CN203284128U - 闸刀主体机构吊装工具 - Google Patents

闸刀主体机构吊装工具 Download PDF

Info

Publication number
CN203284128U
CN203284128U CN2013203188371U CN201320318837U CN203284128U CN 203284128 U CN203284128 U CN 203284128U CN 2013203188371 U CN2013203188371 U CN 2013203188371U CN 201320318837 U CN201320318837 U CN 201320318837U CN 203284128 U CN203284128 U CN 203284128U
Authority
CN
China
Prior art keywords
switch blade
main mechanism
winch
hoisting tool
rotating arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203188371U
Other languages
English (en)
Inventor
宋光辉
董春雷
高尚
康军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuyang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Fuyang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyang Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Fuyang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN2013203188371U priority Critical patent/CN203284128U/zh
Application granted granted Critical
Publication of CN203284128U publication Critical patent/CN203284128U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

闸刀主体机构吊装工具,由支撑柱、转动臂、滑轮、抱箍、卷扬机和钢丝绳构成,其特征是:支撑柱上焊有抱箍和支架,卷扬机安装在支架上,支撑柱顶端设有转动臂,转动臂两端设有滑轮,卷扬机上的钢丝绳通过转动臂两头的滑轮与吊钩相连接。本实用新型适用于变电站10kV、35kV户外水泥柱上闸刀主体机构的吊装。本实用新型可以缩短闸刀拆除、安装时间,同时可以避免因为使用吊车导致扩大停电范围和对变电站绿化带的损伤,达到节约时间和加快工程进度以及缩小停电范围的作用。

Description

闸刀主体机构吊装工具
技术领域:
本实用新型属于电力安装工具,尤其涉及到闸刀主体机构吊装专用工具。
背景技术:
目前我公司在所承担的户外柱上10kV、35kV闸刀的安装和更换任务,每年大概为30-40组,1相闸刀主体机构净重在100kg左右,由于闸刀构架是由槽钢构成,距离地面2米左右,如果人力拆除或者安装闸刀主体机构,上面没有扶手且无处借力很容易出现人身和设备事故,因此,必须使用吊车或其他方法起吊。
由于10kV、35kV闸刀间隔所占空间比较小,吊车往往很难进入,即使闸刀主体机构可以用吊车起吊,根据安全距离的要求,需要停母线、旁母或线路,导致大面积停电,吊车的支腿展开时,占地面积大,破坏基础设施和站内绿化。由于闸刀所处位置不同,吊车就位后很难一次吊装3相闸刀主体机构,因此,需要来回移动吊车以满足检修工作,只是吊车就位就增加了施工时间约2小时,而闸刀主体机构起吊拆卸或安装只需50分钟。因此,使用吊车起吊瓷瓶不但扩大了停电范围、延长了停电时间而且更增加了施工成本。
发明内容:
为了克服在施工中存在的技术问题,本实用新型提供一种闸刀主体机构吊装专用工具,它不仅可以避免利用吊车等大型起吊装置,节约施工成本、缩短施工时间、减少停电范围,而且现场应用更加稳定、简单,并不受施工现场空间大小和地面状况的影响。
本实用新型是通过以下技术方案实现其发明目的的。
闸刀主体机构吊装工具,由支撑柱、转动臂、滑轮、抱箍、卷扬机和钢丝绳构成,其特征是:支撑柱上焊有抱箍和支架,卷扬机安装在支架上,支撑柱顶端设有转动臂,转动臂两端设有滑轮,卷扬机上的钢丝绳通过转动臂两头的滑轮与吊钩相连接。
本实用新型适用于变电站10kV、35kV户外水泥柱上闸刀主体机构的吊装。本实用新型可以缩短闸刀拆除、安装时间,同时可以避免因为使用吊车导致扩大停电范围和对变电站绿化带的损伤,达到节约时间和加快工程进度以及缩小停电范围的作用。
附图说明:
附图是本实用新型结构示意图。
在附图中,1是支撑柱,2是抱箍,3是支架,4是卷扬机,5是钢丝绳,6是滑轮,7是吊钩,8是转动臂。
具体实施方式:
下面结合附图对本实用新型作进一步说明。
闸刀主体机构吊装工具,由支撑柱1、转动臂8、滑轮6、抱箍2、卷扬机4和钢丝绳5构成,其特征是:支撑柱1上焊有抱箍2和支架3,卷扬机4安装在支架3上,支撑柱1顶端设有转动臂8,转动臂8两端设有滑轮6,卷扬机4上的钢丝绳5通过转动臂两头的滑轮6与吊钩7相连接。
其中支撑柱1由φ55mm,壁厚8mm钢管制成,抱箍2由两付直径300mm的对合抱箍焊接在支柱上,用于固定在水泥杆上,卷扬机4为小型卷扬机,功率2000W,交流220V,可牵引500kg的重物。

