CN103184870A - 深孔凿岩阶段空场嗣后充填采矿法 - Google Patents

深孔凿岩阶段空场嗣后充填采矿法 Download PDF

Info

Publication number
CN103184870A
CN103184870A CN2013100700343A CN201310070034A CN103184870A CN 103184870 A CN103184870 A CN 103184870A CN 2013100700343 A CN2013100700343 A CN 2013100700343A CN 201310070034 A CN201310070034 A CN 201310070034A CN 103184870 A CN103184870 A CN 103184870A
Authority
CN
China
Prior art keywords
ore
drilling
mining
adopt
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100700343A
Other languages
English (en)
Inventor
牛忠育
姜家宝
潮文凯
彭威
潘路军
屠涛
李泽阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jinrisheng Mining Co Ltd
Original Assignee
Anhui Jinrisheng Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jinrisheng Mining Co Ltd filed Critical Anhui Jinrisheng Mining Co Ltd
Priority to CN2013100700343A priority Critical patent/CN103184870A/zh
Publication of CN103184870A publication Critical patent/CN103184870A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

一种深孔凿岩阶段空场嗣后充填采矿法,涉及矿石开采方法技术领域,所述的方法主要包括(1)采准,采准工程主要有通风天井、矿石溜井、出矿巷道、出矿联络巷道、凿岩硐室联络道和深孔凿岩硐室,(2)切割,开掘堑沟拉底巷道,在装矿进路端部开掘堑沟拉底巷道,在堑沟拉底巷道中采用中深孔钻机穿凿扇形孔开掘堑沟和拉底,(3)采用大直径深孔凿岩,矿块垂直矿体走向布置,沿走向每4个矿块组成一个盘区,每个盘区设1条矿石溜井和1条通风天井,(4)回采步骤。本发明劳动生产率高,所需备采的采场较少,作业安全可靠。

