CN103195248B - A kind of construction method for building high altitudes and cold area concrete winter - Google Patents

A kind of construction method for building high altitudes and cold area concrete winter Download PDF

Info

Publication number
CN103195248B
CN103195248B CN201310119519.7A CN201310119519A CN103195248B CN 103195248 B CN103195248 B CN 103195248B CN 201310119519 A CN201310119519 A CN 201310119519A CN 103195248 B CN103195248 B CN 103195248B
Authority
CN
China
Prior art keywords
concrete
building
construction method
insulation layer
cold area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310119519.7A
Other languages
Chinese (zh)
Other versions
CN103195248A (en
Inventor
李家亮
阎士勤
王明涛
黄玮
刘俊
王祥峰
柏显麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tibet Electric Power Jiancheng Exploration Institute Engineering Co ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201310119519.7A priority Critical patent/CN103195248B/en
Publication of CN103195248A publication Critical patent/CN103195248A/en
Application granted granted Critical
Publication of CN103195248B publication Critical patent/CN103195248B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of concrete construction method, especially disclosing a kind of construction method for building high altitudes and cold area concrete winter, belonging to civil engineering design field.Thering is provided a kind of constructing operation convenient, the construction method for building high altitudes and cold area concrete winter of continuity insulation being carried out the concrete after having built.Described construction method by carry out concrete build operation before, first paste the insulation layer that a layer thickness is not less than 2.5 ㎝ in the inner side of the qualified concrete-pouring template of erection, and then carry out describedly concretely building, coagulation forming and the insulation of postorder curing time.

