CN102704933B - 采动覆岩分区隔离注浆充填采煤方法 - Google Patents
采动覆岩分区隔离注浆充填采煤方法 Download PDFInfo
- Publication number
- CN102704933B CN102704933B CN201210164929.9A CN201210164929A CN102704933B CN 102704933 B CN102704933 B CN 102704933B CN 201210164929 A CN201210164929 A CN 201210164929A CN 102704933 B CN102704933 B CN 102704933B
- Authority
- CN
- China
- Prior art keywords
- coal
- mining
- inlet well
- face
- isolated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005065 mining Methods 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000011435 rock Substances 0.000 title claims abstract description 11
- 239000003245 coal Substances 0.000 claims abstract description 68
- 238000002955 isolation Methods 0.000 claims abstract description 10
- 239000002002 slurry Substances 0.000 claims abstract description 8
- 239000010881 fly ash Substances 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 abstract description 6
- 238000011084 recovery Methods 0.000 abstract description 5
- 230000006578 abscission Effects 0.000 abstract 1
- 239000010883 coal ash Substances 0.000 abstract 1
- 238000013508 migration Methods 0.000 abstract 1
- 230000005012 migration Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 241001347978 Major minor Species 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000007569 slipcasting Methods 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种采动覆岩分区隔离注浆充填采煤方法,将采区划分为若干个采煤工作面,采煤工作面之间留设隔离煤柱,依次在若干个采煤工作面上方的地表向煤层方向施工若干组注浆钻孔,每组注浆钻孔为主、辅2个注浆钻孔,主注浆钻孔的终孔深度位于煤层上方15~40倍煤层采高;辅注浆钻孔的终孔深度位于主注浆钻孔终孔深度上方30~50m处;当采煤工作面开采至距主或辅注浆钻孔10~30m时,通过主或辅注浆钻孔向采煤工作面上方岩层中的离层带内注入粉煤灰浆体,直至完成采区隔离注浆充填采煤。适用于建筑物下压煤开采,采出率高、充填与采煤干扰小、充填成本低、沉陷控制效果好,能够实现充分采动条件下不迁村采煤。
Description
技术领域
本发明涉及一种煤矿开采沉陷控制方法,尤其是一种适用于建筑物下采动覆岩分区隔离注浆充填采煤方法。
背景技术
建筑物下压煤开采一直是困扰我国煤矿企业的重大问题,尤其是村庄下压煤开采。随着部分矿区资源逐渐枯竭,村庄压煤问题愈发突出;特别是在经济相对发达地区,由于土地资源紧张、征迁费用提高,不搬迁开采建筑物下压煤势在必行。建筑物(村庄)压煤的成功开采,对提高煤炭资源利用率、缓解矿井资源紧张局面意义重大。
传统的建筑物下压煤问题解决方法有留设保护煤柱、条带开采、离层注浆充填、采空区充填(如矸石充填、膏体充填、高水材料充填等)。留设保护煤柱方法虽然能够解决地表沉陷问题,但无法回收建筑物下压煤,造成大量煤炭损失;条带开采的缺点是回采率低(一般小于50%)、资源浪费严重,而且巷道掘进率高、生产效率低,制约着煤矿高产高效发展;传统的离层注浆充填,仅在非充分开采时(即开采区域尺寸较小)减沉效果较好,其缺点是无法在相邻多工作面开采时取得理想的减沉率,即注浆充填开采第一个工作面时减沉效果较好,而开采相邻第二个工作面时减沉率有限甚至出现注浆困难从而导致失败的情况;采空区充填在解决部分矿井建筑物下压煤问题的同时也显示出局限与不足之处,例如,充填系统初期投资大、充填体接顶性差、充填材料价格高、充填与采煤干扰大、充填采煤效率低等。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种方法简单、煤炭采出率高、充填与采煤干扰小、充填成本低、沉陷控制效果好的采动覆岩分区隔离注浆充填采煤方法。
技术方案:本发明的采动覆岩分区隔离注浆充填采煤方法,包括如下步骤:
(1)将采区划分为若干个采煤工作面,采煤工作面之间留设隔离煤柱,在保证覆岩主关键层不发生破断的情况下确定采煤工作面的开采宽度l为100~200m,在保证相邻工作面注浆充填开采后隔离煤柱具有足够稳定性的条件下设定隔离煤柱的宽度b为40~80m;
(2)在采煤工作面开采之前,依次在若干个采煤工作面上方的地表向煤层方向施工若干组注浆钻孔,每组注浆钻孔为一个主注浆钻孔和一个辅注浆钻孔,同一个采煤工作面内相邻两组注浆钻孔之间的距离为100~200m;
所述主注浆钻孔的终孔深度位于煤层上方15~40倍煤层采高;
所述辅注浆钻孔的终孔深度位于主注浆钻孔终孔深度上方30~50m处;
(3)按常规开采工艺逐一对所有采煤工作面进行开采,当采煤工作面开采至距主注浆钻孔10~30m时,通过主注浆钻孔向采煤工作面上方岩层中的离层带内注入粉煤灰浆体;当采煤工作面开采至距辅注浆钻孔10~30m时,通过辅注浆钻孔向采煤工作面上方岩层中的离层带内注入粉煤灰浆体,如此循环,直至完成采区隔离注浆充填采煤。
有益效果:本发明适用于建筑物下压煤开采,通过设计合理的采煤工作面宽度,并留设适当的隔离煤柱实现相邻多工作面注浆充填并保证采动覆岩结构的稳定性,减沉率明显增大,解决了以往的离层注浆充填在相邻工作面开采时注浆失败的问题,能够实现相邻多工作面充分采动条件下不迁村采煤;与传统的条带开采相比,采出率大大提高、工作面宽度增加、巷道掘进率降低,能实现工作面高产高效;与采空区膏体充填、矸石充填等全部充填技术相比,充填系统建设周期短、初期投资少、采煤与充填相互干扰少、充填成本低,对“工作面间因构造而必须留设保护煤柱的采区”、“村庄位于采区边界导致部分压煤的采区”、“采区煤层赋存不稳定造成迁村采煤具有经济风险的采区”等条件下不迁村采煤具有更好的适应性。煤炭采出率高(面积采出率达80%)、充填与采煤干扰小、充填系统简单、充填成本低、沉陷控制效果好,能够将煤层开采导致的地表沉陷控制在允许范围之内,并且能够适用于大面积开采。
附图说明
图1 是本发明的采区工作面划分平面示意图;
图2 是本发明的注浆钻孔布置平面示意图;
图3 是本发明的采动覆岩分区隔离注浆充填采煤剖面示意图。
图中:1-采煤工作面;2-隔离煤柱;3-主注浆钻孔;4-辅注浆钻孔;5-地表;6-岩层;7-离层带;8-煤层。
具体实施方式
下面结合附图对本发明的一个实施例作进一步描述:
本发明的采动覆岩分区隔离注浆充填采煤方法,根据建筑物压煤区域的地质条件,对采区的开采尺寸参数进行设计,通过设计合理的采煤工作面宽度并留设一定宽度的隔离煤柱控制相邻采煤工作面均处于非充分采动状态,充分利用上覆岩层结构的自承载能力,同时在采煤工作面开采过程中从地面施工钻孔向覆岩离层带进行注浆充填形成注浆充填承载体,转移减轻隔离煤柱承担的覆岩载荷,限制采动覆岩结构的弯曲下沉量,减缓地表沉陷。具体做法是:首先将采区划分为若干个采煤工作面1,在采煤工作面1之间留设隔离煤柱2,在保证覆岩主关键层不发生破断的情况下确定采煤工作面1的开采宽度l为100~200m,在保证相邻工作面注浆充填开采后隔离煤柱2具有足够稳定性的条件下设定隔离煤柱2的宽度b为40~80m;在采煤工作面1开采之前,依次在若干个采煤工作面1上方的地表5向煤层8方向施工若干组注浆钻孔,每组注浆钻孔为一个主注浆钻孔3和一个辅注浆钻孔4,同一个采煤工作面1内相邻两组注浆钻孔之间的距离为100~200m;所述主注浆钻孔3的终孔深度位于煤层8上方15~40倍煤层采高;所述辅注浆钻孔4的终孔深度位于主注浆钻孔3 终孔深度上方30~50m处;按常规开采工艺逐一对所有采煤工作面1进行开采,当采煤工作面1开采至距主注浆钻孔10~30m时,通过主注浆钻孔3向采煤工作面1上方岩层6中的离层带7内注入粉煤灰浆体;当采煤工作面1开采至距辅注浆钻孔10~30m时,通过辅注浆钻孔4向采煤工作面1上方岩层6中的离层带7内注入粉煤灰浆体,如此循环,直至完成采区隔离注浆充填采煤。
结合某矿104采区实例作具体说明:
1、划分采煤工作面1和留设隔离煤柱2。根据104采区地层的地质信息,确定覆岩主关键层,并通过地质信息数据计算出主关键层不发生破断时对应的工作面宽度为180m,为安全起见留一定的富裕系数,取采煤工作面1宽度为150m,保证注浆充填后在工作面中部能形成1/3采宽(即50m)的压实区域,此时采煤工作面1开采相当于开采50m并留设50m煤柱,按照极限强度理论,取1.5倍的安全系数可以保证隔离煤柱2具有稳定性,得出隔离煤柱2的宽度为45m。因此,104采区共划分为2个采煤工作面1,编号为1042、1044,中间留设45m宽的隔离煤柱2;