Description

深孔凿岩阶段空场嗣后充填采矿法
技术领域
本发明涉及矿石开采方法技术领域,具体涉及一种深孔凿岩阶段空场嗣后充填采矿法。
背景技术
矿业是人类步入文明社会的奠基石,是国民经济发展及至高新技术产业的重要物质基础。在实现工业化、建设小康社会的进程中,无论从保障原材料可持续供应的角度,还是从节能减排的角度,矿业的地位都更加突出。进入21世纪以来,中国、印度等若干发展中国家的工业化高潮,极大的刺激了金属市场需求和矿业投资的猛增,国际间跨国矿业集团的兼并、重组浪潮风起云涌,一时间,矿业界呈现出一派欣欣向荣的景象。近十年来,尽管矿石品位趋于降低,开采难度不断增加、环保要求日益严格,但在计算机技术、信息技术、现代化大型设备、岩石力学研究成果和经济全球化等的推动下,采矿技术获得了突飞猛进的发展,出现了日出矿13.7万t的地下矿山,采深达1000m的露天矿山和采深达4500m的深井开采矿山,年产阴极铜30万t的浸溶开采矿山,数百千米的长距离矿浆管道输送工程,催生了生态矿业工程(如无废开采矿山)和远程遥控、自动化采矿的采区(最大单日生产能力达到2.8万t),采矿办公室化(地表办公室遥控井下采矿作业)的理想已进入实现的婴儿期。
VCR法采矿是国际镍公司(Inco)和加拿大工业有限公司(CL)共同开发的,它是以利文斯顿的漏斗爆破理论为基础,于1974年首次应用于利瓦克矿,后来很快便在萨德伯里地区其它矿山推广。在美国,VCR法于1977年用于霍姆斯特克矿。由于受到各国采矿界的重视,20世纪70年代末期,加拿大、美国、澳大利亚、西班牙等国家相继推广应用。80年代初我国凡口铅锌矿试用成功并推广应用,VCR采矿法问世以来,采场出矿技术朝着高效,低费用方向不断发展,促进了VCR法的不断改进与完善,加速了VCR采矿法的推广步伐。本发明是对VCR采矿法的进一步改进和提升。
发明内容
本发明所要解决的技术问题在于提供一种方法简单,开采效率高的深孔凿岩阶段空场嗣后充填采矿法。
本发明所要解决的技术问题采用以下技术方案来实现:
一种深孔凿岩阶段空场嗣后充填采矿法,所述的方法主要包括以下步骤:
a.回采方案
矿块垂直矿体走向布置,一步采矿块高120m,分段凿岩,即凿岩高度60m,阶段出矿和充填中段高度120m;二步采矿块高60m,即凿岩、出矿和充填中段高度均为60m,一步采矿块和二步采矿块宽均20m,矿块长≤50m,当矿块长度大于60m时,分上下盘回采;
b.采准
采准工程主要有通风天井、矿石溜井、出矿巷道、出矿联络巷道、凿岩硐室联络道和深孔凿岩硐室,所述的通风天井、矿石溜井采用上下盘脉外布置,出矿联络巷道、凿岩硐室联络道及深孔凿岩硐室采用矿块内布置,矿石溜井从运输平巷反掘施工或利用相邻的其它巷道正掘施工,通风天井从上、下运输平巷采用吊罐施工。
c.切割
在矿块中央开掘堑沟拉底巷道,在装矿进路端部开掘上向垂直切割井,在切割井两侧布置平行上向中孔,以切割井为自由面通过中孔爆破形成切割槽;在堑沟拉底巷道中采用中深孔钻机穿凿扇形孔,通过爆破形成集矿堑沟;
d.回采
采用大直径深孔凿岩,在凿岩硐室中穿凿下向大直径深孔,在矿块中部采用VCR法形成切割天井,以切割天井和拉底层为自由面分层倒梯段状侧向崩矿,每层爆破高度12-17m,每次爆破后,放出崩下矿石量的1/3,剩余矿石留在采场支撑围岩,当矿块矿石全部爆破后,高强度大量出矿,出空后进行填充,一步采矿块采用尾砂胶结充填,二步采矿块主要采用尾砂充填。
所述深孔凿岩在凿岩硐室中进行,选用潜孔钻机穿凿垂直或倾斜深孔,钻机偏斜率控制在1%以内,炮孔直径165mm,炮孔间距和排距3.5m,当矿体和围岩比较稳固时,边孔靠近矿体边缘线布置,当围岩稳固性较差和靠近充填体时,边孔距回采边界线1m-1.5m布置,潜孔钻机一次钻凿完一个采场的全部炮孔,然后分次装药爆破,炮孔延米爆破量30t/m,炮孔利用率95%。
所述一步采矿块采用的尾砂胶结是由灰砂组成,其灰砂比平均为1:8,浓度不小于73%。
本发明的有益效果是:
1.劳动生产率高,所需备采的采场较少;
2.人力少、万吨采切比低、采矿成本低;
3.采矿作业循环中无非生产性间隙;
4.作业安全;
5.地压控制得到有效改善,推进速度较快。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例,进一步阐述本发明。
实施例
一种深孔凿岩阶段空场嗣后充填采矿法,主要包括以下步骤:
1.回采方案
矿块垂直矿体走向布置,一步采矿块高120m,分段凿岩,即凿岩高度60m,阶段出矿和充填中段高度120m;二步采矿块高60m,即凿岩、出矿和充填中段高度均为60m,一步采矿块和二步采矿块宽均20m,矿块长≤50m,当矿块长度大于60m时,分上下盘回采;
2.采准
采准工程主要有通风天井、矿石溜井、出矿巷道、出矿联络巷道、凿岩硐室联络道和深孔凿岩硐室,所述的通风天井、矿石溜井采用上下盘脉外布置,出矿联络巷道、凿岩硐室联络道及深孔凿岩硐室采用矿块内布置,矿石溜井从运输平巷反掘施工或利用相邻的其它巷道正掘施工,通风天井从上、下运输平巷采用吊罐施工。
3. 切割
在矿块中央开掘堑沟拉底巷道,在装矿进路端部开掘上向垂直切割井,在切割井两侧布置平行上向中孔,以切割井为自由面通过中孔爆破形成切割槽;在堑沟拉底巷道中采用中深孔钻机穿凿扇形孔,通过爆破形成集矿堑沟。
4. 回采
在凿岩硐室中穿凿下向大直径深孔,在矿块中部采用VCR法形成切割天井,以切割天井和拉底层为自由面分层倒梯段状侧向崩矿,每层爆破高度12-17m,每次爆破后,放出崩下矿石量的1/3,剩余矿石留在采场支撑围岩,当矿块矿石全部爆破后,高强度大量出矿,出空后进行填充,矿块分步回采,一步采矿块采用尾砂胶结充填,二步采矿块主要采用尾砂充填。
深孔凿岩在凿岩硐室中进行,选用潜孔钻机穿凿垂直或倾斜深孔,钻机偏斜率控制在1%以内,炮孔直径165mm,炮孔间距和排距3.5m,当矿体和围岩比较稳固时,边孔靠近矿体边缘线布置,当围岩稳固性较差和靠近充填体时,边孔距边界线1m-1.5m布置,潜孔钻机一次钻凿完一个采场的全部炮孔,然后分次装药爆破,炮孔延米爆破量30t/m,炮孔利用率95%。
一步采矿块采用的尾砂胶结是由灰砂组成,其灰砂比为1:8,浓度不小于73%;二步采矿块主要采用尾砂充填,或低配比的尾砂胶结充填。为保证二步采矿块回采的安全,要求一步采用尾砂胶结充填必须有足够的强度和站立高度,这主要取决于充填材料的性质和充填料的配比,生产之前要进行充填材料和充填料配比试验,并进行采矿方法工业试验。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (3)