Description

A kind of construction method for building high altitudes and cold area concrete winter
Technical field
The present invention relates to a kind of concrete construction method, especially relating to a kind of construction method for building high altitudes and cold area concrete winter, belonging to civil engineering design field.
Background technology
In concrete engineering construction, Insulation choose the development being not only related to early age strength of concrete, also affect the generation of inside concrete temperature rise and external crack.Heat-insulating property is not enough, and concrete may be endured cold and affect performance, causes that dehydration is too fast also may produce drying shrinkage crack simultaneously; Heat-insulating property is excessive, and concrete maximum temperature rises, and likely suffers again " cold hit " when form removal and produces thermal cracking.And in high altitudes and cold area, the duration in winter is generally 4 ~ 6 months, and monthly mean temperature is lower, so how the concrete work in high altitudes and cold area chooses appropriate Insulation, is that engineering circles is extremely paid close attention to, a very thorny again problem.
At present, in the heat preserving method mainly Surgery therapy method of high altitudes and cold area concrete winter construction, namely before concrete warehousing, first set up template, and utilize arc lamp to bake inside hot-die plate, outside template, paste the thick plastic, thermal-insulation plate of about 10cm simultaneously, after concrete warehousing has been built, cover the thick thermal insulating coiled material of 5cm or insulation quilt at the upper surface of concrete germinal layer, after concrete formation 3 ~ 5 days strippings, utilize hanging basket to paste the thick plastic, thermal-insulation plate of about 10cm at form removal position.
The method is more conventional in general area, but in high altitudes and cold area winter construction, the thermal insulating coiled material of the upper surface of concrete germinal layer or insulation quilt are difficult to ensure heat insulation effect, in the place that thermal insulating coiled material or insulation quilt overlap, inside concrete thermal loss is comparatively serious, and sleet and construction water easily infiltrate in template, are formed icing when nighttime temperature is extremely low or there's a sudden fall in temperature, destroy concrete performance, form concrete defect; Utilize after form removal hanging basket work high above the ground paste the method for plastic, thermal-insulation plate time-consuming, to take a lot of work and safety is poor, meanwhile, complete to paste heat-preserving material from stripping, be incubated in this process and do not have a continuity, easily make concrete suffer " cold hit " and produce crack.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of constructing operation convenient, can carry out the construction method for building high altitudes and cold area concrete winter of continuity insulation to the concrete after having built.
For solving the problems of the technologies described above adopted technical scheme be: a kind of construction method for building high altitudes and cold area concrete winter, comprises the following steps,
1) template is set up, the concrete size of building as required erection formwork for placing;
2) adhesive insulating layer, table is first pasted the insulation layer that a layer thickness is not less than 2.5 ㎝ in the formwork for placing that erection is qualified, and then pastes one deck geomembrane in the outside of described insulation layer;
3) concreting, by existing construction technology to concreting in above-mentioned formwork for placing, and is building the insulation layer qualified concrete upper surface covering a layer thickness and be not less than 2.5 ㎝;
4) formwork for placing is removed, after concrete setting shaping 3 ~ 5, formwork for placing described in dismounting, and make described insulation layer be attached on described concrete, proceed to be incubated till reaching predetermined curing time to concrete, so just complete in the winter time once to the concrete pouring construction in described high altitudes and cold area.
Further, described insulation layer is the composition of one or more in polystyrene board, foam coiled material, insulation quilt.
Further, the thickness being pasted onto the insulation layer on described formwork for placing inner surface is 3.0 ㎝, and the thickness of geomembrane is 0.01 ㎝.
Further, when building qualified concrete upper surface covering and heat insulating layer, first cover one deck geomembrane at described concrete upper surface.
Further, the thickness of the insulation layer covered on described concrete upper surface is 3.0 ㎝.
Further, the material of described insulation layer is the composition of one or more in polystyrene board, foam coiled material, insulation quilt.
The invention has the beneficial effects as follows: by carry out concrete build operation before, first paste the insulation layer that a layer thickness is not less than 2.5 ㎝ in the inner side of the qualified concrete-pouring template of erection, and then carry out describedly concretely building, coagulation forming and the insulation of postorder curing time.Like this, because insulation layer is arranged on the inner surface of formwork for placing, thus the insulation layer after making described concreting complete is positioned at concrete direct lateral, centre no longer between be separated with formwork for placing, just do not have loosening lap joint, reduce the thermal loss of concrete in process of setting greatly yet.And after the shaping dismounting formwork for placing of described concrete setting, the insulation layer adhered on described concrete external surface described in one deck can be ensured again, and do not need again to adopt the artificial adhesive insulating layer of hanging basket, and then enable the insulation of described concrete postorder keep continuous, what avoid due to insulation to greatest extent is discontinuous, and the concrete caused suffers " cold hit " and produces crack.
Detailed description of the invention
For solving the technical problem that concrete exists in insulation in prior art, the invention provides a kind of constructing operation and facilitating, the construction method for building high altitudes and cold area concrete winter of continuity insulation being carried out the concrete after having built.Described construction method comprises the following steps,
1) template is set up, the concrete size of building as required erection formwork for placing;
2) adhesive insulating layer, table is first pasted the insulation layer that a layer thickness is not less than 2.5 ㎝ in the formwork for placing that erection is qualified, and then pastes one deck geomembrane in the outside of described insulation layer;
3) concreting, by existing construction technology to concreting in above-mentioned formwork for placing, and is building the insulation layer qualified concrete upper surface covering a layer thickness and be not less than 2.5 ㎝;
4) formwork for placing is removed, after concrete setting shaping 3 ~ 5, formwork for placing described in dismounting, and make described insulation layer be attached on described concrete, proceed to be incubated till reaching predetermined curing time to concrete, so just complete in the winter time once to the concrete pouring construction in described high altitudes and cold area.Above by carry out concrete build operation before, first paste the insulation layer that a layer thickness is not less than 2.5 ㎝ in the inner side of the qualified concrete-pouring template of erection, and then carry out describedly concretely building, coagulation forming and the insulation of postorder curing time.Like this, because insulation layer is arranged on the inner surface of formwork for placing, thus the insulation layer after making described concreting complete is positioned at concrete direct lateral, centre no longer between be separated with formwork for placing, just do not have loosening lap joint, reduce the thermal loss of concrete in process of setting greatly yet.And after the shaping dismounting formwork for placing of described concrete setting, the insulation layer adhered on described concrete external surface described in one deck can be ensured again, and do not need again to adopt the artificial adhesive insulating layer of hanging basket, and then enable the insulation of described concrete postorder keep continuous, what avoid due to insulation to greatest extent is discontinuous, and the concrete caused suffers " cold hit " and produces crack.
In above-mentioned embodiment, in order to reduce construction cost, meanwhile, can ensure very much again described concrete heat insulation effect, described insulation layer adopts the composition of one or more in existing polystyrene board, foam coiled material, insulation quilt; And the thickness of the insulation layer be pasted onto on described formwork for placing inner surface is 3.0 ㎝, the thickness of geomembrane is 0.01 ㎝.Meanwhile, in order to make described upper surface can not be damaged and affect surface quality when covering and heat insulating layer, when building qualified concrete upper surface covering and heat insulating layer, first one deck geomembrane be covered at described concrete upper surface; And the thickness of the insulation layer covered on described concrete upper surface also adopts 3.0 ㎝, like this, the logical versatility meeting insulation layer, makes construction become very convenient, can play good insulation again to described concrete.
In sum, after described construction method of the present invention, both enhanced concrete heat insulation effect, and made described concrete quality control become easy, and made again operation become easily simple, thus reduce operating risk greatly, meanwhile, can also effectively save heat insulating material, reduce construction cost, and to concrete upper surface and side all noiseless, be incubated continuous and be easy to ensure concrete performance, being particularly suitable for high altitudes and cold area.

