CN103161102A - 钢制导轨硫磺砂浆锚固方法 - Google Patents
钢制导轨硫磺砂浆锚固方法 Download PDFInfo
- Publication number
- CN103161102A CN103161102A CN2012105866567A CN201210586656A CN103161102A CN 103161102 A CN103161102 A CN 103161102A CN 2012105866567 A CN2012105866567 A CN 2012105866567A CN 201210586656 A CN201210586656 A CN 201210586656A CN 103161102 A CN103161102 A CN 103161102A
- Authority
- CN
- China
- Prior art keywords
- sulphur
- guide rail
- bonded mortar
- sulfur mortar
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明涉及一种钢制导轨硫磺砂浆锚固方法,按照下列步骤施工,轨道基础施工,螺栓位置放线,道钉孔洞打眼,施工材料准备,熬制硫磺砂浆,灌硫磺砂浆,螺栓安装,压板安装,轨道安装,轨道测量与复核,调整轨道误差。本发明与传统技术相比较,具有以下技术经济效果:硫磺砂浆熬制过程较为简单,没有大机械大设备的应用,只要把握好材料选用和熬制温度的控制就可以,施工相对简洁方便;硫磺砂浆强度生成速度快,锚固所需要时间短,锚固效果好;硫磺砂浆抗冻性能、抗疲劳性能和承受重复荷载的能力都极为优异;超长导轨的安装精度高,安装难度大。
Description
技术领域
本发明涉及一种建筑施工方法,尤其是一种钢制导轨硫磺砂浆锚固方法。
背景技术
硫磺砂浆锚固施工技术在铁路、桥梁工程中有着广泛的应用,但在工业与民用建筑中的应用较少,随着现在大车间、大设备的建设越来越多,工业厂房内铺装轨道已成为很多厂房建设的一部分,传统的锚固方法一般是预埋螺栓法,但此种方法承受动荷载的能力较差,容易发生质量和安全事故。
发明内容
本发明要解决的是提供一种钢制导轨硫磺砂浆锚固方法。
为解决上述技术问题,本发明的钢制导轨硫磺砂浆锚固方法,按照下列步骤施工,轨道基础施工,螺栓位置放线,道钉孔洞打眼,施工材料准备,熬制硫磺砂浆,灌硫磺砂浆,螺栓安装,压板安装,轨道安装,轨道测量与复核,调整轨道误差。
所述螺栓位置放线、道钉孔洞打眼步骤中,按螺纹道钉轴线位置放出道钉的位置线,采用电锤在混凝土轨道基础上打眼,孔径比道钉直径大4mm,开孔尺寸偏差不得大于2mm。
所述熬制硫磺砂浆步骤包括,先将硫磺打成2-5mm的小块,按比例称好分批放入锅中,加热130-150℃熔化,边熔边放边搅;硫磺脱水后,分批将已搅拌均匀的130℃烘干细骨料水泥放入锅中不断搅拌脱水,混合均匀,控制熬制温度为140-180℃,熬制3-4小时;待硫磺砂浆熬制均匀,颜色一致,气泡完全消失时,取样检查。
所述灌硫磺砂浆、安装螺纹道钉和压板步骤包括,用吹风机将打好眼的螺纹道钉空内灰尘清理干净,将熬制合格的硫磺砂浆倒入孔内约2/3,然后将螺纹道钉垂直插入孔内,再倒入硫磺砂浆,最后将孔洞灌满。
本发明与传统技术相比较,具有以下技术经济效果:硫磺砂浆熬制过程较为简单,没有大机械大设备的应用,只要把握好材料选用和熬制温度的控制就可以,施工相对简洁方便;硫磺砂浆强度生成速度快,锚固所需要时间短,锚固效果好;硫磺砂浆抗冻性能、抗疲劳性能和承受重复荷载的能力都极为优异;超长导轨的安装精度高,安装难度大。
具体实施方式
本发明的钢制导轨硫磺砂浆锚固方法,按照下列步骤施工:
1、轨道基础施工:轨道基础为钢筋混凝土地梁,其施工工艺要求与房屋建筑中混凝土结构要求一样,要保证其强度、截面尺寸、轴线位置、表面平整度、成型质量等。在这主要容易出现问题的是混凝土的轴线和表面平整度,应在施工过程重点加以控制。
2、螺栓位置放线、道钉孔洞打眼:根据图纸要求按螺纹道钉轴线位置放出道钉的位置线,采用电锤在混凝土轨道基础上打眼,要有专人操作,孔径比道钉直径大4mm,开孔尺寸偏差不得大于2mm。开孔及其孔位的控制,为解决无定位机具造成的螺栓活动量大引起螺栓水平间距误差大的影响,我们对锚固钢模板改进,在钢模板上开孔,孔径26mm(螺旋道钉材料为Q235A,M24,长230±5),两孔中-中各188mm,宽145mm,中到边206mm。26mm孔钻通后正面焊接钢管(钢管垂直度90°位置正确)钢管焊接好后,反面再次以26mm孔为中心扩钻30mm,通过增加螺栓套筒的办法控制螺栓位移量,确保螺栓外露量及螺杆间距。
3、施工材料准备
1)硫磺:用一般工业用粉状或块状硫磺,含硫量不低于95%,其中不得含有木屑、草末、石块等杂物。并要求保持干燥,如是块状硫磺,使用前要经机械破碎,并通过15mm孔径的筛子过筛,以免颗粒过大,熔化时不仅速度慢,而且熔化不均匀,影响质量。硫磺在锚固体中主要是起胶结作用。
