CN103147758B - 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 - Google Patents
与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 Download PDFInfo
- Publication number
- CN103147758B CN103147758B CN201210164928.4A CN201210164928A CN103147758B CN 103147758 B CN103147758 B CN 103147758B CN 201210164928 A CN201210164928 A CN 201210164928A CN 103147758 B CN103147758 B CN 103147758B
- Authority
- CN
- China
- Prior art keywords
- coal
- mining
- face
- inlet well
- grouting filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
一种与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法,根据采煤工作面的地质信息,设定采煤工作面浆体的扩散半径R;按照扩散半径R的扩散区域将采煤工作面分为若干个分段,在采煤工作面每个分段内布置一组注浆钻孔,开采过程中按照设定的注浆钻孔每天的粉煤灰通过量Q,控制采煤速度小于计算出的采煤速度v,将工作面采煤速度控制在与注浆充填相匹配的范围之内,使采煤工作面各分段均能够得到有效充填并达到设计充填率,解决了地表沉陷过快的问题,保证了工作面开采过程中地表沉陷得到有效控制。其方法简单,操作方便,沉陷控制效果好。
Description
技术领域
本发明涉及一种工作面采煤速度控制方法,尤其是一种与采动覆岩分区隔离注浆充填相匹配的工作面采煤速度控制方法,属于注浆充填开采建筑物下压煤技术领域。
背景技术
随着煤矿安全、高效、集约化开采逐渐推行,煤炭资源开发中面临的资源枯竭问题日趋严重,特别是部分矿区资源逐渐枯竭,建筑物下采煤问题愈发突出。同时煤矿传统的垮落式开采方法也带来一系列环境问题,如地表塌陷、建筑物破坏等。采动覆岩分区隔离注浆充填采煤是解决上述建筑物下压煤开采与地表环境破坏问题的有效技术方法之一。其中,注浆充填工程质量控制是该项技术方法的一个关键点,例如,钻孔注浆充填量与工作面的采煤速度匹配控制。传统的离层注浆充填,较少涉及对工作面采煤速度控制问题。而实际工程中,对于采煤工作面的特定区域,注浆钻孔布置方式(主要是钻孔数量)一经确定,受钻孔孔径等因素的限制,整个注浆系统的最大注浆流量也即确定,大于该流量进行注浆时极易导致注浆钻孔发生堵孔事故;在注浆系统最大注浆流量确定的情况下,为了使采煤工作面各部分均能得到有效充填,保证注浆充填效果,必须控制工作面采煤速度与注浆充填相匹配,若工作面某部分采煤速度过快,一定注浆速度条件下必须导致这部分的充填率将减小,以至达不到设计要求,导致该区域开采时地表下沉加快,影响整个工作面的沉陷控制效果,这正是以往注浆充填工作面未将采煤速度控制在与注浆充填相匹配的范围内导致地表沉陷较快的原因。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种方法简单、易操作、效果好的与采动覆岩分区隔离注浆充填相匹配的工作面采煤速度控制方法。
技术方案:本发明的与采动覆岩分区隔离注浆充填相匹配的工作面采煤速度控制方法,包括如下步骤:
a、根据采煤工作面的地质信息,设定采煤工作面浆体的扩散半径R;
b、按照扩散半径R的扩散区域将采煤工作面分为若干个分段,在采煤工作面每个分段内布置一组注浆钻孔,一组注浆钻孔为1个主注浆钻孔和1个辅注浆钻孔,设定每一组注浆钻孔每天的粉煤灰通过量Q;
c、根据采煤工作面分段内注浆钻孔每天的粉煤灰通过量Q,由公式:v=Q/(LMEβ)计算出采煤速度,
式中:v为采煤速度,l为采煤工作面宽度,M为煤层采高,E为采煤工作面减沉率,β为采煤工作面充填系数;
d、依次对采煤工作面的若干个分段进行开采,开采过程中按照设定的注浆钻孔每天的粉煤灰通过量Q,控制采煤速度小于计算出的采煤速度v,通过主、辅注浆钻孔对采煤工作面上方地层中的离层进行注浆充填,直至采煤工作面注浆充填结束。
所述设定的每一组注浆钻孔每天的粉煤灰通过量Q为600~1500m3/d;
所述的采煤工作面减沉率E为80%~95%;
所述的采煤工作面充填系数β为0.6~0.7。
有益效果:由于采用了上述技术方案,在实施采动覆岩分区隔离注浆充填采煤时,将工作面采煤速度控制在与注浆充填相匹配的范围之内,保证了采煤工作面各分段均能够得到有效充填、达到设计充填率,解决了以往工作面注浆充填时由于缺乏对采煤速度有效控制导致采煤工作面某一分段开采时(即注浆工程中某一时期)地表沉陷过快的问题,保证工作面开采过程中地表沉陷得到有效控制。其方法简单,操作方便,控制采沉陷效果好,具有广泛的实用性。
具体实施方式
下面对本发明的一个实施例作进一步的描述:
本发明的与采动覆岩分区隔离注浆充填相匹配的工作面采煤速度控制方法:
a、根据采煤工作面的地质信息,设定采煤工作面浆体的扩散半径R;
b、按照扩散半径R的扩散区域将采煤工作面分为若干个分段,在采煤工作面每个分段内布置一组注浆钻孔,一组注浆钻孔为1个主注浆钻孔和1个辅注浆钻孔,设定每一组注浆钻孔每天的粉煤灰通过量Q;设定的每一组注浆钻孔每天的粉煤灰通过量Q为600~1500m3/d;
c、根据采煤工作面分段内注浆钻孔每天的粉煤灰通过量Q,由公式:v=Q/(LMEβ)计算出采煤速度,
式中:v为采煤速度,l为采煤工作面宽度,M为煤层采高,E为采煤工作面减沉率,β为采煤工作面充填系数,所述的采煤工作面减沉率E为80%~95%;所述的采煤工作面充填系数β为0.6~0.7;
d、依次对采煤工作面的若干个分段进行开采,开采过程中按照设定的注浆钻孔每天的粉煤灰通过量Q,控制采煤速度小于计算出的采煤速度v,通过主、辅注浆钻孔对采煤工作面上方地层中的离层进行注浆充填,直至采煤工作面注浆充填结束。
实施例1、以某煤矿366工作面为例:
1、首先设定366工作面浆体的扩散半径。366工作面上覆地层以泥岩、砂岩互层为主,砂岩单层厚度较小,不存在典型的厚硬岩层,故地层属于中硬偏软弱地层结构。这种地层条件下,浆体的扩散半径R取中间值,设定为150m;
2、对366工作面进行分段。按照扩散半径R,沿走向方向将366工作面分为若干段;如366工作面走向长度为280m,扩散半径R为150m,据此将366工作面分为两段,第一段、第二段长度分别150m、130m;366工作面开采之前,在工作面各分段上方的地表布置一组注浆钻孔,一组注浆钻孔为1个主注浆钻孔和1个辅注浆钻孔;由于366工作面属于软弱地层结构,因此设定每组注浆钻孔每天的粉煤灰通过量Q为800m3/d;
3、根据采煤工作面分段内注浆钻孔每天的粉煤灰通过量Q,由公式:v=Q/(LMEβ)计算出366工作面各分段的采煤速度v。根据366工作面各分段内主注浆钻孔和辅注浆钻孔每天的粉煤灰通过量Q为800m3/d、366工作面宽度L为120m、煤层采高M为3.5m、基于366工作面上方建筑物的保护要求设定采煤工作面减沉率E为85%并设定采煤工作面充填系数β为0.7,由v=Q/(LMEβ)计算出366工作面各分段的采煤速度v为3.2m/d;
4、依次对366工作面的第一、第二分段进行开采,开采过程中按照设定的注浆钻孔每天的粉煤灰通过量1000m3/d通过注浆钻孔对采煤工作面上方地层中的离层进行注浆充填,开采过程中控制366工作面采煤速度小于3.2m/d。
Claims (4)
1.一种与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法,其特征在于:
a、根据采煤工作面的地质信息,设定采煤工作面浆体的扩散半径R;
b、按照扩散半径R的扩散区域将采煤工作面分为若干个分段,在采煤工作面每个分段内布置一组注浆钻孔,一组注浆钻孔为1个主注浆钻孔和1个辅注浆钻孔,设定每一组注浆钻孔每天的粉煤灰通过量Q;
c、根据采煤工作面分段内注浆钻孔每天的粉煤灰通过量Q,由公式:v=Q/(LMEβ)计算出采煤速度,
式中:v为采煤速度,L为采煤工作面宽度,M为煤层采高,E为采煤工作面减沉率,β为采煤工作面充填系数;
d、依次对采煤工作面的若干个分段进行开采,开采过程中按照设定的注浆钻孔每天的粉煤灰通过量Q,控制采煤速度小于计算出的采煤速度v,通过主、辅注浆钻孔对采煤工作面上方地层中的离层进行注浆充填,直至采煤工作面注浆充填结束。
2.根据权利要求1所述的与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法,其特征在于:所述设定的每一组注浆钻孔每天的粉煤灰通过量Q为600~1500m3/d。
3.根据权利要求1所述的与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法,其特征在于:所述的采煤工作面减沉率E为80%~95%。
4.根据权利要求1所述的与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法,其特征在于:所述的采煤工作面充填系数β为0.6~0.7。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210164928.4A CN103147758B (zh) | 2012-05-25 | 2012-05-25 | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210164928.4A CN103147758B (zh) | 2012-05-25 | 2012-05-25 | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103147758A CN103147758A (zh) | 2013-06-12 |
CN103147758B true CN103147758B (zh) | 2014-12-10 |
Family
ID=48546041
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210164928.4A Active CN103147758B (zh) | 2012-05-25 | 2012-05-25 | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103147758B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105134288B (zh) * | 2015-09-25 | 2017-04-19 | 中国矿业大学 | 一种采动覆岩隔离注浆充填钻孔透孔装置及方法 |
CN105804752A (zh) * | 2016-03-15 | 2016-07-27 | 淮北矿业(集团)勘探工程有限责任公司 | 一种煤矿条带开采中覆岩离层注浆减沉工艺 |
CN106593444A (zh) * | 2016-12-02 | 2017-04-26 | 淮北矿业(集团)有限责任公司 | 一种坚硬岩层下降低采动震动能量的方法 |