Claims (5)

1., for building a construction method for high altitudes and cold area concrete winter, it is characterized in that: comprise the following steps,
1) template is set up, the concrete size of building as required erection formwork for placing;
2) adhesive insulating layer, the inner surface setting up qualified formwork for placing is first pasted the insulation layer that a layer thickness is not less than 2.5 ㎝, and then pastes one deck geomembrane in the outside of described insulation layer;
3) concreting, by existing construction technology to concreting in above-mentioned formwork for placing, and is building the insulation layer qualified concrete upper surface covering a layer thickness and be not less than 2.5 ㎝;
4) formwork for placing is removed, until concrete setting after shaping 3 ~ 5 days, formwork for placing described in dismounting, and make above-mentioned steps 2) and step 3) in insulation layer be attached on the described concrete of corresponding site respectively, proceed to be incubated till reaching predetermined curing time to described concrete, so just complete in the winter time once to the concrete pouring construction in described high altitudes and cold area
When building qualified concrete upper surface covering and heat insulating layer, first cover one deck geomembrane at described concrete upper surface.
2. a kind of construction method for building high altitudes and cold area concrete winter according to claim 1, is characterized in that: above-mentioned steps 2) and step 3) described in insulation layer be the composition of one or more in polystyrene board, foam coiled material, insulation quilt.
3. a kind of construction method for building high altitudes and cold area concrete winter according to claim 1, is characterized in that: the thickness being pasted onto the insulation layer on described formwork for placing inner surface is 3.0 ㎝, and the thickness of geomembrane is 0.01 ㎝.
4. a kind of construction method for building high altitudes and cold area concrete winter according to claim 1, is characterized in that: the thickness covering the insulation layer on described concrete upper surface is 3.0 ㎝.
5. a kind of construction method for building high altitudes and cold area concrete winter according to claim 4, is characterized in that: above-mentioned steps 2) and step 3) described in the material of insulation layer be the composition of one or more in polystyrene board, foam coiled material, insulation quilt.
CN201310119519.7A 2013-04-08 2013-04-08 A kind of construction method for building high altitudes and cold area concrete winter Active CN103195248B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310119519.7A CN103195248B (en) 2013-04-08 2013-04-08 A kind of construction method for building high altitudes and cold area concrete winter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310119519.7A CN103195248B (en) 2013-04-08 2013-04-08 A kind of construction method for building high altitudes and cold area concrete winter

Publications (2)

Publication Number Publication Date
CN103195248A CN103195248A (en) 2013-07-10
CN103195248B true CN103195248B (en) 2015-08-26

Family

ID=48718050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310119519.7A Active CN103195248B (en) 2013-04-08 2013-04-08 A kind of construction method for building high altitudes and cold area concrete winter

Country Status (1)

Country Link
CN (1) CN103195248B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239677A (en) * 2015-10-27 2016-01-13 中国水利水电科学研究院 Concrete overwintering heat insulation method in cold regions
CN106285006A (en) * 2016-08-31 2017-01-04 绍兴职业技术学院 A kind of cold district concreting in cold-weather method
CN108316249A (en) * 2018-03-13 2018-07-24 中水北方勘测设计研究有限责任公司 Overwintering storehouse surface insulation construction for severe cold area grinding coagulation soil
CN108843023B (en) * 2018-07-21 2020-08-14 四川启创建设工程有限公司 Concrete construction method in cold region in low-temperature season
CN109487790A (en) * 2018-12-24 2019-03-19 中水电第十工程局(郑州)有限公司 A kind of concrete heat-insulating method suitable for the big temperature difference area of High aititude
CN113622693A (en) * 2021-09-14 2021-11-09 中国二十二冶集团有限公司 Cast-in-place concrete column heat preservation freeze-proof device
CN114960563A (en) * 2022-04-29 2022-08-30 宜昌天宇科技有限公司 Anti-aging structure and method along with increase of strength of dam concrete for long time

