1上设置有用于穿设与桥墩连接的连接件3的纵向套管,加设所述横向套管和纵向套管,便于所述预应力筋的现场穿设,以及完成预制节段1与桥墩2的预制拼接,进一步降低施工难度,提高其结构可靠性。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思做出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。

Claims (4)

1.一种大型盖梁中分节段预制拼装方法,所述盖梁吊装在两桥墩上,其特征在于,包括以下步骤:
步骤一:根据设计要求,将所述盖梁由中部划分为两段预制节段进行预制,两所述预制节段上均设置有用于穿设预应力筋的横向套管以及用于穿设与所述桥墩连接的连接件的纵向套管;
步骤二:采用吊机将所述预制节段吊装至所述桥墩上,在所述纵向套管内穿设连接件,完成所述预制节段与所述桥墩的预制拼接,同时设置稳定索连接所述预制节段与所述桥墩;
步骤三:重复步骤二,将另一所述预制节段吊装固定到另一所述桥墩上;
步骤四:在两所述预制节段相向端面之间浇筑现浇段,将两所述预制节段进行混凝土浇筑完成对接,同时通过所述横向套管横向贯穿两所述预制节段和所述现浇段导入预应力筋。
2.一种大型盖梁中分节段预制拼装结构,其特征在于:包括两预制节段和一现浇段,两所述预制节段通过所述现浇段进行对接,两所述预制节段和所述现浇段之间贯穿设置有预应力筋。
3.如权利要求2所述的大型盖梁中分节段预制拼装结构,其特征在于:两所述预制节段内设置有用于穿设所述预应力筋的横向套管。
4.如权利要求2所述的大型盖梁中分节段预制拼装结构,其特征在于:所述预制节段上设置有用于穿设与桥墩连接的连接件的纵向套管。
CN2013101503501A 2013-04-26 2013-04-26 大型盖梁中分节段预制拼装方法及其拼装结构 Pending CN103215893A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101503501A CN103215893A (zh) 2013-04-26 2013-04-26 大型盖梁中分节段预制拼装方法及其拼装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101503501A CN103215893A (zh) 2013-04-26 2013-04-26 大型盖梁中分节段预制拼装方法及其拼装结构

Publications (1)

Publication Number Publication Date
CN103215893A true CN103215893A (zh) 2013-07-24

Family

ID=48814018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101503501A Pending CN103215893A (zh) 2013-04-26 2013-04-26 大型盖梁中分节段预制拼装方法及其拼装结构

Country Status (1)