2、施工地面钻孔。开采前,在1044采煤工作面1的上方施工2组地面钻孔,每组地面钻孔为主辅2个注浆钻孔。主注浆钻孔3终孔位置距煤层高度90m,辅注浆孔4终孔位置距煤层高度120m;各注浆钻孔均位于1044采煤工作面1中部,第一组主注浆钻孔3、辅注浆钻孔4距采煤工作面1起始开采位置的距离分别为100m、150m;第二组注浆钻孔距第一组注浆钻孔的距离为150m,即第二组主注浆钻孔3、辅注浆钻孔4距采煤工作面1起始开采位置的距离分别为250m、300m。按照同样的方法,在1042采煤工作面1的上方施工2组地面钻孔,每组地面钻孔为主辅2个注浆钻孔,钻孔位置及深度参数与1044采煤工作面1钻孔相同;
3、用常规的综合机械化采煤工艺开采1044采煤工作面1,开采过程中,当1044采煤工作面1开采至距主或辅注浆钻孔20m时,通过主或辅注浆钻孔向1044采煤工作面1上方岩层6中的离层带7注入粉煤灰浆体;1044采煤工作面1开采完毕后,按照同样的方式完成1042采煤工作面1开采。
Claims (1)
1. 一种采动覆岩分区隔离注浆充填采煤方法,按常规开采工艺逐一对所有采煤工作面(1)进行开采,当采煤工作面(1)开采至距主注浆钻孔(3) 10~30m时,通过主注浆钻孔(3)向采煤工作面(1)上方岩层(6)中的离层带(7)内注入粉煤灰浆体;当采煤工作面(1)开采至距辅注浆钻孔(4)10~30m时,通过辅注浆钻孔(4)向采煤工作面(1)上方岩层(6)中的离层带(7)内注入粉煤灰浆体,如此循环,直至完成采区隔离注浆充填采煤;其特征在于,包括如下步骤:
(1)将采区划分为若干个采煤工作面(1),采煤工作面(1)之间留设隔离煤柱(2),在保证覆岩主关键层不发生破断的情况下确定采煤工作面(1)的开采宽度l为100~200m,在保证相邻工作面注浆充填开采后隔离煤柱(2)具有足够稳定性的条件下设定隔离煤柱(2)的宽度b为45m;
(2)在采煤工作面(1)开采之前,依次在若干个采煤工作面(1)上方的地表(5)向煤层(8)方向施工若干组注浆钻孔,每组注浆钻孔为一个主注浆钻孔(3)和一个辅注浆钻孔(4),同一个采煤工作面(1)内相邻两组注浆钻孔之间的距离为100~200m;
所述主注浆钻孔(3)的终孔深度位于煤层(8)上方15~40倍煤层采高;
所述辅注浆钻孔(4)的终孔深度位于主注浆钻孔(3)终孔深度上方30~50m处。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210164929.9A CN102704933B (zh) | 2012-05-25 | 2012-05-25 | 采动覆岩分区隔离注浆充填采煤方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210164929.9A CN102704933B (zh) | 2012-05-25 | 2012-05-25 | 采动覆岩分区隔离注浆充填采煤方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102704933A CN102704933A (zh) | 2012-10-03 |
CN102704933B true CN102704933B (zh) | 2014-10-29 |
Family
ID=46897958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210164929.9A Active CN102704933B (zh) | 2012-05-25 | 2012-05-25 | 采动覆岩分区隔离注浆充填采煤方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102704933B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105134288A (zh) * | 2015-09-25 | 2015-12-09 | 中国矿业大学 | 一种采动覆岩隔离注浆充填钻孔透孔装置及方法 |
CN106050234A (zh) * | 2016-05-26 | 2016-10-26 | 中国神华能源股份有限公司 | 在煤炭开采过程中对地下水进行保护的施工工艺 |
US12044125B2 (en) | 2021-08-30 | 2024-07-23 | China University Of Mining And Technology | Isolated overburden grouting filling method for coal gangue underground emission reduction |
Families Citing this family (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103216236B (zh) * | 2013-03-13 | 2015-05-06 | 中国矿业大学(北京) | 一种采场覆岩离层的注浆减沉方法 |