CN112196536B (zh) * | 2020-11-13 | 2022-06-21 | 西安科技大学 | 基于采动力学的冲击地压矿井采煤面推进速度的确定方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032378A (zh) * | 1987-09-26 | 1989-04-12 | 抚顺矿务局 | 减缓采煤区地表下沉的方法及其实施设备 |
GB2229747A (en) * | 1989-02-24 | 1990-10-03 | Colin John Macleod | A mining method |
CN101021162A (zh) * | 2007-03-23 | 2007-08-22 | 开滦(集团)有限责任公司 | 覆岩离层注浆充填装置及注浆充填系统 |
-
2012
- 2012-05-25 CN CN201210164928.4A patent/CN103147758B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032378A (zh) * | 1987-09-26 | 1989-04-12 | 抚顺矿务局 | 减缓采煤区地表下沉的方法及其实施设备 |
GB2229747A (en) * | 1989-02-24 | 1990-10-03 | Colin John Macleod | A mining method |
CN101021162A (zh) * | 2007-03-23 | 2007-08-22 | 开滦(集团)有限责任公司 | 覆岩离层注浆充填装置及注浆充填系统 |
Non-Patent Citations (4)
Title |
---|
公路桥下放顶煤开采注浆减沉技术;冯树国等;《煤矿开采》;20100831;第15卷(第4期);32-34 * |
冯树国等.公路桥下放顶煤开采注浆减沉技术.《煤矿开采》.2010,第15卷(第4期),32-34. * |
对采动覆岩离层注浆减沉技术的再认识;杨伦;《煤炭学报》;20020831;第27卷(第4期);352-356 * |
杨伦.对采动覆岩离层注浆减沉技术的再认识.《煤炭学报》.2002,第27卷(第4期),352-356. * |
Also Published As
Publication number | Publication date |
---|---|
CN103147758A (zh) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704933B (zh) | 采动覆岩分区隔离注浆充填采煤方法 | |
CN102705001B (zh) | 采动覆岩分区隔离双孔错层注浆充填钻孔布置方法 | |
CN105587318B (zh) | 一种缓倾斜平行中厚矿体群连续回采的充填采矿法 | |
CN102080526B (zh) | 地面煤层顶板顺层水平压裂井抽采瓦斯方法 | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN100554642C (zh) | 一种长壁综采回收房式开采煤柱的方法 | |
CN104314570B (zh) | 长厚矿体挂帮矿回收及露天转地下过渡期的开采方法 | |
CN103527196B (zh) | 一种黄土充填回收房式煤柱的方法 | |
CN104832178A (zh) | 一种厚煤层分层部分充填采煤方法 | |
CN102352769A (zh) | 高突矿井煤与瓦斯共采一体化开采方法 | |
CN105464700B (zh) | 综采‑充填混合开采工作面充填段长度确定方法 | |
CN106593445A (zh) | 一种老采空区下伏近距离煤层覆岩隔离注浆充填开采方法 | |
CN103147758B (zh) | 与采动覆岩分区隔离注浆充填相匹配的采煤速度控制方法 | |
CN106930763A (zh) | 一种充填复采特厚煤层残采区护巷煤柱的方法 | |
CN104775816A (zh) | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 | |
CN106894816A (zh) | 基于三角板结构模型的远场关键层切顶卸压护巷方法 | |
CN104763466B (zh) | 一种覆岩隔离注浆充填浆体有效扩散半径的检测方法 | |
CN106150546B (zh) | 一种根据地表沉陷特征进行采空区部分充填的方法 | |
CN106321025A (zh) | 一种煤与油气绿色协调开采系统及应用方法 | |
CN113700527B (zh) | 高强度开采工作面煤矸石覆岩隔离注浆充填绿色开采方法 | |
CN107339105A (zh) | 一种分层膏体充填复采特厚煤层残采区停采线煤柱的方法 | |
CN103557001B (zh) | 一种低段高无底柱留矿嗣后充填采矿法 | |
CN109162713A (zh) | 一种不改变覆岩水文地质条件的煤水双资源矿井开采模式 | |
CN104343453B (zh) | 一种缓倾斜中厚矿床充填采矿方法 | |
Meshkov et al. | Methane emission control at the high-productive longwall panels of the Yalevsky coal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |