CN103195454B - 充填体内巷道和硐室支护方法 - Google Patents
充填体内巷道和硐室支护方法 Download PDFInfo
- Publication number
- CN103195454B CN103195454B CN201310132284.5A CN201310132284A CN103195454B CN 103195454 B CN103195454 B CN 103195454B CN 201310132284 A CN201310132284 A CN 201310132284A CN 103195454 B CN103195454 B CN 103195454B
- Authority
- CN
- China
- Prior art keywords
- supporting
- concrete
- anchor
- chamber
- anchor pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000011378 shotcrete Substances 0.000 claims abstract description 29
- 239000011435 rock Substances 0.000 claims abstract description 17
- 210000003462 vein Anatomy 0.000 claims abstract description 7
- 239000004567 concrete Substances 0.000 claims description 42
- 230000005641 tunneling Effects 0.000 claims description 9
- 210000001367 artery Anatomy 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000004568 cement Substances 0.000 claims description 2
- 238000004140 cleaning Methods 0.000 claims description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 239000004576 sand Substances 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000005553 drilling Methods 0.000 abstract description 7
- 238000005065 mining Methods 0.000 abstract description 6
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 4
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 238000007796 conventional method Methods 0.000 abstract 1
- 239000002184 metal Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 238000005422 blasting Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 231100000241 scar Toxicity 0.000 description 2
- 230000003335 steric effect Effects 0.000 description 2
- 230000001550 time effect Effects 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000009514 concussion Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007062 hydrolysis Effects 0.000 description 1
- 238000006460 hydrolysis reaction Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000004899 motility Effects 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000000518 rheometry Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310132284.5A CN103195454B (zh) | 2013-04-16 | 2013-04-16 | 充填体内巷道和硐室支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310132284.5A CN103195454B (zh) | 2013-04-16 | 2013-04-16 | 充填体内巷道和硐室支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195454A CN103195454A (zh) | 2013-07-10 |
CN103195454B true CN103195454B (zh) | 2016-08-03 |
Family
ID=48718253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310132284.5A Expired - Fee Related CN103195454B (zh) | 2013-04-16 | 2013-04-16 | 充填体内巷道和硐室支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195454B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103603676B (zh) * | 2013-11-21 | 2015-12-30 | 长沙矿山研究院有限责任公司 | 一种电耙巷道支护方法 |
CN103953374B (zh) * | 2014-05-13 | 2016-09-07 | 铜陵有色金属集团铜冠矿山建设股份有限公司 | 一种立井施工预装井壁悬挂临时风水管路专用锚杆的安装方法 |
CN106338226B (zh) * | 2015-07-10 | 2018-10-12 | 中国华冶科工集团有限公司 | 一种提高回采率的采矿作业方法 |
CN105569672A (zh) * | 2015-12-29 | 2016-05-11 | 大同煤矿集团有限责任公司 | 胶带大巷输送机机头硐室的支护方法 |
CN106401601B (zh) * | 2016-11-10 | 2019-06-11 | 中国恩菲工程技术有限公司 | 放矿口眉线支护装置 |
CN107130962A (zh) * | 2017-05-23 | 2017-09-05 | 西北矿冶研究院 | 一种用于厚大矿体的分段崩矿嗣后胶结充填采矿方法 |
