CN103178463A - 变电站电力设备起吊装置 - Google Patents

变电站电力设备起吊装置 Download PDF

Info

Publication number
CN103178463A
CN103178463A CN2013101392068A CN201310139206A CN103178463A CN 103178463 A CN103178463 A CN 103178463A CN 2013101392068 A CN2013101392068 A CN 2013101392068A CN 201310139206 A CN201310139206 A CN 201310139206A CN 103178463 A CN103178463 A CN 103178463A
Authority
CN
China
Prior art keywords
angle elbow
elbow pipe
pipe
seat
hoisting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101392068A
Other languages
English (en)
Inventor
乔辉
赵华
徐振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bengbu Power Supply Co Of State Grid Anhui Electric Power Supply Co
State Grid Corp of China SGCC
Original Assignee
Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Bengbu Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN2013101392068A priority Critical patent/CN103178463A/zh
Publication of CN103178463A publication Critical patent/CN103178463A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开一种变电站电力设备起吊装置,包括一根座管,座管的圆周面上固定连接有抱箍,座管的上端口插入一根与座管内壁间隙配合的直角弯管,直角弯管的水平段设置一个用于连接滑轮的吊环,直角弯管的竖直段上设有一个与座管外径相等的圆环限位台;本发明采用两段组装方式有效地降低单杆的长度,便于携带、运输和安装,满足与带电设备的安全距离,特别适合空间狭小的变电站使用;改变传统绳索固定方式,采用抱箍通过螺栓固定,提高装置的稳定性和可靠性;经企业内部实用测试,对于安装、更换隔离开关、避雷针、互感器等设备,工作时间比以前大幅缩短,安全性得到很大提高。

Description

变电站电力设备起吊装置
技术领域
本发明涉及起吊设备领域,特别是一种用于变电站安装、更换电力设备的起吊装置。
背景技术
变电站技改更换设备(如隔离开关、互感器、避雷针等)时,由于这些设备都是安装在构架上,仅靠人力是无法完成,一般需要采用吊车或抱杆进行吊装,如采用吊车更换,停电范围大,费用高,部分变电站设备受施工环境限制,在具体的施工中,停电范围往往只是一个间隔,周围都是带电设备,因此无法使用吊车;抱杆由于其长度相对较长、体积重,运输、搬运不便,且变电站内空间狭小,周边均为带电设备,抱杆在使用时经常不能满足与带电设备的安全距离,抱杆的使用受到一定限制,抱杆稍有倾斜就可能触及邻近带电设备放电,存在安全隐患。固定抱杆时,通常是将抱杆靠在构架上用绳索绑扎,施工过程中一旦绳索松动,就可能导致抱杆倾覆,稳定性和可靠性较差。
发明内容
本发明的目的在于提供一种便携可拆卸式的变电站电力设备起吊装置,该起吊装置的稳定性和可靠性显著提高,体积与长度较小,满足与带电设备的安全距离,特别适合空间狭小的变电站使用。
本发明的目的是通过以下技术方案予以实现的,变电站电力设备起吊装置,其特征在于,包括一根座管,座管的圆周面上固定连接有抱箍,座管的上端口插入一根与座管内壁间隙配合的直角弯管,直角弯管的水平段设置一个用于连接滑轮的吊环。
进一步地,所述吊环挂装在直角弯管的水平段上,所述直角弯管的水平段上还设有限制吊环滑出直角弯管水平段的限位杆,所述限位杆的两端焊接在直角弯管的水平段上。
进一步地,所述直角弯管的竖直段上设有一个外径大于座管内径的圆环限位台。
进一步地,所述直角弯管的竖直段上圆环限位台的下方设置一个与座管上端面配合的平面轴承,平面轴承的外径与座管的外径相等。
进一步地,所述圆环限位台的外径与座管的外径相等。
有益效果:本发明采用两段组装方式有效地降低单杆的长度,便于携带、运输和安装,满足与带电设备的安全距离,特别适合空间狭小的变电站使用;改变传统绳索固定方式,采用抱箍通过螺栓固定,提高装置的稳定性和可靠性;经企业内部实用测试,对于安装、更换隔离开关、避雷针、互感器等设备,工作时间比以前大幅缩短,安全性得到很大提高。
附图说明
图1为本发明的结构示意图;
图2为图1的左视图;
图3为图1的A—A剖视图;
图4为图1中的B部放大剖视图。
具体实施方式
如图1、图2所示,本发明所提供的变电站电力设备起吊装置,包括一根竖直的座管9,结合图3所示,座管9下段的圆周面上间隔焊接两个抱箍10,为了增加强度,与座管焊接固定的抱箍两侧分别加焊一块加强板12与座管9焊接固定,抱箍10通过螺栓11与安装构架的电杆固定连接,结合图4所示,座管9的上端口插入一根与座管9内壁间隙配合的直角弯管5,直角弯管5的竖直段6上设有一个与座管外径相等的圆环限位台7,直角弯管的竖直段上圆环限位台7的下方设置一个与座管9上端面配合的平面轴承8,平面轴承8的外径与座管9的外径相等,直角弯管5的上端水平段4上挂装一个用于连接滑轮1的吊环3,直角弯管的水平段4上还设有限制吊环3滑出直角弯管水平段的限位杆2,限位杆2采用圆钢,其两端弯曲焊接在直角弯管的水平段4上,直角弯管5的直角处焊接一根斜梁支撑管13。
使用说明:首先将抱箍打开沿电杆周向合拢后通过螺栓固定,竖直的座管被牢固地固定在电杆上,然后将直角弯管的竖直段从座管的上端口插入,此时直角弯管竖直段上的平面轴承与座管上端面配合,通过转动直角弯管调整直角弯管水平段的指向,通过吊环在直角弯管的水平段上滑动来确定起吊位置,最后将滑轮挂接在吊环上,利用滑轮或滑轮组起吊电力设备。
上述实施例作为本发明的较佳实施方式,详细说明了本发明的技术构思和实施要点,并非是对本发明的保护范围进行限制,凡根据本发明精神实质所作的任何简单修改及等效结构变换或修饰,均应涵盖在本发明的保护范围之内。