1.一种深孔凿岩阶段空场嗣后充填采矿法,其特征在于:所述的方法主要包括以下步骤:
a.回采方案
矿块垂直矿体走向布置,一步采矿块高120m,分段凿岩,即凿岩高度60m,阶段出矿和充填中段高度120m;二步采矿块高60m,即凿岩、出矿和充填中段高度均为60m,一步采矿块和二步采矿块宽均20m,矿块长≤50m,当矿块长度大于60m时,分上下盘回采;
b.采准
采准工程主要有通风天井、矿石溜井、出矿巷道、出矿联络巷道、凿岩硐室联络道和深孔凿岩硐室,所述的通风天井、矿石溜井采用上下盘脉外布置,出矿联络巷道、凿岩硐室联络道及深孔凿岩硐室采用矿块内布置,矿石溜井从运输平巷反掘施工或利用相邻的其它巷道正掘施工,通风天井从上、下运输平巷采用吊罐施工;
c.切割
在矿块中央开掘堑沟拉底巷道,在装矿进路端部开掘上向垂直切割井,在切割井两侧布置平行上向中孔,以切割井为自由面通过中孔爆破形成切割槽;在堑沟拉底巷道中采用中深孔钻机穿凿扇形孔,通过爆破形成集矿堑沟;
d.回采
采用大直径深孔凿岩,在凿岩硐室中穿凿下向大直径深孔,在矿块中部采用VCR法形成切割天井,以切割天井和拉底层为自由面分层倒梯段状侧向崩矿,每层爆破高度12-17m,每次爆破后,放出崩下矿石量的1/3,剩余矿石留在采场支撑围岩,当矿块矿石全部爆破后,高强度大量出矿,出空后进行填充,一步采矿块采用尾砂胶结充填,二步采矿块主要采用尾砂充填。
2.根据权利要求1所述的深孔凿岩阶段空场嗣后充填采矿法,其特征在于:所述深孔凿岩在凿岩硐室中进行,选用潜孔钻机穿凿垂直或倾斜深孔,钻机偏斜率控制在1%以内,炮孔直径165mm,炮孔间距和排距3.5m,当矿体和围岩比较稳固时,边孔靠近矿体边缘线布置,当围岩稳固性较差和靠近充填体时,边孔距回采边界线1m-1.5m布置,潜孔钻机一次钻凿完一个采场的全部炮孔,然后分次装药爆破,炮孔延米爆破量30t/m,炮孔利用率95%。
3.根据权利要求1所述的深孔凿岩阶段空场嗣后充填采矿法,其特征在于:所述一步采矿块采用的尾砂胶结是由灰砂组成,其灰砂比平均为1:8,浓度不小于73%。
CN2013100700343A 2013-03-05 2013-03-05 深孔凿岩阶段空场嗣后充填采矿法 Pending CN103184870A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100700343A CN103184870A (zh) 2013-03-05 2013-03-05 深孔凿岩阶段空场嗣后充填采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100700343A CN103184870A (zh) 2013-03-05 2013-03-05 深孔凿岩阶段空场嗣后充填采矿法

Publications (1)

Publication Number Publication Date
CN103184870A true CN103184870A (zh) 2013-07-03

Family

ID=48676286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100700343A Pending CN103184870A (zh) 2013-03-05 2013-03-05 深孔凿岩阶段空场嗣后充填采矿法

Country Status (1)