CN103364534B (zh) * | 2013-07-03 | 2015-04-15 | 中国矿业大学 | 采动覆岩隔离注浆充填模拟实验装置及方法 |
CN103498697A (zh) * | 2013-10-18 | 2014-01-08 | 中铁二十四局集团安徽工程有限公司 | 隧道下方采空区充填施工工法 |
CN103628912B (zh) * | 2013-11-04 | 2016-05-11 | 中国葛洲坝集团基础工程有限公司 | 一种采空区处理充填灌浆的施工方法 |
CN103603689B (zh) * | 2013-11-04 | 2015-07-08 | 葛洲坝集团基础工程有限公司 | 一种采空区处理帷幕灌浆的施工方法 |
CN103821538B (zh) * | 2013-12-26 | 2016-09-07 | 安徽理工大学 | J型水平羽翼分支孔地面预注浆方法 |
CN103993882A (zh) * | 2014-05-26 | 2014-08-20 | 中国矿业大学 | 一种冒落区注浆充填置换条带煤柱的方法 |
CN104775816B (zh) * | 2015-02-27 | 2017-04-26 | 中国矿业大学 | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 |
CN105822305A (zh) * | 2016-03-15 | 2016-08-03 | 淮北矿业(集团)勘探工程有限责任公司 | 一种用于煤矿开采的覆岩隔离柱将充填减沉方法 |
CN105804752A (zh) * | 2016-03-15 | 2016-07-27 | 淮北矿业(集团)勘探工程有限责任公司 | 一种煤矿条带开采中覆岩离层注浆减沉工艺 |
CN106093341B (zh) * | 2016-05-30 | 2018-02-13 | 中国矿业大学 | 地面钻孔错动变形反演覆岩破断规律的实验装置及方法 |
CN106593489A (zh) * | 2016-12-02 | 2017-04-26 | 淮北矿业股份有限公司 | 一种难采煤层底板薄层灰岩高压强含水层岩溶裂隙骨料灌注方法 |
CN106593445A (zh) * | 2016-12-02 | 2017-04-26 | 淮北矿业(集团)有限责任公司 | 一种老采空区下伏近距离煤层覆岩隔离注浆充填开采方法 |
CN106555607B (zh) * | 2016-12-02 | 2019-02-22 | 淮北矿业(集团)有限责任公司 | 一种老采空区注浆充填控制地表残余沉降方法 |
CN106869966B (zh) * | 2017-03-02 | 2018-10-23 | 宿州学院 | 一种离层水补给源的封堵方法 |
CN106869934B (zh) * | 2017-04-06 | 2018-08-31 | 安徽理工大学 | 一种适用于倾斜煤层的注浆开采方法 |
CN106958446B (zh) * | 2017-06-01 | 2019-02-12 | 湖南科技大学 | 一种急倾斜煤层开采的岩层移动及地表沉陷的控制方法 |
CN107313806B (zh) * | 2017-08-09 | 2023-03-14 | 新疆国利衡清洁能源科技有限公司 | 一种煤炭地下气化燃空区回填系统和回填方法 |
CN107989613A (zh) * | 2017-11-14 | 2018-05-04 | 太原理工大学 | 一种覆岩离层分区隔离注浆充填开采煤层全部回采方法 |
CN108756944B (zh) * | 2018-05-29 | 2019-10-08 | 中国煤炭地质总局勘查研究总院 | 采煤过程中控制地表塌陷的方法 |
CN108999634B (zh) * | 2018-07-26 | 2019-07-05 | 中国矿业大学 | 地面钻孔实现水害防治和地表沉降控制的一孔多用方法 |
CN108979590A (zh) * | 2018-09-01 | 2018-12-11 | 安徽理工大学 | 一种地面钻孔至煤层破碎顶板注浆加固的方法及注浆装置 |
CN109611146B (zh) * | 2018-11-29 | 2020-10-13 | 山东科技大学 | 一种离层水疏放注浆方法 |
CN110043312B (zh) * | 2019-04-04 | 2020-10-27 | 中勘资源勘探科技股份有限公司 | 一种注浆充填地表沉降范围的控制方法 |
CN110130977A (zh) * | 2019-05-16 | 2019-08-16 | 中国煤炭地质总局勘查研究总院 | 一种煤基固废注浆填充系统和注浆的方法 |
CN110017155B (zh) * | 2019-05-23 | 2020-11-06 | 合肥工业大学 | 一种采煤工作面顶板富水砾石层注浆加固隔水方法 |