2)水泥:用普通硅酸盐水泥,强度等级最好不低于42.5Mpa水泥是锚固体中的填料,如受潮结块,必须先用孔径2mm的筛子过筛后当可使用。
3)砂子:砂子在锚固体中起骨料作用。粒径不得大于2mm,泥污含量不得大于5%,并保持清洁,使用前应在钢板上加热烘烤,除去水分。
4)石蜡:为一般工业用石蜡,在锚固体中起防水绝缘作用。使用前应加工成粒径5mm的碎块。
4、硫磺砂浆的熬制方法:
1)先将硫磺打成2-5mm的小块,按比例称好分批放入锅中,加热130-150℃熔化,边熔边放边搅,注意防止局部过热,已达到充分脱水的目的。
2)硫磺脱水后,分批将已搅拌均匀的130℃烘干细骨料水泥放入锅中不断搅拌脱水,混合均匀,注意要严格控制熬制温度,一般为140-170℃,最高不超过180℃,约熬制3-4小时。
3)待硫磺砂浆熬制均匀,颜色一致,气泡完全消失时,先取样检查,以确定其熬制质量,如不符合要求时,应继续熬制,直到合格。
4)硫磺砂浆质量鉴定,在140℃时,浇入8字型抗拉试模中,观察其冷却时应无涌泡、凹陷、不密实、分层现象,将其打断观察,其颈部断面内,肉眼看可见小孔多于5个,说明熬制时间不够,通常延长熬制时间,直到眼见小孔小于或等于5个为止。
5、灌硫磺砂浆、安装螺纹道钉和压板
1)用吹风机将打好眼的螺纹道钉空内灰尘清理干净,将熬制合格的硫磺砂浆倒入孔内约2/3,然后将螺纹道钉垂直插入孔内,再倒入硫磺砂浆,最后将孔洞灌满。
2)在硫磺砂浆达到设计强度,验收抽检合格后,安装道轨压板。
6、轨道安装
1)道轨的埋设深度应与地面装饰层持平或略高于3-5mm。
2)道轨安装后要任意1m长度内,水平偏差不大于1mm,全长不大于2mm,道轨区间对应的水平偏差不应大于1mm,每条轨道之间的平行度偏差小于2mm。
3)轨道底面与地面必须紧密着力,不得有虚跨间隙,以防止轨道载荷后弯曲变形。
Claims (4)
1.一种钢制导轨硫磺砂浆锚固方法,其特征在于:按照下列步骤施工,轨道基础施工,螺栓位置放线,道钉孔洞打眼,施工材料准备,熬制硫磺砂浆,灌硫磺砂浆,螺栓安装,压板安装,轨道安装,轨道测量与复核,调整轨道误差。
2.按照权利要求1所述的钢制导轨硫磺砂浆锚固方法,其特征在于:所述螺栓位置放线、道钉孔洞打眼步骤中,按螺纹道钉轴线位置放出道钉的位置线,采用电锤在混凝土轨道基础上打眼,孔径比道钉直径大4mm,开孔尺寸偏差不得大于2mm。
3.按照权利要求1所述的钢制导轨硫磺砂浆锚固方法,其特征在于:所述熬制硫磺砂浆步骤包括,先将硫磺打成2-5mm的小块,按比例称好分批放入锅中,加热130-150℃熔化,边熔边放边搅;硫磺脱水后,分批将已搅拌均匀的130℃烘干细骨料水泥放入锅中不断搅拌脱水,混合均匀,控制熬制温度为140-180℃,熬制3-4小时;待硫磺砂浆熬制均匀,颜色一致,气泡完全消失时,取样检查。
4.按照权利要求1所述的钢制导轨硫磺砂浆锚固方法,其特征在于:所述灌硫磺砂浆、安装螺纹道钉和压板步骤包括,用吹风机将打好眼的螺纹道钉空内灰尘清理干净,将熬制合格的硫磺砂浆倒入孔内约2/3,然后将螺纹道钉垂直插入孔内,再倒入硫磺砂浆,最后将孔洞灌满。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105866567A CN103161102A (zh) | 2012-12-31 | 2012-12-31 | 钢制导轨硫磺砂浆锚固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105866567A CN103161102A (zh) | 2012-12-31 | 2012-12-31 | 钢制导轨硫磺砂浆锚固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103161102A true CN103161102A (zh) | 2013-06-19 |
Family
ID=48584612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105866567A Pending CN103161102A (zh) | 2012-12-31 | 2012-12-31 | 钢制导轨硫磺砂浆锚固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161102A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115196935A (zh) * | 2022-07-07 | 2022-10-18 | 常熟市俊恩轨道科技有限公司 | 一种螺旋道钉锚固砂浆 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5197104A (en) * | 1975-02-19 | 1976-08-26 | Kidochunyusono chunyuzairyo | |
CN85103638A (zh) * | 1985-05-28 | 1985-12-20 | 铁道部第三工程公司 | 混凝土粘接材料 |
CN101745981A (zh) * | 2010-01-26 | 2010-06-23 | 王丹 | 一种预应力锚穴封锚方法 |
CN102557528A (zh) * | 2012-02-23 | 2012-07-11 | 上海市城市建设设计研究总院 | 整体道床板脱空模拟试验的热敏填料配制方法 |
-
2012
- 2012-12-31 CN CN2012105866567A patent/CN103161102A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5197104A (en) * | 1975-02-19 | 1976-08-26 | Kidochunyusono chunyuzairyo | |
CN85103638A (zh) * | 1985-05-28 | 1985-12-20 | 铁道部第三工程公司 | 混凝土粘接材料 |
CN101745981A (zh) * | 2010-01-26 | 2010-06-23 | 王丹 | 一种预应力锚穴封锚方法 |
CN102557528A (zh) * | 2012-02-23 | 2012-07-11 | 上海市城市建设设计研究总院 | 整体道床板脱空模拟试验的热敏填料配制方法 |
Non-Patent Citations (3)
Title |
---|
黄小军: ""DPK32型铺轨机铺设工具轨排综合施工技术"", 《国防交通工程与技术》 * |
黄明光: ""硫磺砂浆配制与起鼓原因分析"", 《建筑技术》 * |
黄金田: ""锚固螺旋道钉硫磺砂浆组成材料研究"", 《铁道标准设计》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115196935A (zh) * | 2022-07-07 | 2022-10-18 | 常熟市俊恩轨道科技有限公司 | 一种螺旋道钉锚固砂浆 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102323396B (zh) | 大体积混凝土实体模拟试验装置及其试验施工方法 | |
CN105133487B (zh) | 使用复合式桥梁临时支座快速架设连续梁的施工方法 | |
CN107941594A (zh) | 一种用于衬砌结构的多功能试验装置 | |
CN106812219A (zh) | 填充墙顶部塞缝施工方法 | |
CN104612165A (zh) | 非熔焊多节连接的预制钢筋砼构件围护体系及其施工方法 | |
CN206385801U (zh) | 地下室外墙单侧支模外模板 | |
CN109610879B (zh) | 一种建筑物移位过程中的防侧向位移方法 | |
CN103276645B (zh) | 既有线隧道基底病害预制桩梁板整治技术 | |
CN103161102A (zh) | 钢制导轨硫磺砂浆锚固方法 | |
CN207689039U (zh) | 用于大体积混凝土浇注施工过程中分布光纤传感器 | |
CN103981909B (zh) | 地脚螺栓断裂后的快速修复方法及结构 | |
CN107012756A (zh) | 一种抗冲耐磨混凝土道路 | |
CN202194074U (zh) | 墩身保温模板 | |
CN103590508A (zh) | 一种复合保温墙体结构及其施工方法 | |
CN106836559A (zh) | 一种防止开裂的钢筋混凝土墙体结构及其施工方法 | |
CN204023418U (zh) | 拉杆楔形组合支座 | |
CN104929012A (zh) | 一种试车场玄武岩砖路与瓷砖路的施工方法 | |
CN110318463A (zh) | 一种基于磷镁材料的预制柱与梁的连接结构及施工方法 | |
CN115262778A (zh) | 一种箱型钢柱与钢筋混凝土梁新型连接施工工法 | |
CN111910845A (zh) | 一种预制女儿墙与“l”型止水坎台灌浆施工工艺 | |
CN103953194A (zh) | 一种变截面变坡度大体积混凝土导流槽施工方法 | |
CN208072369U (zh) | 一种强夯机施工监测系统 | |
CN104746402B (zh) | 井盖周边破损路面的修复方法 | |
CN208604640U (zh) | 一种外墙后浇带快速建造结构 | |
CN102051888B (zh) | 设备基础直埋地脚螺栓调整孔的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130619 |