Country Link
CN (1) CN103184870A (zh)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557001A (zh) * 2013-11-21 2014-02-05 武汉科技大学 一种低段高无底柱留矿嗣后充填采矿法
CN103615250A (zh) * 2013-12-09 2014-03-05 中南大学 分条间柱全空场开采嗣后充填协同采矿法
CN104695960A (zh) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 空气柱成井后退回采嗣后充填采矿法
CN105178961A (zh) * 2015-09-01 2015-12-23 安徽金日盛矿业有限责任公司 一种宽大采场深孔凿岩阶段空场嗣后充填采矿法
CN108625855A (zh) * 2018-06-11 2018-10-09 安徽大昌矿业集团有限公司 一种充填体下安全高效的采矿方法
CN108625857A (zh) * 2018-06-15 2018-10-09 甘肃酒钢集团宏兴钢铁股份有限公司 单双联合凿岩巷道布置结构及回采方法
CN108678745A (zh) * 2018-05-11 2018-10-19 长春黄金研究院有限公司 一种薄矿脉砼垫层削壁充填采矿法
CN109184694A (zh) * 2018-09-05 2019-01-11 巴彦淖尔西部铜业有限公司 一种上盘预锚分段凿岩阶段空场嗣后充填采矿法
CN109322670A (zh) * 2018-11-13 2019-02-12 中国恩菲工程技术有限公司 双巷道上向扇形炮孔爆破拉底采矿系统
CN109505606A (zh) * 2019-01-08 2019-03-22 马钢集团矿业有限公司 一种预控顶机械化分段空场嗣后充填采矿方法
CN110644997A (zh) * 2019-10-10 2020-01-03 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
CN111927459A (zh) * 2020-07-30 2020-11-13 西部矿业股份有限公司 一种采用上向扇形中孔爆破辅助上层凿岩巷掘进的采矿方法
CN112177613A (zh) * 2020-11-13 2021-01-05 长沙矿山研究院有限责任公司 急倾斜中厚矿体的扇形中直径深孔采矿工艺
CN113530549A (zh) * 2021-09-03 2021-10-22 玉溪矿业有限公司 一种缓倾斜矿体中厚矿体侧向预裂爆破采矿方法
CN114776366A (zh) * 2022-04-08 2022-07-22 紫金矿业集团股份有限公司 360°环形深孔凿岩阶段空场嗣后充填采矿方法
CN114810071A (zh) * 2022-04-14 2022-07-29 中钢集团马鞍山矿山研究总院股份有限公司 一种适于地下矿山大型采空区放顶处理的结构布置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881169A (zh) * 2010-06-25 2010-11-10 东北大学 一种分段留矿崩落阶段空场嗣后充填采矿法
CN102587916A (zh) * 2012-02-01 2012-07-18 金建工程设计有限公司 一种崩矿嗣后充填采矿方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881169A (zh) * 2010-06-25 2010-11-10 东北大学 一种分段留矿崩落阶段空场嗣后充填采矿法
CN102587916A (zh) * 2012-02-01 2012-07-18 金建工程设计有限公司 一种崩矿嗣后充填采矿方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汪文明等: "VCR采矿法采场结构参数优化研究", 《采矿技术》 *
马维清等: "垂直深孔落矿阶段矿房(VCR)法在草楼铁矿的应用", 《现代矿业》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103557001B (zh) * 2013-11-21 2015-11-04 武汉科技大学 一种低段高无底柱留矿嗣后充填采矿法
CN103557001A (zh) * 2013-11-21 2014-02-05 武汉科技大学 一种低段高无底柱留矿嗣后充填采矿法
CN103615250A (zh) * 2013-12-09 2014-03-05 中南大学 分条间柱全空场开采嗣后充填协同采矿法
CN104695960B (zh) * 2015-02-10 2016-11-02 山东黄金矿业(玲珑)有限公司 空气柱成井后退回采嗣后充填采矿法
CN104695960A (zh) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 空气柱成井后退回采嗣后充填采矿法
CN105178961B (zh) * 2015-09-01 2018-09-28 安徽金日盛矿业有限责任公司 一种宽大采场深孔凿岩阶段空场嗣后充填采矿法
CN105178961A (zh) * 2015-09-01 2015-12-23 安徽金日盛矿业有限责任公司 一种宽大采场深孔凿岩阶段空场嗣后充填采矿法
CN108678745A (zh) * 2018-05-11 2018-10-19 长春黄金研究院有限公司 一种薄矿脉砼垫层削壁充填采矿法
CN108625855A (zh) * 2018-06-11 2018-10-09 安徽大昌矿业集团有限公司 一种充填体下安全高效的采矿方法
CN108625857B (zh) * 2018-06-15 2024-02-02 甘肃酒钢集团宏兴钢铁股份有限公司 单双联合凿岩巷道布置结构及回采方法
CN108625857A (zh) * 2018-06-15 2018-10-09 甘肃酒钢集团宏兴钢铁股份有限公司 单双联合凿岩巷道布置结构及回采方法
CN109184694A (zh) * 2018-09-05 2019-01-11 巴彦淖尔西部铜业有限公司 一种上盘预锚分段凿岩阶段空场嗣后充填采矿法
CN109322670A (zh) * 2018-11-13 2019-02-12 中国恩菲工程技术有限公司 双巷道上向扇形炮孔爆破拉底采矿系统
CN109322670B (zh) * 2018-11-13 2024-03-19 中国恩菲工程技术有限公司 双巷道上向扇形炮孔爆破拉底采矿系统
CN109505606A (zh) * 2019-01-08 2019-03-22 马钢集团矿业有限公司 一种预控顶机械化分段空场嗣后充填采矿方法
CN110644997B (zh) * 2019-10-10 2021-06-11 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
CN110644997A (zh) * 2019-10-10 2020-01-03 安徽金安矿业有限公司 分阶段凿岩并阶段开采嗣后充填采矿法
CN111927459A (zh) * 2020-07-30 2020-11-13 西部矿业股份有限公司 一种采用上向扇形中孔爆破辅助上层凿岩巷掘进的采矿方法
CN112177613A (zh) * 2020-11-13 2021-01-05 长沙矿山研究院有限责任公司 急倾斜中厚矿体的扇形中直径深孔采矿工艺
CN112177613B (zh) * 2020-11-13 2021-08-17 长沙矿山研究院有限责任公司 急倾斜中厚矿体的扇形中直径深孔采矿工艺
CN113530549A (zh) * 2021-09-03 2021-10-22 玉溪矿业有限公司 一种缓倾斜矿体中厚矿体侧向预裂爆破采矿方法
CN114776366A (zh) * 2022-04-08 2022-07-22 紫金矿业集团股份有限公司 360°环形深孔凿岩阶段空场嗣后充填采矿方法
CN114810071A (zh) * 2022-04-14 2022-07-29 中钢集团马鞍山矿山研究总院股份有限公司 一种适于地下矿山大型采空区放顶处理的结构布置
CN114810071B (zh) * 2022-04-14 2023-06-06 中钢集团马鞍山矿山研究总院股份有限公司 一种适于地下矿山大型采空区放顶处理的结构布置