CN110552717A (zh) * | 2019-05-27 | 2019-12-10 | 中铁十八局集团第四工程有限公司 | 砂卵石地层盾构隧道地表分层差异沉降空间注浆减沉方法 |
CN110295904B (zh) * | 2019-06-28 | 2021-05-14 | 中勘资源勘探科技股份有限公司 | 一种孤岛工作面注浆充填的采煤方法及其沉降观测装置 |
CN110145309B (zh) * | 2019-06-28 | 2020-11-13 | 中勘资源勘探科技股份有限公司 | 一种浅埋煤层注浆充填绿色采煤方法及其沉降观测装置 |
CN110630320B (zh) * | 2019-09-30 | 2020-07-07 | 中国矿业大学 | 基于钻孔注入流量测量的覆岩隔离注浆充填层位确定方法 |
CN111594168B (zh) * | 2020-05-26 | 2021-04-06 | 山东科技大学 | 一种岩矸配合成形的伪采空层支护限沉回采方法 |
CN111810194B (zh) * | 2020-07-10 | 2022-04-19 | 中勘资源勘探科技股份有限公司 | 一种地面预注浆加固高度的确定方法 |
CN112360550A (zh) * | 2020-10-28 | 2021-02-12 | 安徽理工大学 | 一种沿空留巷中低位顶板离层区煤基固废膏体注充方法 |
CN113700527B (zh) * | 2021-08-30 | 2022-05-06 | 中国矿业大学 | 高强度开采工作面煤矸石覆岩隔离注浆充填绿色开采方法 |
CN113530545B (zh) * | 2021-08-31 | 2024-05-10 | 徐州格润矿山技术开发有限公司 | 孤岛工作面覆岩隔离注浆充填开采方法 |
CN113803087B (zh) * | 2021-09-07 | 2023-11-10 | 山西晋煤集团技术研究院有限责任公司 | 一种小煤柱沿空掘巷破碎围岩注浆加固方法 |
CN114233380B (zh) * | 2021-12-27 | 2023-12-05 | 徐州格润矿山技术开发有限公司 | 一种煤基固废用于覆岩隔离注浆充填的方法 |
CN114370251B (zh) * | 2022-01-14 | 2023-08-18 | 安徽理工大学 | 一种煤层群下行开采覆岩离层定向分级分区注浆方法 |
CN114483173B (zh) * | 2022-01-18 | 2023-03-14 | 安徽理工大学 | 一种滞后下沉可控的覆岩离层注浆减沉方法 |
CN114483172B (zh) * | 2022-01-18 | 2022-09-06 | 安徽理工大学 | 一种穿鞋戴帽式覆岩离层注浆减沉方法 |
CN114575918B (zh) * | 2022-01-18 | 2022-08-26 | 安徽理工大学 | 覆岩离层注浆后的探测与补强一体方法 |
CN114607378B (zh) * | 2022-03-28 | 2023-04-11 | 中国矿业大学 | 煤基固废覆岩隔离注浆充填保水采煤方法 |
GB2621642A (en) * | 2022-05-06 | 2024-02-21 | Univ Henan Polytechnic | Mining-induced high-level fractured space grouting repair method |
CN114876403B (zh) * | 2022-05-06 | 2023-04-21 | 河南理工大学 | 一种采动高位破裂空间注浆修复方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101372891A (zh) * | 2008-06-10 | 2009-02-25 | 沈阳市华祥矿山机械厂 | 条带充填整体回采采煤方法 |
CN101487392A (zh) * | 2008-01-16 | 2009-07-22 | 中国神华能源股份有限公司 | 房柱式采煤方法 |
CN101660410A (zh) * | 2008-11-03 | 2010-03-03 | 侯忠杰 | 一种长壁间隔式采煤方法 |
CN102155225A (zh) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | 煤矿气体充填开采方法 |
CN102226396A (zh) * | 2011-05-19 | 2011-10-26 | 中南大学 | 非爆破开挖再造人工群柱深孔崩矿嗣后充填采矿法 |
-
2012
- 2012-05-25 CN CN201210164929.9A patent/CN102704933B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101487392A (zh) * | 2008-01-16 | 2009-07-22 | 中国神华能源股份有限公司 | 房柱式采煤方法 |