CN107893666A (zh) * | 2017-11-09 | 2018-04-10 | 河南工程学院 | 一种装配式补偿变形的暗挖隧道支护方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235719A (zh) * | 2008-02-29 | 2008-08-06 | 李明远 | 预空泄压软岩巷道支护技术 |
CN101280684A (zh) * | 2008-05-12 | 2008-10-08 | 淮南矿业(集团)有限责任公司 | 三软地质条件下采空区留巷围岩支护方法 |
CN101338679A (zh) * | 2008-06-26 | 2009-01-07 | 王光平 | 深井大断面松散围岩巷道支护方法 |
CN101725362A (zh) * | 2009-12-09 | 2010-06-09 | 中国矿业大学(北京) | 动压软岩巷道基于钢管混凝土支架的复合支护装置 |
-
2013
- 2013-04-16 CN CN201310132284.5A patent/CN103195454B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101235719A (zh) * | 2008-02-29 | 2008-08-06 | 李明远 | 预空泄压软岩巷道支护技术 |
CN101280684A (zh) * | 2008-05-12 | 2008-10-08 | 淮南矿业(集团)有限责任公司 | 三软地质条件下采空区留巷围岩支护方法 |
CN101338679A (zh) * | 2008-06-26 | 2009-01-07 | 王光平 | 深井大断面松散围岩巷道支护方法 |
CN101725362A (zh) * | 2009-12-09 | 2010-06-09 | 中国矿业大学(北京) | 动压软岩巷道基于钢管混凝土支架的复合支护装置 |
Non-Patent Citations (3)
Title |
---|
《充填体下矿柱的回收》;G•雷等;《世界采矿快报》;19990215;第43页倒数第6行至第44页第3行 * |
《深井爆破振动衰减规律与控制技术研究》;杨志强;《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》;20081215(第12期);第63-64页 * |
《深井采矿巷道支护技术在冬瓜山矿的应用研究》;汪振鹏;《现代矿业》;20090815(第8期);第78倒数第5行至第79页第3行 * |
Also Published As
Publication number | Publication date |
---|---|
CN103195454A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195454B (zh) | 充填体内巷道和硐室支护方法 | |
CN104790978B (zh) | 小净距立体交叉隧道环形导坑施工方法 | |
CN104453899B (zh) | 复杂条件下孤岛工作面安全回采方法 | |
CN113175325B (zh) | 基于关键层保护的煤与共生砂岩型铀矿协调开采方法 | |
CN103775092B (zh) | 隧道浅埋暗挖预留核心土改良crd施工工法 | |
CN104074524B (zh) | 一种浅埋下穿高速公路大断面隧道的施工方法 | |
CN103899318B (zh) | 中硬地层隧道铣挖及配套机械化施工工法 | |
CN103835648B (zh) | 一种通过地面注浆改善岩层性能反井钻井工艺 | |
CN104533453A (zh) | 巷道穿断层破碎带分步动态耦合支护方法 | |
CN108005660A (zh) | 一种高速公路隧道施工方法 | |
CN108049896A (zh) | 一种综放工作面沿空留巷方法 | |
CN101838957B (zh) | 整体式t形外悬臂道路及其施工方法 | |
CN110700860B (zh) | 一种穿越黄土沟谷的土石分界隧道施工方法 | |
CN112943306A (zh) | 一种基于失稳变形研究的巷道过断层带支护方法及步骤 | |
CN114592909A (zh) | 一种极破碎厚大矿体下向分层进路充填采矿方法 | |
CN110821500B (zh) | 穿越土石分界地层的大断面隧道开挖及支护施工方法 | |
CN102926753B (zh) | 一种人工冻结采场顶板深孔崩矿嗣后充填采矿法 | |
CN108397202B (zh) | 冻结超前支护下多台阶中导坑先行开挖方法 | |
CN112302663B (zh) | 一种用于富水砂化白云岩地层隧道的铣爆结合施工方法 | |
CN103233739A (zh) | 充填体包裹下厚大矿柱开采方法 | |
CN110118085A (zh) | 一种大采深大采高复合顶工作面两巷超前二次成巷方法 | |
CN109296368A (zh) | 一种阶梯式上向水平分层胶结充填采矿方法 | |
CN110778318B (zh) | 穿越土石分界地层的隧道预加固及开挖施工方法 | |
CN117345234A (zh) | 一种适用于缓倾斜矿体开采的人工矿柱布置与施工方法 | |
CN115773113A (zh) | 急倾斜破碎厚大矿体采矿方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 246131 Anqing copper mine, Huaining County, Anqing City, Anhui Province Co-patentee after: Bgrimm Technology Group Patentee after: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd. Address before: 246131 Anqing copper mine, Huaining County, Anqing City, Anhui Province Co-patentee before: Beijing General Research Institute of Mining and Metallurgy Patentee before: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200416 Address after: 244000 Changjiang West Road, Anhui, Tongling Co-patentee after: Bgrimm Technology Group Patentee after: TONGLING NONFERROUS METALS GROUP Co.,Ltd. Address before: 246131 Anqing copper mine, Huaining County, Anqing City, Anhui Province Co-patentee before: Bgrimm Technology Group Patentee before: ANQING COPPER MINE OF TONGLING NONFERROUS METALS GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160803 |