Similar Documents

Publication Publication Date Title
CN103184870A (zh) 深孔凿岩阶段空场嗣后充填采矿法
CN105178961B (zh) 一种宽大采场深孔凿岩阶段空场嗣后充填采矿法
CN103590831B (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN102493806B (zh) 一种壁式缓倾斜薄矿体机械化连续采矿方法
CN103615250B (zh) 分条间柱全空场开采嗣后充填协同采矿法
CN104481539B (zh) 自拉槽挤压爆破崩落采矿法
CN111828007B (zh) 一种地下矿山采空区遗留间柱的回采方法
CA2986062C (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN102086765B (zh) 一种极薄铜矿体高分段多分层采矿方法
CN103527196B (zh) 一种黄土充填回收房式煤柱的方法
CN105041314A (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN103437768B (zh) 一种不留顶底柱预置空间充填采矿法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN107829742A (zh) 一种崩落‑充填‑空场‑崩落采矿方法
CN101285384B (zh) 大直径深孔不拉底采矿法
CN111706328B (zh) 一种用于充填法处理采空区遗留间柱的开采方法
CN103075157A (zh) 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法
CN104481543A (zh) 阶段留矿崩落采矿法
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN205638458U (zh) 一种加快地下溜破系统施工速度的施工结构
CN106640080A (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN104153807A (zh) 一种厚煤层分层开采工作面过下分层老巷的充填方法
CN106593447A (zh) 一种地下采矿缓倾斜中厚矿体采矿方法
CN104763423B (zh) 利用反井方式凿岩采出粉矿的开采工艺
CN107762513A (zh) 基于在矿产开采中对大直径深孔空场嗣后充填采矿的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130703