Claims (1)

1.闸刀主体机构吊装工具,由支撑柱、转动臂、滑轮、抱箍、卷扬机和钢丝绳构成,其特征是:支撑柱上焊有抱箍和支架,卷扬机安装在支架上,支撑柱顶端设有转动臂,转动臂两端设有滑轮,卷扬机上的钢丝绳通过转动臂两头的滑轮与吊钩相连接。
CN2013203188371U 2013-06-04 2013-06-04 闸刀主体机构吊装工具 Expired - Fee Related CN203284128U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203188371U CN203284128U (zh) 2013-06-04 2013-06-04 闸刀主体机构吊装工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203188371U CN203284128U (zh) 2013-06-04 2013-06-04 闸刀主体机构吊装工具

Publications (1)

Publication Number Publication Date
CN203284128U true CN203284128U (zh) 2013-11-13

Family

ID=49540503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203188371U Expired - Fee Related CN203284128U (zh) 2013-06-04 2013-06-04 闸刀主体机构吊装工具

Country Status (1)

Country Link
CN (1) CN203284128U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107611829A (zh) * 2017-09-19 2018-01-19 国网山东省电力公司济宁供电公司 一种隔离开关吊装工具及使用方法
CN109081256A (zh) * 2018-09-25 2018-12-25 国网辽宁省电力有限公司锦州供电公司 隔离开关专用起吊装置
CN109467015A (zh) * 2018-11-20 2019-03-15 国网安徽省电力有限公司蚌埠供电公司 小型分体式电力起重装置
CN113200469A (zh) * 2021-04-16 2021-08-03 国网山东省电力公司枣庄供电公司 一种变压器吊装机

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107611829A (zh) * 2017-09-19 2018-01-19 国网山东省电力公司济宁供电公司 一种隔离开关吊装工具及使用方法
CN109081256A (zh) * 2018-09-25 2018-12-25 国网辽宁省电力有限公司锦州供电公司 隔离开关专用起吊装置
CN109467015A (zh) * 2018-11-20 2019-03-15 国网安徽省电力有限公司蚌埠供电公司 小型分体式电力起重装置
CN113200469A (zh) * 2021-04-16 2021-08-03 国网山东省电力公司枣庄供电公司 一种变压器吊装机

Similar Documents

Publication Publication Date Title
CN203284128U (zh) 闸刀主体机构吊装工具
CN202967920U (zh) 变压器有载开关吊检装置
CN202575753U (zh) 一种滑动式龙门行车
CN201234081Y (zh) 220kV母线支柱瓷瓶检修支架
CN103332608B (zh) Gw6刀闸瓷柱更换专用杆吊
CN201656340U (zh) 高压管母线支撑绝缘子更换工具
CN203278097U (zh) 电杆横担架设装置
CN102761077A (zh) 1000kV特高压交流线路耐张绝缘子串绝缘起吊支架
CN103010965A (zh) 一种110kVGW4型闸刀瓷瓶吊装专用工具
CN202429945U (zh) 一种供电设施起吊装置
CN203434492U (zh) 组合式电动起吊装置
CN203284094U (zh) Gw6刀闸瓷柱更换专用杆吊
CN201252354Y (zh) 有载分接开关吊架
CN202268651U (zh) 一种输电导线提线器固定装置
CN203754287U (zh) 一种小型间隔二用起吊装置
CN201536236U (zh) 向电线杆状物上吊装重物的支架
CN205484430U (zh) 一种变压器高压试验支架
CN203288976U (zh) 隔离开关吊装装置
CN202840363U (zh) 1000kV特高压交流线路耐张绝缘子串绝缘起吊支架
CN201238159Y (zh) Gw4-110型隔离开关检修支架
CN205231576U (zh) 拆装半高层布局隔离开关的辅助装置
CN203589536U (zh) Gw6型隔离开关快装检修支架
CN203481749U (zh) 自吊式绝缘横担
CN205151577U (zh) 一种固定在槽钢架构上的小型吊装机
CN202544473U (zh) 一种人字杆立杆支撑器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131113

CF01 Termination of patent right due to non-payment of annual fee