Claims (5)

1.变电站电力设备起吊装置,其特征在于,包括一根座管,座管的圆周面上固定连接有抱箍,座管的上端口插入一根与座管内壁间隙配合的直角弯管,直角弯管的水平段设置一个用于连接滑轮的吊环。
2.根据权利要求1所述的变电站电力设备起吊装置,其特征在于,所述吊环挂装在直角弯管的水平段上,所述直角弯管的水平段上还设有限制吊环滑出直角弯管水平段的限位杆,所述限位杆的两端焊接在直角弯管的水平段上。
3.根据权利要求1所述的变电站电力设备起吊装置,其特征在于,所述直角弯管的竖直段上设有一个外径大于座管内径的圆环限位台。
4.根据权利要求3所述的变电站电力设备起吊装置,其特征在于,所述直角弯管的竖直段上圆环限位台的下方设置一个与座管上端面配合的平面轴承,平面轴承的外径与座管的外径相等。
5.根据权利要求3所述的变电站电力设备起吊装置,其特征在于,所述圆环限位台的外径与座管的外径相等。
CN2013101392068A 2013-04-19 2013-04-19 变电站电力设备起吊装置 Pending CN103178463A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101392068A CN103178463A (zh) 2013-04-19 2013-04-19 变电站电力设备起吊装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101392068A CN103178463A (zh) 2013-04-19 2013-04-19 变电站电力设备起吊装置

Publications (1)

Publication Number Publication Date
CN103178463A true CN103178463A (zh) 2013-06-26

Family

ID=48638153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101392068A Pending CN103178463A (zh) 2013-04-19 2013-04-19 变电站电力设备起吊装置

Country Status (1)

Country Link
CN (1) CN103178463A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523704A (zh) * 2013-10-25 2014-01-22 国网安徽省电力公司池州供电公司 一种应用于小型电力设备起吊的可拆卸支架及其施工方法
CN103626070A (zh) * 2013-12-03 2014-03-12 国家电网公司 一种与电杆固定的吊架
CN105958351A (zh) * 2016-07-22 2016-09-21 国网河南省电力公司南阳供电公司 减少变电站母线停电时间的工作方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201236116Y (zh) * 2008-03-27 2009-05-13 郑丰 一种小型卷扬机
CN201323398Y (zh) * 2008-12-16 2009-10-07 邢台供电公司 小型电力设备起落架
CN201766314U (zh) * 2010-09-13 2011-03-16 山东电力集团公司潍坊供电公司 一种绝缘子更换工具
CN202260340U (zh) * 2011-10-14 2012-05-30 广西电网公司电力科学研究院 配电网架空线路绝缘塔头吊装工具
CN203278042U (zh) * 2013-04-19 2013-11-06 安徽省电力公司蚌埠供电公司 变电站电力设备起吊装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201236116Y (zh) * 2008-03-27 2009-05-13 郑丰 一种小型卷扬机
CN201323398Y (zh) * 2008-12-16 2009-10-07 邢台供电公司 小型电力设备起落架
CN201766314U (zh) * 2010-09-13 2011-03-16 山东电力集团公司潍坊供电公司 一种绝缘子更换工具
CN202260340U (zh) * 2011-10-14 2012-05-30 广西电网公司电力科学研究院 配电网架空线路绝缘塔头吊装工具
CN203278042U (zh) * 2013-04-19 2013-11-06 安徽省电力公司蚌埠供电公司 变电站电力设备起吊装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523704A (zh) * 2013-10-25 2014-01-22 国网安徽省电力公司池州供电公司 一种应用于小型电力设备起吊的可拆卸支架及其施工方法
CN103626070A (zh) * 2013-12-03 2014-03-12 国家电网公司 一种与电杆固定的吊架
CN105958351A (zh) * 2016-07-22 2016-09-21 国网河南省电力公司南阳供电公司 减少变电站母线停电时间的工作方法

Similar Documents

Publication Publication Date Title
CN203278042U (zh) 变电站电力设备起吊装置
CN203079577U (zh) 一种互感器专用起重工具
CN103009174B (zh) 大型转子轴翻转设备的轴向滑移、径向定位及夹持机构
CN103178463A (zh) 变电站电力设备起吊装置
CN103173582A (zh) 高炉五通球及其导出管高空整体就位安装方法
CN103993730B (zh) 钢煤斗对接安装施工操作台
CN202785387U (zh) 一种室内悬臂起重机
CN203284128U (zh) 闸刀主体机构吊装工具
CN203271102U (zh) 一种烟囱外壁检修施工吊点固定件
CN104953471A (zh) 能够移动的避雷针
CN205346632U (zh) 一种圆管桁架吊装工具
CN205132955U (zh) 一种电力行业低空吊装作业用吊装架
CN204144679U (zh) 一种配电柜保护支架
CN103334690A (zh) 一种电力杆塔用绝缘平梯悬挂装置
CN204737704U (zh) 一种用于滑触线安装专用吊篮
CN204879247U (zh) 焦炉地下室管道设备安装装置
CN201702544U (zh) 风力发电机变桨轴承安装走台
CN204592635U (zh) 一种带桩体安装孔模具的法兰
CN203891440U (zh) 可自由旋转的储罐内检修工作平台
CN203924659U (zh) 挂架式施工平台装置
CN203754287U (zh) 一种小型间隔二用起吊装置
CN203161459U (zh) 用于固定风力发电机塔筒与平台的固定装置
CN203208568U (zh) 一种安全带挂具
CN203568661U (zh) 内置式溜尾吊耳
CN202865370U (zh) 电泳喷涂生产线工件接电传输装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: BENGBU POWER SUPPLY COMPANY STATE GRID ANHUI ELECTRIC POWER CO., LTD.

Effective date: 20140409

Owner name: BENGBU POWER SUPPLY COMPANY STATE GRID ANHUI ELECT

Effective date: 20140409

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 233000 No. 245 Shengli Road, mussel District, Anhui, Bengbu

Applicant after: BENGBU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER SUPPLY Co.

Address before: 233000 No. 245 Shengli Road, mussel District, Anhui, Bengbu

Applicant before: ANHUI BENGBU POWER SUPPLY Co.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ANHUI ELECTRIC POWER COMPANY BENGBU POWER SUPPLY CORP. TO: BENGBU POWER SUPPLY COMPANY STATE GRID ANHUI ELECTRIC POWER CO., LTD.

Free format text: CORRECT: ADDRESS; FROM: 233000 BENGBU, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140409

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: BENGBU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER SUPPLY Co.

Address before: 233000 No. 245 Shengli Road, mussel District, Anhui, Bengbu

Applicant before: BENGBU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER SUPPLY Co.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130626