Country Link
CN (1) CN103215893A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981803A (zh) * 2014-05-30 2014-08-13 中铁第一勘察设计院集团有限公司 预制拼装组合型门型墩及其施工方法
CN105442434A (zh) * 2015-12-21 2016-03-30 上海市城市建设设计研究总院 桥梁预制立柱与预制盖梁插槽式连接结构及其拼装方法
CN109083003A (zh) * 2018-09-21 2018-12-25 上海市隧道工程轨道交通设计研究院 一种预制桥墩用墩顶连接结构及其施工方法
CN109137759A (zh) * 2018-09-29 2019-01-04 中铁第四勘察设计院集团有限公司 一种预应力混凝土箱梁节段预制悬臂拼装方法及系统
CN109853362A (zh) * 2019-03-29 2019-06-07 上海应用技术大学 一种临时预应力锚固分段预制盖梁及临时预应力施加方法
CN110359362A (zh) * 2019-07-10 2019-10-22 江苏镇江路桥工程有限公司 一种模块化预制盖梁及其施工工艺
CN110387809A (zh) * 2019-08-21 2019-10-29 上海建工集团股份有限公司 一种新型承台结构及施工方法
CN110541364A (zh) * 2019-09-04 2019-12-06 上海城建市政工程(集团)有限公司 一种桥梁盖梁分段预制拼装固定方法
CN110644371A (zh) * 2019-09-30 2020-01-03 中铁大桥局集团第五工程有限公司 预制盖梁安装方法及系统
CN110685222A (zh) * 2019-09-04 2020-01-14 上海城建市政工程(集团)有限公司 一种预制盖梁无支架拉杆平衡施工方法
CN111794074A (zh) * 2020-07-07 2020-10-20 浙江华东工程咨询有限公司 一种拱桥混凝土横梁及其成梁方法
CN113293702A (zh) * 2021-04-23 2021-08-24 浙江交工集团股份有限公司 一种预制盖梁分节湿接反拉施工方法
CN113957782A (zh) * 2021-08-20 2022-01-21 上海市政工程设计研究总院(集团)有限公司 一种采用双主梁预制拼装方法的盖梁构造及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003336213A (ja) * 2002-05-17 2003-11-28 Ps Mitsubishi Construction Co Ltd コンクリート受け梁及びこれを用いた桁の架設方法
CN1548654A (zh) * 2003-05-12 2004-11-24 上海市政工程设计研究院 一种宽体盖梁桥墩
JP2010084349A (ja) * 2008-09-30 2010-04-15 Ihi Corp 箱桁端部の補強工法
CN203188113U (zh) * 2013-04-26 2013-09-11 上海市城市建设设计研究总院 大型盖梁中分节段预制拼装结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003336213A (ja) * 2002-05-17 2003-11-28 Ps Mitsubishi Construction Co Ltd コンクリート受け梁及びこれを用いた桁の架設方法
CN1548654A (zh) * 2003-05-12 2004-11-24 上海市政工程设计研究院 一种宽体盖梁桥墩
JP2010084349A (ja) * 2008-09-30 2010-04-15 Ihi Corp 箱桁端部の補強工法
CN203188113U (zh) * 2013-04-26 2013-09-11 上海市城市建设设计研究总院 大型盖梁中分节段预制拼装结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国土木工程学会桥梁及结构工程分会: "《第十八届全国桥梁学术会议论文集(上册)》", 30 April 2008, article "全预制混凝土桥梁技术概论", pages: 146-149 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981803B (zh) * 2014-05-30 2016-04-13 中铁第一勘察设计院集团有限公司 预制拼装组合型门型墩及其施工方法
CN103981803A (zh) * 2014-05-30 2014-08-13 中铁第一勘察设计院集团有限公司 预制拼装组合型门型墩及其施工方法
CN105442434A (zh) * 2015-12-21 2016-03-30 上海市城市建设设计研究总院 桥梁预制立柱与预制盖梁插槽式连接结构及其拼装方法
CN105442434B (zh) * 2015-12-21 2017-06-30 上海市城市建设设计研究总院(集团)有限公司 桥梁预制立柱与预制盖梁的拼装方法
CN109083003A (zh) * 2018-09-21 2018-12-25 上海市隧道工程轨道交通设计研究院 一种预制桥墩用墩顶连接结构及其施工方法
CN109083003B (zh) * 2018-09-21 2023-11-28 上海市隧道工程轨道交通设计研究院 一种预制桥墩用墩顶连接结构及其施工方法
CN109137759A (zh) * 2018-09-29 2019-01-04 中铁第四勘察设计院集团有限公司 一种预应力混凝土箱梁节段预制悬臂拼装方法及系统
CN109137759B (zh) * 2018-09-29 2023-12-19 中铁第四勘察设计院集团有限公司 一种预应力混凝土箱梁节段预制悬臂拼装方法及系统
CN109853362B (zh) * 2019-03-29 2021-02-26 上海应用技术大学 一种临时预应力锚固分段预制盖梁及临时预应力施加方法
CN109853362A (zh) * 2019-03-29 2019-06-07 上海应用技术大学 一种临时预应力锚固分段预制盖梁及临时预应力施加方法
CN110359362A (zh) * 2019-07-10 2019-10-22 江苏镇江路桥工程有限公司 一种模块化预制盖梁及其施工工艺
CN110359362B (zh) * 2019-07-10 2021-07-20 江苏镇江路桥工程有限公司 一种模块化预制盖梁及其施工工艺
CN110387809A (zh) * 2019-08-21 2019-10-29 上海建工集团股份有限公司 一种新型承台结构及施工方法
CN110685222A (zh) * 2019-09-04 2020-01-14 上海城建市政工程(集团)有限公司 一种预制盖梁无支架拉杆平衡施工方法
CN110541364A (zh) * 2019-09-04 2019-12-06 上海城建市政工程(集团)有限公司 一种桥梁盖梁分段预制拼装固定方法
CN110644371A (zh) * 2019-09-30 2020-01-03 中铁大桥局集团第五工程有限公司 预制盖梁安装方法及系统
CN111794074A (zh) * 2020-07-07 2020-10-20 浙江华东工程咨询有限公司 一种拱桥混凝土横梁及其成梁方法
CN113293702A (zh) * 2021-04-23 2021-08-24 浙江交工集团股份有限公司 一种预制盖梁分节湿接反拉施工方法
CN113957782A (zh) * 2021-08-20 2022-01-21 上海市政工程设计研究总院(集团)有限公司 一种采用双主梁预制拼装方法的盖梁构造及其施工方法

Similar Documents

Publication Publication Date Title
CN103215893A (zh) 大型盖梁中分节段预制拼装方法及其拼装结构
CN203188113U (zh) 大型盖梁中分节段预制拼装结构
CN103194983A (zh) 大型盖梁挑臂分段节段预制拼装方法及其拼装结构
CN102154992B (zh) 波形钢腹板错位安装方法
CN103374880B (zh) 一种预制桥墩与承台的连接构造及其对接式施工方法
CN103276662B (zh) 大悬臂钢腹板脊骨箱梁节段
CN103215894B (zh) 移动式临时预应力张拉锚块
CN103074941A (zh) 一种端部含有钢筋桁架梁的装配式再生混凝土节点及作法
CN108774948A (zh) 一种节段悬臂拼装桥墩盖梁及其拼装方法
CN108867310A (zh) 先张法预应力混凝土矮肋t梁桥及其施工方法
CN207794327U (zh) 一种地铁车站站台板的预制拼装结构
CN103470272A (zh) 一种用于矿山法多种断面混凝土施工的台车及其施工方法
CN103711067A (zh) 一种少支架横向拼装波形钢腹板组合箱梁及施工方法
CN209493826U (zh) 混凝土节段预制桥梁临时拼接构造
CN103132708A (zh) 一种梁柱节点加固方法及其加固装置
CN103924525A (zh) 城市立交桥工业化短线预制拼装施工方法
CN108005118A (zh) 地下管廊主体结构整合施工方法
CN203188132U (zh) 大型盖梁挑臂分段节段预制拼装结构
CN103966956A (zh) 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法
CN103233426A (zh) 一种软基中无支墩的贝雷梁支架及其支护方法
CN204475184U (zh) 城市轻轨高架桥山型u梁施工支撑体系
CN203593950U (zh) 横向抗剪的节段式自复位桥墩
CN205243529U (zh) 隧道暗挖衬砌施工台车
CN105603890A (zh) 矮塔斜拉式体外拉索加固梁式桥
CN208563093U (zh) 一种节段悬臂拼装桥墩盖梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130724