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2459395Y (en) * 2000-12-04 2001-11-14 北京市城市建设工程研究院 Form for in-situ cast concrete and outer thermo-insulation integral construction
JP2002339469A (en) * 2001-03-08 2002-11-27 Takahashi Curtain Wall Kogyo Kk Precast concrete panel and its manufacturing method
JP3685495B2 (en) * 2003-02-10 2005-08-17 株式会社テスク Moisture-proof and heat-insulating wall panel and concrete wall construction method
CN102086670A (en) * 2009-12-08 2011-06-08 上海汉鑫硬质合金有限公司 Energy-saving and heat-preserving construction method for building wall body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2459395Y (en) * 2000-12-04 2001-11-14 北京市城市建设工程研究院 Form for in-situ cast concrete and outer thermo-insulation integral construction
JP2002339469A (en) * 2001-03-08 2002-11-27 Takahashi Curtain Wall Kogyo Kk Precast concrete panel and its manufacturing method
JP3685495B2 (en) * 2003-02-10 2005-08-17 株式会社テスク Moisture-proof and heat-insulating wall panel and concrete wall construction method
CN102086670A (en) * 2009-12-08 2011-06-08 上海汉鑫硬质合金有限公司 Energy-saving and heat-preserving construction method for building wall body

Also Published As

Publication number Publication date
CN103195248A (en) 2013-07-10

Similar Documents

Publication Publication Date Title
CN103195248B (en) A kind of construction method for building high altitudes and cold area concrete winter
CN206844742U (en) A kind of assembled energy-saving communication base station room
CN203716410U (en) Novel roof grid seam
CN204212298U (en) A kind of thermal insulation laminated floor slab
CN207260352U (en) A kind of exterior-wall heat insulation template
CN206769073U (en) A kind of compound insulation structure integration non-dismantling formwork
CN206769078U (en) A kind of architectural exterior insulation composite plate
CN206829427U (en) A kind of two-chamber square bar restrains heat-preserving wall component
CN109944350A (en) A kind of composite insulation boards wall and its construction method
CN201843227U (en) Insulated outer wall structure
CN206053005U (en) Prefabricated thin-coat plaster composite insulation boards
CN109487790A (en) A kind of concrete heat-insulating method suitable for the big temperature difference area of High aititude
CN206174447U (en) Demolition -free compound insulation template
CN206581506U (en) A kind of roofing antiseep coiled material
CN106869348A (en) Warming plate, warming plate system and warming plate system casting method
CN103628634B (en) The energy-conservation dry-method structure of pitched roof heat preservation ventilating and construction method thereof
CN204386622U (en) A kind of tunnel is far from wall type insulation construction
CN206591662U (en) Warming plate and warming plate system
CN101502980B (en) Method for producing compound heat preserving building block connected by pin bolt formed using irrigation
CN207672572U (en) The anti-seam temperature control pouring structure of sole plate mass concrete
CN206289658U (en) Mix the foam type relief platform of appropriate flyash
CN204040208U (en) A kind of architectural exterior insulation brace type bridge cutoff structure
CN203654626U (en) Roof gas vent and gutter inlet heat-preservation prefabricated part
CN203383388U (en) Decorative heat insulation foam concrete facing block
CN203729315U (en) Heat preservation foundation of timber-structure residence

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210218

Address after: Room 21, 13th floor, Changxing international building, Beijing Avenue, Liuwu New District, Lhasa City, Tibet Autonomous Region 850012

Patentee after: Tibet electric power Jiancheng Exploration Institute Engineering Co.,Ltd.

Address before: No.1 Huanhua North Road, Qingyang District, Chengdu, Sichuan 610072

Patentee before: China Power Construction Group Chengdu Survey and Design Research Institute Co.,Ltd.

TR01 Transfer of patent right