CN101372891A (zh) * | 2008-06-10 | 2009-02-25 | 沈阳市华祥矿山机械厂 | 条带充填整体回采采煤方法 |
CN101660410A (zh) * | 2008-11-03 | 2010-03-03 | 侯忠杰 | 一种长壁间隔式采煤方法 |
CN102155225A (zh) * | 2011-03-11 | 2011-08-17 | 中国矿业大学 | 煤矿气体充填开采方法 |
CN102226396A (zh) * | 2011-05-19 | 2011-10-26 | 中南大学 | 非爆破开挖再造人工群柱深孔崩矿嗣后充填采矿法 |
Non-Patent Citations (2)
Title |
---|
岩层移动离层演化规律及其应用研究;许家林等;《岩土工程学报》;20041020;第26卷(第5期);第632-636页 * |
许家林等.岩层移动离层演化规律及其应用研究.《岩土工程学报》.2004,第26卷(第5期), |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105134288A (zh) * | 2015-09-25 | 2015-12-09 | 中国矿业大学 | 一种采动覆岩隔离注浆充填钻孔透孔装置及方法 |
CN106050234A (zh) * | 2016-05-26 | 2016-10-26 | 中国神华能源股份有限公司 | 在煤炭开采过程中对地下水进行保护的施工工艺 |
US12044125B2 (en) | 2021-08-30 | 2024-07-23 | China University Of Mining And Technology | Isolated overburden grouting filling method for coal gangue underground emission reduction |
Also Published As
Publication number | Publication date |
---|---|
CN102704933A (zh) | 2012-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704933B (zh) | 采动覆岩分区隔离注浆充填采煤方法 | |
CN102705001B (zh) | 采动覆岩分区隔离双孔错层注浆充填钻孔布置方法 | |
CN103410515B (zh) | 一种三软煤层往复式无煤柱综采方法 | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN104775816B (zh) | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 | |
CN108661705B (zh) | 条采采空区四位一体综合治理施工方法 | |
CN102877884B (zh) | 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法 | |
CN100535396C (zh) | 不稳定薄煤层组条件下被保护煤层的卸压瓦斯抽采方法 | |
CN103306720A (zh) | 一种特厚煤层倾斜分层固体充填采煤方法 | |
CN106593445A (zh) | 一种老采空区下伏近距离煤层覆岩隔离注浆充填开采方法 | |
CN103498696A (zh) | 一种从顶板巷道注浆充填压实采空区充填体的方法 | |
CN102352769A (zh) | 高突矿井煤与瓦斯共采一体化开采方法 | |
CN106930763A (zh) | 一种充填复采特厚煤层残采区护巷煤柱的方法 | |
CN108798769A (zh) | 条采采空区一体化综合治理施工方法 | |
CN103527196A (zh) | 一种黄土充填回收房式煤柱的方法 | |
CN103206215A (zh) | 一种预控顶上向进路充填采矿法 | |
CN106761750B (zh) | 急倾斜煤层纵向长壁刨铣建槽式开采方法 | |
CN106014412A (zh) | 一种梯式构造充填复采残采区遗留煤柱群的方法 | |
CN107339105A (zh) | 一种分层膏体充填复采特厚煤层残采区停采线煤柱的方法 | |
CN106337685A (zh) | 一种煤炭与其伴生油页岩联合开采方法 | |
CN103557001B (zh) | 一种低段高无底柱留矿嗣后充填采矿法 | |
CN111520141A (zh) | 一种二步骤采场回采的深孔布置工艺 | |
CN106401609A (zh) | 一种控制深部巷道底臌的底板卸压加固结构及其施工方法 | |
CN105822305A (zh) | 一种用于煤矿开采的覆岩隔离柱将充填减沉方法 | |
CN206205903U (zh) | 一种控制深部巷道底臌的底板卸压加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |