CN103197246A - 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法 - Google Patents

一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法 Download PDF

Info

Publication number
CN103197246A
CN103197246A CN2013101106422A CN201310110642A CN103197246A CN 103197246 A CN103197246 A CN 103197246A CN 2013101106422 A CN2013101106422 A CN 2013101106422A CN 201310110642 A CN201310110642 A CN 201310110642A CN 103197246 A CN103197246 A CN 103197246A
Authority
CN
China
Prior art keywords
steam
unit
throttle
temperature
generation power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101106422A
Other languages
English (en)
Other versions
CN103197246B (zh
Inventor
杨海生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, Hebei Electric Power Construction Adjustment Test Institute filed Critical State Grid Corp of China SGCC
Priority to CN201310110642.2A priority Critical patent/CN103197246B/zh
Publication of CN103197246A publication Critical patent/CN103197246A/zh
Application granted granted Critical
Publication of CN103197246B publication Critical patent/CN103197246B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

本发明涉及一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法,其基于DCS的实时计算功能,排除机组运行时汽轮机主汽进汽压力、主汽进汽温度、热再热进汽压力、热再热进汽温度变化的影响,仅计算汽轮机排汽压力对机组发电功率影响值。本发明解决了电厂节能优化运行或技术改进中采用的汽轮机排汽压力变化对机组发电功率影响系数的准确性问题,并且方法简单,现场使用方便。

Description

一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法
技术领域
本发明涉及一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法。 
背景技术
随着国家节能及减排的压力加大,提高现有运行机组,尤其是大型汽轮发电机组的运行经济性,得到了电厂越来越多的重视。而影响发电机组运行经济性的参数中,汽轮机排汽压力的变化对机组发电功率的影响最为明显。对于一般大型机组,排汽压力变化1kPa,将直接影响机组发电功率近0.5%至1%。但此项数据对于不同类型的机组也存在较大的差异,如空冷机组与湿冷机组、低压缸配置型式不同的机组等。确定电厂汽轮机排汽压力对机组发电功率影响的特性系数,对于电厂进行节能优化运行或技术改进具有特别重要的意义。 
目前,电厂汽轮机排汽压力对机组发电功率影响的特性系数,电厂一般都直接采用汽轮机制造商提供的修正曲线来获得,现场缺少一种简便直接的验证手段。 
发明内容
本发明提供了一种方法简单,现场使用方便,能够准确确定电厂汽轮机排汽压力变化对机组发电功率影响系数的现场测算方法。 
本发明所采用的技术方案如下: 
本发明基于DCS的实时计算功能,排除机组运行时汽轮机主汽进汽压力、主汽进汽温度、热再热进汽压力、热再热进汽温度变化的影响,仅计算汽轮机排汽压力对机组发电功率影响值;其包括下述具体步骤:
步骤一:机组在基本运行方式下,解除机组一次调频及AGC功能,并保持机组汽轮机进汽阀位一定,机组运行稳定后采集机组在这一稳定状态下的汽轮机排汽压力p x1 、机组发电功率P g1 、汽轮机主汽进汽压力p ms1 、进汽温度T ms1 及再热蒸汽进汽温度T rh1
步骤二:在运行条件允许的条件下,维持与步骤一相同的汽轮机进汽阀位,大幅度调整汽轮机排汽压力,采集机组在汽轮机排汽压力变化后运行至稳定运行状态后的汽轮机排汽压力p x2 、机组发电功率P g2 、汽轮机主汽进汽压力p ms2 、进汽温度T ms2 及再热蒸汽进汽温度T rh2
步骤三:依据步骤一和步骤二所获得的数据,根据公式(1~3)分别计算在汽轮机主汽进汽压力p ms 、主汽进汽温度T ms 、再热蒸汽进汽温度T rh 变化下机组发电功率P g 的变化值;
 △P gpms  = k pms×△p ms ×P g1  = k pms×(p ms2 p ms1 )×P g1          (1)
P gTms k Tms×△T ms ×P g1  =k Tms×(T ms2 T ms1 )×P g1          (2)
P gTrh k Trh×△T rh ×P g1  = k Trh ×(T rh2 T rh1 )×P g1              (3)
其中△P gpms 为汽轮机主汽进汽压力改变下的机组发电功率变化值,单位为KW;
P gTms 为主汽进汽温度改变下的机组发电功率变化值,单位为KW;
P gTrh 为再热蒸汽进汽温度改变下的机组发电功率变化值,单位为KW;
k pms为厂家提供的汽轮机主汽进汽压力修正系数,单位为%/bar; 
k Tms为厂家提供的主汽进汽温度修正系数,单位为%/℃; 
k Trh为厂家提供的再热蒸汽进汽温度修正系数,单位为%/℃;
p ms 为步骤二与步骤一汽轮机主汽进汽压力的差值,单位为bar;
T ms 为步骤二与步骤一主汽进汽温度的差值,单位为℃;
T rh 为步骤二与步骤一再热蒸汽进汽温度的差值,单位为℃;
p ms1 为步骤一的汽轮机主汽进汽压力,单位为 bar;
p ms2 为步骤二的汽轮机主汽进汽压力,单位为 bar;
T ms1 为步骤一的主汽进汽温度,单位为℃;
T ms2 为步骤二的主汽进汽温度,单位为℃;
T rh1 为步骤一的再热蒸汽进汽温度,单位为℃;
T rh2 为步骤二的再热蒸汽进汽温度,单位为℃;
P g1 为步骤一的机组发电功率,单位为KW;
步骤四:依据步骤三和步骤四所得的数值,根据公式(4),以与步骤一相同的主汽进汽压力P ms 、主汽进汽温度T ms 、再热蒸汽进汽温度T rh ,计算修正后的步骤二的机组发电功率P g2c
P g2c  = P g2  -△P gpms  -△P gTms -△P gTrh    (4)
其中P g2c 为经修正后的步骤二的机组发电功率,单位为KW;
P g2 为步骤二获得的机组发电功率,单位为KW;
P gpms 为汽轮机主汽进汽压力改变下的机组发电功率变化值,单位为KW;
P gTms 为主汽进汽温度改变下的机组发电功率变化值,单位为KW;
P gTrh 为再热蒸汽进汽温度改变下的机组发电功率变化值,单位为KW;
步骤五:依据步骤一、步骤二和步骤四所得的数值,根据公式(5),计算汽轮机排汽压力px变化对机组发电功率Pg影响系数k
= △P g /△p x = (P g2c  -P g1  )/( p x2 p x1  )   (5)
其中k为汽轮机排汽压力对机组发电功率的影响系数,单位为kW/kPa;
P g 为经修正后的步骤二的机组发电功率与步骤一的机组发电功率的差值,单位为KW;
p x 为步骤二与步骤一的汽轮机排汽压力的差值,单位为 kPa;
P g2c 为经修正后的步骤二的机组发电功率,单位为KW;
P g1 为步骤一的机组发电功率,单位为KW;
p x1 为步骤一的汽轮机排汽压力,单位为kPa;
p x2 为步骤二的汽轮机排汽压力,单位为kPa。
本发明采用的技术原理及计算如下: 
汽轮机组的发电功率与汽轮机排汽压力参数的变化密切相关,在汽轮机进汽阀位一定、及进汽参数一定的条件下,与汽轮机排汽压力变化之间的关系可表示为: 
P g f△p x
P g ——机组发电功率变化值,KW;
p x ——汽轮机排汽压力的差值, kPa;
f——汽轮机排汽压力对机组发电功率的函数系数。
p x 大于机组运行阻塞背压时,上述函数关系一般为近似线性关系,可表示为:  
P f△p x )= k×△p x
P g ——机组发电功率变化值,KW;
p x ——汽轮机排汽压力的差值, kPa;
k——汽轮机排汽压力对机组发电功率的影响系数,kW/kPa,在本发明中主要通过现场试验及修正的方法获得。
考虑两个稳定的试验条件即步骤一及步骤二。两个步骤中机组的运行方式是相同的,均为基本运行方式,且两个步骤中的汽轮机进汽阀位不变。由此,可确定两个步骤的工况下汽轮机设备性能如缸效率等未发生变化。则影响机组发电功率的因素仅包括运行参数,如汽轮机主汽进汽压力p ms 、进汽温度T ms 、再热蒸汽进汽温度T rh 、汽轮机排汽压力p x 。以下公式中,角标为“1”的均代表步骤一的数据,角标为“2”的均代表步骤二的数据。 
首先将两个步骤的工况下获得的机组发电功率修正至同一汽轮机运行边界条件,如相同的主汽进汽压力、主汽进汽温度及再热蒸汽进汽温度。 
两个步骤的工况下汽轮机主汽进汽压力p ms 、进汽温度T ms 、再热蒸汽进汽温度T rh 的变化,导致的机组发电功率变化可以表示为: 
P gpms  = k pms×△p ms ×P g1  = k pms×(p ms2 p ms1 )×P g1       
P gTms k Tms×△T ms ×P g1  =k Tms×(T ms2 T ms1 )×P g1     
P gTrh k Trh×△T rh ×P g1  = k Trh ×(T rh2 T rh1 )×P g1       
P gpms ——汽轮机主汽进汽压力改变下的机组发电功率变化值, KW;
P gTms ——主汽进汽温度改变下的机组发电功率变化值, KW;
△PgTrh——再热蒸汽进汽温度改变下的机组发电功率变化值, KW;
k pms ——厂家提供的汽轮机主汽进汽压力修正系数, %/bar; 
k Tms——厂家提供的主汽进汽温度修正系数, %/℃; 
k Trh——厂家提供的再热蒸汽进汽温度修正系数, %/℃;
p ms ——步骤二与步骤一汽轮机主汽进汽压力的差值, bar;
T ms ——步骤二与步骤一主汽进汽温度的差值,℃;
T rh ——步骤二与步骤一再热蒸汽进汽温度的差值,℃;
p ms1 ——步骤一的汽轮机主汽进汽压力, bar;
p ms2 ——步骤二的汽轮机主汽进汽压力, bar;
T ms1 ——步骤一的主汽进汽温度,℃;
T ms2 ——步骤二的主汽进汽温度,℃;
T rh1 ——步骤一的再热蒸汽进汽温度,℃;
T rh2 ——步骤二的再热蒸汽进汽温度,℃;
P g1 ——步骤一的机组发电功率, KW。
则步骤二修正至与步骤一相同汽轮机主汽进汽压力、主汽进汽温度、再热蒸汽进汽温度后的机组发电功率为: 
P g2c  = P g2  -△P gpms  -△P gTms -△P gTrh     
P g2c ——经修正后的步骤二的机组发电功率, KW,修正后的机组发电功率具有与步骤一试验时相同的主汽进汽压力、主汽进汽温度及再热蒸汽进汽温度条件;
P g2 ——步骤二获得的机组发电功率, KW;
P gpms ——汽轮机主汽进汽压力改变下的机组发电功率变化值, KW;
P gTms ——主汽进汽温度改变下的机组发电功率变化值, KW;
P gTrh ——再热蒸汽进汽温度改变下的机组发电功率变化值, KW。
则汽轮机排汽压力变化对机组发电功率影响系数k可采用下式计算: 
  = △P g /△p x = (P g2c  -P g1  )/( p x2 p x1 
k——汽轮机排汽压力对机组发电功率的影响系数, kW/kPa;
△Pg——经修正后的步骤二的机组发电功率与步骤一的机组发电功率的差值, KW;
p x ——步骤二与步骤一的汽轮机排汽压力的差值, kPa;
P g2c ——经修正后的步骤二的机组发电功率, KW;
P g1 ——步骤一的机组发电功率, KW;
p x1 ——步骤一的汽轮机排汽压力, kPa;
p x2 ——步骤二的汽轮机排汽压力, kPa。
采用上述技术方案所产生的有益效果在于: 
本发明主要是现场试验,通过控制机组的运行方式及参数变化获取试验数据,进行计算后最终可以获得汽轮机排汽压力变化对机组发电功率影响系数,其解决了电厂节能优化运行或技术改进中采用的汽轮机排汽压力变化对机组发电功率影响系数的准确性问题,不仅方法简单,现场使用方便,可以为准确获得汽轮机排汽压力变化对机组发电功率影响系数提供准确的数据。
本发明的方法在计算电厂汽轮机排汽压力变化对机组发电功率的影响时,排除了主要运行参数(如汽轮机主汽进汽压力、主汽进汽温度、热再热进汽压力、热再热进汽温度)的影响。因此,最终确定的结果只反映了汽轮机排汽压力对机组发电功率影响。 
具体实施方式
 实施例1: 
某660MW直接空冷机组,机组在基本运行方式下,解除机组一次调频及AGC功能,并保持机组汽轮机进汽阀位一定,机组运行稳定后采集机组在这一稳定状态下的汽轮机排汽压力p x1 、机组发电功率P g1 、汽轮机主汽进汽压力p ms1 、进汽温度T ms1 、再热蒸汽进汽温度T rh1 ,此为步骤一所获得的数据;在运行条件允许的条件下,维持与步骤一相同的汽轮机进汽阀位,大幅度调整汽轮机排汽压力,采集机组在汽轮机排汽压力变化后运行至稳定运行状态后的汽轮机排汽压力p x2 、机组发电功率P g2 、汽轮机主汽进汽压力p ms2 、进汽温度T ms2 、再热蒸汽进汽温度T rh2 ,此为步骤二所获得的数据;所采集的数据如表1所示。
表1 现场采集的步骤一及步骤二的试验数据 
Figure 2013101106422100002DEST_PATH_IMAGE001
根据汽轮机厂家提供的运行参数修正曲线,可以获得如下的修正系数:
k pms为厂家提供的汽轮机主汽进汽压力修正系数,为4%/MPa; 
k Tms为厂家提供的主汽进汽温度修正系数,为-0.0142%/℃; 
k Trh为厂家提供的再热蒸汽进汽温度修正系数,为0.09%/℃。
根据公式(1)至(3),计算步骤二相对于步骤一,由于运行参数变化引起的发电功率变化量: 
P gpms  = k pms×△p ms ×P g1  = k pms×(p ms2 p ms1 P g1  =-0.055×4%×660580= -1453.28 kW
P gTms  k Tms×△T ms ×P g1  =k Tms×(T ms2 T ms1 P g1  =-2.61×-0.0142%×660580= 244.82 kW
P gTrh  k Trh×△T rh ×P g1  = k Trh×(T rh2 T rh1 P g1  =2.54×0.09%×660580= 1510.1 kW。       
 根据公式(4),计算得到步骤二修正后的机组发电功率:
P g2c  = P g2 -△P gpms -△P gTms -△P gTrh   = 647549-(-1453.28+244.82+1510.1)= 647247.37 kW。
根据公式(5),计算汽轮机排汽压力变化对机组发电功率影响系数k: 
=  △P g /△p = ( 647247.37 -660580 )/( 16.78-9.35 )= -1794.4 kW/kPa。
 据此,得到该机组计算汽轮机排汽压力变化对机组发电功率的影响值为-1794.4 kW/kPa,试验数据准确可靠,并排除了机组主要运行参数:汽轮机主汽进汽压力、主汽进汽温度、热再热进汽压力、热再热进汽温度的影响。本发明解决了电厂节能优化运行或技术改进中采用的汽轮机排汽压力变化对机组发电功率影响系数的准确性问题,并且方法简单,现场使用方便。 

Claims (1)

1.一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法,其特征在于基于DCS的实时计算功能,排除机组运行时汽轮机主汽进汽压力、主汽进汽温度、热再热进汽压力、热再热进汽温度变化的影响,仅计算汽轮机排汽压力对机组发电功率影响值;其包括下述具体步骤:
步骤一:机组在基本运行方式下,解除机组一次调频及AGC功能,并保持机组汽轮机进汽阀位一定,机组运行稳定后采集机组在这一稳定状态下的汽轮机排汽压力p x1 、机组发电功率P g1 、汽轮机主汽进汽压力p ms1 、进汽温度T ms1 及再热蒸汽进汽温度T rh1
步骤二:在运行条件允许的条件下,维持与步骤一相同的汽轮机进汽阀位,大幅度调整汽轮机排汽压力,采集机组在汽轮机排汽压力变化后运行至稳定运行状态后的汽轮机排汽压力p x2 、机组发电功率P g2 、汽轮机主汽进汽压力p ms2 、进汽温度T ms2 及再热蒸汽进汽温度(T rh2 );
步骤三:依据步骤一和步骤二所获得的数据,根据公式(1~3)分别计算在汽轮机主汽进汽压力p ms 、主汽进汽温度T ms 、再热蒸汽进汽温度T rh 变化下机组发电功率P g 的变化值;
P gpms  = k pms×△p ms ×P g1  = k pms×(p ms2 p ms1 )×P g1      (1)
P gTms k Tms×△T ms ×P g1  =k Tms×(T ms2 T ms1 )×P g1          (2)
P gTrh k Trh×△T rh ×P g1  = k Trh ×(T rh2 T rh1 )×P g1               (3)
 其中△P gpms 为汽轮机主汽进汽压力改变下的机组发电功率变化值,单位为KW;
P gTms 为主汽进汽温度改变下的机组发电功率变化值,单位为KW;
P gTrh 为再热蒸汽进汽温度改变下的机组发电功率变化值,单位为KW;
k pms为厂家提供的汽轮机主汽进汽压力修正系数,单位为%/bar; 
k Tms为厂家提供的主汽进汽温度修正系数,单位为%/℃; 
k Trh为厂家提供的再热蒸汽进汽温度修正系数,单位为%/℃;
p ms 为步骤二与步骤一汽轮机主汽进汽压力的差值,单位为bar;
T ms 为步骤二与步骤一主汽进汽温度的差值,单位为℃;
T rh 为步骤二与步骤一再热蒸汽进汽温度的差值,单位为℃;
p ms1 为步骤一的汽轮机主汽进汽压力,单位为 bar;
p ms2 为步骤二的汽轮机主汽进汽压力,单位为 bar;
T ms1 为步骤一的主汽进汽温度,单位为℃;
T ms2 为步骤二的主汽进汽温度,单位为℃;
T rh1 为步骤一的再热蒸汽进汽温度,单位为℃;
T rh2 为步骤二的再热蒸汽进汽温度,单位为℃;
P g1 为步骤一的机组发电功率,单位为KW;
步骤四:依据步骤三和步骤四所得的数值,根据公式(4),以与步骤一相同的主汽进汽压力P ms 、主汽进汽温度T ms 、再热蒸汽进汽温度T rh ,计算修正后的步骤二的机组发电功率P g2c
 P g2c  = P g2  -△P gpms  -△P gTms -△P gTrh        (4)
 其中P g2c 为经修正后的步骤二的机组发电功率,单位为KW;
P g2 为步骤二获得的机组发电功率,单位为KW;
P gpms 为汽轮机主汽进汽压力改变下的机组发电功率变化值,单位为KW;
P gTms 为主汽进汽温度改变下的机组发电功率变化值,单位为KW;
P gTrh 为再热蒸汽进汽温度改变下的机组发电功率变化值,单位为KW;
步骤五:依据步骤一、步骤二和步骤四所得的数值,根据公式(5),计算汽轮机排汽压力px变化对机组发电功率Pg影响系数k
 = △P g /△p x = (P g2c  -P g1  )/( p x2 p x1  )   (5)
其中k为汽轮机排汽压力对机组发电功率的影响系数,单位为kW/kPa;
P g 为经修正后的步骤二的机组发电功率与步骤一的机组发电功率的差值,单位为KW;
p x 为步骤二与步骤一的汽轮机排汽压力的差值,单位为 kPa;
P g2c 为经修正后的步骤二的机组发电功率,单位为KW;
P g1 为步骤一的机组发电功率,单位为KW;
p x1 为步骤一的汽轮机排汽压力,单位为kPa;
p x2 为步骤二的汽轮机排汽压力,单位为kPa。
CN201310110642.2A 2013-04-01 2013-04-01 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法 Active CN103197246B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310110642.2A CN103197246B (zh) 2013-04-01 2013-04-01 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310110642.2A CN103197246B (zh) 2013-04-01 2013-04-01 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法

Publications (2)

Publication Number Publication Date
CN103197246A true CN103197246A (zh) 2013-07-10
CN103197246B CN103197246B (zh) 2016-03-16

Family

ID=48719925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310110642.2A Active CN103197246B (zh) 2013-04-01 2013-04-01 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法

Country Status (1)

Country Link
CN (1) CN103197246B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983841A (zh) * 2014-04-29 2014-08-13 国家电网公司 热电联产机组的背压变化对功率影响的确定方法
CN106872894A (zh) * 2017-03-03 2017-06-20 南方科技大学 一种三相电机的故障检测方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019566A (ja) * 2002-06-18 2004-01-22 Mitsubishi Heavy Ind Ltd ガスタービンの監視装置
JP2007239580A (ja) * 2006-03-08 2007-09-20 Chugoku Electric Power Co Inc:The 火力発電プラントの性能診断方法、火力発電プラント性能データ算出プログラム及び火力発電プラント性能データ算出プログラムを記録した記録媒体
CN102967464A (zh) * 2012-12-07 2013-03-13 山东电力集团公司电力科学研究院 凝汽式汽轮机高背压改造后的性能评价方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004019566A (ja) * 2002-06-18 2004-01-22 Mitsubishi Heavy Ind Ltd ガスタービンの監視装置
JP2007239580A (ja) * 2006-03-08 2007-09-20 Chugoku Electric Power Co Inc:The 火力発電プラントの性能診断方法、火力発電プラント性能データ算出プログラム及び火力発電プラント性能データ算出プログラムを記録した記録媒体
CN102967464A (zh) * 2012-12-07 2013-03-13 山东电力集团公司电力科学研究院 凝汽式汽轮机高背压改造后的性能评价方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李秀云等: "用等效热降法确定排汽压力变化对机组经济性的影响", 《热能动力工程》, vol. 14, no. 83, 30 September 1999 (1999-09-30) *
林湖等: "背压变化对汽轮机功率影响的计算修正", 《汽轮机技术》, vol. 46, no. 1, 29 February 2004 (2004-02-29), pages 18 - 20 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983841A (zh) * 2014-04-29 2014-08-13 国家电网公司 热电联产机组的背压变化对功率影响的确定方法
CN103983841B (zh) * 2014-04-29 2016-08-24 国家电网公司 热电联产机组的背压变化对功率影响的确定方法
CN106872894A (zh) * 2017-03-03 2017-06-20 南方科技大学 一种三相电机的故障检测方法及装置

Also Published As

Publication number Publication date
CN103197246B (zh) 2016-03-16

Similar Documents

Publication Publication Date Title
CN105201564B (zh) 一种基于主蒸汽流量的汽轮机滑压优化的控制方法
CN103196673B (zh) 一种确定电厂汽轮机排汽压力对机组经济性影响的现场测算方法
CN102628378B (zh) 一种滑压曲线修正方法及装置
CN106936627B (zh) 一种基于大数据分析挖掘的火电设备性能监测方法
CN104481598B (zh) 一种火电厂汽轮机在线滑压优化方法
CN104564529B (zh) 风力发电机组的输出功率补偿方法、装置和系统
CN103048020B (zh) 基于性能试验数据的发电厂主蒸汽流量在线计算方法
CN102661176B (zh) 一种以主蒸汽流量作为调度变量获取汽轮机滑压曲线方法
CN105275508A (zh) 一种基于功率值计算的汽轮机流量曲线辨识及优化方法
CN102998122B (zh) 一种基于多因素的汽轮机组最佳初压全局寻优方法
CN107066712A (zh) 基于导叶开度—功率特性的水轮机模型参数辨识方法及装置
CN105184087B (zh) 环境温度变化对燃煤发电机组煤耗影响的计算方法及装置
CN108661725A (zh) 一种供热抽汽机组自整调节系统与控制方法
CN106096310B (zh) 一种抽汽供热机组供热工况热力性能计算方法
CN105317476A (zh) 一种基于特征通流面积的汽轮机流量曲线辨识及优化方法
CN104504458A (zh) 一种火电厂汽轮机的节能潜力分析方法
CN106765520B (zh) 一种实现供热机组最优初压运行的自动控制方法
CN103389743B (zh) 考虑凝汽器实时运行清洁系数提高发电机组效率的方法
CN110207098A (zh) 考虑锅炉金属蓄热的二次再热机组蒸汽温度控制方法
CN102904518A (zh) 一种同步发电机q轴参数在线辨识方法
CN113343490B (zh) 一种耦合熔盐储热的工业供汽电站运行优化方法及系统
CN103197246B (zh) 一种确定电厂汽轮机排汽压力对机组发电功率影响的现场测算方法
RU2621422C2 (ru) Система и способ тестирования показателя работы паровой турбины
CN110056858A (zh) 一种火电机组加热器端差自适应调节方法和装置
CN104965410A (zh) 一种蒸汽发生器水位系统的动态滑模变结构控制器与方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant